Variety of uses: Universal Pool Skimmer Cover, Water Main, Valves, Waterfalls & Fountains, Sewer Cleanouts MADE IN USA. Also Available in Gray & Tan

Similar documents
BRILLIANT WONDERS LED WATERFALL INSTALLATION INSTRUCTIONS CMP SERIES. Brilliant Wonders LED WATERFALLS

INSTALLATION INSTRUCTIONS CMP SERIES

Inground Pool Liners

Inground Pool Liners

Inground Pool Liners

Drainage and Erosion Control

Toll Free Order Line: or Fax: Advantage Leisure Products Ltd. All rights reserved.

Fiberstars Lighted Laminar Flow Fountains


Toll Free Order Line: or Fax: Advantage Leisure Products Ltd. All rights reserved.

YOUR SPLASH PAD RESOURCE

Concrete Answers for Better Living. Plastics

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.

FLOOR AND AREA DRAINS

SECTION PLUMBING SPECIALTIES

STANDARD CONSTRUCTION DETAILS SANITARY SEWER REVISED MARCH 2018 DEPARTMENT OF ENGINEERING

CHAPTER 12 INSTALLATION OF UTILITIES AND OTHER SYSTEMS TABLE OF CONTENTS

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms.

PHASE 1 Foundation & Drainage New Construction Phased Inspection Report John & Mary Doe 5237 Clinton Street, Denver, CO 80238

CITY OF WARRENVILLE STANDARD SPECIFICATIONS WATER MAIN, SANITARY SEWER AND STORM SEWER

D. Encase exterior cleanouts in concrete with access cover installed flush with grade.

SV24. Submittal Special Precautions Specifications Installation. 12½" (31.8 cm) 12½" (31.8 cm) 12" (30.5 cm) 12" (30.5 cm) 12" (30.

Installation Instructions

5.0 ENDURA GREASE MANAGEMENT. Endura Grease Interceptors with Spigot format Flow Control Devices.

PLASTIC FITTINGS Avenue Edmonton, AB Canada T6E 5Z7. Toll Free: Phone: (780) Fax: (780)

A. Provide floor drains in all restrooms placed a minimum of 7 from back of wet wall, janitor closets, and mechanical rooms.

SECTION SANITARY UTILITY SEWERAGE PIPING

STORM DRAINAGE CHAPTER 11

STORM DRAINAGE CHAPTER 11

Series. 6 Wide POLYCAST 600 SP Polymer Concrete Trench Drain Kit

ROOF DRAINS TABLE OF CONTENTS

TYPICAL INSTALLATION INSTRUCTIONS

200 Series In-Slab Pool Fittings

Project Location: Various, Anywhere, PA Bid Date: 7/16/ Rock Construction Entrance

Page 1- MAGNEIS PANEL POOLS 2- BETON BLOCK POOLS

POLYLOK / ZABEL PRODUCT BROCHURE v.3

Product Manual PV1700 / PV1800 / PV2300 / PV18EXT / PV23EXT / SP1600 / SP1900 / SP2600 / SP

ETL listed for installations within 5 ft. (1.5M) of outer edge of water

University of Central Florida Main Campus. Domestic Water. Service and Meter Installations Requirements. Issued January 26 th, 2017.

FIELD GUIDE FOR MILLENNIUM MOUNDS CLERMONT CO. GENERAL HEALTH DISTRICT 2010

0.75 " transparent hose w/ valve for head measurements fixed to screws 20 MIL PVC liner. 6" gate valve

RADIAL FLOW SETTLER 60 CONE (RFS-60)

Pre-Sloped Drain System

How To Construct a Ferro Cement Tank

1. Required Minimum Flow:

1. Division 01 Section General Requirements - Temporary Facilities and Controls. 2. Division 31 Section Earthwork.

TECHNICAL SPECIAL PROVISION FOR FINANCIAL PROJECT ID:

Never ones to rest on our laurels, at NDS we ve taken our popular, easy-to-install Pro Series Channel Drain and made it even better.

Grease Management. EnduraGreaseManagement.com. Rethinking Grease Interception

SUPPLEMENTAL SPECIFICATIONS AND DRAWINGS TO THE IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION TABLE OF CONTENTS

SURFACE DRAINAGE SYSTEMS

QUOTE Quote Process City Of Taylor

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SPECIAL SPECIFICATION 3504 Septic Tank System

Installation Manual. Read the complete installation manual and Owners Manual before beginning the installation.

SYSTEMS LTD. Leader in Linear Drain Solutions. A Publication of. Page 1. Randy Franzke. Cellar Master Supplies. Phone:

PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT]

olor Match POOL FITTINGS, INC. Blending Beauty & Function

A. This Section includes the following sanitary drainage piping specialties:

Skimmers. The Industry Standard for Performance and Reliability. For All Types of Inground and Aboveground Swimming Pools

CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413

Welcome: What is U-Drain? Drain Materials. Flow

Proper Construction of detention and sediment basins and their conversions

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION HYDRONIC PIPING

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST

FS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm)

FERTILIZER IRRIGATION EQUIPMENT LTD. SERIES 6000 APPLICATIONS

POLYCAST Trench Drain Systems

SECTION FACILITY SANITARY SEWERS

SECTION HYDRONIC PIPING

DEPARTMENT OF PUBLIC UTILITIES

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

Section 403. DRAINAGE STRUCTURES

CHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION.

City of Fort Walton Beach Engineering Standards Manual November City of Fort Walton Beach Engineering Standards Manual

Hi-Cap Slotted Drainage System Surface Drainage

Stainless Steel Perimeter Recirculation Systems Engineered supply and return systems for swimming pools, water features and aquatic facilities.

YAKIMA COUNTY, WASHINGTON. Special Provisions For Water Main Construction

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1

APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES

ASHWELL FIRE PIT SIENNA QUARRY GRAY TAN AUTUMN BLEND. Plan Date: June 2016

Welcome: What is U Drain? Drain Materials. Cost Comparisons

4.28 Underground Detention

FLOOR DRAINS GENERAL INFORMATION

1 ½

SUNY Genesee Community College JMZ Project No Implementation of Master Plan Projects - Phase 1 Site Improvements

ZS880 Linear Shower Drain Installation Instructions

EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02

COTTONWOOD IMPROVEMENT DISTRICT SALT LAKE COUNTY SERVICE AREA #3 SOLITUDE IMPROVEMENT DISTRICT TOWN OF ALTA WATERSHED SERVICE LINE SPECIFICATIONS

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

RUSTIC FIRE PIT SIENNA QUARRY GRAY TAN AUTUMN BLEND.

Contactor & Recharger

A. This Section includes subdrainage systems for foundations and underslab areas. A. Product Data: For each type of drainage panel indicated.

Design Plans for the "Advantage 6000 Gallon Koi Pond"

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Linear Drainage Z886. Perma-Trench. Installation Instructions. 100mm Clear Opening

SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES

GBHF Submittal Special Precautions Specifications Installation Application Specific Details

Transcription:

MADE IN USA Variety of uses: Universal Pool Skimmer Cover, Water Main, Valves, Waterfalls & Fountains, Sewer Cleanouts Also Available in Gray & Tan Pour-A-Lid is a product of Stetson Development, Inc. For further information call (800) 532-8215 or fax (951) 246-9253. Come visit our website at www.pouralid.com

Pour-A-Lid 201 PAL Tan 201 PAL Grey 201 PAL Clear Now with universal fit and screw down capability 10 Pour-A-Lid Pool Skimmer Cover for New Construction Fits: Hayward 1070, Hayward 1080, Waterway, Sta-Rite, Swimquip, U3, Jacuzzi, American, Pentair/Pacfab 204 PAL Tan 204 PAL Grey Screw down capability 9 Pour-A-Lid Replacement Lid for existing Pool Skimmer Fits: Hayward 1070, Waterways, Sta-Rite, U3, MP Auto Fill 202 PAL Tan 202 PAL Grey 202 PAL Clear 6 Pour-A-Lid Cover Fits: Play Equipment, Sewer Cleanouts, Valves, Water Main Also Available Automatic Water Level System SDI-WF420 Includes a Pour-A-Lid For further information: Call (800) 532-8215 Fax (951) 246-9253 Pour-A-Lid is a product of Stetson Development, Inc. Patent #6,393,771 B1 visit our website at : www.pouralid.com

Stetson Development Inc. ABS Auto Fill Standard Available in 3/8 #3-8ATF 1/2 #1-2ATF Standard pipe thread inlet and free flow outlet Adjustable arm can be used in the vertical or horizontal position Estimated flow rate of 1.5 at 40 PSI.093 orifice Approximate overall length of 7.5 ABS construction Excellent for Ponds, Fountains and MP-Auto Fills For further information contact Mike: Phone (800) 532-8215 Fax (951) 246-9253 32535 Bramble Ct., Lake Elsinore, CA 92532 visit our website at www.pouralid.com

ABS Auto Fill Standard 3-8ATF 3-8ATFLA 1-2ATF 1-2ATFLA 3-8ATF 3-8ATFLA 1-2ATF 1-2ATFLA 1-4ATFC 3/8 Auto-Fill 3/8 Auto-Fill with 5 extension 1/2 Auto-Fill 1/2 Auto-Fill with 5 extension 1/4 Auto-Fill with Compression Fitting Swamp Coolers Pool Water Levelers Variety of Uses Fountains Ponds Cooling Towers Live Stock Water Feeders For further information: ABS Auto-Fill is a product of Stetson Development, Inc. Patent Pending Call (800) 532-8215 Fax (951) 246-9253 visit our website at : www.pouralid.com

Pour-A-Lid and Pour-A-Lid Automatic Water Level System are products of Stetson Development, Inc. For further information call (800) 532-8215 or fax (951) 246-9253. Come visit our website at www.pouralid.com Lid also Available in Gray & Tan

Automatic Water Level System Coping Decking Bond Beam Top of bond beam reference level point 1/2 PVC Pipe Over Flow (optional) 1/2 ABS Float Valve Adjustable Float Arm 1 1/2 Equalizer Drawing not to Scale SDI WF 420 PAL Tan SDI WF 420 PAL Grey SDI WF 420 PAL Clear 10 Pour-A-Lid Pool and Pond Automatic Water Level System For further information: Pour-A-Lid is a product of Stetson Development, Inc. Patent #6,393,771 B1 Call (800) 532-8215 Fax (951) 246-9253 visit our website at : www.pouralid.com

Made in USA Pour-A-Drain is a product of Stetson Development, Inc. For further information call (800) 532-8215 or fax (951) 246-9253. Come visit our website at www.pouralid.com Patent Pending

Pour-A-Drain Easy to Install 1. Cut pipe and set top of coupling to finished drain elevation. Make sure coupling is facing up. 2. For best results remove drain insert from coupling use tape or paper to keep drain coupling free of construction debri. 3. Pour concrete or cut stone to finished surface elevation. Fill with stone or concrete. 4. Cut stone or pour concrete into drain cap. For best results tap bottom of drain cap to settle concrete into place. 5. When concrete is cured clean coupling and drain cap. Install drain cap into coupling. DC 401 Tan DC 401 Gray DC 401 Clear 4 SDR35 3 drain pipe / Specifications 4 Round Poly Resin Grate with Universal Fit 3 to 4 Collar Fits: 3 or 4 SDR-35 Drain Pipe 3 Open surface area 4.125 SQ.IN. 5.66 G.P.M Recommended Load Class A Load at 1-60 PSI For Pedestrians, Bicycles and Wheel Chair Traffic Loads are based on encasing product in Concrete For further information: Call (800) 532-8215 Fax (951) 246-9253 Pour-A-Drain is a product of Stetson Development, Inc. Patent Pending visit our website at : www.pouralid.com