The Kingdom of Saudi Arabia National Renewable Energy Program. Renewable Project Development Office (REPDO) July, 2017

Similar documents
June, 2017 RENEWABLE PROJECTS. Enhancing The Local Supply Chain

India Solar Market Update Q Executive Summary.

REQUEST FOR QUOTATION (RFQ) For Parking P4 - Upgradation of the Parking Facility at Kempegowda International Airport, Bengaluru

Results of California s Renewable Energy Program and Agricultural Biomass to Energy Program (SB704)

Small scale Hydro Electric Power IPP compliance with legislation and REBID process

Green Power Market Development Group - India. Tara Parthasarathy, Ashok Thanikonda Progress Review - Collaborative Rooftop PV Purchase Sept 30, 2013

ADDENDUM NO. 1 REQUEST FOR PROPOSALS NO ENERGY SUPPLY AND RELATED SERVICES ANSWERS TO QUESTIONS

The Republic of South Africa. Department of Energy

Non-consolidated Forecast of Income <1>

SOLAR ENERGY IN IRAQ: FROM OUTSET TO OFFSET. Harry Istepanian CEng., PMP. IRAQ ENERGY FORUM March Harry Istepanian

ACEF Deep Dive Workshop. 5 8 July 2017 Manila, Philippines

A World Bank Group solution to rapidly expand private investment in utility-scale solar PV

Support for Competitive Procurement of Renewables in Mongolia

ATTACHMENT 1 COVER LETTER AND INSTRUCTIONS ON TENDERING PROCEDURES. CPG/2124/2017 Political Economy Analysis (PEA) of Colombia s Agriculture Sector

Harnessing the Saudi Arabian solar powerhouse opportunity. Webinar Yusuf Macun, Partner May 10, 2017

Peter Randall Solar Kingdom Ltd

Let s be Practical- Evaluating RFPs for Key Requirements. Breakout Session Speaker: Brad A. Edwards

Overview of the South Africa s Independent Power Producers Procurement Programme

A NATIONAL ENERGY STRATEGY FOR LEBANON LEBANESE NATIONAL ENERGY (LNE) CONFERENCE

California Independent System Operator Corporation. California ISO. Import resource adequacy. Department of Market Monitoring

Substantial Changes Ahead for MISO North Michigan Impacts 2018 MMEA Fall Conference

Wild Horse Solar Photovoltaic Project

South African IPP Procurement Programme. December 2016

The South African Renewable Energy Independent Power Producers Procurement Programme (REIPPPP) Lessons Learned

Clean Energy Business Council 6th MENA Clean Energy Summit Dubai, Monday 6 th March 2018.

W I N D A N D S O L A R R F Q / R F P P R O C E S S

REPLIES TO QUERIES. Sr. Clause No Reference from RfQ cum RfP Queries Clarification. Developer. Bidder shall furnish the please.

For personal use only

Manitoba Hydro - Power Plants and SWOT Analysis, 2011 Update

Company: Rockwell Collins Industry: Aerospace & Defense Category: Technology

Macquarie s Eighth Alternative Energy Conference. London 22 September 2015

2016 ISO Flexible Capacity Needs Assessment: Study Methodology, Assumptions, and Preliminary Results

BARBADOS WATER AUTHORITY

ATTACHMENT 1 COVER LETTER AND INSTRUCTIONS ON TENDERING PROCEDURES

U.S. Renewable Energy: Increasing Capacity- Reducing Costs

NEXT POTENTIAL HOTSPOTS FOR CLEAN POWER Victoria Cuming Head of Policy EMEA Bloomberg New Energy Finance United Kingdom. African Utility Week

City of Olean Water Filtration Plant

Trethowans LLP. Recruitment Agency Preferred Supplier List (PSL) Invitation to Tender

Competitive Biddings Renewable Energy Projects in Thailand. SPP Hybrid-Firm. Asian Clean Energy Forum 2018

Utility-scale PV challenges in the Australian market

BANGALORE INTERNATIONAL AIRPORT LIMITED INFORMATION DOCUMENT

Request for Proposals (RFP) The provision of labour law specialist services for subsidised public transport contracts to the CSIR

REQUEST FOR QUALIFICATIONS Quantity Surveyor Pre-qualified List for Partnerships British Columbia Inc. RFQ #: 3567

For personal use only

FLEXIBILITY HOW TO CONTRIBUTE TO THE STABILITY OF THE GRID THANKS TO THE FLEXIBILITY OF YOUR PRODUCTION PROCESSES?

Request for Proposal for Annual Financial Audit Services

Solar PV Capacity Additions Forecast for PJM States:

PROCUREMENT PLAN. Date of First Procurement Plan: 22 October 2009 Date of this Procurement Plan: 13 December 2018, Version 12 Advance Contracting: No

Procurement Assistance Software & Support, LLC. The USA Buyers eprocurement Marketplace

Invitation for Bid - Standard Office Furniture / Task Chair

Facility Study. 100MW Solar Photovoltaic Generation Interconnection. Lake County, Florida

Opening Remarks. Mr. Adnan Z. Amin. Director-General, International Renewable Energy Agency. at the launch of

High-Performing Home Certificate. Certified Solar

Renewable energy. Sustainable investments. Summary PORTFOLIO HIGHLIGHTS SEPTEMBER Environmental Impact Calculator

Best Value Basics II. Isaac Kashiwagi Kashiwagi Solution Model Inc.

Department of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD Phone: 605/ FAX: 605/

PROCUREMENT CODE ARTICLE 5 GOODS AND SERVICES

2011 RFP for All Generation Sources Proposal Conference

PORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS

Morocco s experience in CSP projects

SHOP IT RFP Update & Review. November 5, 2014

Purchasing and Procurement Policy

QUALIFIED MARKETING INSIGHTS/RESEARCH VENDOR QUALIFICATION REQUEST FOR PROPOSALS

EoI Reference No.: The last date of submission of EoI is 6/08/2018, 3:30pm through hard copy submission at the address below.

Gadsden City Schools

FREQUENTLY ASKED QUESTIONS: STANDALONE PV

UK Power Networks Innovation and future energy systems. Neil Madgwick & Giulia Privitera 3 March 2017

Implementation Status & Results Jordan Promotion of a Wind Power Market (P093201)

REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES

Invitation to Tender. External Audit Services. July 2015

Delhi Metro Rail Corporation Limited (A JV of Govt. of India and Govt. of Delhi) Metro Bhawan,Barakhamba Road, Delhi (India)

NHS ROTHERHAM PROCUREMENT SCHEME

The First Solar Thermal Power Plant. In Egypt. Engineer. R & D Sector Director New & Renewable Energy Authority NREA, Egypt

a) Seek clarification from the Department for Transport in respect of future core funding for the work of the Strategic Transport Forum.

Casework Technical Support (Social Welfare - Project Management)

Opportunities in the Energy Sector of the Kingdom of Saudi Arabia. December 2017

Generation Attribute Tracking System (GATS) Overview of PJM-EIS

How to stimulate the South African rooftop PV market without putting municipalities financial stability at risk A Net Feed-in Tariff proposal

Demand Turn Up (DTU) Interactive Guidance document and invitation to tender

Meridian Energy presentation to UBS Australasia Conference

Assessing the Flexible Capacity Requirements for 2018 through 2020

WEST BENGAL INSTITUTIONAL STRENGTHENING OF GRAM PANCHAYATS PROJECT PROCUREMENT PLAN FOR ONE YEAR (1 APRIL MARCH 2014)

Request for Proposal. 4229P PeopleSoft HCM Technical Consulting Services

Question & Answers on Invitation to tender for Framework Contract 2007/S

AFC Energy plc AGM Presentation. 25 April 2017

Renewable Energy in Egypt Ehab Ismail Amin New and Renewable Energy Authority

Progressive Design Build

Jordan Renewable Energy program. Ministry of Energy and Mineral Resources Nov. 2017

Bordei Verde. 8 MW Wind Park Romania.

Invitation to Tender. Development Legal Services. August 2015

Integrity National Corporation

Joe McDonald.

Items Local Content (%) Service Contract 20% 22% 25% Supply Contracts 20% 22% 25% EPC Contracts (Others) 30% 35% 40%

Factsheet N 12. Focus on public procurement

REQUEST FOR EXPRESSIONS OF INTEREST 5006 EOI DETERRENT PROGRAM FOR SNOW GEESE CONTROL

Flexible Resource Adequacy Criteria and Must-Offer Obligation

PROCUREMENT PLAN. Date of First Procurement Plan: 3 July 2014 Date of this Procurement Plan: 23 March 2016, Version 3

PECO CHP Call for Projects ( CfP ) Bidders Webinar Presented on September 19, 2017

Renewable Generation A Utility Perspective. Paul Davis, Customer Services Manager Platte River Power Authority

ADMINISTRATIVE REVIEW: STRATEGIC PROCUREMENT

Transcription:

The Kingdom of Saudi Arabia National Renewable Energy Program Renewable Project Development Office (REPDO) July, 2017

Legal Disclaimer The information contained in this presentation is provided as general information only. It does not form part of the RFP package issued to any pre-qualified bidder and it does not constitute an addendum to, clarification of, part of or replacement of any part of the RFP. It is being furnished by REPDO solely for information purposes and on a non-reliance basis. No part of the presentation's content constitutes, nor does MEIM claim it to be, a comprehensive review of the National Renewables Energy Program. To the extent of any conflict or inconsistency between the RFP package and this presentation, the RFP package shall prevail. REPDO makes no representations and gives no warranties of whatever nature in respect of the content of the presentation, including but not limited to the accuracy or completeness of information, facts and/or opinions contained therein. None of MEIM, REPDO, their directors, employees, agents and advisors can be held liable for the use of or reliance on the contents of the presentation or for any costs, expense or any other liabilities resulting from relying on or sharing the contents of the presentation. 2

Background and Targets 3

National Renewable Energy Program: Vision 2030 Objectives & Targets CREATE RENEWABLE ENERGY INDUSTRY ENCOURAGE PUBLIC-Private partnerships Allow the private sector to buy & invest in RE INVESTING FOR THE LONG TERM Localization is key Localize R&D, manufacturing & other sections of the value chain 9.5GW By 2023 NATIONAL RENEWABLE ENERGY PROGRAM Responsible for all RE related initiatives in the Kingdom Review legal & regulatory frameworks 4

National Renewable Energy Program: Vision 2030 Objectives & Targets 9.5 GW Accounts for 10% of the Kingdom s total generation capacity by 2023 3.45 GW Accounts for approx. 4% of the Kingdom s total generation capacity by 2020 5

National Renewable Energy Program: Vision 2030 Project Announcements VISION 2023 TARGET : 9.5 GW NTP 2020 Phase (1) Target : 3.45 GW Round 1: 700 MW Round 2: 1.02 GW Round 3: 1.73 GW Solar PV- Sakaka 300MW Wind Dumat AlJandal - 400MW Solar PV - 620MW Wind - 400MW 10 Site Locations 6

National Renewable Energy Program: Vision 2030 Renewable Technologies Targeted Solar PV Wind Solar CSP W2E Others 7

National Renewable Energy Program: Vision 2030 Execution Model Saudi Arabia is open for Business IPP Model Open for Local and International companies with experience in the electricity sector Multiple bidders Award goes to lowest LCOE PPA signed by LLC financially guaranteed by SEC 8

National Renewable Energy Program Projects selected on multi-criteria basis STAKEHOLDER ENGAGEMENT RENEWABLES GIS ANALYSIS LAND AVAILABILITY DEVELOPMENT STATUS DISPLACEMENT OF HIGH VALUE FUELS ECONOMIC DEVELOPMENT LONG-TERM WATER & POWER PLAN (LTP) 9

National Renewable Energy Program Offtake REPDO responsible for preparation of all tendering documentation and Predevelopment Energy generated at the sites will be sold to a limited liability company, guaranteed by the Saudi Electricity Company (SEC) 10

National Renewable Energy Program Approach: The NREP eprocurement Portal Legal Team Procurement Portal All communication is managed through the portal and directed to the appropriate teams seamlessly Technical Team MEIM Team Suppliers Finance Team Support Team 11

National Renewable Energy Program Important Dates for Round 1 Sakaka Solar PV Power Plant 300 MW Feb 20,2017 Request for Qualification (RFQ) Mar 20,2017 RFQ submission deadline Apr 17,2017 Request for Proposal (RFP) Sep 11,2017 Submission Deadline Nov,2017 Bid Award 12

National Renewable Energy Program Important Dates for Round 1 Dumat Al Jandal Wind Power Plant 400 MW Jul 16,2017 Aug 10,2017 Aug 29,2017 Jan 25,2018 Request for Qualification (RFQ) RFQ submission deadline Request for Proposal (RFP) Submission Deadline 13

Thank You FOR GENERAL ENQUIRES EMAIL: INFO_REPDO@MEIM.GOV.SA