Response to requests for review Aços Villares Natural gas fuel switch project (0474)

Similar documents
Modalities of Communication Form

VALIDATION REPORT AÇOS VILLARES NATURAL GAS FUEL SWITCH PROJECT IN BRAZIL REPORT NO REVISION NO. 0 DET NORSKE VERITAS

Session II: Improving the stakeholder consultation process

Capacity Building Workshop on Development of CDM Activities and NAMA for Public And Private Sector In Zimbabwe

Your ref.: Our ref.: Date: CDM Ref 1443 YKK/TRIKA/MLEH 19 January 2008

Modalities of Communication Form

Post Registration Changes How to Address? Sustainable Development Mechanisms, UNFCCC secretariat

Post Registration Changes How to Address? Nitin Arora Sustainable Development Mechanisms, UNFCCC secretariat

CDM Experience: QUEZON CITY (PAYATAS) Controlled Disposal Facilities

Registration - Information and reporting checklist (Version 2.0) The main changes between version 1.0 and version 2.0 are the following:

Ref: Response to request for review Hubei Yuquanhe 25.2MW Hydropower Project with the Reference Number 2188

Annex 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01.2) CONTENTS ABBREVIATIONS... 3 I. INTRODUCTION...

Subject: Call for public comments on Clean Development Mechanism Validation and Verification Manual (CDM-VVM)

Annex 3 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01) CONTENTS I. INTRODUCTION

Al-Shaheen CDM Project Experience

GUIDELINES FOR COMPLETING THE FORM FOR SUBMISSION OF BUNDLED SMALL-SCALE CDM PROJECT ACTIVITIES (F-CDM-SSC-BUNDLE) (Version 01) CONTENTS

Validation and Verification DOE s Perspective

VALIDATION REPORT SAIHANBA EAST MW WINDFARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

Risk Based Verification Cambodia cook stove project

Report of the Conference of the Parties on its tenth session, held at Buenos Aires from 6 to 18 December 2004

Overview of the CDM in the agriculture sector

PROGRAMME OF ACTIVITIES (POA) REQUEST FOR REGISTRATION - INFORMATION AND REPORTING CHECK CHECKLIST

The World Bank 1818 H Street, NW, Washington, DC 20433, USA

Stakeholders Consultation Process -

A rating of Designated Operational Entities (DOEs) Accredited under the Clean Development Mechanism (CDM)

Response to the Request for Review BK Energia Itacoatiara Project

Introduction to the Project Cycle

Introduction to the Project Cycle

VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN

Mr. Rajesh Kumar Sethi Chair, CDM Executive Board UNFCCC Secretariat 16 th December 2008

Request for review Project 1141 : Amurang Biomass Cogeneration Project

VALIDATION REPORT. Offis Textile Ltd. Fuel Switch Project in Israel REPORT NO REVISION NO. 02

Below, IETA provides a number of comments and views that will allow the Secretariat to further refine the current draft.

Cost and duration of planning, approving and executing Clean Development Mechanism (CDM) projects

GUIDELINES FOR COMPLETING CDM-SSC-PDD, F-CDM-SSC-Subm, F-CDM-BUNDLE

National procedure for using Joint Implementation (JI) mechanism under Track I (National JI Track I Procedure)

A CASE STUDY: ASJA S BELO HORIZONTE CDM PROJECT BRAZIL / KYOTO PROTOCOL

Background information on existing PoA regulations

Clean Development Mechanism. Lessons learned and future directions. Martin Hession CDM Executive Board

CDM What and How? /

Experiences with the first approved projects from a DOE perspective

Comments on the Draft CDM Validation and Verification Manual

Annex 2 PROCEDURES FOR THE SUBMISSION AND CONSIDERATION OF A PROPOSED NEW SMALL SCALE METHODOLOGY. (Version 03) I. BACKGROUND

, UNFCCC secretariat Asia and the Pacific Workshop: Promoting the CDM and the Market mechanisms October 2014

VALIDATION REPORT. Quezon City Controlled Disposal Facility Biogas Emission Reduction Project in Philippines REPORT NO REVISION NO.

European Investment Bank (EIB) Guidelines for the Climate Change Technical Assistance Facility (CCTAF) Operations

Validation of CDM Projects Real life examples of what a DOE looks for

VERIFICATION REPORT VEJO GUSIS,UAB

Clean development mechanism and joint implementation

VALIDATION REPORT NINGXIA TIANJING MW WIND-FARM PROJECT IN CHINA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

Clean Development Mechanism

Carbon Finance Opportunities for Africa. Maputo, 11 June 2009 Dr Charlotte Streck

CDM Programme of Activities - Rules and Procedures

Concepts of Clean Development Mechanism. Confederation of Indian Industry

CDM Programme of Activities Call for Public Inputs

Views on the materiality standard under the clean development mechanism

JIAG Input for Call for public inputs on draft recommendations to be forwarded to the CMP

UNFCCC/CCNUCC. CDM Executive Board EB 49 Proposed Agenda - Annotations Annex 8 page 1 DRAFT. Annex 8

CDM Module 1. Introduction to Programmatic CDM (PoA) Lesson 2. How does the Programmatic CDM Work? Select Next to begin. Menu November 2011.

Views on possible improvements to emissions trading and the project-based mechanisms

VALIDATION REPORT. Liaoning Changtu Quantou Wind Power Project in China. REPORT NO REVISION NO. 03 Deleted: 2

VCS METHODOLOGY ELEMENT ASSESSMENT REPORT

The Clean Development Mechanism (CDM)

DRAFT TEXT on CMP 12 agenda item 4 Matters relating to the clean development mechanism. Draft decision -/CMP.12

DRAFT UNFCCC/CCNUCC Page 1

Determinants of Clean Development Mechanism Projects

Amendments to PS, VVS and PCP based on CMP10 decisions

1. The PP/DOE are requested to justify prior consideration of the CDM following EB 41 guidance, Annex 46, paragraph 5 and 6.

CDM Guide Book for Oil & Gas Sector. Ariesta Ningrum GGFR Workshop September 19-20, 2006 Jakarta - Indonesia

The Clean Development Mechanism. Martin Hession - CDM Executive Board Member -DECC UK

Renewable energy project bundling and PoA, Sources for further information

Subject: Answer to Request for review Saldanha Small Hydroelectric Project (1526)

Validation Report. Kalpataru Energy Venture Pvt. Ltd. Validation of the Biomass Power Project at Kalpataru Energy Venture Private Limited

Revision of the modalities and procedures for the Clean Development Mechanism

Overview of CDM Documentation and Procedures

VERIFICATION REPORT RENERGA,UAB

GS VALIDATION & VERIFICATION REPORT

CDM High Level Policy Dialogue

JI DETERMINATION REPORT FORM

Request for review for: "Chao Khun Agro Biogas Energy Project" (2138): Response from the Project Participants

Clean Development Mechanism (CDM)

Policies and Strategies Credibility, efficiency & integrity of the CDM

VALIDATION OPINION FOR REVISION OF REGISTERED MONITORING PLAN

Your Our reference/name Tel. Fax extension Date/Document Page

Terms of Reference to International Project

We think the word Professional scepticism needs to be defined in detail to avoid individual interpretation leading to confusion.

VALIDATION REPORT ENERGY EFFICIENCY PROJECT IN THE RAMLA CEMENT PLANT IN ISRAEL THROUGH INSTALMENT OF NEW GRINDING TECHNOLOGY

Criteria Catalogue: VER+

Revision of the Joint Implementation guidelines

Views on modalities and procedures for the new market-based mechanism

Memorandum of Understanding on cooperation regarding Clean Development Mechanism project activites and climate policy issues.

How to Select a DOE and preparation for validation and verification Presentation Report

CDM project review - technology and regulation aspects

Waste management - Hydro, Wind, Solar Energy. - Capturing of landfill methane emission - Biomass power. to generate power - Geothermal, Tidel Energy

VALIDATION REPORT BHL PALIA KALAN PROJECT IN INDIA REPORT NO REVISION NO. 01 DET NORSKE VERITAS

REPORT OF THE SEVENTH MEETING OF THE EXECUTIVE BOARD Annex 5

Initiative to Reduce CDM Barriers

Legal Issues around Carbon Credit Transactions and Introduction to Emission Reduction Purchase Agreement (ERPA) Yisong Guan

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD)

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD)

Transcription:

UNFCCC Secretariat Martin-Luther-King-Strasse 8 D-53153 Bonn Germany Att: CDM Executive Board Your ref.: Our ref.: Date: CDM Ref 0474 MLEH/SUHA 11 September 2006 Response to requests for review Aços Villares Natural gas fuel switch project (0474) Dear Members of the CDM Executive Board, We refer to the requests for review raised by the Board members and the DNA of Brazil concerning DNV s request for registration of the Aços Villares Natural gas fuel switch project (0474). Please find below DNV s initial response to the issues raised by the requests for review: 1) Precise information on the age of the replaced equipment is missing in the PDD. If the emission reductions are deemed to be additional depends on expected equipment lifetimes. If one assumes that only older equipment was replaced which was at the end of their expected lifetimes, an investment by Aços Villares S.A. may have been needed anyway in order to remain operational. AM0008 takes this into account by capping the crediting period by the remaining lifetime of the existing equipment. In the validation report it is confirmed that the remaining lifetime of the equipment is more than 20 years. However, the only proof that has been given by the project participants seems to have been a reference to the maintenance regime of Aços Villares S.A. Since Aços Villares S.A. start of operation at the Pindamonhangaba plant was in 1979, the equipment is expected to be in operation for more than 46 years (assuming that no replacement has been and will be made since the beginning of operation). Please clarify. DNV has been on-site and verified the maintenance log of the equipment that has been replaced. The equipment was in good conditions and well maintained. A good maintenance regime is important to ensure a long lifetime of equipment and DNV observed that Aços Villares has such a regime in place. The steel making process needs large amounts of heat and the equipment used is very robust and requires little maintenance. The use of equipment that is over 50 years old is not an exception but common practice in this industry. This fact is difficult to prove with documentary evidence but is based on DNV s professional judgement and consultations with industry experts. 2) The Project Design Document and the Validation Report submitted to the Executive Board of the CDM for registration do not correspond to the documents identified in paragraph 1 (iii) of the Letter of Approval of the Brazilian Designated National Authority, dated 9 May, 2006, forwarded to the Executive Board by the DOE. The Letter of Approval of the refers to Revision 1 of the Validation Report, dated 27 October 2005, while the Validation Report submitted for registration is Revision 2, 1

dated 15 May 2006. The Revision 2 states that: The only changes made to this version of the validation report compared to the validation report rev. 01 dated 27 October 2005 referred to in the letter of approval of the DNA of Brazil are linked to the status of issuance of the letter of approval by the DNAs of Brazil and the United Kingdom. However, this statement is incorrect, since other changes have been identified, as listed below: 1. On page 7, section 3.4, paragraph 3, of the Validation Report the average prices of LPG and natural gas have been changed. The same changes appear in page A-10 of the Validation Protocol. However, these changes in prices have not been reflected in the difference in NPV that remained unchanged between the two versions of the document. 2. Furthermore, both versions of the Validation Report refer to Version 2 of the PDD, while the PDD submitted for registration is Version 3. There are several differences between Version 3 and the version that is referred to in the DNA Letter of Approval and made available at the DNA web site. For example, the table in section A.4.4.1 of PDD version 2 was changed in response to a request from the DNA (so it would present the estimated amount of emission reductions over the first crediting period, i.e., 7 years instead of all 21 years). But version 3 submitted for registration reflects the original PDD, not the one approved by the DNA. Also, Version 3 submitted for registration contains changes in pages 31 and 32 (equipment data and financial analysis data). However, the fuel prices in all versions of the PDD are not the prices introduced in the new version of the Validation Report. First we would like to note that for all Brazilian projects submitted for registration by DNV, a revised version of the validation report is submitted for registration compared to the version submitted to the DNA of Brazil. This is due to DNV not being able to finalise a validation report prior to having received the LoA(s) of the participating Parties. Only after the receipt of the LoA(s) DNV can conclude on whether the project meets the two CDM modalities and procedures requirements: approval of voluntary participation of the Parties involved and the confirmation by the host Party that the project assists in achieving sustainable development. Hence, DNV submits one version of the validation report to the DNA of Brazil (both in English and Portuguese), in which we state that we will recommend a project for registration given that we receive the LoAs of the participating Parties. Once the LoA(s) are received, we revise the validation report and submit it for registration. This approach was discussed and agreed with the DNA of Brazil in June 2005. The inconsistencies within the fuel prices stated in the English and Portuguese Project Design Documents (PDD) and validation reports submitted to the DNA of Brazil and the English PDD and validation report submitted for registration are due to an unfortunate inattention. Also, small errors corrected in the Portuguese PDD were not consistently communicated and reflected in the corresponding parts of the Portuguese validation report submitted to the and the English PDD and validation report submitted for registration. Finally, the English PDD, even though called Version 3, was an old version and mistakenly submitted for registration. The following two tables provide an overview of the correct values and the ones stated in the different documents submitted both to the DNA of Brazil and the CDM EB. We would like to emphasize here that the project s additionality is not questioned despite the incorrect fuel prices stated in the validation report submitted for registration. The project is additional based 2

on the correct values of fuel prices. The correct fuel prices and investment costs have a marginal impact on the net present value (NPV). Likewise, the correct energy consumption for some of the equipment has a marginal impact on the project design. Further, DNV would like to stress the fact that the Portuguese version of the PDD submitted to the DNA of Brazil is the correct one. Hence, the DNA of Brazil has assessed and approved the project based on the correct PDD and we hope that you agree that there is no need for the to again assess the project. Table 1: Differences in fuel prices Correct values (Average prices 2000 2001) PDD Version 3, to the CDM EB PDD, Version 2, to the (Portuguese version) Validation, report, Revision 2, to CDM EB Validation report, Revision 1, to the (Portuguese version) Fuel oil R$ 0.00759/kj R$ 0.00759/kj R$ 0.00759/kj R$ 0.0079/kj R$ 0.0079/kj LPG R$ 0.01127/kj R$ 0.01127/kj R$ 0.01127/kj R$ 0.0116/kj R$ 0.01127/kj Natural gas R$ 0.00856/kj R$ 0.00856/kj R$ 0.00856/kj R$ 0.089/kj R$ 0.0856/kj Table 2: Differences regarding the table in A.4.4.1 as well as the equipment data and the financial analysis data tables in Annex 3 Correct table/numbers PDD, Version 3, to the CDM EB Table A.4.4.1 7 years 21 years 7 years Changes to the tables on page 31 and 32: Annual energy consumption (in TJ) Correct table/numbers PDD, Version 3, to the CDM EB UP-710-1 Aquecedor de Panelas 5.69 6.83 5.69 UP-710-2 Aquecedor de Panelas 5.69 6.83 5.69 UP-710-3 Aquecedor de Panelas 5.69 6.83 5.69 UP-710-4 Aquecedor de Panelas 5.69 6.83 5.69 UP-530-2 Forno de ToTo 5.78 5.06 5.78 UP-530-3 Forno de ToTo 5.78 5.06 5.78 UP-530-4 Forno de ToTo 5.78 5.06 5.78 UP-530-5 Forno de Toto 5.78 5.06 5.78 UP-720-1 Forno de ToTo 6.77 7.99 6.77 UP-720-2 Forno de ToTo 6.44 7.99 6.44 PDD, Version 2, to the PDD, Version 2, to the 3

UP-720-3 Forno de ToTo 6.44 7.99 6.44 UP-720-4 Forno de ToTo 6.32 7.99 6.32 UP-720-5 Forno de ToTo 6.32 7.99 6.32 UP-720-6 Forno de ToTo 6.14 7.99 6.14 UP-720-7 Forno de ToTo 6.14 7.99 6.14 UP-630-1 Forno de Recozimento 27.54 10.05 27.54 UP-630-2 Forno de Recozimento - 10.05 - Changes to the table Financial Analysis, values in R$ Correct table/numbers PDD, Version 3, to the CDM EB Total Investment: 4 882 711 Pipeline Install: R$ 1 300 000 Equipments: R$ 1 787 422 Others: R$ 308 742 During the site visit additional expenses for a total of R$ 1 486 547 related to the removal of pipelines. These costs were only included in the version sent to the DNA of Brazil. PDD, Version 2, to the Total Investment : 4 882 711 In order to assist in the efficient process to register this project (Please note that the project requests early credits from 1 January 2003), DNV would like to propose the following corrective action: The corrected PDD and validation report in English are submitted as an annex to this letter. The corrected validation report in Portuguese is submitted to the in parallel. The PDD in Portuguese earlier submitted to the is the correct one and therefore not again submitted. In order to avoid similar errors in the future, the following preventive actions have been taken by DNV to avoid similar mishaps in the future: DNV has established a new document recording procedure earlier this summer, which is aimed at avoiding mistakes related to the version number and date of the document. DNV has so far not sufficiently reviewed the Portuguese version of the PDD and validation report before their submission to the DNA of Brazil. From now on, DNV will also carefully review the Portuguese version of the PDD and validation report. 4

We sincerely hope that the Board accepts our aforementioned explanations. Yours faithfully for DET NORSKE VERITAS CERTIFICATION LTD Michael Lehmann Technical Director International Climate Change Services Susanne Haefeli-Hestvik Project Manager International Climate Change Service Annexes - PDD Aços Villares Natural gas fuel switch project, correct version in English with highlighted changes. - Validation report, correct version in English. 5