WAIKOLOA RESERVOIR NO. 1 EARTHQUAKE REPAIR PROJECT Information Sheet

Similar documents
DATE: October 31, 2016 FILE: /CV TO: Chair and directors Comox Valley Regional District (Comox Strathcona waste management) board

DATE: October 31, 2016 FILE: /CV TO: Chair and directors Comox Valley Regional District (Comox Strathcona waste management) board

DATE: October 6, 2016 FILE: /CV TO: Chair and directors Comox Valley Regional District (Comox Strathcona waste management) board

Initial Closure Plan Phase 1 Module 1 Phase 1 Module 2 Phase 1 Module 3. Columbia Dry Ash Disposal Facility. Wisconsin Power and Light Company

Massachusetts Water Resources Authority Alewife Brook Pump Station Rehabilitation Design/CA/RE Services Contract 7034 Amendment No.

SECTION ADDENDA

UPPER MISSISSIPPI RIVER RESTORATION FEASIBILITY REPORT WITH INTEGRATED ENVIRONMENTAL ASSESSMENT

Facility Emergency Power Plan

Appendix 3-G SWM AND BMP CONSTRUCTION INSPECTIONS

Construction Project Management

Christopher Glinski Construction Management. AE Senior Thesis Columbia Heights Community Center. Appendix B. Project Summary /Detailed Schedule

PURPOSE: The purpose of this meeting was to review the scope and schedule with the Vocational Technology staff.

PROJECT STATUS TOTAL MAN HOURS FROM 11/20 THRU 12/14 PERCENT COMPLETE 18% OVERALL PROJECT 24% LOWER SCHOOL 31% PLAYGROUND 17% PARKING LOT

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL

TSAILE DAM MODIFICATION PROJECT Unearthing a Safer Dam

Traffic Department Anchorage: Performance. Value. Results.

PROPOSAL FOR CINDER LAKE LANDFILL RESIDENTIAL DROP OFF CENTER

Arlington East WRF Influent Channel Rehabilitation - Final

PROJECT INFORMATION REPORT INFORMATION. Date: February 25, Owner s Rep: Alrich Lynch. 123 Project Address Drive, Savannah GA 31404

Schedule Guidance Document

Operational and SO Cost Update

DIVISION of WATER QUALITY NDPDES PROGRAM

Wisconsin Place Residential Chevy Chase, MD. Jenna Marcolina Construction Management

CLOSURE PLAN W.H. Sammis Coal Plant North and South Ponds Stratton, Ohio

5/1/2013. Puget Sound Conditions. LID research, data, guidelines, specifications, and regulations are evolving rapidly.

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

Pace University Request for Proposal Contracting Services

CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER

Table of Contents for Guide Specifications

Ironton Russell Bridge Project

Transmitted via . Mr. Nate Nemani U.S. Environmental Protection Agency Region 5 77 West Jackson Boulevard LU-9J Chicago, IL

Wilmette - Background

Ironton Russell Bridge Project

BAY STREET RESERVOIR REPLACEMENT PROJECT

a. Unless otherwise specified, all lengths shall be horizontal distances.

DRAFT MASTER PLAN RICHFIELD HERITAGE PRESERVE. Environmental OCTOBER 2016

Residential Street Rebuild Program (RSRP) Test Project Updates Rogerson Drive & Ralston Avenue. Council Presentation January 23, 2018

I-64 Pavement Rehabilitation

East Branch Dam Safety Modification Project

Appendix C. Construction Programme

SECTION WATERTIGHTNESS TEST FOR PLANT TANKAGE STRUCTURES

Initial Closure Plan Slag Pond. Nelson Dewey Generating Station. Wisconsin Power and Light Company. Prepared for:

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

Table of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9

NAUGHTON POWER PLANT NORTH ASH POND INITIAL CLOSURE PLAN

G2-0 LIST OF ACTIVE MTODs

Stevens & Associates, Inc. Tunnel Construction Projects. Fact Sheets

Norwood High Service Pump Replacement

Installation and Maintenance of Erosion Control BMPs

SWPPP Inspection Procedures and Form 247 Instructions

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

CBC Aids WVDEP with Fresh Water Reservoir - Chief Logan State Park

SECTION PAYMENT PROCEDURES

Hydraulic Updates. History of 603/604

Scott Hockly. Environmental Management of an Inner City Roading Project

G2-0 LIST OF ACTIVE MTODs

Industrial Estate Authority of Thailand (IEAT) Saharatananakorn IE., Ayutthaya. Rojana IZ., Ayutthaya. Hi-Tech IE., Ayutthaya

9. Attachments MII Cost Report Abbreviated Risk Analysis (ARA) 9.3. Total Project Cost Summary (TPCS) 9.4.

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

CONSTRUCTION PLAN CHECKLIST

Monthly Progress Report. January 2018

Woking. q business confidence report

Taxiways P and P7 Drainage Improvements Re-bid CONTRACT NO ADDENDUM NUMBER ONE

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Electric Forward Market Report

Dr. David R. Riley October 30, 2006 TABLE OF CONTENTS. Executive Summary.1. Detailed Project Schedule Site Layout Planning 4

State Project No.: , N501 Contract ID Number: C DB66

Traffic Division Public Works Department Anchorage: Performance. Value. Results.

Delaware River Basin Commission

TECHNICAL ASSIGNMENT 2

ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018

207 TEMPORARY SEDIMENT AND EROSION CONTROLS

NANISIVIK MINE Closure Design and Performance Monitoring

Ironton Russell Bridge Project

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

SC-01 Surface Outlet and Baffle Sediment Basin

SAND POINT CITY DOCK REPLACEMENT ALTERNATIVES ANALYSIS REPORT

Planned Procurement Opportunities Report. May 2017

SECTION UNCLASSIFIED EXCAVATION AND GRADING

! "#$$%& MY BLOG 2014

LONG LAKE LEVEL CONTROL STRUCTURE PART 307 INSPECTION

6 Preliminary Assessment of Construction Method and Constructability Issues

Demand Estimation Sub Committee. Seasonal Normal Review 2020: Review of CWV Formula

Index Number District II Primary Clarifier #2 and #3 Rehabilitation Project Definition FINAL

PROJECT: BIRMINGHAM INTERMODAL FACILITY PHASE 2 BID PACKAGE 1

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

2018 Annual Dam and Dike Inspection Report

Renovation of an Office Building in Washington D.C.

Construction Inspection Checklists

Permit applications and agency approvals

Description. Installation and Implementation Requirements

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis

Design Division Project Management & Engineering Department Anchorage: Performance. Value. Results.

SITE FIGURE 1 SITE LOCATION MAP SLRIDT SITE DULUTH, MINNESOTA SERVICE. PHASEIIIB.ppt 01/26/01 L.SIMMONS MC

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

SECTION TRENCHING

Pond Closure - Case Study[TP1]

TECHNICAL REPORT 2. C-5 Fuel Cell Facility. 167 th Airlift Wing. Martinsburg, WV. Kyle Goodyear. Construction Management. October 28, Dr.

Making a Dramatic Impact on Water Loss. Robert Horvat, PE cell:

York County STORMWATER LUNCH & LEARN

Transcription:

March 5, 2015 WAIKOLOA RESERVOIR NO. 1 EARTHQUAKE REPAIR PROJECT Information Sheet Overview The purpose of this Project is to repair damages to the Waikoloa Reservoir No. 1 which were sustained during the October 2006 Kīholo Bay Earthquake. After the Earthquake, an inspection of the Reservoir and its neighboring Reservoir Waikoloa Reservoir No. 2 - found cracks in the internal slope, as well as seepage along the external embankment slope of both Reservoirs, requiring complete drainage of Reservoir No. 2 until the repairs were completed in 2011. While the repairs were being done, Waikoloa Reservoir No. 1 remained in service to maximize water storage for area residents. The Waikoloa Reservoir No. 1 Repair Project will involve installing a new liner on the floor and internal slope as well as stabilizing the external slope of the reservoir. Monetary funds for the Repair Project will be provided by the DWS. The DWS is presently seeking Federal Emergency Management Agency (FEMA) financial assistance for the Project construction. Facility Information Constructed in 1970, the Waikoloa Reservoir No. 1 is one of 3 large open reservoirs. The storage capacity of this Reservoir is 50 million gallons. Water from the Waikoloa and Kohākōhau Streams is diverted into this Reservoir for storage, and then conveyed to the Waimea Treatment Plant facility for treatment. The treated water is stored in the Waimea Clearwater Reservoir for distribution to area customers. Figure 1: Waikoloa Reservoir No. 1 is the kidney shaped reservoir in the middle of the picture. Reservoir No. 2 is at the bottom and No. 3 is at the top. At the very top is the much smaller pentagonshape 8.5-MG reservoir.

Figure 2: Waikoloa Reservoir No. 1 was partially drained after the 2006 Kīholo Bay Earthquake. It is presently empty and will remain empty until repairs are completed. Summary of Repairs The cracks and joints in the concrete panels lining the internal slope, the floor and side slopes will be repaired. A lining material will then be placed over the panels. The sample drawing on the next page (Figure 4) details how the reservoir will be lined. Using sophisticated seismic modeling computer software, the exterior slope improvements include a subdrainage system and a stability berm at the bottom of the slope. A sample drawing for this work is also shown on the next page (Figure 5). Project Status The Project is currently in its Design Phase. Design documents (construction plan drawings and specifications), an environmental assessment and a biological assessment have been prepared and are being reviewed by affected government organizations for final approval before the Bidding and Construction Phases are allowed to begin. The respective Design and Construction Schedules are shown in Figures 6 and 7. Contact: Owen Nishioka, P.E., Engineering Branch Department of Water Supply Engineering Division onishioka@hawaiidws.org 961-8070 ext. 259

Figure 3: Due to an accumulation of sediment, the reservoir had to be scraped and washed. Figure 4: The Reservoir Liner

Figure 5: Exterior Slope Improvements

Figure 6 ID Task Name Duration Start Finish 4 December 2014 January 2015 February 2015 March 2015 April 2015 May 2015 19222528 1 4 7 1013161922252831 3 6 9 12151821242730 2 5 8 111417202326 1 4 7 1013161922252831 3 6 9 12151821242730 3 6 9 1 1 Waikoloa Reservoir #1 Repairs 111 days Tue 11/25/14 Wed 5/6/15 2 Finalize Archeological Report 1 day Wed 12/3/14 Wed 12/3/14 3 Edits to Specifications Package 7 days Tue 11/25/14 Fri 12/5/14 4 Edits to Drawing Package 7 days Tue 11/25/14 Fri 12/5/14 5 Edits to Spillway Report 3 days Tue 11/25/14 Mon 12/1/14 6 Update Engineer's Opinion of Probable Cost (EOPC) 2 days Mon 12/8/14 Tue 12/9/14 7 Design Report Edits 5 days Mon 12/8/14 Fri 12/12/14 8 Complete Response to Comment Form 3 days Fri 12/12/14 Tue 12/16/14 9 Document Reproduction 3 days Wed 12/17/14 Fri 12/19/14 10 Submittal of 100% Documents 1 day Fri 12/19/14 Fri 12/19/14 11 3 copies each of final design drawings, specifications, design report, and detailed cost estimate 1 day Fri 12/19/14 Fri 12/19/14 12 Review and Approval of 100% Documents (By Others) 40 days Mon 12/22/14 Thu 2/19/15 13 Document Reproduction 5 days Fri 2/20/15 Thu 2/26/15 14 40 sets each of the final approved design drawings and specifications 5 days Fri 2/20/15 Thu 2/26/15 15 Preparation of Bidding Documents 10 days Fri 2/20/15 Thu 3/5/15 16 Release for Bid 1 day Fri 3/6/15 Fri 3/6/15 17 Bidding 31 days Mon 3/9/15 Mon 4/20/15 18 Contractor Bidding 30 days Mon 3/9/15 Fri 4/17/15 19 Pre Bid Meeting 1 day Mon 3/16/15 Mon 3/16/15 20 Bids Due 1 day Mon 4/20/15 Mon 4/20/15 21 Contractor Selection and Award 10 days Tue 4/21/15 Mon 5/4/15 22 Pre Construction Meeting 1 day Tue 5/5/15 Tue 5/5/15 23 Notice to Proceed 1 day Wed 5/6/15 Wed 5/6/15 Task Project Summary Inactive Milestone Manual Summary Rollup Deadline Project: Design Schedule 112514_ Date: Tue 11/25/14 Split Milestone External Tasks External Milestone Inactive Summary Manual Task Manual Summary Start only Progress Summary Inactive Task Duration only Finish only Page 1

Figure 7 ID Task Name Duration Start Finish 1 Waikoloa Reservoir No. 1 Earthquake Repairs 286 days Wed 5/6/15 Wed 6/8/16 2 Notice to Proceed 0 days Wed 5/6/15 Wed 5/6/15 3 Mobilize 3 days Wed 5/6/15 Fri 5/8/15 4 Install Temporary Erosion Control Measures 10 days Thu 5/7/15 Wed 5/20/15 5 Clean Existing Reservoir Liner 15 days Thu 5/21/15 Wed 6/10/15 6 Install Dewatering Measures 15 days Thu 5/21/15 Wed 6/10/15 7 Existing Liner Repairs 120 days Thu 6/11/15 Wed 11/25/15 8 Grout Voids Beneath Existing Concrete Liner 20 days Thu 6/11/15 Wed 7/8/15 9 Repair Existing Concrete Liner Cracks 30 days Thu 7/9/15 Wed 8/19/15 10 Repair Existing Concrete Liner Construction Joints 30 days Thu 8/20/15 Wed 9/30/15 11 Repair Existing Concrete Liner Expansion Joints 30 days Thu 10/1/15 Wed 11/11/15 12 Repair Spalling of Existing Liner 10 days Thu 11/12/15 Wed 11/25/15 13 Install New Reservoir Liner 90 days Thu 11/26/15 Wed 3/30/16 14 Install Geotextile Underlayment and Anchoring System 45 days Thu 11/26/15 Wed 1/27/16 15 Install Hypalon Liner Including Anchoring System 45 days Thu 1/28/16 Wed 3/30/16 16 Spillway Modification 35 days Thu 6/11/15 Wed 7/29/15 17 Saw and Demolish Existing Liner 5 days Thu 6/11/15 Wed 6/17/15 18 Clearing and Grubbing 5 days Thu 6/18/15 Wed 6/24/15 19 Excavate New Spillway 5 days Thu 6/25/15 Wed 7/1/15 20 Place Precast Spillway 5 days Thu 7/2/15 Wed 7/8/15 21 Place New Concrete and Riprap 15 days Thu 7/9/15 Wed 7/29/15 22 Install Seepage Stability Berm and Drainage System 151 days Thu 6/11/15 Thu 1/7/16 23 Clearing and Grubbing 5 days Thu 6/11/15 Wed 6/17/15 24 Degrade Downstream Embankment 20 days Thu 6/18/15 Wed 7/15/15 25 Excavate Pipe Trench 35 days Thu 6/18/15 Wed 8/5/15 26 Place Zone 2 Material (Below Pipe) 60 days Fri 6/19/15 Thu 9/10/15 27 Place Zone 3 Material and Pipe 30 days Fri 9/11/15 Thu 10/22/15 28 Construct Outfall Structure 15 days Tue 10/20/15 Mon 11/9/15 29 Place Zone 2 Material and Zone 1 Backfill 55 days Fri 10/23/15 Thu 1/7/16 30 Install and Test Geotechnical Instrumentation 15 days Fri 1/8/16 Thu 1/28/16 31 Remove Dewatering Measures 15 days Thu 3/31/16 Wed 4/20/16 32 Install Perimeter Fencing 10 days Thu 4/21/16 Wed 5/4/16 33 Site Restoration 20 days Thu 5/5/16 Wed 6/1/16 34 Demobilization 5 days Thu 6/2/16 Wed 6/8/16 Qtr 3, 2015 Qtr 4, 2015 Qtr 1, 2016 Qtr 2, 2016 May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 5/6 Waikoloa Reservoir No. 1 Earthquake Repairs Project: 119160 Construction Sch Date: Tue 11/25/14 Task Split Milestone Summary Project Summary External Tasks External Milestone Inactive Task Inactive Milestone Inactive Summary Manual Task Duration only Manual Summary Rollup Manual Summary Start only Finish only Deadline Progress Page 1