CITY OF ANN ARBOR ENGINEERING RIVERVIEW DRIVE SANITARY SEWER AND WATER MAIN EXTENSION PROJECT WARREN STEIN BARTON NIXON EARHART DHUVARREN TRAIL GREEN

Similar documents
CITY OF ANN ARBOR PROJECT MANAGEMENT MAXWELL, WAKEFIELD, LUTZ WATER MAIN REPLACEMENT WARREN STEIN BARTO NIXON DHUVARREN TRAIL RIVER GREEN GOSS

CITY OF ANN ARBOR PROJECT MANAGEMENT PHASE 2 - HMA SHARED USE PATH W.R. WHEELER (SWIFT RUN) SERVICE CENTER PUD NON-MOTORIZED IMPROVEMENTS WARREN

CITY OF ANN ARBOR ENGINEERING 2019 MISC UTILITY PROJECTS WARREN STEIN MAPLE BARTON NIXON DHUVARREN HURON RIVER RIVER DRIVE HURON TRAIL GREEN PONTIAC

Date: 11/30/2018 RFB No: Commodity: Herring Avenue Street & Utility Improvements Purchasing Agent: Mr. Victor Venegas

SANITARY ENGINEERING ASSISTANT, 7866 SANITARY ENGINEERING ASSOCIATE, 7870 SANITARY ENGINEER, 7872

1200 UNDERGROUND GENERAL

SITE PLAN - TURNING MOVEMENTS CONVENIENCE STORE 187. Know what's

ADDENDUM 2. Harriman Back Tax Properties Demolition Harriman, Tennessee Bid Number: /101 S&ME PROJECT NO A

29.68' 20' TYPE 'G' BUFFER ' POCKET PARK STANDARD ASPHALT PAVEMENT FOR PARKING SPACES ONLY (TYP.) CONCRETE SIDEWALK (TYP.) VAN ACC ACC ACC ACC

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

ADDENDUM NO Q. Can you please tell me if there is any soil stabilization in this project? More specifically, soil nails or micropiles?

Conceptual Design. and Cost Estimate. for a Phased. Wastewater. Collection and. Treatment System. Clearwater River. Wenck. Watershed District

HAMPTON ROADS PROJECT

TO ALL WHO HAVE RECEIVED PLANS AND SPECIFICATIONS FOR THE REFERENCED PROJECT.

ADVERTISEMENT SET DECEMBER 2013

PRODUCT CONTROL SECTION

INDOOR FOOTBALL FIELD

INDOOR FOOTBALL FIELD

Stacking Spheres. The dimensions of a tetrahedron. The basic structure of a stack of spheres is a tetrahedron.

This addendum forms a part of the Contract Documents and modifies the original Bid Documents and Project Manual dated January 8, 2019.

ADDRESS: 3500 LOADSTONE DRIVE INTERIOR REMODEL / ADDITION SHERMAN OAKS, CA OWNER: JASON LUI. Sheet S0.0 CONNECTION NAILING.

GUIDE FOR THE DESIGN OF CRANE-SUPPORTING STEEL STRUCTURES

USC - AIKEN CONVOCATION CENTER ROOF REPLACEMENT PROJECT 2049 CHAMPION WAY, GRANITEVILLE, SC

OUTDOOR FOOTBALL FIELD

Whakatu Arterial Link Planning Assessment. June 2014

POSITIVE METALLURGICAL RESULTS FOR THE TAMPIA GOLD PROJECT

APPENDIX L COST ESTIMATE

*** NOTICE *** PUBLIC NOTICE UNIVERSITY OF ALASKA DEVELOPMENT AND DISPOSAL PLANS GAKONA, ALASKA

Multi-year Expert Meeting on Transport, Trade Logistics and Trade Facilitation:

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

CONRACT RDS OSBORNE STREET AND MAPLE STREET SOUTH SANITARY AND STORM SEWER, WATERMAIN, AND ROADWAY RECONSTRUCTION

SIERRA VISTA OPEN SPACE PRESERVE Santa Clara Open Space Authority Santa Clara, County, CA

on the eastbound side of Route 29). identified in the table.

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA

( τα ) = Product of transmittance and absorptance

Castor. subwatershed report card

10.2% 2.5% FY19 to FY21

CONSTRUCTION DRAWINGS FOR SPRING OF BLESSING ASSEMBLY OF GOD

WINSTON CHURCHILL HIGH SCHOOL BACKSTOP NETTING

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

Side Cutter with Low Cutting Resistance

GEO-SLOPE International Ltd, Calgary, Alberta, Canada Salt Flow Example

5.5 Alternative 3: Nonstructural Flood Protection

4 STRUCTURAL MODELLING

ADSSC. Commercial Supply Registration Supply Department

CITY OF FORKS CLALLAM COUNTY, WASHINGTON TIB PROJECT NO. 6-W-825(008)-1 SOUTH ELDERBERRY AVENUE RECONSTRUCTION SITE MAP

SECTION ADDENDUM. Village of Mesick USDA Sanitary Sewer System Improvements Project Date: Engineer s Project No.: Fleis and VandenBrink

Payer Specification Sheet For Prime Therapeutics BCBS of Illinois Blue Cross Community ICP and FHP (Medicaid)

Agricultural Trade Developments and Future Prospective in China

UTILITY NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: TREE PROTECTION NOTES

Integrating conflict analysis in drought risk management: Some hints from the Mediterranean area

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

DRAFT Traffic Operations & Safety Evaluation Technical Memorandum

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

DESIGN AND STRESS ANALYSIS OF HIGH PRESSURE ACCUMULATOR

CITY OF RICHMOND, VIRGINIA

TENTATIVE SUBDIVISION MAP FOR THE LOT MERGER & RE-SUBDIVISION OF A VERTICAL SUBDIVISION & CONDOMINIUM MAP

NCPDP VERSION D.0 CLAIM BILLING MEDICAID/COMMERCIAL REQUEST CLAIM BILLING PRIMARY PAYER SHEET

A Shaking Table Test Design on Seismic Strengthened Brick Masonry Structures

NCPDP VERSION D.0 CLAIM BILLING MEDICAID/COMMERCIAL REQUEST CLAIM BILLING PRIMARY PAYER SHEET

SURVEY OF MOVING CAR OBSERVER AND MKJI 1997 APPLICATIONS AGAINST THE TRAFFIC FLOW SECTION IN MERAUKE REGENCY

Item No.: 7 Date: July 23, 2018 Item Description: 2018 Road Maintenance Project- Change Order

SUBJECT: ADDENDUM #1 IFB # RE-BID Taxiway A Rehabilitation - Bid Package 1 at Myrtle Beach International Airport (MYR)

DEPENDENCE OF FUEL CONSUMPTION OF MEDIUM POWER TRACTOR ON DIFFERENT SOIL AND TIRE DEFORMATIONS

November 29, CITY OF PLANT CITY Purchasing Division (813)

4' - 8" EXISTING FLOOR DRAIN 8' - 0" 2' - 8" 8' - 0" EXISTING WALL LINTEL 2' - 8" PHOTO 2 8' - 0" 1' - 4" 72' - 0" 3' - 4" A302 33' - 4"

APPENDIX K. No Effect Memorandum

SECTION 3 SERVICE ENTRANCE SECTION UNDERGROUND

FOUNDRY DIVISION. Ferrous & Non-ferrous castings

HOUSTON PUBLIC WORKS STORM WATER MAINTENANCE BRANCH

Automated Machine Guidance

NCPDP VERSION D.0 CLAIM BILLING MEDICAID/COMMERCIAL REQUEST CLAIM BILLING PRIMARY PAYER SHEET

The 23 rd. Corresponding author: Tel ,

NCPDP VERSION D.0 CLAIM BILLING MEDICAID/COMMERCIAL REQUEST CLAIM BILLING PRIMARY PAYER SHEET

machine design, Vol.6(2014) No.3, ISSN pp

SHORT SEA PORTS WITH PORT OPERATIONS ON THE RIVERS OUSE AND TRENT, PD PORTS CAN PROVIDE SUPPLY CHAIN SOLUTIONS ON THE HUMBER AND ACROSS THE UK.

A1.00 Title Sheet A2.00 Exterior Elevations A3.00 Floor Plan A4.00 Section Views A5.00 Furniture Plan. E1.00 Electrical Layout

HOBAS NC Line. Make things happen.

Sea-Level Rise and Coastal Wetlands Impacts

RAINBOW POND AND DOWNSTREAM GENERAL NOTES & ABBREVIATIONS CHANNEL SHEET 2 OF 28

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:

Power Module Installation Notes for TELP Series

Herrington Architects PC 101 Richard Arrington Jr. Blvd. S. Birmingham, AL phone fax

TOWN OF GREENWICH, CONNECTICUT WILLIAM STREET BALL FIELD REMEDIATION WILLIAM STREET WEST, GREENWICH, CONNECTICUT

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

Compartments 601, 602, 603, 604 &606 J:.:. Corporation. Nymboida State Forest. ProjecUon: GDA_1994_MGA_Zone_ _

Municipality of Anchorage, Alaska Parks & Recreation Department

NEW RESIDENCE FOR: Designer: Project: DESIGNS INC. BUILDING A

HyperCoat CTPM125 EN

Eastern Sewershed Package IV Project Solicitation Number: CO Job No.: ADDENDUM 1 April 20, 2018

City of Northport Stormwater Management Program. PHASE II ANNUAL REPORT April 1, 2016 to March 31, 2017

Super Precision Bearings for Machine Tools

ASSESSMENT OF MATERIAL BEHAVIOUR AND STRUCTURAL INTEGRITY OF ENGINEERING STRUCTURES BASED ON R6 PROCEDURE

Re-Designing a Customer Satisfaction and Loyalty Program via Linkage

Change Order. No. 02. Date of Issuance: 8/4/15 Effective Date: 8/4/15

Cow Catcher Timber Sale Environmental Assessment (EA # OR ) South River Field Office, Roseburg District Prepared: August 25, 2003

Fig. 1; Study Area, Source (PPC), Meteorological Stations (Souda and Airport) and Modeling Domain.

PRODUCT APPROVAL INFORMATION PRODUCT MANUFACTURE TYPE NOA

Transcription:

APLE - - CAPENTE DWS NOTES Know what's below. ABO ENGINEEING I CH INCOPOATED 1851 I GAN Sheet List Table Sheet Number 1 COVE STANDAD DETAILS EQUIED ON THIS POJECT ITE WOK DETAIL X STANDAD ANHOLE (TYPE I) SD-S-1 X DOP ANHOLE CONNECTION SD-S-5 X SEWE CONNECTION SD-S-6 X SANITAY SEWE CONNECTION WITH ISE SD-S-7 X THUST BLOCK SD-W-2 X FIE HYDANT ASSEBLY SD-W-1 X GATE WELL FO AIN 12" AND SALLE SD-W-3 X TEPOAY TESTING BLOW-F SD-W-7 X ANHOLE CASTING ADJUSTENT SD-GU-6 X VALVE/ONUENT BOX ADJUSTENT SD-GU-7 X STUCTUE PLATE SD-GU-8 X Sheet Title 2 LEGEND, WITNESSES AND BENCHAKS 3 NOTES 4 OVEALL SITE UTILITY PLAN 5 SOIL EOSION AND SEDIENTATION CONTOL PLAN 6 SOIL EOSION DETAILS 7 POPOSED SANITAY PLAN & PILE STA 6+00 TO STA 8+00 8 POPOSED SANITAY PLAN & PILE STA 3+00 TO STA 6+00 9 POPOSED SANITAY PLAN & PILE STA 0+00 TO STA 3+00 10 POPOSED WATE AIN PLAN & PILE STA 0+00 TO STA 3+00 11 POPOSED WATE AIN PLAN & PILE STA 3+00 TO STA 6+00 12 POPOSED WATE AIN PLAN & PILE STA 6+00 TO STA 9+00 13 POPOSED WATE AIN PLAN & PILE W EXTENSION 505 14 POPOSED WATE AIN PLAN & PILE DOVE PL 15 DETAILS 16 EXISTING TYPICAL COSS SECTION 17 POPOSED TYPICAL COSS SECTION 18 ALIGNENT PLAN STA 0+00 to STA 5+00 19 ALIGNENT PLAN STA 5+00 TO STA 10+00 20 POPOSED PAVING STA 0+00 TO STA 3+00 21 POPOSED PAVING STA 3+00 TO STA 6+00 22 POPOSED PAVING STA 6+00 TO STA 10+00 23 AINTENANCE TAFFIC PLAN 24 SUAY QUANTITIES 25 SOIL BOING LOG INFOATION H; VALVE/ONUENT BOX LOWEING SD-GU-9 NOTH WAGNE WAGNE JACKSON SCIOCHUCH WATES APLE HUON IVE ILLE DEXTE ABOSALINE APLE 94 14 STADIU NEWPOT DIVE LIBETY LOH STEIN HUON IVE SEVENTH SUNSET HUON AIN BATON STATE ELLSWOTH D TAIL PONTIAC PACKAD STADIU STATE EISENHOWE VICINITY AP DHUVAEN GEDDES WASHTENAW STONE SCHOOL NIXON FULLE WAEN 23 14 94 EAHAT PLYOUTH ABO PLATT HUON GEEN PKWY GLAZIE GEDDES HUON HOGBACK GOSS 23 DIXBOO WASHTENAW PACKAD ELLSWOTH P.O.E P.O.B PEPAED UNDE THE SUPEVISION VAUGHN C. ATIN, P.E. - I LICENSE No. 52002 POJECT ANAGE DATE L STAT E I CENSED P ESS I CHI GAN VAUGHN C. ATIN ENGINEE No. 52002 ENG I NEE I ONA L - - ENGINEEING ABO, I 47-8647 ABO INCO POA T ED 18 5 1 1 25 2017-031-1 ; BID No. 4527; 2017-031

B # ELEV DESCIPTION POJECT NAE BENCHAKS EXISTING LEGEND POPOSED LEGEND 24 847.027 SPIKE IN EAST SIDE POWE POLE ACOSS FO HOUSE #645. W 25 843.990 26 809.801 27 827.613 28 817.365 SPIKE IN EAST SIDE UTILITY POLE ON WEST SIDE IVEVIEW, ACOSS FO HOUSE #615. SPIKE IN WEST SIDE 24" TEE BETWEEN HOUSE #519 AND #508 ON EAST SIDE IVEVIEW. NOTHELY I STO ANHOLE AT CENTELINE IVEVIEW OPPOSITE HOUSE NOTH #580. NOTHELY I STO ANHOLE AT CENTELINE IVEVIEW OPPOSITE HOUSE #559. W 29 801.362 NOTHELY I SANITAY ANHOLE. 30 802.978 31 806.437 50 837.735 51 837.621 52.010 53 847.262 SET AILOAD SPIKE IN NOTHEAST SIDE UTILITY POLE ON SOUTHELY SIDE IVEVIEW AT 90 BEND IN OAD. NOTHELY I ANHOLE AT CENTELINE INTESECTION IVEVIEW AND HUNTINGTON. SET AILOAD SPIKE IN NOTH SIDE UTILITY POLE ON SOUTH SIDE GEDDES AT CENTELINE IVEVIEW EXTENDED. NOTHELY I ON STO ANHOLE CENTELINE IVEVIEW, 25'± SOUTH CENTELINE DOVE. NOTHELY I STO ANHOLE ON CENTELINE IVEVIEW, 20'± NOTH CENTELINE DIVE FO HOUSE #480. CENTELINE TOP STEP FO STEPS AT WEST END DOVE LEADING TO HOUSE #3055 co AND WATE AIN POJECT HOIZONTAL DATU: NAD 83 STATE PLANE COODINATES VETICAL DATU: NAVD 88 UNITS: INTENATIONAL FEET SUVEYED BY: ABO, I 47-8647 HOIZONTAL CONTOL POINTS CONTOL POINT: CP50 DESCIPTION: SET PIPE WITH TAVESE CAP ON SOUTH SIDE GEDDES. PIPE IS 30'± EAST CENTELINE DIVE FO HOUSE NUBES 3090/3100, AND 3.6'± SOUTH SOUTH BACK CUB. COODINATES: N=282398.850, E=13302337.400, ELEV=837.26' ABO INCO POA T ED 18 5 1 CONTOL POINT: DESCIPTION: COODINATES: CP25 FOUND AGNAIL IN ASPHALT ON NOTH SIDE IVEVIEW OPPOSITE HOUSE #645. N=258., E=13302272.970, ELEV=844.08' CONTOL POINT: DESCIPTION: COODINATES: CONTOL POINT: DESCIPTION: COODINATES: CONTOL POINT DESCIPTION: COODINATES: CONTOL POINT: DESCIPTION: COODINATES: CONTOL POINT: DESCIPTION: COODINATES: CONTOL POINT: DESCIPTION: COODINATES: CONTOL POINT: DESCIPTION: COODINATES: CP26 FOUND PIPE WITH TAVESE CAP ON EAST SIDE IVEVIEW IN FONT HOUSE #615. 2.5' F BACK CUB. N=282719.540, E=13302280.780, ELEV=838.64' CP51 SET PIPE WITH TAVESE CAP ON NOTH SIDE DOVE. PIPE IS 50'± WEST CENTELINE IVEVIEW AND 9.0'± NOTH CENTELINE DOVE. N=282802.220, E=13302250.120, ELEV=838.97' CP52 SET PIPE WITH TAVESE CAP AT NOTH EDGE GAVEL ON DOVE. PIPE IS 26'± WEST WEST EDGE BLOCK WALL ON WEST EDGE DIVE FO HOUSE #3081. N=282827.150, E=13302147.460, ELEV=843.59' CP27 FOUND PIPE WITH TAVESE CAP ON WEST SIDE IVEVIEW. 3' F BACK CUB AND 28' NOTH CENTELINE DIVE FO HOUSE #580. N=282893.590, E=13302350.600, ELEV=823.70' CP28 FOUND PIPE WITH TAVESE CAP ON EASTELY SIDE IVEVIEW. 2.2' F BACK CUB AND OPPOSITE CENTELINE DIVE FO HOUSE #480. N=283124.480, E=13302365.980, ELEV=811.92' CP29 FOUND PIPE WITH TAVESE CAP ON NOTH SIDE (AFTE CUB) IVEVIEW. 3.0' F BACK CUB AND 50'± WEST AILBOX FO HOUSE #485. N=283231.200, E=13302225.190, ELEV=804.58' CP53 SET AGNAIL IN ASPHALT AT BEND IN OAD. NAIL IS NEA B30. N=283125.190, E=13302083.540, ELEV=803.38' - - ENGINEEING : NTS LEGEND, WITNESSES AND BENCHAKS 2017-031-2 2 25

WATE AIN AND SANITAY SEWE QUANTITIES PEITS EQUIED TO BE OBTAINED BY THE CONTACTO PIO TO THE BEGINNING CONSTUCTION. PEIT LANE CLOSUE PEIT* ENGINEEING ISSUING AUTHOITY GADING/SOIL EOSION & SEDIENTATION CONTOL PEIT* CUSTOE SEVICE IGHT--WAY PEIT* CUSTOE SEVICE * NO COST TO CONTACTO PEITS EQUIED TO BE OBTAINED BY THE ABO PIO TO THE BEGINNING CONSTUCTION. PEIT ISSUING AUTHOITY CONTACT INFOATION PUBLIC UTILITIES OWNE CONTACT ABO INCO POA T ED 18 5 1 : NTS - - ENGINEEING 2017-031-3 NOTES ABO, I 47-8647 PIVATE UTILITIES OWNE CONTACT 3 25

11 615 60 485 VIEW D E V I. 10 4 3122 645 595 34 519 5 9 537 559 6 8 CO P O A T E D 18 5 1 IN A NN A 3123 4 25 OVEALL SITE UTILITY PLAN F 614 2017-031-4 580 480 : 1" = 80' 640 O ABO, I 47-8647 61 - - ENGINEEING 10 5 50 L. 439 3081 P 3060 C IT Y GEDDES AVE. DO VE 448 3055 63 62 BO 540 Know what'sbelow.

519 537 559 IN CO P O A T E D 18 5 1 A 3123 5 25 SOIL EOSION AND SEDIENTATION CONTOL PLAN ABO, I 47-8647 615 2017-031-5 10 4 A NN 580 F 480 : 1"=80' 645 D. W E I V IVE O VE P L. 640 - - ENGINEEING DO 439 3081 C IT Y GEDDES AVE. 614 540 BO 595 9 5 Know what'sbelow.

ABO, I 47-8647 ABO INCO POA T ED 18 5 1 SILTSACK DETAIL SIDE VIEW INSTALLED INSTALLATION DETAIL EGULA FLOW SILTSACK HI-FLOW SILTSACK OIL-ABSOBANT SILTSACK ULCH BLANKET DETAIL PLAN VIEW FONT VIEW SECTION A-A SECTION B-B SILT FENCE SD-EC-3 - - ENGINEEING : NTS SOIL EOSION DETAILS 2017-031-6 6 25

10 614 GEDDES AVE. 640 11.425 IVEVIEW D. DOVE PL. 11 ABO, I 47-8647 615 ABO INCO POA T ED 18 5 1 8+50 8+00 7+00 850 845 840 6+00 SANITAY SEWE STUCTUE TABLE INV ELEV EASUED IN FIELD INV ELEV POVIDED ON PILE INV ELEV PUBLIC SEWE - - ENGINEEING PILE: 1" = 4' PLAN: 1"=20' POPOSED SANITAY PLAN & PILE STA 6+00 TO STA 8+00 2017-031-7 7 25

580 IVEVIEW D. 595 537 559 ABO, I 47-8647 ABO INCO POA T ED 18 5 1 795 790 6+00 5+00 4+00 795 790 3+00 SANITAY SEWE STUCTUE TABLE - - ENGINEEING PILE: 1" = 4' PLAN: 1" = 20' POPOSED SANITAY PLAN & PILE STA 3+00 TO STA 6+00 2017-031-8 8 25

480 60 IVEVIEW D. 10 4 485 ABO, I 47-8647 ABO 537 519 INCO POA T ED 18 5 1 795 790 3+00 2+00 1+00 0+00 795 790-0+25 SANITAY SEWE STUCTUE TABLE - - ENGINEEING PILE: 1" = 4' PLAN: 1"=20' POPOSED SANITAY PLAN & PILE STA 0+00 TO STA 3+00 2017-031-9 9 25

640 GEDDES AVE. IVEVIEW D. 11 615 34 645 ABO, I 47-8647 ABO INCO POA T ED 18 5 1 850 850 845 840 785 845 840 - - ENGINEEING PILE: 1" = 4' PLAN: 1" = 20' POPOSED WATE AIN PLAN & PILE STA 0+00 TO STA 3+00 2017-031-10-0+05 0+00 1+00 2+00 3+00 10 25

DOVE PL. 580 IVEVIEW D. 615 559 595 ABO, I 47-8647 ABO INCO POA T ED 18 5 1 845 840 845 840 - - ENGINEEING PILE: 1" = 4' PLAN: 1" = 20' POPOSED WATE AIN PLAN & PILE STA 3+00 TO STA 6+00 2017-031-11 3+00 4+00 5+00 6+00-0+25 0+00 0+60 11 25

480 60 IVEVIEW D. B-26 809.801000 485 795 795 537 519 10 4 790 785 790 785 ABO, I 47-8647 ABO INCO POA T ED 18 5 1-0+25 0+00 0+70 795 790 785 795 790 785 795 790 795 790 - - ENGINEEING PILE: 1" = 4' PLAN: 1" = 20' POPOSED WATE AIN PLAN & PILE STA 6+00 TO STA 9+00 2017-031-12 +00 7+00 8+00 9+00-0+25 0+00 0+60 12 25

505 485 10 4 95 6 60 B-26 809.801000 ABO, I 47-8647 ABO INCO POA T ED 18 5 1 795 795 790 790 785 785-0+10 0+00 1+00 2+00 2+15 - - ENGINEEING PLAN: 1"=20' PILE: 1" = 4' POPOSED WATE AIN PLAN & PILE W EXTENSION 505 2017-031-13 13 25

580 3055 ABO, I 47-8647 ABO INCO POA T ED 18 5 1 850 845 840 2+80 2+00 DOVE W 1+00 0+00 850 845 840-0+05 - - ENGINEEING PLAN: 1"=20' PILE: 1" = 4' POPOSED WATE AIN PLAN & PILE DOVE PL 2017-031-14 14 25

WATE AIN W/ POLYWAP DETAIL ABO, I 47-8647 ABO INCO POA T ED 18 5 1 TENCH DETAIL I HDPE/DI WATE AIN CONNECTION WITH THUST ING AND ESTAINT TEPOAY TENCH ESTOATION DETAIL - - ENGINEEING :NTS 15 25 DETAILS 2017-031-15

: NTS ABO INCO POA T ED 18 5 1 - - ENGINEEING 2017-031-16 EXISTING TYPICAL COSS SECTION ABO, I 47-8647 16 25

: NTS ABO INCO POA T ED 18 5 1 - - ENGINEEING 2017-031-17 POPOSED TYPICAL COSS SECTION ABO, I 47-8647 17 25

11 580 615 34 645 595 PLAN: 1" = 20' ABO, I 47-8647 ABO INCO POA T ED 18 5 1 - - ENGINEEING 2017-031-18 ALIGNENT PLAN STA 0+00 TO STA 5+00 18 25

61 480 ABO, I 47-8647 ABO INCO POA T ED 18 5 1 60 10 4 485 - - ENGINEEING PLAN: 1"=20' ALIGNENT PLAN STA 5+00 TO STA 10+00 2017-031-19 19 25

GEDDES AVE. 10 640 11 IVEVIEW D. 615 ABO, I 47-8647 ABO INCO POA T ED 18 5 1 34 645 850 850 845 840 845 840 - - ENGINEEING PLAN: 1" = 20' PILE: 1" = 4' POPOSED PAVING STA 0+00 TO STA 3+00 2017-031-20 0+00 1+00 2+00 3+00 20 25

Know what'sbelow. 0 58 4 DOVE PL. 61 9 55 5 61 BO O F IN CO P O A T E D 18 5 1 A NN A 5 59 ABO, I 47-8647 IVEVIEW D. STO SEWE STUCTUE TABLE 3+00 4+00 5+00 6+00 STUCTUE OAD STATION 88-603541 3+63-16.87' LT 92-58700 3+64-1.68' LT INVET ELEVATION, SIZE & DIECTION 12" NW 833.34 12" SE 832.24 (P) 12" NE 831.84 TOP CASTING ELEVATION DEPTH (Feet) SIZE 837.57 5.19 837.63 (e) 7.79 837.63 (P) 88-60353 3+65 13.93' T 12" NW 832.65 (P) 837.21 6.56 88-60263 4+84 14.38' T 12" NW.05 (P) 828.01 4.96 827.75 (e) 827.75 (P) 6.64 827.73 5.80 12" SW 823.21 12" NW 823.31 12" SE 823.91 (P) 12" NE 823.11 92-59016 4+84-0.39' LT 88-60264 4+80-16.61' LT 12" SE 823.93 APPLICATION/ CONSTUCTION/ DETAIL STO ANHOLE/ ADJUST COVE STO ANHOLE/ ADJUST COVE POPOSED PAVING STA 3+00 TO STA 6+00 21 25 2017-031-21 840 PILE: 1" = 4' 840 PLAN: 1" = 20' 845 - - ENGINEEING C IT Y 845

Know what'sbelow. 540 STO SEWE STUCTUE TABLE 480 INVET ELEVATION, SIZE & DIECTION TOP CASTING ELEVATION DEPTH (Feet) STUCTUE OAD STATION r-88-60266 6+33-15.01' LT 12" E 814.13 817.12 4.99 r-92-59015 6+33-0.57' LT 12" S 812.11 12" W 813.51 12" E 813.01 (P) 12" N 812.11 817.44 (e) 817.44 (P) 7.33 r-88-60265 6+33 13.90' T 12" W 813.22 (P) 816.79 5.57 r-88-60267 8+01 14.09' T 12" W 806.06 (P).01 5.95.03 (e).03 (P) 10.80 SIZE APPLICATION/ CONSTUCTION/ DETAIL STO ANHOLE/ ADJUST COVE 802.79 6.27 r-92-59085 10+47 1.41' T 12" NE 797.47 12" NW 798.07 12" SE 798.07 12" SW 796.97 803.10 8.13 r-88-60269 10+48 14.70' T 12" SE 798.71 802.78 6.07 A 1 P O A T E D 18 5 CO 22 25 6+00 7+00 8+00 9+00 10+00 POPOSED PAVING STA 6+00 TO STA 10+00 IN F BO 10+46-14.61' LT 12" NW 798.52 r-88-60270 A NN 2017-031-22 5.93 5 9 809.84 PILE: 1" = 4' 537 519 8+01-15.04' LT 12" E.91 PLAN: 1"=20' 559 r-88-60268 STO ANHOLE/ ADJUST COVE O 485 10 4 8+02-0.82' LT - - ENGINEEING B-26 809.801000 r-92-59026 C IT Y IVEVIEW D. 12" S 803.73 12" W.43 12" E.43 (P) 12" N 801.23 ABO, I 47-8647 60

OAD WOK AHEAD IVEVIEW D ONE LANE OAD AHEAD END OAD WOK ABO, I 47-8647 ABO INCO POA T ED 18 5 1 IVEVIEW DIVE OLLING CLOSUE STAGE 1 STAGE 2 - - ENGINEEING PLAN: 1"=200' AINTENANCE TAFFIC PLAN 2017-031-23 23 25

:NONE ABO INCO POA T ED 18 5 1 - - ENGINEEING 2017-031-24 SUAY QUANTITIES ABO, I 47-8647 24 25

25 25 2017-031-25 PLAN: NONE SOIL BOING LOG INFOATION - - ENGINEEING O CO P O A T E D 18 5 1 A NN IN F A BO C IT Y ABO, I 47-8647 Know what'sbelow.