Stormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide

Similar documents
The following sections provide the approved standard infiltration testing specifications.

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

To The Applicant For A Small Wastewater System Permit Sheridan County, Wyoming

STORMWATER MANAGEMENT. 158 Attachment 2. Borough of Perkasie

***NO SEPTIC SYSTEM EXCAVATION WITHOUT AN APPROVED PERMIT IN POSSESSION****

CITY UTILITIES DESIGN STANDARDS MANUAL

Maria Cahill, Green Girl Land Development Solutions; Derek C. Godwin and Marissa Sowles, Oregon Sea Grant Extension

Wyoming Water Quality Application Form Permit to Construct Small Wastewater System. Complete attached package and submit to appropriate office:

SMALL WASTEWATER FACILITY APPLICATION PACKET

GRAY WATER RECYCLING SYSTEMS

November 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112

Native Soil Assessment for Small Infiltration- Based Stormwater Control Measures

The Presby Wastewater Treatment System

CHAPTER 4 GEOTECHNICAL SITE CHARACTERIZATION

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

November 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112

UC SANTA CRUZ NATIVE SOIL ASSESSMENT FOR SMALL INFILTRATION BASED STORMWATER CONTROL MEASURES

The Presby Wastewater Treatment System

ADMINISTRATIVE MANUAL COUNTY OF LOS ANGELES 6/30/17 DEPARTMENT OF PUBLIC WORKS GEOTECHNICAL AND MATERIALS ENGINEERING DIVISION

PROJECT NO A. ISSUED: February 29, 2016

STARK COUNTY HEALTH DEPAIRmEm

Appendix A. Infiltration and Soil Texture Testing Methods. Appendix A. A.1 General Description. A.2 Infiltration Testing: A Four-Step Process

Public Health STARK COUNTY HEALTH DEPARTMENT

Misan University - College of Engineering Civil Engineering Department

Re: Geotechnical Consultation for Storm Infiltration Robert Louis Stevenson ES Modernization th Avenue San Francisco, California

CITY OF MONTCLAIR Montclair Civic Center 5111 Benito Street Montclair, CA 91763

INYO COUNTY ENVIRONMENTAL HEALTH SERVICES RESIDENTIAL ONSITE SEWAGE TREATMENT AND DISPOSAL GUIDE

August 15, 2006 (Revised) July 3, 2006 Project No A

Section 8 Minimum Horizontal and Vertical Setback Distances

November 2007 DRAFT Appendix E: Soil Testing Criteria

A-2. Soils. Soil Media. Chapter Contents. Soil Media In-situ Soil Testing Separation from Seasonal High Water Table (SHWT)

SPECIAL CONDITIONS FOR HORIZONTAL AUGER BORING (HAB) October, 2006

Soil Class Handouts Greeley Colorado October 22 & 23, 2015

Typical Subsurface Profile. November 28, 2016

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

BROWARD COUNTY ENVIRONMENTAL PROTECTION DEPARTMENT (EPD) MINIMUM CRITERIA FOR MONITORING WELL INSTALLATION AND SAMPLING

CHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted September 5, Part 1 Introduction...2

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

SECTION SUBSURFACE INVESTIGATION. 1. Protection of the environment; Section

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Appendix B.2. Construction Specifications for Infiltration Practices

Source of Pollution or Groundwater Solution?

SMALL WASTEWATER (SEPTIC SYSTEM) APPLICATION FREMONT COUNTY, WYOMING

#611 ON-SITE TESTING AND EVALUATION

March 28, Port of Kalama Mr. Jacobo Salan 380 West Marine Drive Kalama, Washington 98625


1.0 BACKGROUND 2.0 DIAGRAMS. The attached diagrams illustrate a typical NDDS system. 3.0 CDPHE OWTS REGULATION #43

CHAPTER 39 REQUIREMENTS FOR PROPERLY PLUGGING ABANDONED WELLS

SECTION SOILS REPORT

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E.

SECTION IRRIGATION WATER WELL

PROJECT INFORMATION. 1.1 Site Location. October 4, Jerry Schwab/President 315 Aden Ave., Suite 26 Glendale, CA 91203

SECTION IRRIGATION WATER WELL

BARTOW COUNTY RESIDENTIAL DRAINAGE PLAN or RDP

Results of Onsite Percolation Testing Ellis Commons Senior Housing Development APN City of Perris, California

SECTION VI SANITARY SEWERS

APPENDIX A DRAINAGE STUDY PHASE 2 ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE 4C IMPROVEMENTS LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC

SepticDesign.ca Gunnell Engineering Ltd.

Module 24 : Onsite Sanitation. Lecture 41 : Onsite Sanitation

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

Soil Improvement by Compaction Grouting

1. Introduction Site Information Site Characteristics Hydrogeologic Setting... 2

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

EXHIBIT G GEOTECHNICAL REPORT (DRAFT)

How & Where does infiltration work? Context: Summary of Geologic History Constraints/benefits for different geologic units

City of Vineland Health Department 640 E. Wood Street, Vineland, NJ (856) (ph.) / (856) (fax)

Subsurface Environmental Investigation

Appendix D General Earthwork and Grading Specifications for Rough Grading

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

Transitioning from the Percolation Test to Soils Evaluation Colorado Environmental Health Association Annual Education Conference 2015

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

Permeable Pavement Facilities and Surfaces

Klickitat County. On-Site Sewage System. Construction Manual

ITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems

NOVEMBER 2016 GRANDWALL. retaining walls installation guide

PARK COUNTY PLANNING DEPARTMENT 1002 SHERIDAN AVE. CODY, WY OR

SECTION ROCK REMOVAL

APPLICATION FOR PERMIT TO CONSTRUCT A PRIVATE SEWAGE DISPOSAL SYSTEM. 1. Name (Owner): Phone # ( )

Appendix III. Onsite Wastewater System Feasibility Report and Plans (2012)

Building. Anchorplex. Retaining Wall Systems

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

July 23, Mr. Richard Miller, Vice President Lake Arrowhead Property Owners Association 7065 Arrowroot Trail Gaylord, Michigan 49735

INSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION

COTTONWOOD IMPROVEMENT DISTRICT SALT LAKE COUNTY SERVICE AREA #3 SOLITUDE IMPROVEMENT DISTRICT TOWN OF ALTA WATERSHED SERVICE LINE SPECIFICATIONS

Ponds: planning, design, and construction

SECTION 02215BP TRENCHING AND BACKFILLING

TRIP REPORT ARCONA ROAD VALVE SITE INFILTRATION TESTING

NORTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN SERVICES DIVISION OF PUBLIC HEALTH ENVIRONMENTAL HEALTH SECTION ON-SITE WATER PROTECTION BRANCH

Alteration/Expansion or Change in Use Alteration/Malfunctioning System Deviation from Standards Repairs to Existing System

Electrical Conductivity & Hydraulic Profiling. The Combining of Two Subsurface Investigation Methods (With More to Come)

Last Updated March 15, Cass County On-Site Sewage disposal system repair/replacement permit application

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION

Background. AEM Tier 2 Worksheet Farmstead Water Supply Evaluation. AEM Principle: Glossary

Lantz-Boggio Architects, P.C LBA Project No

Anchorplex retaining wall construction guide

Appendix 3-G SWM AND BMP CONSTRUCTION INSPECTIONS

Transcription:

Stormwater Standards Clackamas County Service District No. 1 APPENDIX E Infiltration Testing Guide

Table of Contents Appendix E - Infiltration Testing Guide... Page E.1 General... 1 E.2 Basic Method - Open Pit Infiltration Test... 1 E.2.1 Basic Method Instructions... 1 E.2.2 Professional Method Infiltration Testing... 2 E.2.3 Testing Criteria... 2 E.2.4 Depth and Location of Required Tests... 2 E.2.5 Minimum Number of Required Tests... 3 Table E-1: Infiltration Rate Safety Factor... 3 E.2.6 Open Pit Falling Head Procedure... 3 Figure E.1: Encased Falling Head Procedure... 4 E2.7 Encased Falling Head Test... 5 E2.8 Double Ring Infiltrometer Test... 6 E.3 Reporting Requirements... 7 Figure E-2: Infiltration Test Data Table Example... 8 Figure E-3: Infiltration Test Data Table... 9 i

E.1 General Infiltration Testing Guide To properly size and locate stormwater management facilities it is necessary to characterize the soil infiltration conditions at the location of the proposed facility. All projects proposing stormwater BMP facilities designed to infiltrate stormwater runoff, therefore reducing the size of the detention facility and storage volume, must evaluate existing site conditions and determine if the site s infiltration rate is adequate to support the proposed stormwater management facility. The following sections provide a guidance for standard infiltration testing specifications. E.2 Basic Method - Open Pit Infiltration Test (Single Lot - Residential Only) The Basic Method open pit test is applicable only to residential projects on private property. The results of infiltration testing must be documented on the Basic Method Form. The intent of the open pit test is to determine whether or not the local infiltration rate is adequate to design an infiltration system. The Basic Method infiltration test does not need to be conducted by a licensed professional, but it is recommended. E.2.1 Basic Method Instructions (Single Lot Residential) 1. A simple open pit infiltration test is required for each stormwater BMP facility designed to infiltrate stormwater runoff, therefore, reducing the size of the detention facility and storage volume. The test should be in close proximity to the proposed facility location. 2. Excavate a test hole to the depth of the bottom of the infiltration system, or otherwise to 4 feet. The test hole can be excavated with small excavation equipment or by hand using a shovel, auger, or posthole digger. 3. If a layer hard enough to prevent further excavation is encountered, or if noticeable moisture/water is encountered in the soil, stop and measure this depth from the surface and record it on the Simplified Method Form. Proceed with the test at this depth. 4. Fill the hole with water to a height of about 6 inches from the bottom of the hole (or to one-half the maximum depth of the proposed facility), and record the exact time. Check the water level at regular intervals (every 1 minute for fast-draining soils to every 10 minutes for slower-draining soils) for a minimum of 1 hour or until all of the water has infiltrated. Record the distance the water has dropped from the top edge of the hole. 5. Repeat this process two more times, for a total of three rounds of testing. These tests should be performed as close together as possible to portray the soil s ability to infiltrate at different levels of saturation accurately. The third test provides the best measure of the saturated infiltration rate. 6. For each test pit required, submit all three testing results with the date, duration, drop in water height, and conversion into inches per hour. The rate to be used for design will be the lowest rate measured of the three tests performed. If the results of the Basic Method open pit test show an infiltration rate greater than 0.5-inches per hour, the applicant can proceed with facility design (where applicable). 1

E.2.2 Professional Method Infiltration Testing CCSD#1 Stormwater Standards - Appendix E The Professional Method should be used for all public and private developments where the Basic Method is not applicable. The qualified professional must exercise judgment in the selection of the infiltration test method. The three available infiltration testing methods used to determine a design infiltration rate are: a) Open pit falling head b) Encased falling head c) Double-ring infiltrometer E.2.3 Testing Criteria 1. Testing must be conducted or observed by a qualified professional. The professional must be a Professional Engineer (PE), Registered Geologist (RG), or Certified Engineering Geologist (CEG) licensed in the State of Oregon. 2. The location and depth of the test must correspond to the facility location and depth. 3. Infiltration testing should not be conducted in engineered or undocumented fill. 4. Boring logs should be provided as supporting information with infiltration and depth to groundwater tests. Note: All testing data must be documented with the project submittals. The submittals must adequately demonstrate that the proposed facilities 1) are appropriate to the assessment and characterization of the site soils, 2) will work, based on insitu infiltration tests, and 3) are sized appropriately, based on design infiltration rates. E.2.4 Depth and Location of Required Tests Infiltration tests must be performed at the base of the proposed facility. If a confining layer, or soil with a greater percentage of fines, is observed during the subsurface investigation to be within 4 feet of the bottom of the planned infiltration system, the testing should be conducted within that confining layer. Tests must be performed in the immediate vicinity of the proposed facility. Exceptions can be made to the test location provided the qualified professional can support that the strata are consistent from the proposed facility to the test location. For relatively deep stormwater facilities, a hollow stem auger with an electronic measuring tape can be used, provided there is an adequate seal between the auger and the native soil. 2

E.2.5 Minimum Number of Required Tests a. Land Division An infiltration test in the approximate location of the proposed stormwater infiltration facility. No more than five tests are required per development (at the discretion of the qualified professional assessing the site, as well as the District). Tests performed at the Land Division will be used at the building permit stage as long as the results of the test are submitted with the separate applications and no major changes to the site soil conditions have occurred. Where multiple types of facilities are used, it is likely that multiple tests will be necessary, since an infiltration test can test only a single soil stratum. It is highly recommended to conduct an infiltration test at each stratum used for infiltration. b. Building Permits (Single Lot Residential Only) The Basic Method requires one infiltration test for every proposed facility. c. Correction (Safety) Factors Table E-1 lists correction or safety factors to be used. The maximum design infiltration rate is 20-inches per hour. TABLE E-1. Infiltration Rate Safety Factor Test Method Required Correction Factor Open Pit Falling Head 2 Encased Falling Head 3 Double-Ring Infiltrometer Public Facilities: 2 Private Facilities: 2 E.2.6 Open Pit Falling Head Procedure The open pit falling head procedure is based on the Environmental Protection Agency (EPA) Falling Head Percolation Test Procedure (Onsite Wastewater Treatment and Disposal Systems Design Manual, EPA/625/1-80-012, 1980). The test is performed in an open excavation and, therefore, is a test of the combination of vertical and lateral infiltration. 1. Excavate an approximately 2-foot by 2-foot-wide hole into the native soil to the elevation of the proposed facility bottom (see Figure E-1). The test can be conducted in a machine-excavated pit or a hand-dug pit using a shovel, posthole digger, or hand auger. If smooth auguring tools or a smooth excavation bucket is used, scratch the sides and bottom of the hole with a sharp-pointed instrument, and remove the loose material from the bottom of 3

the test hole. 2. A 2-inch layer of coarse sand or fine gravel may be placed to protect the bottom from scour and sloughing. 3. Fill the hole with clean water a minimum of 1 foot above the soil to be tested, and maintain this depth of water for at least 4 hours (or overnight if clay soils are present) to presoak the native material. 4. Percolation rate measurements must be made after 15 hours and no more than 30 hours after the soaking period begins. It is important that the soil be allowed to soak for a sufficiently long period of time to allow the soil to swell if accurate results are to be obtained. Any soil that sloughed into the hole during the soaking period must be removed and the water level shall be adjusted to 6 inches above the added gravel (or 8 inches above the bottom of the hole). EXCAVATE OR USE SOIL-BORING CASING GOOD SEAL BETWEEN SOIL AND CASING IS NECESSARY PROPOSED DEPTH OF TRENCH OR FACILITY BOTTOM 6" DIAMETER SOLID CASING Figure E.1 Encased Falling Head Procedure 5. In sandy soils with little or no clay, soaking is not necessary. If, after filling the hole twice with 12 inches of water, the water seeps completely away in less than 10 minutes, the test can proceed immediately. 6. The measurements should be made with reference to a fixed point. A lath placed in the test pit prior to filling or a sturdy beam across the top of the pit is a convenient reference point. The tester and excavator should conduct all testing in accordance with OSHA regulations. 7. Measure the water level to the nearest 0.01 foot (1/8 inch) at 10-minute intervals for a total period of 1 hour (or 20-minute intervals for 2 hours in 4

slower soils) or until all of the water has drained. At no time during the test is the water level allowed to rise more than 6 inches above the gravel. 8. Successive trials must be run until the measured infiltration rate between two successive trials does not vary by more than 5 percent. At least three trials must be conducted. After each trial, the water level is readjusted to the 12- inch level. Enter results into the data table (See Figure E-2). 9. The results of the last water level drop are used to calculate the tested infiltration rate. The final rate must be reported in inches per hour. See the calculation following Figure E-2. 10. For very rapidly draining soils, it may not be possible to maintain a water head above the bottom of the test pit. If the infiltration rate meets or exceeds the flow of water into the test pit, conduct the test in the following manner: a. Approximate the area over which the water is infiltrating. b. Using a water meter, bucket, or other device, measure the rate of water discharging into the test pit. c. Calculate the infiltration rate by dividing the rate of discharge (cubic inches per hour) by the area over which it is infiltrating (square inches). 11. Upon completion of the testing, the excavation must be backfilled. E.2.7 Encased Falling Head Test The encased falling head procedure is based on a modification of the EPA Falling Head Percolation Test Procedure (Onsite Wastewater Treatment and Disposal Systems Design Manual, EPA/625/1-80-012, 1980). The most significant modification is that this test is performed with a 6-inch casing that is embedded approximately 6 inches into the native soil. The goal of this field test is to evaluate the vertical infiltration rate through a 6-inch plug of soil, without allowing any lateral infiltration. The test is not appropriate in gravelly soils or in other soils where a good seal with the casing cannot be established. 1. Embed a solid 6-inch-diameter casing into the native soil at the elevation of the proposed facility bottom (see Figure E-1). Ensure that the embedment provides a good seal around the pipe casing so that percolation will be limited to the 6-inch plug of the material within the casing. This method can also be applied to testing within hollow stem augers, provided the driller and tester are reasonably certain that a good seal has been achieved between the soil and auger. 2. A 2-inch layer of coarse sand or fine gravel may be placed to protect the bottom from scour and sloughing. 3. Fill the pipe with clean water a minimum of 1 foot above the soil to be tested, and maintain this depth for at least 4 hours (or overnight if clay soils are present) to presoak the native material. 5

Percolation rate measurements must be made after 15 hours and no more than 30 hours after the soaking period begins. It is important that the soil be allowed to soak for a sufficiently long period of time to allow the soil to swell if accurate results are to be obtained. Any soil that sloughed into the hole during the soaking period must be removed and the water level shall be adjusted to 6 inches above the added gravel (or 8 inches above the bottom of the hole). In sandy soils with little or no clay, soaking is not necessary. If after filling the hole twice with 12 inches of water, the water seeps completely away in less than 10 minutes, the test can proceed immediately. 4. To conduct the first trial of the test, fill the pipe to approximately 6 inches above the soil and measure the water level to the nearest 0.01 foot (1/8 inch). The level should be measured with a tape or other device with reference to a fixed point. The top of the pipe is often a convenient reference point. Record the exact time. 5. Measure the water level to the nearest 0.01 foot (1/8 inch) at 10-minute intervals for a total period of 1 hour (or 20-minute intervals for 2 hours in slower soils) or until all of the water has drained. The infiltration test is continued until the measured infiltration rate between two successive trials does not vary by more than 5 percent. At least three trials must be conducted. After each trial, the water level is readjusted to the 6 inch level. Enter results into the Data Table (see Figure E-2). At no time during the test is the water level allowed to rise more than 6 inches above the gravel. 6. The result of the last water level drop is used to calculate the tested infiltration rate. The final rate must be reported in inches per hour. 7. Upon completion of the testing, the casings must be immediately pulled, and the test pit must be backfilled. E.2.8 Double Ring Infiltrometer Test The double-ring infiltrometer test procedure must conform to ASTM 3385-94. The test is performed within two concentric casings embedded and sealed to the native soils. The outer ring maintains a volume of water to diminish the potential of lateral infiltration through the center casing. The volume of water added to the center ring to maintain a static water level is used to calculate the infiltration rate. The double-ring infiltrometer is appropriate only in soils where an adequate seal can be established. This test may be difficult to perform where the tested soil strata are in a pit, since careful regulation of the static volumes is necessary. 6

E.3 Reporting Requirements In addition to the information required by the State for a signed and stamped geotechnical report, the following information should be included in the project submittals. 1. Infiltration results in inches per hour. 2. Location and depth of excavation. The excavation should be deep enough to verify that there is a 5-foot separation between the final depth of the facility (rock gallery) and the seasonal high groundwater or soil layer that could reduce the infiltration rate. 3. Summary and discussion of infiltration testing, including number of tests, amounts of water used in each test (inches, gallons, etc.), and time of each test. Testing is required to show that an accurate rate was achieved. 4. Discussion of how the test was performed: Encased falling head Pipe type Embedment depth Size of pipe Double ring infiltrometer Pipe type Embedment depth Size of pipe Open pit (size of area) 5. Soil types with depth 6. Groundwater observations seasonal high groundwater level estimation 7

Figure E-2: Infiltration Test Data Table Example Location: Lot 105, Low Point Heights Subdivision Date: 6/28/2010 Test Hole Number: 3 Depth to bottom of hole: 57 inches Diameter of hole: 0.5 feet Test Method: Encased Falling Head Tester s Name: C.J. Tester Tester s Company: Tester Company Tester s Contact Number: 555-1212 Time Depth, feet Time interval, minutes Soil Texture 0-0.5 Black Top Soil 0.5-1.0 Brown SM 1.0-2.2 Brown ML 2.2-5.1 Brown CL Measurement, feet Drop in water level, feet Percolation rate, inches per hour Remarks 9:00 0 3.75 - Filled with 6 9:20 20 3.83 0.08 9:40 20 3.91 0.08 2.88 10:00 20 3.98 0.07 2.52 10:20 20 4.04 0.06 2.16 10:40 20 4.11 0.07 2.52 11:00 20 4.17 0.06 2.16 11:20 20 4.225 0.055 1.98 Adjusted to 6 level for Trial #2 Calculation is performed for each water level drop = (Drop in water level/time interval) x conversion = 0.055ft/20min x (12in/ft) x (60min/hr) = 1.98 inches per hour The design infiltration rate of two successive trials must have a difference of 5% or less. 8

Figure E-3: Infiltration Test Data Table Location: Date: Test Hole Number: Depth to bottom of hole: Diameter of hole: Test Method: Tester s Name: Tester s Company: Depth, feet Tester s Contact Number: Soil Texture Time Time interval, minutes Measurement, feet Drop in water level, feet Percolation rate, inches per hour Remarks 9