A/E REVIEW CHECKLIST STEAM GENERATION

Similar documents
A/E REVIEW CHECKLIST STRUCTURAL

SECTION FUEL-FIRED UNIT HEATERS

University of Delaware

C. Concrete Inertia Bases: Drawings showing required concrete steel reinforcing, construction details, and dimensions.

DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST

2012 IPC Sections

SECTION VIBRATION ISOLATION

PIPING FLEXIBILITY & STRESS ANALYSIS COURSE DURATION: 5 DAYS

B. System Design and Performance Requirements

Element Z General Design Requirements Existing Facilities Information

Structural Engineering Review Checklist Project List

Thule Prototype BIM Manual for Dormitories. February 5, 2010

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

MEP Design Standards & Equip Cuts NYP BEST PRACTICES. Presentation for GC/CM Retreat 2014

SECTION 11 Architectural and Nonstructural Elements Field Investigation

2015 IPC Sections 308 through 316

Summary of Modifications/Changes in this Update

SECTION COOLING TOWER

Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

SECTION ROTARY SCREW WATER CHILLERS

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED

SECTION CONVECTORS

Flow Meter Calibration

Pipe Stress Analysis Where Do I Start?

Chapter 9 - Design Guides 9.18 HVAC GUIDE

B Contractor License GUIDE FOR ASSESSMENT TEAMS & APPLICANTS

SECTION PACKAGED, SUBMERSIBLE, DRAINAGE PUMP UNITS

SECTION LOW-VOLTAGE TRANSFORMERS

COMPLETE REVISION April Process Industry Practices Piping. PIP PNC00004 Piping Stress Analysis Criteria for ASME B31.

SECTION HANGERS AND SUPPORTS FOR PLUMBING

University of Delaware

B. ASHRAE 1991 HVAC Applications Handbook: Chapter 34--Testing, Adjusting and Balancing.

SECTION VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT

Village of Gurnee Construction Documents Submittal Requirements

Refrigeration (REF) Contractor License GUIDE FOR ASSESSMENT TEAMS & APPLICANTS

SECTION HVAC AIR CLEANING DEVICES

SEA Certified Piping Design Engineer

Carey Automatic Door, LLC PNEUMATIC OPERATOR FOR SINGLE SLIDING DOOR

2. Water Pressure Booster Systems. 3. Duplex Pedestal Type Sump Pumps.

A/E Design Deliverable Checklist

Revision Date: February 28,

HVAC WATER TREATMENT 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS. D. Section Plumbing (Potable) Water Treatment

Handling Fluid Fertilizers Selecting the Right Equipment Components

Minimum Residential Plan Submittal Requirements

PENNSAFE BUILDING INSPECTION SERVICES LLC NEW COMMERCIAL BUILDING UCC PLAN REVIEW HANDOUT AND CHECKLIST

SECTION NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and &

2.3.6 Design Development

Common Plan Review Rejection Reasons

Building Permit Application

DESIGN REGISTRATION GUIDELINES FOR NUCLEAR PRESSURE RETAINING SYSTEMS AND COMPONENTS

Common Plan Review Rejection Reasons

2) These Standards are available on the University s website at:

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Trane U.S. Inc. Authorized Government Price List. GSA Hourly Billing Rates for Labor Categories Under SINs and Position Description

PROJECT DESIGN COORDINATION CHECKLIST

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER. A. Basic Services...A-1. B. Pre-Design and Start-Up Services...

A. ASTM F Standard Specification for Pressure-rated Polypropylene (PP) Piping Systems.

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

PUMP STATION CHECK LIST

4th Class Power Engineering (PEN) Curriculum Mapping

1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures.

CONSTRUCTION DOCUMENTS NECESSARY FOR PLAN REVIEW

INDEPENDENT REVIEW REPORT

D. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required.

Errata for the 2003 Uniform Plumbing Code Study Guide (5th Printing)

Architectural Services Consultant Registration Form

COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

Building Hydronic Systems Pressure Profile

MINUTES OF THE MEETING SDSU CENTRAL HEATING PLANT BOILER REPLACEMENT AND PLANT UPGRADES June 17, 2011

Installation of Vacuklav 24-B. 1 General features. Figure 1

REQUEST FOR PROPOSALS (RFP) TO DESIGN AND INSTALL SPLASH PAD AT RIVERVIEW PARK (NORTH AUGUSTA, SC)

A. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials

gwinnettcounty RACKING SHELVING CONVEYOR CONSTRUCTION CODE COMPLIANCE GUIDELINES Permitting Procedure

Design & Construction Standards, Revised January

Facilities Planning, Design & Operations University of Kansas Job Title Definitions Job Family Definition:

INSTRUCTIONS FOR COMPLETING THE BUILDING PERMIT APPLICATION FOR COMMERCIAL PROJECTS

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

Metropolitan Community College COURSE OUTLINE FORM

A. Piping materials shall bear label, stamp, or other markings of specified testing agency.

AMENDMENT OF SOLICITATION

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Building Maintenance & Property Management Syllabus Outline

CAMPUS STANDARDS HANDBOOK

CRAFTSMAN EXAMINATION, NOVEMBER 2008 PLUMBING ANSWER SCHEDULE

National technical University Kharkov polytechnic institute. Faculty Power Mechanical Engineering Department. Department of Turbomachinery

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

HIGH EFFICIENCY SHOWERS WASTE WATER HEAT RECOVERY UNIT. Saved power 80kW. Showers waste water 9 C Power consumption 3,1kW. Showers waste water 31 C

Construction Documents Checklist

QUALIFICATIONS NEEDED TO DESIGN, CONSTRUCT AND MANUFACTURE NUCLEAR SYSTEMS AND EQUIPMENT. Cosmos M. Voutsinos, P.Eng.

EXHIBIT "A" RESPONSIBILITIES AND SERVICES OF ARCHITECT/ENGINEER. A. Basic Services... A-2. B. Architectural Programming... A-5

PTFE Pipe Slide Assemblies

Archdiocesan Procedures For Building and Renovation Projects

Archdiocesan Procedures For Building and Renovation Projects

EVERY ITEM WILL BE REVIEWED AND NOTED FOR COMPLIANCE (C), OR NON-APPLICABILITY (NA).

STANDARD DETAILS. Revised January Bonita Springs Utilities, Inc East Terry Street (239)

Transcription:

A/E REVIEW CHECKLIST STEAM GENERATION Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing, Fire Protection, and Sanitary, Heating, Ventilating, and Air Conditioning (HVAC), Steam Generation, Steam Distribution, Incineration/Solid Waste, and Electrical. Reviewers should - Insure that A/E Submission Instructions (PG-18-15) for Schematic, Design Development, and Construction Documents are followed for various types of VA construction projects. Reviewers should - Insure that every VA construction project is in compliance with all life safety issues. Reviewers should - Be aware that these checklists are not allinclusive but only provide minimum review items. 1

GENERAL INFORMATION FOR REVIEWERS S The reviewer should be thoroughly familiar with the following VA standards before conducting a design review. These are available on Internet: http://www.va.gov/facmgt/standard/ 1. DESIGN MANUALS (PG-18-10) 2. MASTER CONSTRUCTION SPECIFICATIONS (PG-18-1) 3. STANDARD DETAILS (PG-18-4) (Available in AutoCADD 2000 Format) 4. DESIGN AND CONSTRUCTION PROCEDURES (formerly Construction Standards) (H-18-3) (Policies defining the minimum level of excellence in the design of VA facilities) 5. DESIGN GUIDES (PG-18-12) (Graphic information on specific programs in the design development of VA facilities) 6. DESIGN ALERTS (These alerts are issued on a regular basis for design and construction related issues) 7. A/E QUALITY ALERTS (These alerts are issued to guard against common and repeat design errors) 8. A/E SUBMISSION INSTRUCTIONS (PG-18-15) 9. TECHNICAL SUMMARIES (The summaries of HVAC design requirements for special and critical areas) 10. NATIONAL CAD STANDARD 11. VA NATIONAL CAD STANDARD APPLICATION GUIDE 2

SCHEMATIC 1 2 Is seismic anchoring and bracing necessary? 3 Does A/E have latest VA Master Spec sections? 4 Does A/E have latest VA Standard Details? 5 Does A/E have latest VA Design Manual? 6 Compliance with VA National CAD Standard Application Guide and SCHEMATIC 2 2 Equipment selection and location complies with Steam Generation Design Manual. 3 Life cycle cost method complies with NIST Handbook 135? 4 Acceptable responses to previous comments? 5. Compliance with VA National CAD Standard Application Guide and 3

DESIGN DEVELOPMENT 1 2 Equipment selection and location complies with Steam Generation Design Manual. 3 Equipment sizing calculations acceptable? 4 Pipe sizing calculations acceptable? 5 Plan views and sections of major equipment show proper access to equipment? 6 Piping plans and sections show proper allowance for thermal expansion? 7 Flow diagrams for all piping systems conform to VA Standard Detail? 8 Acceptable responses to previous comments? 9 Coordination with other disciplines 10. Compliance with VA National CAD Standard Application Guide and 4

DESIGN DEVELOPMENT 2 2 Are calculations complete including pipe and equipment sizing, control and regulating valves, flowmeter systems, steam traps, heating systems, pipe stress? 3 Are Master Specs to be utilized of current issue? 4 Do all pump calculations include suction head, NPSH, discharge head (with adequate safety factor), including accurate list of fittings for friction loss? 5 Is all pipe stress (major steam lines) within ASME B31.1 limits? 6 Are boiler steam nozzle loadings (forces and moments) within acceptable range? 7 Is adequate clearance shown around all equipment, including fire tube boiler tube pull space and front and rear door opening? 8 Does design comply with VA Design Manual? 9 Acceptable responses to previous comments? 10 Coordination with other disciplines 11 Compliance with VA National CAD Standard Application Guide and 5

CONSTRUCTION DOCUMENTS 1 1 Have A/E Submission Requirements (PG-18-15) for the review been 2 Have all calculations been revised per comments in last review? 3 Have any major steam pipes been relocated since last review? This would require a revised stress analysis. 4 Are all valves shown in plans and sections and in accessible locations? 5 Are boiler access catwalks shown to scale in proper relation to boiler valves? 6 Do structural and architectural drawings show catwalks and equipment pads? 7 Are all spring type and roller pipe hanger locations shown? 8 Are seismic brace locations shown and braces detailed? 9 Acceptable responses to previous comments? 10 Coordination with other disciplines 11 Compliance with VA National CAD Standard Application Guide and 6