CONSTRUCTION PROJECT TEMPORARY FACILITIES SITING POLICY February 19, 2003

Similar documents
Exhibit G. Construction Mitigation Plan

The 2020 Project will be delivered in three phases between 2018 and 2020.

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM

BARRY S CORNER. Draft Construction Management Plan

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

STREET ADDRESS OF EVENT: Description of Event:

MAINE MEDICAL CENTER

1. APPLICANT: RSA Architecture is the applicant for this request.

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: September 7, 2017

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201

District of North Vancouver Construction Traffic Management Plan Guidelines

DISTRICTWIDE MODAL DEVELOPMENT OFFICE (MDO) RAIL CONSULTANT SERVICES SCOPE OF SERVICES FM# Ad # 19627

SECTION TRAFFIC REGULATIONS

CHAPTER BEVERAGE CONTAINER RECYCLING COLLECTION CENTERS

MIRACOSTA COLLEGE. [X] MiraCosta College Bid Opportunities Website /FAX

C. The Joint Utility Committee regularly meets on the 2 nd Wednesday of each month at 9 A.M. unless otherwise rescheduled.

TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES

STATE UNIVERSITY CONSTRUCTION FUND

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions:

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

McLoughlin Point Wastewater Treatment Plant. CRD Contract No: CAWTP Submittal No: AGJV-PLAN-022. McLoughlin Point Traffic Management Plan

0100 GENERAL 0200 PROJECT MANAGEMENT

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

City of Reno Public Works

Project Description: FOR STAFF USE ONLY. Date: TYPE OF PERMIT(S) REQUESTED

(DC2) SITE SPECIFIC DEVELOPMENT CONTROL PROVISION

ADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION)

POSITION DESCRIPTION

0100 GENERAL. C. The limits for Maintenance Services are set forth in Attachment 3 to this Maintenance Specification.

V. MITIGATION MONITORING PLAN

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department

811 Emerson St. - Demolition & Site Prep

Oakland City Planning Commission

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663

Chapter Design Review. 1

New Administration Building

Superintendent Job Description:

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required.

CONSTRUCTION MANAGEMENT PLAN LIMELIGHT HOTEL PREPARED FOR THE CITY OF KETCHUM, IDAHO

STAFF REPORT. About percent depending on how much is added in the outdoor storage area (max allowed where storm sewer exists is 90 percent).

CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL

Building Better Storm Water Quality

YOUR TRANSPORTATION CO.

Attachment 1 Findings and Conditions

PROJECT ADDRESS: THRIFT AVE, WHITE ROCK, BC EXCAVATION -

Community Advisory Panel Meeting #

SECTION TRAFFIC CONTROL. A. The following is a list of standards which may be referenced in this section:

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Beck Street single family home rebuild Conditional Use PLNPCM North Beck Street June 26, 2013

(To be printed on Professional s Letterhead) PRE-CONSTRUCTION MEETING AGENDA (Professional to provide attendance sign-up sheet

Public Open House. Proposed Liberty Village Natural Gas Pipeline Project. Please sign-in at the registration table upon arrival

Section Safety Section Cleanup. None Required

Below are the existing regulations for solar uses included in the Charlotte County Zoning Ordinance. All proposed amendments are marked in red.

Date: May 4, Clare M. Look-Jaeger, P.E. Kevin C. Jaeger Linscott, Law & Greenspan, Engineers Weingart Projects Construction Traffic Analysis

8.0 MITIGATION MONITORING AND REPORTING PROGRAM

WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

ARCHITECTUS FEBRUARY 2010

Revised: 12/5/08 NORTHERN VIRGINIA REGIONAL PARK AUTHORITY Sandy Run Rowing Facility Regatta Guidelines and Permit Application

[THIS PAGE INTENTIONALLY LEFT BLANK]

Good Neighbor Plan Lake Oswego Tigard Water Partnership Water Treatment Plant

SECTION CONSTRUCTION OPERATIONS AND SITE UTILIZATION PLAN

Construction Management Plan

GUIDE SPECIFICATION Los Angeles World Airports. xx xx xx CALM Review Procedures. CALM Element Background

Managing Site Compounds & Containers

New Stadium Project. Construction Activity Mitigation Program. January 22, 2014

DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS RADIANT LAKE ESTATES SUPPLEMENTAL ARCHITECTURAL GUIDELINES ARTICLE I INTRODUCTION AND POLICY

FINAL INSPECTION OF CONSTRUCTION PROJECTS

Jobs & Transportation Ramping it Up Roadway and Traffic Dan Groh, P.E.

Parnassus Construction Projects Community Meeting. August 22, 2018

STATE BOARD FOR TECHNICAL AND COMPREHENSIVE EDUCATION PROCEDURE ASSETS AND INVENTORY MANAGEMENT

REQUEST FOR PROPOSALS OREGON CITY ANNEX FIBER OPTIC ENGINEERING & INSTALLATION. Date Due: Friday, September 8, Time Due: 4:00 p.m.

RIGHT-OF-WAY PERMIT SUBMITTAL CHECKLIST

Disaster Planning Checklist for Chief Financial Officers of Healthcare Organizations

HARRISBURG ESTATES OWNERS ASSOCIATION DESIGN STANDARDS REQUEST FOR APPROVAL FORM

Submission, Review and Approval of Construction Documents Submission and Review of a Completed Application for Permit

El Dorado Avenue

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

SANTA BARBARA COUNTY ZONING ADMINISTRATOR STAFF REPORT October 21, 2011

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Alberta Transportation The City of Edmonton The City of Calgary

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

ECU Staff Employees. FROM: John M. Toller, Associate Vice Chancellor University Human Resources. Interim Adverse Weather Guidelines

Request Modification of Conditions (CUP (Religious Use approved by City Council on July 14, 2015) Staff Recommendation Approval

Existing Project Conditions. General Conditions Estimate. Michael Vergari Construction Management Advisor: Dr. Riley

Pre-Construction Meeting Minutes

Scope of Work Bid Package C-4 - West Polished Concrete

Requests Conditional Use Permits (Craft Brewery & Open Air Market) Staff Recommendation Approval. Staff Planner Kristine Gay

Q. CONSTRUCTION IMPACTS

Pest Management Policy

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 18, 2015

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted:

PART II - CODE OF ORDINANCES Chapter 16 - CONSTRUCTION, REHABILITATION AND PROPERTY MAINTENANCE REGULATIONS ARTICLE VIII. PROPERTY MAINTENANCE

155 North Beech, Casper, WY * (307) * (307) Fax INDEX

City of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ)

Policy on Authority to Execute Construction Projects

October 17, Albany MS Logistics Plan. Overview:

Presented by Henry L. Barbaro Stormwater Management Unit Supervisor MassDOT Highway Division

1107 E. Madison Street Student Housing Project. Monthly Update May 12, 2017

Transcription:

CONSTRUCTION PROJECT TEMPORARY FACILITIES SITING POLICY February 19, 2003 Authority: This policy has been approved by the Vice-Provost for Lands and Buildings. Summary: This policy outlines a procedure for obtaining approval needed for any Stanford University (SU) land to be used temporarily for construction related purposes. It also references the Santa Clara County General Use Permit (GUP) conditions of approval for construction traffic. It does not cover the use of SU utilities or other SU facilities. DEFINITIONS: A) A construction site is any land disturbed by construction including land that is needed for project trailers, equipment and material storage, surplus dirt and construction equipment. An ancillary site is one that is not contiguous with the actual project site. B) A construction project trailer is any enclosed structure that requires land and access that is used for storage or office space, with or without utilities. It is to be used to construct a Land and Buildings approved project. C) Contractor parking is land or accommodations requested for the purposes of providing parking for construction workers. D) Small projects are those that have a duration of less than one week, do not require ASA or Board approval, do not require special access into the central campus pedestrian zone, involve no contractors outside of Stanford personnel or use only a single outside contractor with no subcontractors, need to park fewer than five vehicles, involve no closures of campus access routes and have no need for exterior laydown areas. GUIDELINES: The Stanford University Architect/Planning Office (UA/PO), through the procedure outlined in this policy, must approve any use of Stanford land for construction and/or construction related activities. This includes any need for land that is not contiguous with the actual project site. Requests for contractor parking and use of sites that effect existing university parking should be submitted directly to Parking and Transportation Services (P&TS). (See also: Guidelines for Contractor Parking for Construction Projects.) Such requests must outline the duration, purpose and size, and be submitted in writing. Any ancillary site will be chosen to be as convenient to the actual project site as possible; 1

to minimize impacts on adjacent permanent sites; and to minimize impact on vehicle, bicycle, shuttle and pedestrian circulation and existing university uses. Once construction project sites have been identified and approved, proposed details for temporary construction sites for laydown, parking, trailers and/or office space and access routes shall be submitted as a part of a construction logistics plan for each project by the SU Project Manager for input and approval by the UA/PO, P&TS and Public Safety. (See Construction Logistics Plan template at http://www.stanford.edu/dept/archplng/). Sites located within assigned Stanford auxiliary program areas including the Department of Athletics, Physical Education and Recreation (DAPER), Residential and Dining Enterprises (R&DE), and/or the Stanford University Hospital and Clinics (SHC) or the Stanford Management Company (SMC) leaseholds (must also be coordinated with and approved by the appropriate entity. The logistics plan will satisfy criteria for access, fencing, tree protection, site preparation, temporary detours and site restoration, and must have a deadline for completion and removal no longer than the actual project completion. Access into campus and to the site must be compatible with the University truck, service and delivery routes identified on maps at (http://transportation.stanford.edu/maps_forms_apps/mapsforms.shtml); minimize impacts to the campus; and provide an efficient route that can accommodate the type and size of vehicles authorized to access the site. The primary Stanford Project Manager shall be responsible for contractor compliance with all conditions of this policy, and any specific site approval conditions. There will be no approvals granted to individual contractors and/or vendors outside of this process. Small projects may be exempted from submitting a logistics plan, but the project manager is still responsible for addressing all of the site logistics and details described above and for coordinating with the appropriate departments. Project managers must receive approval from their immediate supervisors to designate a small project as exempt. PROCEDURE: The primary Stanford Project Manager associated with the approved construction project must submit one comprehensive request in writing for space to the UA/PO and for contractor parking to P&TS. Requests shall contain the following information: Official project name and project number Primary project manager name Construction company name, job superintendent, phone number and email address 2

Project start date and estimated duration Estimated size of construction site and size and preferred location of ancillary sites Size and numbers of trailers and proposed utility needs Quantity of materials to be stored Type and size of equipment or vehicles to be stored Access requirements times, quantity, special requirements Number of contractor parking spaces anticipated, by phase of construction LOGISTICS PLAN: After initial site identification and approval and prior to ASA submittal, a preliminary construction logistics plan shall be developed and submitted to the UA/PO and P&TS as a drawing that clearly describes the following for both on- and off-site construction areas: Access routes by vehicle type into campus and to the construction site Areas designated as laydown and storage Proposed routes for pedestrians, bicycles, vehicles, and public transportation, with sign locations indicating detours Tree protection fencing Project limit fencing, curbing and vehicle control devices Number of employees that will use the site Proposed hours and dates of work Start and finish dates for the construction project Parking, and access routes from contractor parking to the construction site A template for the logistics plan is presented as Appendix A. This plan shall be further refined as contractors are engaged and as the project develops. The final plan shall remain available at the job site for the duration of the project. It is suggested that there be one to two logistics meetings held during the course of project development with all relevant parties in attendance to help define the initial and the final logistics plan. EXTERNAL APPROVALS/NOTIFICATIONS: For projects requiring Santa Clara County Architecture and Site Approval (ASA), approval of a Construction Traffic Management Plan by the County Planning Office is required prior to commencement of construction. This is to be coordinated by the SU Project Manager. 3

The SU Project Manager shall provide written notification to all contractors of appropriate routes to and from construction sites, with weight and speed limits indicated for local roads used. A copy of that notification shall be sent by the SU Project Manager to the Santa Clara County Planning Office: Attention - Secretary of ASA. The SU Project Manager shall inform the Stanford Police, Environmental Health and Safety, and the Palo Alto Fire Department of approved construction locations and alternate evacuation and emergency route information so they may maintain established response times during construction periods. Per 2000 GUP requirements, all construction sites are required to post a construction sign as noted on the logistics plan template attached. This sign must list a Stanford contact person to whom complaints about construction traffic or actual construction procedures will be reported. This person shall be the primary SU Project Manager, who will keep a log of complaints and provide them to the Santa Clara County Planning Office as part of the annual report process. In addition, projects expected to continue through the rainy season are required by the County to prepare a Storm Water Pollution Prevention Program Plan (SWPPP) and conduct regular monitoring for compliance which would include all construction sites and contractor parking areas. RESPONSIBILITIES: The primary SU Project Manager is responsible for oversight of the General Contractor for traffic related to construction site activities; for all activities on the site during the project; and for returning the site to its original condition at project close out. Prior to any construction activities the condition of the site shall be photographically documented as a part of the project records. There will be a walk through and final acceptance of the site by the University Architect/Planning Office and SU Grounds and/or Parking and Transportation Services when existing landscape and transportation facilities have been utilized and/or impacted through construction activities. A Construction Policy oversight group has been established including representatives from the Department of Project Management, the University Architect/Planning Office and Facilities Operations to address extraordinary issues or concerns, and to review these policies as the University evolves. If questions arise from project managers in these groups please contact your department s representative. 4