PLM and ERP permanently welded together

Similar documents
sbn conference 21st/22nd October 2015 SAP Engineering Control Center with the new CIDEON interfaces

Mesh Welding Machines modular design for optimum productivity

Industry solutions Machine Tool Engineering

EPLAN Engineering Center Automation strategies

EPLAN Fluid Fluid power engineering

Process consulting Engineering software Implementation Global support

EPLAN Electric P8 Electrical engineering

Electronic document management offers many advantages

GETRAG FORD TRANSMISSIONS

proalpha ERP CAD Integration ERP for SMEs

Aras Accelerates Innovation at GETRAG FORD Transmissions

PLM System as Data Centerpiece used by Packaging Systems Specialist

EPLAN Pro Panel Virtual control cabinet engineering

Forming Hub Cold Forming Rolling Hot Forging

Solid Edge provides recipe for success for one of the world s oldest manufacturers of brewery machinery

Performance Description Contents: EPLAN Engineering Configuration One 2.5 Status: 09/2015

Forming Hub Cold Forming Hot Forging

EPLAN Preplanning Basic Engineering

IT documentation does not have to be static

Redundance-free data management Automated role workflows Access and version management PDM / PLM. isdgroup.com

Legacy Decommissioning and System Consolidation

Our Portfolio. SEAL Systems AG

Modul Confirmation Electronic Delivery of Order Confirmations out of SAP

Clean water for the world. Innovative technology from the ultrafiltration specialists

INDUSTRY EXPERTISE IN AUTOMATION AND ELECTRONICS AUTOMATION

Contents. Company portrait. Solutions. Processes. Sector know-how. High-tech capacity. Quality management. Logistics A shared future

POWER. for Electrical planning and engineering

Automated Warehouse Technology and Warehouse Management Hardware & Brainware Made in Germany GEBHARDT Material Handling Systems

RADIOLOGY WORKFLOW SOLUTIONS

FRAUNHOFER INSTITUTE FOR PRODUCTION TECHNOLOGY IPT CAX-TECHNOLOGIES. Our Partner

MIGROS & WITRON. Application for the IFOY Award Category: Integrated Warehouse Solution. Copyright WITRON, 2018

PLM Flexibility with ARAS out-of-the-cloud. Anderes Bild

Back on track. We needed a fresh start in both production and in the entire order-management process. STAUFEN. OSKAR FRECH 2

SAP Authoring Tool Integration Platform Strategy Overview SAP SE

An overview of TEAM strategies for integrating the product realization process

VG InLine 3.0. Easily Automate CT Inspections and Analyses

Diehl Aerospace Establishes Support Center in Singapore

CadConnect (CCN) add-on module to MS Dynamics NAV

Customized heat treatment systems for. press hardening

Success Story. Pushing the Boundaries of Treasury

MS Machine Manufacturer Optimal processing solutions for the welding, joining and processing of plastics

Success Story. Blueprint Automation Fast & energy-saving packaging

Reprint from No. 5 September Clean data provides the drive

Press Presse Press Presse

SIWAREX FTC The belt scales in SIMATIC More than just standard. siwarex ftc

Industrial machinery and heavy equipment. Haidlmair

Boost Your Business. From geometry to NC program faster than ever before.

Management of Complex Products with Agile PLM

White paper SAP HANA and SAP S/4HANA The right steps towards a digital advantage

HYDRA Shop Floor Scheduling

Individual Product Data Management. How do you use your PDM flexibility?

Step on it, Arnold! Arnold Jäger Holding GmbH. How the Arnold Jäger Holding achieves a five years competitive advantage with windream

THE ROYAL INSTITUTION OF NAVAL ARCHITECTS

Products «Made in Germany» All you should know

KPS / KPSA Punching-Shearing Machines

Delivering Innovation in Digital Manufacturing through XVL

SAP Automotive for Suppliers

E³.series Electrical Wiring, Control Systems and Fluid Engineering Software

+Maintenance Solution. The maintenance solution for the SAP Business ByDesign ERP system

Andreas Schreiber. Industrie 4.0 in Practical Applications: Challenges and Experiences

OPTIMAL LOGISTICS SOFTWARE

PRO.FILE by PROCAD. The Backbone for Your Product Data and Documents

Digital manufacturing tools strengthen rapid organic growth

SYSTEM SOLUTIONS. Connecting systems, people and processes. Systems Integration Application Development Workflow Automation

V.T. Garment Co., Ltd.

AND SAP INTEGRATED IT PORTFOLIO MANAGEMENT. Dispersed SAP systems present a business challenge

Explore the world of AGRO innersprings

Machine speaks MES & ERP CNCnet PDM allows you to integrate different types of machines directly with MES - ERP systems

Agile Development Doesn t Have to Mean Fragile Enterprise Processes

QUICK FACTS. Integrating Multiple Databases for The Institutes TEKSYSTEMS GLOBAL SERVICES CUSTOMER SUCCESS STORIES. Client Profile

CONNECT ALL OF YOUR DATA

Teamcenter Express. The fast track to cpdm

Wire EDM directly from the 3D CAD model

VIRIO the right turn for new challenges The new, flexible generation of vertical balancing machines

Product Data Management Product Lifecycle Management

Maier Werkzeugmaschinen

STRACK NORMA. The Best out of Steel. Customer reference

Industry 4.0 Showcase

Innovative MES Solutions. for Production, Human Resources and Quality Management

DSC Software AG. Parts management with SAP Engineering Control Center and PARTsolution from CADENAS

PDM vs. PLM: It All Starts with PDM

Introduction to the new 3DMP ApplicationCenter

Pallet Handling System (PHS)

harness manufacturing

PLM: A way out of the crisis 6/2009. Originally published in: Das Wirtschaftsmagazin für Ingenieure. Intelligente Methoden, Prozesse und Technologien

Innovative methods and tools support Siemens Energy Oil & Gas to ensure greater transparency and lower costs in outsourcing

Explore the world of AGRO innersprings

Efficient generation management and operation management

CONVEYING PIECE GOODS SPECIAL PLANTS AND DEVICES SERVICES MINDA TANGERMÜNDE

PAC Q&A Trusted Cloud A Strategic Offer from Siemens IT Solutions and Services

Produkt og Procesmodeller (PPM) i byggeriet. Product and Process models in Construction. 6. Process Models

KANBAN SUPPLY C-parts management with ROM REYHER Order Management

PRODUCTS&SERVICES Depliant PWT ok indd 3 23/04/

COMOS Process. Highest consistency for process plant engineering.

Efficient CAD/CAM programming for ambitious 5X machining

Dear Ladies and Gentlemen,

QINEO PULSE. The versatile welding machine for industry

INOView. Safety at a glance. Sicherheitstechnik GmbH

Compass Software CAD/CAM COMPLETE SOLUTIONS FOR STAIRCASE MANUFACTURING

Customised service. Our services for ensuring your success

Transcription:

PLM and ERP permanently welded together

IDEAL-Werk C. + E. Jungeblodt GmbH & Co. KG PLM and ERP permanently welded together By Michael Wendenburg Process optimization is often hindered by ingrained structures, especially in small and mid-sized companies. With the assistance of the experts at CIDEON Software, IDEAL, a manufacturer of high-quality welding systems, has consolidated its technical system landscape and integrated a PLM/ERP solution throughout its processes as part of its company-wide roll-out of SAP. Thanks to SAP PLM, all employees in the company can now access the files and documents relevant to their roles. There are certain metallic materials that, because of their composition, actually cannot be welded or can only be welded after being treated. IDEAL-Werk C. + E. Jungeblodt GmbH + Co. KG is a recognized authority specializing in just such impossible missions. Since 1923, the mid-sized company headquartered in Lippstadt has been manufacturing innovative welding solutions for customers in the steel, mechanical engineering, automotive manufacture, and other industries. Between 70% and 80% of the systems are exported to destinations outside Germany. The company is represented by distribution partners in more than 90 countries around the world. IDEAL's range of products includes welding machines for band saws, wires, cables, pipes, sheet metal, wire mesh, etc.; coil joining machines using resistance welding, arc welding and laser welding processes; as well as complete production lines for various applications. In addition to standard designs and systems made of prefabricated modules configured specifically for certain applications, the company also develops and produces completely customized special solutions. "That is our strength. Innovations are continually being integrated into our standard machines from our customized systems," says Managing Director Max Clemens Jungeblodt, who with his cousin has been running the family business since 2006. IDEAL is an engineering-driven company with a relatively high vertical integration. Nearly one-fifth of the employees are engineers, among them 12 electrical or electronics engineers. Typically, the more complex the welding systems become, the greater the proportion of mechatronics involved and therefore the higher the degree of coordination required among the various disciplines.

Consolidating the menagerie of systems CIDEON - a competent partner Since the new generation took over the top management, The aim of the integration project was the improvement of After deciding on SAP as its new ERP solution, the idea of Moreover, the CIDEON specialists working with project the company has also become technically and organiza- data consistency and transparency between the PLM and implementing SAP PLM instead and managing the techni- director Klaus Becker supported the project team in esta- tionally younger. Mechanical production was completely ERP worlds in order to reduce throughput times and lower cal data and documents in the same system environment blishing optimized links between materials and documents modernized so that it is now possible to operate two shifts, costs. was obvious. And the groundwork was laid for the selection under process criteria. "This kind of consulting ability was and a new assembly and logistics center was built. of a partner: something we didn't experience with other system provi- "Especially with the parts we manufacture ourselves, we "I conferred with other system administrators, and time and ders," says Tünsmeier. Additionally, SAP was introduced as the ERP system at the wanted to achieve a simple process flow for creating mate- again the name CIDEON came up. Having been burned end of last year, and at the same time the heterogeneous rials and improved data transparency when changes are once, we naturally examined the integration solution very To Jungeboldt's excitement, the migration of the existing 3D system landscape in the engineering areas with separate made," says Jungeblodt. "We wanted to make it possible for closely. But after the first presentation we had already come models and 2D documents required a good bit of prepa- CAD and document-management systems with dozens of every employee in the company to access data, including to the decision that this company was the right partner for ration, but overall was an outstanding success. CIDEON additional programs written in-house was consolidated. design data. And we made it happen across the board. We us," says Tünsmeier. CIDEON distribution manager Martin made available to IDEAL a powerful migration tool that now have only one 'source of truth' and only one valid Bentin adds, "With our experience with heterogeneous enabled the project team to analyze the errors during the "A daunting undertaking, which we would not have been version of each document." system landscapes, we were able to convince IDEAL of data import themselves and optimize the data structure able to surmount without a competent partner such as the benefits of our solutions." accordingly. CIDEON," says IT project manager Manfred Löher. Also SAP PLM took the place of a heterogeneous, unintegrated of decisive importance to the success of the project was system landscape with multiple data repositories, as system CIDEON didn't implement an off-the-shelf PLM solution in "After numerous test runs, we succeeded in migrating the seamless collaboration with the SAP partner, which administrator Christoph Tünsmeier explains. Lippstadt that would need to be adapted later on; rather, around 70,000 documents. Only 48 files fell by the way- implemented the ERP solution. they took the customer's needs into consideration when side," says Tünsmeier, who was responsible for preparing designing the first test installation. the data. "We are always attempting to further standardize the mechanics using PLM and to increase benefits to the individual customers by means of electronics and simple communication between man and machine." In 2005 IDEAL expanded its 2D CAD installation with its first SolidWorks workstations and added a reasonably priced database to manage its 3D CAD data. The CAD data management system, however, neither supported the versioning of files nor permitted the hierarchical management of access rights, and the company attempted to replace the existing database with a stand-alone PDM system. After all the 2D documents had been transferred to the new system, it became apparent that the provider was not in a position to migrate the 3D data cleanly. "This failed attempt cost us huge amounts of time and energy," says Jungeblodt. At a glance Company: IDEAL-Werk C. + E. Jungeblodt GmbH + Co. KG Challenge: Consolidate the heterogeneous IT system landscape and improve process integration between PLM and ERP Solution: SAP PLM Integration for SOLIDWORKS, CIDEON SAP PLM Integration to EPLAN, CIDEON Conversion Engine and CIDEON Output Management, CIDEON View Manager, CIDEON Import PDM, CIDEON Add Ons for SAP PLM Benefits: Project durations shortened with the implementation of central data archiving and faster availability of drawings for proposals, production orders and documentation; greater data security and transparency through document access management CIDEON services: Consulting, workshops, requirement specifications, implementation, customization, additional programs, training, support

All integrations from a single source CIDEON Output Management saves time The CIDEON integration currently links 25 SolidWorks workstations to SAP PLM so that engineers can save their 3D models and 2D drawings directly to the document containers. The interface makes it easier to create new materials by automatically entering certain information; users need only select whether the part is produced in house or is a boughtin part. The integrated PLM/ERP solution creates more transparency in processes and, in Jungeblodt's estimation, will lead to faster project completion. With CIDEON Output Management alone, the time required for outputting drawings for proposals and production orders has been perceptibly reduced. Electric plans from EPLAN software can also be saved directly to SAP PLM via an interface. Because CIDEON Software is now a company of the Friedhelm Loh Group, which is also the parent company of EPLAN, there are, in the words of Martin Bentin, new opportunities in the area of mechatronics. According to Jungeblodt, one of the benefits of the integration solution is the seamless interoperability between ERP and document management, which makes it possible to assign various documents to one material and determine at any time which ones are up to date and which are not. If a drawing changes, for instance, the user sees immediately that the associated NC program does not correspond to the current version and may need to be updated. "Who is able to see which documents and the tasks for which they may be used is controlled via the document status network," says Tünsmeier. "It has been tried and proven that there are no more back doors." integrates different authoring systems. Using additional software, users can check documents in, search for them, jump from one document to another, and conveniently branch off to parts lists and materials. As Tünsmeier explains, "By comparison, this kind of navigation in different views is laborious in a standard SAP installation." "After all PLM is not a project that comes to an end, but instead is part of the continuous Before, each drawing had to be opened individually and sent for printing-now, the responsible employee need only click on the assembly and the complete set of drawings is converted to the desired format and printed out in the background. "Each drawing is stamped. This allows us to determine whether it is intended for a production order or for internal use," says Jungeblodt. development of the company." Together with CIDEON View Manager, authorization administration ensures that only authorized users have access to clear document versions and that security gaps in the access process are closed. Thanks to the operating concept, not only designers but also users in other departments can easily access data and documents in SAP. The solution could be viewed as a cockpit that consolidates various views of the information contained in SAP in one user-friendly interface and Company headquarters in Lippstadt. Managing Directors: Dorothee Jungeblodt and Dipl.-Ing. Max Clemens Jungeblodt. In addition to purchasing and production, project planning also benefits from the system documentation of the Output Management functions. Converting the documentation for a welding system in the steel-production industry into the format requested by the customer and printing it now takes only two days. Before, it took one employee three to four weeks to complete the same tasks. Assuming three or four large orders of this type annually, this represents considerable savings potential. Even more important than the fast return on investment is that IDEAL is now equipped with a powerful solution and a reliable partner for future requirements, says Jungeblodt: "After all PLM is not a project that comes to an end, but instead is part of the continuous development of the company.

Process Consulting Engineering Software Implementation Global Support 12.2014/ CIDEON Success Stories: IDEAL-Werk CIDEON Software GmbH & Co. KG Peterstraße 1 D-02826 Görlitz Phone + 49(0)3581 3878-0 Fax + 49(0)3581 3878-19 info@cideon-software.com www.cideon-software.com