SECTION QUALITY CONTROL - CONSTRUCTION MANAGER EDITION

Similar documents
SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address:

C. Miscellaneous Metal Fabricators are specified elsewhere in Division 5.

SECTION CODE-REQUIRED SPECIAL INSPECTIONS AND PROCEDURES. 1. Define and coordinate structural testing and special inspection services.

SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address:

Project Address: Name of Person Completing Form:

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEV\, YORK PROJECT NO

Mechanical Engineer of Record: (Smoke Control Systems Only) Name & License Company. Others: Responsible Party Name & License Company

EXAMPLE STATEMENT OF SPECIAL INSPECTIONS (SSI)

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012)

PROJECT: TULSA COMMUNITY COLLEGE BOOKSTORE RENOVATION PROJECT NUMBER: ISSUE: CONSULTANT: SEAL: SHEET NUMBER: GENERAL NOTES

SPECIAL INSPECTION AND TESTING AGREEMENT

SECTION TESTING LABORATORY SERVICES

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Commission No Section

Statement of Special Inspections

2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS

Statement of Special Inspection Requirements

STRUCTURAL STEEL FRAMING Section

SPECIAL INSPECTION AGREEMENT

DESIGN STANDARDS WASHINGTON UNIVERSITY SCHOOL OF MEDICINE

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM):

2016 Port of San Francisco Building Code

Report of Special Inspections

SECTION STRUCTURAL METAL FRAMING

SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving

REQUEST FOR PROPOSAL FOR MATERIAL TESTING AND SPECIAL INSPECTION SERVICES

STATEMENT OF SPECIAL INSPECTIONS - MBC-200 City of Bloomfield Hills Building Department

SPECIAL INSPECTION AGREEMENT

SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS Common Usage.

STATEMENT OF SPECIAL INSPECTIONS - MBC-2012

SECTION STRUCTURAL STEEL

MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following:

Building Department Informational Handout

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

REINFORCED CONCRETE MASONRY SECTION

1. Cast-in-place concrete is specified in Section

SECTION DRILLED CONCRETE PIERS AND SHAFTS

STATEMENT OF SPECIAL INSPECTION FORM

Statement. Special Inspection

SECTION CAST-IN-PLACE CONCRETE

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE

SECTION STRUCTURAL STEEL

Mezzanines By Design Page 1

Tnemec 394 Proprietary Long Form Coatings Schedule

32.02 RESPONSIBILITIES OF THE TESTING AGENCY

Arlington County, VA Materials Testing Specification Reference Guide (8/18/2016) MATERIAL AND TEST (REF. - VDOT TEST METHODS MANUAL )

Arlington County, VA Materials Testing Specification Reference Guide (8/18/2016) MATERIAL AND TEST (REF. VDOT TEST METHODS MANUAL )

MATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS

PLANNING DEPARTMENT 701 OCEAN STREET, 4 TH FLOOR, SANTA CRUZ, CA (831) FAX: (831)

SPECIAL INSPECTIONS AND TESTS

1. Cast-in place structural concrete including footers, foundations, and other non-slab applications. 2. Formwork 3. Reinforcement

MATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005. CARLSON TESTING, INC Hudson Avenue, NE Salem, OR James Hathaway, PE Phone:

CELCORE CELLULAR INSULATING CONCRETE SPECIFICATION FOR RETROFIT PLACEMENT OVER EXISTING ROOF MEMBRANES

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

MATERIALS A Concrete A.1 Concrete Walk... Mix No. 3F52. A.2 Concrete Walk, Exposed Aggregate Finish... Mix No.

SECTION RIGID PAVEMENT

HAMPTON ROADS AREA STATEMENT OF SPECIAL INSPECTIONS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

Statement of Special Inspections 2013 CBC

NC Agricultural &Technical State University New Student Center Greensboro, North Carolina Site & Building Demolition & Utility Relocation

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

SPECIAL INSPECTION AGREEMENT FORM

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005. QC LABORATORIES, INC Northwest Freeway Houston, TX Damon Dolat Phone:

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005

SUNY GENESEO RED JACKET DINING HALL RENOVATION SECTION STRUCTURAL STEEL FRAMING

4. Bolts to be Installed in Concrete and Their Installation to allow for higher allowable tension values. 7. Grouting of Bonded Prestressing Tendons

Soil Improvement by Compaction Grouting

STRUCTURAL TESTS AND SPECIAL INSPECTIONS

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes.

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

STRUCTURAL STEEL FRAMING

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

WACEL STUDY GUIDE. Reinforced Concrete Special Inspector (Concrete II)

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE

C. Requirements of this Section relate to customized fabrication and installation procedures, not production of standard products.

SECTION DRILLED CONCRETE PIERS AND SHAFTS

CHAPTER 16 - GANTRIES

SECTION EMBEDDED CMU/SPLIT FACE ARCHITECTURAL PRECAST/SITECAST CONCRETE. A. Site Cast or Tilt-Up CMU/Split Face Concrete Panels.

THRESHOLD INSPECTION SPECIAL INSPECTION PLAN. Evangel Temple Addition

***************************************************************************************************************

SECTION 39 - MANHOLES TABLE OF CONTENTS

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990

Statement of Special Inspections

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

Item P-219 Recycled Concrete Aggregate Base Course

SECTION STRUCTURAL STEEL

SPECIAL INSPECTION PROGRAM GUIDE

PART UF REQUIREMENTS FOR PRESSURE VESSELS FABRICATED BY FORGINGS

Make copies of all test results and control charts readily available to the Engineer at the project site.

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS

SECTION BUILDING EARTHWORK

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building

SECTION ASPHALT PAVING

Module 4 Waterside Bensalem, Pa Date

SPECIAL SPECIFICATION 4491 Type CAC Concrete

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES EVALUATION CRITERIA FOR

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section CEMENT STABILIZED BASE COURSE. 1. Foundation course of cement stabilized crushed stone.

LITHOCRETE ARCHITECTURAL CONCRETE PAVING

Transcription:

Montgomery County Public Schools Facilities DIVISION 1 - GENERAL REQUIREMENTS SECTION 01450 - QUALITY CONTROL - CONSTRUCTION MANAGER EDITION PART 1 - GENERAL 1.1 Summary: A Independent testing, inspection and quality control services for evaluation of material, methods and workmanship for concrete work, steel work, compaction and backfilling, and bituminous concrete. At Contractor's option, one or more agencies may be used for quality control services with the exception of Geotechnical firm that provided Subsurface Exploration Data must be used for Earthwork Inspection and Testing. B. Contractor shall retain services of acceptable independent agencies for testing required by specifications and pay costs related thereto. C. Contractor shall designate one typical classroom in the building as a mock-up for approval of finishes. 1.2 Related Sections: A Drawings and general provisions of Contract, including General Conditions and other Division-1 Specification sections, apply to work of this section. 1.3 Concrete Quality Control Testing During Construction: A Concrete Testing Laboratory: Contractor shall employ testing laboratories to conduct tests and inspections, interpret results and evaluate for compliance with Contract Documents and report findings to Construction Manager, Architect, Owner, Contractor and Structural Engineer. B. Sampling and testing for quality control during placement of concrete shall include the following, as directed by Construction Manager and Architect. 1. Sampling Fresh Concrete: ASTM C 172, except modified for slump to comply with ASTM C 94. a. Slump: ASTM C 143; one test for each concrete load at point of discharge; and one test for each set of compressive strength test specimens. b. Air Content: ASTM C 143, volumetric method for lightweight or normal weight concrete; ASTM C 231 pressure for normal weight concrete; one for each set of compressive strength test specimens. c. Concrete Temperature: Test hourly when air temperature is 40 o Fahrenheit and below, and when 80 o Fahrenheit and above; and each time a set of compression test specimens are made. d. Compression Test Specimen: ASTM C 31; one set of 4 standard cylinders for each compressive strength test, unless otherwise directed. Mold and store cylinders for laboratory cured test specimens. Secure samples in accordance with ASTM C 172. e. Compressive Strength Tests: ASTM C 39; one set for each day's pour, or for each 100 cu. yds. or fraction thereof, of each concrete class placed in any MCPS 10/21/09 Bk2;Vol1 QUALITY CONTROL 01450-1

one day or for each 5,000 sq. ft. of surface area placed; 2 specimens tested at 7 days; 2 specimens tested at 28 days. f. When frequency of testing will provide less than 5 strength tests for a given class of concrete, conduct testing from at least 5 randomly selected batches or from each batch if fewer than 5 are used. g. Strength level of concrete will be considered satisfactory if averages of sets of three consecutive strength test results equal or exceed specified compressive strength, and no individual strength test result falls below specified compressive strength by more than 500 psi. 2. Test results shall be reported in writing to Architect (2 copies); and Construction Manager, Contractor, Owner, and Structural Engineer (1 copy each). Reports of compressive strength tests shall contain the project identification, name of Contractor, name of concrete supplier, truck number and batch number, date of concrete placement, name of concrete testing service and certifying Engineer, concrete type and class, ambient and concrete temperatures, location of concrete batch in structure, design compressive strength at 28 days, concrete mix proportions and materials; slump and air test results, compressive breaking strength and type of break for both 7-day tests and 28-day tests. 3. Test Evaluation: Concrete cylinder tests shall be evaluated by Architect in accordance with ACI 318 and ACI 214. 4. Additional Tests: Testing service shall make additional tests of in-place concrete when test results indicate specified concrete strengths and other characteristics have not been attained in structure, as directed by Construction Manager and Architect. Testing service may conduct tests to determine adequacy of concrete by cored cylinders complying with ASTM C 142, or by other methods as directed. Contractor shall pay for tests conducted, and additional testing as may be required, when unacceptable concrete is verified. 5. In event that additional coring tests do not show strength required or as determined by load tests made in accordance with ACI 318, and if tests indicate necessity, defective parts shall be removed and replaced, or shall be reinforced as directed by Construction Manager and Architect at Contractor's expense, including expense of tests. If tests indicate structure adequately meets requirements of Contract Documents, test results of defective cylinders shall be waived. C. Contractor's Responsibility: Contractor shall observe daily work of testing laboratory in field and laboratory and shall report all known deviations to approved standards to Construction Manager and Architect within 24 hours. Failure to so notify Construction Manager and Architect in event of deviations shall not waive the Contractor's approval of subsequent test results. D. Curing Box: Contractor shall construct an insulated curing box to cure concrete cylinders and maintain required temperatures. Construct each box large enough to store a minimum of 18 cylinders. 1.4 Structural Steel and Steel Joist Quality control During Construction: A. Inspection Agency: Contractor shall employ an independent testing and inspection agency having a registered Professional Engineer licensed in State of Maryland on its staff to inspect high strength bolted connections, welded connections, to perform tests and prepare test reports. This firm shall provide a qualified project inspector who shall work under direct supervision of registered Professional Engineer and who shall be approved in advance by Owner,Local Building Department and be acceptable to Construction Manager and Architect. MCPS 10/21/09 Bk2;Vol1 QUALITY CONTROL 01450-2

1. Testing agency shall conduct and interpret tests and state in each report whether test specimens comply with requirements, and specifically state deviations there from. 2. Testing agency may inspect structural steel and steel joist at plant before shipment; however, Construction Manager and Architect reserve right, at any time before final acceptance, to reject material not complying with specified requirements. B. Testing agency shall have access to places where structural steel Work and steel joist Work is being fabricated or produced so that required inspection and testing can be accomplished. C. Contractor shall correct deficiencies in structural steel and steel joist Work which inspections and laboratory test reports indicate not to be in compliance with requirements. D. Testing agency shall perform additional tests, at Contractor's expense, as may be necessary to reconfirm any non-compliance of original Work, and as may be necessary to show compliance of corrected Work. E. Minimum Testing Requirements: 1. Shop Bolted Connections: Inspect or test in accordance with AISC specifications for structural steel. 2. Shop Welding: Inspect and test during fabrication of structural steel and steel joist assemblies as follows: a. Certify welders and conduct inspections and tests as required. Record types and locations of defects found in Work. Record work required and performed to correct deficiencies. b. Perform visual inspection of all welds. c. Perform tests of suspected defective welds as follows: Inspection procedures listed are to be used at testing agency's option. (1) Liquid Penetrant Inspection: ASTM E 165. (2) Magnetic Particle Inspection: ASTM E 109; performed on root pass and on finished weld. Cracks or zones of incomplete fusion or penetration not acceptable. (3) Radiographic Inspection: ASTM E 94 and ASTM E 142: minimum quality level "2-2T". (4) Ultrasonic Inspection: ASTM E 164. F. Field Bolted Connections: Inspect in accordance with AISC and SJI specifications. G. Field Welding: Inspect and test during erection of structural steel, steel joist and metal decking as follows: 1. Certify welders and conduct inspections and tests as required. Record types and locations of defects found in Work. Record Work required and performed to correct deficiencies. 2. Perform visual inspection of all welds. MCPS 10/21/09 Bk2;Vol1 QUALITY CONTROL 01450-3

3. Perform tests of suspected defective welds and of all moment connection welds as follows: Inspection procedures listed are to be used at testing agency's option. a. Liquid Penetrant Inspection: ASTM E 165. b. Magnetic Particle Inspection: ASTM 109; performed on root pass and on finished weld. Cracks or zones of incomplete fusion or penetration not acceptable. c. Radiographic Inspection: ASTM E 94 and ASTM E 142; minimum quality level "2-2T". d. Ultrasonic Inspection: ASTM E 164. 1.5 Backfilling and Compaction Quality Control During Construction: A. Contractor will employ an independent testing and inspection agency to conduct tests and inspections, interpret them, evaluate results for compliance with specifications and report findings to Construction Manager, Architect, Owner, Contractor, Civil Engineer and Structural Engineer as their interests may appear. B. Quality Control Testing During Construction: Testing agency shall inspect and approve subgrades and fill layers before further Work is performed. 1. Perform field density tests in accordance with ASTM D 1556 (sand cone method) or ASTM D 2922 (nuclear method-shallow depth), as applicable. 2. Footing Subgrade: For each stratum of soil on which footings will be placed, conduct at least one test to verify required design bearing pressure. Subsequent verification and approval of each footing subgrade may be based on a visual comparison of each subgrade with related tested strata, when acceptable to Construction Manager and Architect. 3. Paved Areas and Building Slab Subgrade: Make at least one field density test of subgrade for every 1500 sq. ft. of paved area or building slab, but in no case less than three (3) tests. In each compacted layer of embankment fill, make one field density test for every 1000 sq. ft. of overlaying building slab or paved area, but in no case less than three (3) tests. Augment field density test with observation of fill stability using Proofroll by loaded 20-wheel truck. C. If in opinion of Construction Manager and Architect, based on testing service reports and inspection, subgrade or fills which have been placed are below specified density, provide additional reworking, compaction and testing at no additional expense. 1.6 Concrete and Bituminous Concrete Paving Quality Control During Construction: A. Contractor will employ an independent testing and inspection agency to conduct tests and inspections, interpret them, evaluate results for compliance with specifications and report findings to Construction Manager, Architect, Owner, Contractor and Civil Engineer as their interests may appear. B. General: Test in-place concrete and asphalt concrete paving courses for compliance with requirements for thickness and surface smoothness. C. Thickness: In-place compacted thickness of asphalt concrete paving will not be acceptable if exceeding following allowable variation from required thickness: MCPS 10/21/09 Bk2;Vol1 QUALITY CONTROL 01450-4

Base Course: 1/2", plus or minus. Surface Course: 1/4", plus or minus. D. Surface Smoothness: Test finished surface of each asphalt concrete course for smoothness, using 10' straightedge applied parallel with, and at right angles to centerline of paved area. Surfaces will not be acceptable if exceeding the following tolerances for smoothness: Base Course Surface: 1/4". Wearing Course Surface: 3/16". E. Check surface areas at intervals as directed by Construction Manager and Architect. F. Contractor shall repair or remove and replace unacceptable paving as directed by Construction Manager and Architect. 1.7 Masonry Mortar and Grout Quality Control During Construction: A. Masonry Mortar: The designated testing agency shall sample and test mortars in accordance with property specifications of ASTM C 270 and evaluate in accordance with ASTM C780. At least one test for each 5000 square feet of wall area or portion thereof. B. Masonry Grout: Designated testing agency shall sample and test masonry grout in accordance with ASTM C 1019 for each 5,000 square feet of masonry wall surface. 1.8 Typical Classroom Mock-up for Approval of Finishes: A. Contractor shall designate one classroom to establish a standard for finishes for the balance of the project. Finishes in this classroom must be approved by the Owner and Architect prior to the commencement of finishes in the balance of the building for the following items: 1. Block fill 1 st and 2 nd coat 2. Floor tile/cove base 3. Painting 1 st and 2 nd coat 4. Casework 5. Ceilings/lighting 6. White/Tack boards 7. Window treatments 8. Ductwork hung and insulated 9. Sprinkler System 10. Floor waxing 11. Fire alarm 12. Switches and plugs with cover plates PART 2 - PRODUCTS 2.1 Acceptable Inspection and Testing Agencies: A. Hillis-Carnes Engineering Associates B. Engineering Consulting Services, Ltd. C. Geotech Engineers, Inc. D. Kim Engineering, Inc. E. PSI MCPS 10/21/09 Bk2;Vol1 QUALITY CONTROL 01450-5

F. KCI G. CTI Consultants, Inc. H. Giles Engineering Associates, Inc. I. Specialized Engineering PART 3 - EXECUTION 3.1 Inspection and Testing Reports A. Copies of inspection and testing reports shall be submitted to Architect (2 copies), Construction Manager, Contractor, Owner, Structural Engineer and Civil Engineer (1 copy each). B. Reports shall be clearly and neatly typed (handwritten reports will not be accepted) and shall contain pertinent project information for each type of test. Submit samples of each report form for approval. END OF SECTION MCPS 10/21/09 Bk2;Vol1 QUALITY CONTROL 01450-6