LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum

Similar documents
CHAPTER 6 - How to Prepare a SWPPP

CITY OF VIRGINIA BEACH STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR SINGLE FAMILY RESIDENCES AND ACCESSORY STRUCTURES ONLY

Stormwater Pollution Prevention Plan (SWPPP) For Single Family Residential Construction within a larger plan of development

Stormwater Pollution Prevention Plan (SWPPP) For Single Family Residential Construction within a larger plan of development

COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia Tel.

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

LAMINATE AND POST AT JOB SITE NOTICE MUST BE VISIBLE FROM STREET

Appendix A: SWPPP Template Instructions

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

STORM WATER POLLUTION PREVENTION PLAN TEMPLATE

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009

Checklist Stormwater Pollution Prevention Plan (SWPPP)

Stormwater Pollution Prevention Plan Engineering Department Requirements

POLLUTION PREVENTION TEAM MEMBER ROSTER. Leader: Members: (1) Title: Worksheet #1 Completed by: Title: Date: Title: Office Phone: Responsibilities:

SINGLE FAMILY RESIDENCE COMMON PLAN of DEVELOPMENT or SALE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) For Construction Activities At:

Stormwater Pollution Prevention Plan (SWPPP) for Construction Activity for Small Construction Sites

DIVISION of WATER QUALITY NDPDES PROGRAM

Stormwater Pollution Prevention Training

SWPPP Inspection Procedures and Form 247 Instructions

City of Waukegan, Illinois

Risk Level 1 Annual Report Questions GENERAL INFO

Section 4: Managing the Construction Site

Common Plan SWPPP for

City of Glendale Stormwater Management Plan Checklist

STORM WATER POLLUTION PREVENTION PLAN (SWPPP)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Stormwater Pollution Prevention Plan (SWPPP) for Construction Activity for Large Construction Sites

Minnesota Pollution Control Agency requires that the City of Brainerd develop written procedures for

Storm Water Pollution Prevention Plan for CES Gravel #3800

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

DEQ Form Oct 18, Part A: Operator Information and Certification. DEQ Authorization Number: OKR10

Village of Northbrook, Illinois Stormwater Pollution Prevention Plan Public Works and Fleet Maintenance Garage Facilities

Construction Phasing Bad

CON APPENDIX C USAG HI Storm Water Pollution Prevention Plan Content Review Checklist

Outdoor Equipment Operations SC-32

Erosion Control Inspection Form

QSD/QSP Training Module 9 SWPPP Preparation

Construction Site Runoff (CSR) Permit Application Permit Fee $150.00

STORMWATER POLLUTION PREVENTION PLAN (SWP3)

EROSION CONTROL AND GRADING PERMIT APPLICATION

ATTACHMENT C RISK LEVEL 1 REQUIREMENTS

Stormwater Outreach for Regional Municipalities (STORM) Overview. Maintaining an Updated SWPPP Site Map Required Elements Good Examples Bad Examples

SWPPP Checklist. Project Name: Review Date(s): Reviewer(s): Project Type: Subdivision. Site Plan City Project

Building Better Storm Water Quality

Division of Water Quality (701)

Inspection Requirements of the CGP 2013

Contractors, Illicit Discharges, & Best Management Practices. Chris Allen Stormwater Inspector

APPENDIX A BLANK RECORDKEEPING FORMS AVI-CPL-001

SCDOT & the NPDES Program

NDDOT Erosion & Sediment Control Construction Course

LAKE CHARLES HARBOR & TERMINAL DISTRICT BULK TERMINAL NO. 1 SULPHUR, LOUISIANA

Watershed Enforcement Environmental Services (ESD)

Appendix O Example Industrial SWPPP Template

Regulatory Requirements

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

Construction site inspections are conducted for all projects that receive an approved site plan and proceed to construction.

CITY OF CAMARILLO STORMWATER POLLUTION CONTROL PLAN Demolition or Stockpile Activity Under One Acre

LOS ANGELES UNIFIED SCHOOL DISTRICT REFERENCE GUIDE

LAND DISTURBANCE PERMIT

STORMWATER COMPLIANCE & INSPECTION TRAINING

SUDAS Revision Submittal Form

Stormwater Pollution Prevention Training Arlington Public Schools August 8, 2014

Common Plan of Development Storm Water Pollution Prevention Plan for: Operator(s):

INDUSTRIAL WATER & SEWER USE SURVEY. 3. Operator (If different from the Owner, the name of the person, or firm, legally the operating the facility):

For a complete list of all BMP categories, see Stormwater: Best Management Practices Index.

AMERICAN FORK CITY PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION

2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION

APPENDIX C EROSION AND SEDIMENTATION CONTROL STANDARDS

Nevada Department of Transportation (NDOT)

Annual Stormwater Pollution Prevention Training

Construction Site Inspections

MCM#6 Pollution Prevention/Good Housekeeping for Municipal Operations. Licking County MS

State of Georgia Department of Natural Resources Environmental Protection Division NOTICE OF INTENT. NOI - Version 2012

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION

Re: Erosion Control Report and Drawings Requirements Accompanying Document

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION

SWPPP Development. What are Storm Water Pollution Prevention Plans. Jerald S. Fifield, Ph.D., CISEC HydroDynamics Incorporated Parker, CO

Illinois EPA MS4/ILR10 permit overview & changes

Three copies (one original and two copies) of your completed NOI should be submitted to:

New Administration Building

CITY OF CHICO. Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects. Project Address: Building Permit Number:

City of West Sacramento Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects

GENERAL INFORMATION:

THE UNIVERSITY OF TEXAS AT TYLER. Stormwater Pollution Prevention Program

Appendix M Framework Stormwater Pollution Prevention Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702

Construction Site Runoff Inspections and Enforcement

October 2016 CDRPC Workshop

Blue Book Update Overview

Storm Water Permitting

SECTION STORMWATER POLLUTION PREVENTION

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018

Non-Storm Water Discharges

Single Family Residential Construction Erosion/Sediment Control Standards

Storm Water Pollution Prevention Plan. Wastewater Treatment Facility and Streets & Parks Facility. Village of Fox River Grove, Illinois

Transcription:

LOUISIANA URBAN STORMWATER COALITION EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum

SWPPP NOTIFICATION SIGN Post sign at entrance of site or areas where the public can easily access. Identify inspector and contact numbers. Prefer contacting SWPPP inspector than municipality or DEQ.

OVERVIEW : SECTIONS OF A SWPPP SECTION 1: SITE EVALUATION, ASSESSMENT & PLANNING SECTION 2: EROSION AND SEDIMENT CONTROL BMPS SECTION 3: GOOD HOUSEKEEPING BMPS SECTION 4: SELECTING POST-CONSTRUCTION BMPs SECTION 5: INSPECTIONS SECTION 6: RECORDKEEPING AND TRAINING SECTION 7: FINAL STABILIZATION SECTION 8: CERTIFICATION AND NOTIFICATION SWPPP APPENDICES

EROSION CONTROL Minimizing the Impact of Construction: 1. Minimize disturbed area and protect natural features and soil 2. Phase construction activity 3. Control stormwater flowing onto and through the project 4. Stabilize soils promptly 5. Protect slopes Sediment Controls (the second line of defense): 6. Protect storm drain inlets 7. Establish perimeter controls 8. Retain sediment on-site and control dewatering practices 9. Establish stabilized construction exits 10. Inspect and maintain controls September 21-22, 2011

WHAT IS STABILIZATION IN A SWPPP? EPA s Construction General Permit : stabilization measures must be initiated as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than 14 days after the construction activity in that portion of the site has temporarily or permanently ceased.

WASTE MANAGEMENT Provide for waste management. Design proper management procedures and practices to prevent or reduce the discharge of pollutants to stormwater from solid or liquid wastes that will be generated at your site. Practices such as trash disposal, recycling, proper material handling, and cleanup measures can reduce the potential for stormwater runoff to pick up construction site wastes and discharge them to surface waters. Determine if your site is following LEED requirements.

NON-STORMWATER DISCHARGES Non-stormwater discharges that are allowable should be identified: Discharges from fire-fighting activities, Fire hydrant flushings Waters used to wash vehicles where detergents are not used Water used to control dust in accordance with EPA s CGP, Part 3, Subpart 3.4.G Potable water including uncontaminated water line flushing Routine external building wash down that does not use detergents Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (unless all spilled material has been removed) and where detergents are not used Uncontaminated air conditioning or compressor condensate Uncontaminated ground water or spring water Foundation or footing drains where flows are not contaminated with process materials such as solvents Uncontaminated excavation dewatering Landscape irrigation

SWPPP SECTION 4 SECTION 4: SELECTING POST-CONSTRUCTION BMPs Depends on the local municipality and codes but should have some stormwater post features.

SWPPP SECTION 5 SECTION 5: INSPECTIONS Inspections Delegation of Authority Corrective Action Log

INSPECTION FREQUENCY > Your construction general permit describes the minimum frequency of inspections, which is typically weekly or every 14 days and after each rainfall event exceeding one-half inch. > To meet the requirement to maintain all BMPs in good working order, EPA recommends that you develop an inspection schedule that goes beyond these minimums and is customized for your site and the conditions affecting it.

Training Log SWPPP SECTION 6 SECTION 6: RECORDKEEPING AND TRAINING Recordkeeping Log of Changes to the SWPPP Training Always keep a log of changes and amend the SWPPP as needed. Make sure all records are kept in an orderly fashion. Make sure training is conducted for all employees and signatures are kept for records.

SWPPP SECTION 7 SECTION 7: FINAL STABILIZATION Final stabilization is when more than 70% of the site is stabilized with temporary (hay mats with seed) or permanent stabilization (landscape and grass). Only then can the permit and the SWPPP plan be closed out Make sure NOI is terminated at DEQ offices is submitted. Insure the SWPPP and inspections are archived for 3 years in the event of an audit.

SIGNATORY All SWPPP plans and inspections needs to be signed by someone in the company with authority. It must have this certification: I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Do not falsify records EVER! then it becomes criminal violation

QUESTIONS AND DISCUSSION SWPPP, BMPS, SPECIFICATIONS?