The multi-functional heat storage in Hamburg-Bramfeld innovative extension of the oldest German solar energy housing estate

Similar documents
The BTES project in Crailsheim (Germany) Monitoring results

Prospects of Solar Thermal and Heat Storage in DHC

Next Generation of Seasonal Gravel-Water Thermal Energy Store Design and Operating Results from Eggenstein-Leopoldshafen, Germany

Solar District Heating Connecting Solar Thermal Sources to DHC

SOLAR ENERGY USED FOR HEATING AND COOLING SYSTEMS

The specific segment of large scale solar thermal systems

Advanced Storage Concepts for Solar Combisystems

MODELLING AND SIMULATION OF GROUNDWATER INFLUENCE ON BOREHOLE THERMAL ENERGY STORES

Case study : RIO VENA (Seasonal Storage Solar DH Study)

SOLAR DISTRICT HEATING WITH SEASONAL STORAGE IN ATTENKIRCHEN

Monitoring results from large-scale solar thermal plants with long term storage in Marstal, Brædstrup and Dronninglund, Denmark

Renewable District Heating at International Building Exhibition (IBA) Hamburg INTERNATIONALE BAUAUSSTELLUNG IBA HAMBURG GMBH

Solar district heating

Industrial perspectives in Solar. 27 th of November 2012 Christian Stadler

IEE 2008 Project SDHtake-off - Solar District Heating in Europe. Contract number: IEE/08/460/SI Project duration: 01/07/ /06/2012

Solar District Heating and actions from policy to

SOIL-WATER PIT HEAT STORE WITH DIRECT CHARGING SYSTEM

Stadtwerk: Lehen _ Solar energy in urban community in City of Salzburg, Austria

APPLICATION OF CUSTOMIZED ABSORPTION HEAT PUMPS WITH HEATING CAPACITIES ABOVE 500 kw PROJECT: ACKERMANNBOGEN, MUNICH

Solar Hot Water Storage with Storage Volumes up to 50 m³

Operational analysis and detailed monitoring results of measurements taken from largescale solar thermal plants integrated into district heating

Supplying. Renewable. Zero-emission. Heat.

PUMPED STORAGE FOR BALANCING AND GRID CONTROL IN PREDOMINANT RENEWABLE ENERGY SYSTEMS

Frequently Asked Questions: Existing Houses/Buildings

RAMBOLL THERMAL TECHNOLOGY WITH DISTRICT ENERGY SYSTEMS

3. Legal instruments to create business cases

SUPPLYING RENEWABLE ZERO-EMISSION HEAT

Case study : HEP Toplinarstvo - Cibljanica

Identified technologies for the InfraSUN pilot plant

Managing Large Amounts of Wind Generated Power Feed In Every Day Challenges for a German TSO and Approaches for Improvements

DELIVERABLE 3.1 Documentation of the system installation and integration process Fleischwaren Berger, Austria 1 SOLERA

German Energy Efficiency Policy - Building Sector - Sub Group 3 Meeting; New Delhi

Solar Thermal Market & support schemes in Germany. German Solar Industry Association (BSW-Solar)

The role of biogas in the heat transition in Germany

Impact, Compliance and Control of EPBD Legislation in Germany

Levelized Cost of Heat for Solar Thermal Systems with Overheating Prevention

Potential of Process Integration in four Industrial Companies in Germany

KWK Modellstadt Berlin

Seasonal Ground Solar Thermal Energy Storage - Review of Systems and Applications

ScienceDirect. Model based optimization of a combined biomass-solar thermal system

Solar Thermal Systems Status Technologies - Perspectives. Dr. Bernd Eikmeier Bremer Energie Institut

Promoting Building Energy Efficiency in Germany

LARGE SCALE SOLAR HEATING SYSTEMS FOR HOUSING DEVELOPMENTS

FCEN conference on EU prospects for Fuel Cell CHP. Incentives for fuel cell technology in a booming German market

Renewable Energy Sources Act. Progress Report 2007

SOLAR COOLING: STATE OF THE ART, TECHNICAL ANALYSIS AND FIRSTS APPLICATIONS

ISEC Christian Doczekal, Güssing Energy Technologies, Austria co-author: Dominik Rutz, WIP Renewable Energies, Germany

REGIONAL REPORT ON THE SELECTION OF PRIORITY APPLICATIONS - Upper Austria

Stefanie Uhrhan and Andreas Gerber. University of Applied Science Biberach, Karlstrasse 11, Biberach, Germany.

Energiewende in Germany

Seasonal solar thermal energy storage through ground heat exchangers Review of systems and applications

Sustainable Energy Action Plan. Paros. Action Plan for Energy. Cofinanced by the European Regional Development Fund - MED Programme

Sustainable Energy Action Plan. Sifnos. Save Energy for Tomorrow

Seasonal storage for solar thermal systems in Australia?

F. Kabus, G. Möllmann, F. Hoffmann and J. Bartels

PITAGORAS project. General overview and main results

Combination of wind solar plants and district heating power plants

F. Kabus, G. Möllmann, F. Hoffmann and J. Bartels GTN Geothermie Neubrandenburg GmbH, Seestrasse 7A, Neubrandenburg, Germany

Solar Thermal Systems in Germany: Market, Technologies and Outlook. Dr. Bernd Eikmeier Bremer Energie Institut

Auf in neue Märkte! Exportinitiative Energie Biogas in future energy systems Example Germany Dr. Stefan Rauh, 21. November 2017, Warschau

Fuelling the Climate 2014 Clean Urban Freight Solutions EV Urban Freight in Germany: Perspectives for Municipalities and Enterprises

Programme of the Train the Trainers Course

Internal Contracting: the example of Stuttgart

COMPLETE TEST FACILITY FOR SOLAR THERMAL COLLECTORS AND SYSTEMS

The Renner Residence 2009 Mike and Elida Renner

ZERO-ENERGY/EMISSION-BUILDINGS - TERMS, DEFINITIONS AND BUILDING PRACTICE

SOLAR PROCESS HEAT IN BREWERIES - POTENTIAL AND BARRIERS OF A NEW APPLICATION AREA

ST-4 Polygeneration plant. Parc de l Alba Cerdanyola del Vallès

Modelling of a District Heating System with Decentralized Heat Generators

Market potential and system designs for industrial solar heat applications

Case Study. Stainless Steel Tilted Solar Roof: German Nautical Museum, Stralsund

The Electricity Year Diagram from the publication

GEOTHERMAL DISTRICT HEATING EXPERIENCE IN TURKEY

under New German Climate Legislation

ULLAPOOL COMMUNITY TRUST RENEWABLE HEAT FOR LOCHBROOM

Low-Energy-Building in Hannover

Andrea PONTA, Energy Manager of IREN S.p.A.

THE CHARACTERISTICS OF SOLAR THERMAL COLLECTOR AND STORAGE SYSTEM INCLUDING SEASONAL THERMAL ENERGY STORAGE IN SOUTH KOREA

Power market integration, focusing on the CHP switch to biomass and electric heating to replace fossil-fuelled heating

Why District Energy is the solution of the future

50 Solar Energy Estates in North Rhine-Westphalia

Operation modes and process integration of a thermochemical heat storage system based on CaO/Ca(OH) 2

Authors. Towards 2020 OVERVIEW AND OUTCOMES. 1. General information. 2. Objectives

New Technologies and Opportunities for Solar Thermal Applications

Renewable Energies in Germany - Political Framework and Market Development

RESEARCH OF SOLAR WATER HEATERS MODEL

Potentials of the new design concepts of district heating and cooling toward integration with renewable energy sources

RECOMMENDATIONS FOR THE REDUCTION OF FAILURESDURING THE PLANNING AND INSTALLATION PHASES OF SOLAR THERMAL PROCESS HEAT SYSTEMS

Solar-active-houses analysis of the building concept based on detailed measurements

Conversion Design of Solar Houses from Active to Passive

Stadtwerke Crailsheim

Energy Efficient Building Envelope Kiev,

The Storage of Solar Heat

A Dual Function Energy Store

Heating/cooling demand and technical concept for district heating/cooling in Šabac

Combined Heat and Power. Applications and Guidelines Jeffrey Ihnen, P.E.

Interaction between Electricity and District Heating

FLEXIBLE OPERATION OF COGENERATION PLANTS - CHANCES FOR THE INTEGRATION OF RENEWABLES

Feasibility Study. Solar plant with district heating net (Austria)

Energiewende. Germany s energy system and the status of the energy transition. Sarina Keller. German Aerospace Center Sept 1st,

Transcription:

The multi-functional heat storage in Hamburg-Bramfeld innovative extension of the oldest German solar energy housing estate Thomas Schmidt * and Dirk Mangold Solites - Steinbeis Research Institute for Solar and Sustainable Thermal Energy Systems, Nobelstr. 15, 70569 Stuttgart, Germany, Phone: +49-711 6732000-0, E-Mail: info@solites.de Abstract In 1996 the first large-scale seasonal solar thermal energy storage in Germany was built in Hamburg-Bramfeld. It was operated until 2009 in a central solar heating plant with seasonal storage storing solar thermal energy from the summer period to the heating season. The owner of the storage, the E.ON Hanse Wärme GmbH, now decided to connect the storage to the district heating net of Hamburg-East and to convert it into an innovative multifunctional storage. This means that besides solar heat in future also surplus heat from a waste-fuelled cogeneration plant will be charged into the storage. With this connection a favourable combination of solar seasonal heat storage and waste heat from cogeneration will be demonstrated for the first time. The partners in this project are Hamburg Gas Consult GmbH for the design of the overall system, WTM Engineers GmbH for the design of the storage reconstruction, the Technical University of Brunswick (IGS) for monitoring and Solites for scientific accompaniment and advice. 1. Introduction The 1996 built seasonal thermal energy storage (STES) is a ground buried concrete tank with a water volume of 4 500 m³. For the last 13 years it was charged by 3 000 m² (2.1 MW) of solar collectors to deliver heat for space heating and domestic hot water preparation to residential buildings, see Fig. 1. Fig. 1: Solar housing area in Hamburg-Bramfeld Fig. 2 shows the service area of this central solar heating plant with seasonal storage (CSHPSS) in Hamburg-Bramfeld.

The main characteristics of the plant are: Fig. 2: Site plan of the CSHPSS in Hamburg-Bramfeld Start of operation: 1996 (the first pilot plant for large-scale seasonal thermal energy storage in Germany, built within Solarthermie-2000 ) Owner: E.ON Hanse Wärme GmbH Service area: 124 Row houses Heated area: 14 800 m² Total heat demand: Solar collectors: Storage volume: Solar fraction: 1 610 MWh/a 2 920 m² / 2 040 kw 4 500 m³ Concrete water tank 49% (design) 2. Reasons for the reconstruction of the storage The decision for the reconstruction of the STES was made mainly because of two reasons that are described more detailed in the following sections. The first one is the fact that the efficiency of the storage was much lower than originally expected during the last years of operation. The second is the

plans of the owner for a connection of the storage to the Hamburg-East district heating (DH) network, which is also operated by E.ON Hanse Wärme GmbH. 2.1. Operational results of the storage There are numerous publications available about operational results of this plant. At this point only a short summary can be given as a background for the following. For more detailed information see e.g. [1-3]. Overall it can be stated that the solar system in general was working well, but the efficiency of the storage and the whole solar system was much lower then expected at the time it was realised. Nevertheless, the plant was the first large-scale pilot installation of this kind in Germany and the experiences and results gave very valuable and important knowledge for the development of the technology and for the construction of following plants. The mean efficiency of the seasonal storage during the last years of operation was 46 % compared to 89 % design value. This fact is mainly induced by thermal losses that are up to four times higher than designed. As the storage is a central part of the CSHPSS also the system efficiency and the solar fraction was lower then designed. The latter was at average in the order of 25 % during the last years of operation compared to 49 % design value. The main reasons for the higher thermal losses of the storage are: A fluctuating and in the long run raised groundwater level in the wider area. By this the uninsulated bottom of the storage is temporarily exposed to moving groundwater. The return temperatures of the heat distribution network are higher than expected. By this the uninsulated bottom of the storage is also on higher temperatures than designed what results in higher thermal losses in the bottom region. At the design time no detailed information about the dependency of the thermal conductivity of insulation materials on temperature and humidity rate was available for high temperatures. A humidification of the insulation material. This was approved by taking samples at various places around the storage surface. The dismounting of the roof (see below) showed a damaged insulation in the roof caused by a leakage in the inner liner. 2.2. Connection to the Hamburg East district heating network With the connection of the STES to the district heating network the E.ON Hanse Wärme GmbH aims to extend the utilization of the storage, to increase the share of cogeneration heat in the DH and by this to reduce CO 2 emissions and to improve the economic efficiency of the overall system. In future the STES will be used to store besides solar heat also surplus heat from a waste-fuelled cogeneration plant. This will only take place in time periods with no or only limited usage of the storage for a solar application, e.g. after discharging of the STES in winter and before charging of solar heat into the STES in spring. The monitoring data shows that this time period was in average about four month in the previous years. In peak hours stored cogeneration waste heat can be delivered to the DH net and hence there is no need for the operation of inefficient peak load boilers. As a side effect the connection allows for a further solarisation of the DH area. This is described more in detail below.

3. Reconstruction concept for the storage The original construction of the storage is not able to withstand the thermal stress that is caused by the high capacity rates of 7 to 10 MW during charging of the storage by the cogeneration plant and discharging in peak hours to the DH net. A description of the original storage concept can be found in [4]. For the reconstruction two concepts were developed and tendered in parallel: 1. Insulation of the storage construction from inside To reduce the thermal stress to the existing concrete construction the structure has to be insulated from the inside. The insulation material on the other hand has to be protected from humidification by a suitable liner. Seven columns that carry the roof complicate the insulation and lining work. Due to a high groundwater level the tank can only be emptied during construction with a costly lowering of the groundwater table. Otherwise the whole structure would buoy up and be destroyed. 2. Installation of a second tank into the existing concrete casing In this concept the existing roof and the seven columns are removed and the storage is only partly emptied. Afterwards the bottom truncated cone is backfilled, see Fig. 3. By backfilling a buoying upwards of the structure can be avoided without a lowering of the groundwater table. Then a new steel tank is placed inside the existing concrete structure. Both concepts were tendered and after availability of the offers an economic and risk assessment was conducted by E.ON Hanse Wärme GmbH. Based on this assessment it was decided to realise the second concept. The construction work started in January 2010 and was finished in October 2010. Fig. 4 shows some pictures from the storage construction: on the upper left side the original construction from 1996 can be seen. The upper right side shows the beginning of the reconstruction work after removal of the roof. The picture on the lower left side gives a top view on the new roof construction of the inner stele tank and the on the lower right side the welding of the side walls can be seen. The roof was first prepared on top of the tank bottom. The side walls are realised in a winding method. That means a steel band is fed continuously into a welding machine. During welding the roof and the existing wall section is rotated and lifted to the top until the final size of the tank is reached.

Fig. 3: Reconstruction concept for the storage (source: HGC Hamburg Gas Consult GmbH) Fig. 4: STES during construction in 1996 (upper left) and reconstruction in 2010 (upper right and bottom)

4. Integration of large-scale solar thermal plants into the Hamburg-East district heating network In the course of the planning for the connection of the STES to the Hamburg-East district heating network the E.ON Hanse Wärme GmbH developed a feed-in model for the future integration of largescale solar thermal plants into the DH network. In a first phase the integration of up to 20 000 m² (14 MW) of solar collectors is foreseen, to be doubled later in a second phase. The solar plants can be realised everywhere within the service area of the whole Hamburg-East DH network. The main addressees for this feed-in model are big housing companies that own large housing areas in Hamburg. The main idea behind is to offer a service for storage and transportation of solar heat, allowing for the realisation of simple and cheap solar systems without storage facilities and complex hydraulics and controls. The solar heat can be fed into the DH network directly at any time and taken back at a later time (up to eight month later) or even at another place within the whole DH service area. Besides the reduced investment cost for the solar plants this gives the housing companies the possibility for allocating the renewable heat from the solar systems to the primary energy demand of other buildings in the area. In this way it is possible to benefit from favourable incentive programs. For the service the E.ON Hanse Wärme GmbH plans to charge a service fee of 2,1 2,5 Ct./kWh. For this fee the owner of the solar plant gets heat storage and transportation to any other location within the DH network without any thermal losses. References [1] M. Bodmann, M. Schlosser, (2005).10 Jahre solarunterstützte Nahwärmeversorgung Hamburg Bramfeld (in German), OTTI - 15. Symposium Thermische Solarenergie [2] M. Bodmann, D. Mangold, J. Nußbicker, S. Raab, A, Schenke, T. Schmidt, (2005). Solar unterstützte Nahwärme und Langzeit Wärmespeicher (Februar 2003 bis Mai 2005) (in German). Report to research project BMWA / BMU 0329607F, Solar und Wärmetechnik Stuttgart (SWT) [3] N. Fisch, M. Heuer, L. Kühl, M. Schlosser, (2010). Solar unterstützte Nahwärmeversorgung mit Langzeitwärmespeicher - Wissenschaftlich technische Begleitung der Pilotanlagen Hamburg Bramfeld, Hannover Kronsberg und Steinfurt Borghorst (in German). Report to research project BMU 0329607K and 0329607Q, IGS Technical University of Brunswick [4] M. Benner, B. Mahler, D. Mangold, T. Schmidt, M. Schulz, H. Sei-wald, E. Hahne, (1999). Solar unterstützte Nahwärmeversorgung mit und ohne Langzeitwärmespeicher, 1994 1998 (in German), Report to research project BMFT 0329606C, ISBN 3-9805274-0-9, ITW, Universität Stuttgart Acknowledgement The presented work is supported by the German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU, Contract No. 0329607N). The authors gratefully acknowledge this support. The sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect the opinion of the supporting authority. The supporting authorities not responsible for any use that may be made of the information contained therein.