Thai-Lao Hydro Projects Should Meet International Standards

Similar documents
Power Surge. The small country of Laos is undergoing some big changes. As it tries to become the battery of Southeast.

Nam Theun 2. TNC workshop April 2014

Briefing Summary. Board Meeting on Nam Theun 2 Project: November 22, 2010

The Environmental and Economic Impacts of the Nam Theun 2 Hydroelectric Project on Communities Living in the Xe Bang Fai River Basin 16 March 2004

Nam Theun 2 Hydroelectric Project FREQUENTLY ASKED QUESTIONS February 2007

Session: For more information:

Nam Theun 2 Hydropower Project, Lao P.D.R.

Local Participation on Benefit Sharing of Nam Lik 1-2 Hydropower Project in Lao PDR

The Nam Theun 2 Resettlement Plan and Viability of Proposed Livelihood Options for Displaced Villagers

SUMMARY 2013 EDITION

Field Report regarding Nam Theun 2 Hydroelectric Project

Yangtze Programme Newsletter

TRANSBOUNDARY DIALOGUE

SOCIAL DEVELOPMENT PLAN

The First Mekong River Commission Summit 2010

Comments on CNR s report for the Government of Laos on the Xayaburi Dam June 2012

MEKONG RIVER COMMISSION

Economic analysis of the environmental and social impacts of the Nam Theun 2 Hydroelectricity Power Project. Final Draft Report

The LMB Sustainable Hydropower Development Strategy. Regional Power Trade Coordination Committee 24 Nay Pyi Taw, 20 June 2018

Water for Food and the Environment in the Lower Mekong Region

Economic analysis of the environmental and social impacts of the Nam Theun 2 Hydroelectricity Power Project. Final Draft Report

National Policy on Environmental and Social Sustainability of the Hydropower Sector in Lao PDR

Impact of Global Financial Crisis on Economic Growth in Lao PDR

Sustainable Development 6 and Ecosystem Services

Natura 2000 and Hydropower. Hydropower and Fish Workshop Brussels 29 May, 2017

From Upstream to Downstream:

Economic, Environmental and Social Impacts of Hydropower Development in the Lower Mekong Basin

Contents Overview of Laos Current energy policy and Measure Energy demand and Supply in Laos Energy outlook in Laos Difficulties and bottlenecks in fo

Transboundary Cooperation Workshop # January 2010, Vientiane. Sharing of Benefits in Transboundary Water Resources Management

Drought Situations and Management in Vietnam

January 24, Mr. Rajat Nag Director General, Mekong Department Asian Development Bank PO Box Manila, PHILIPPINES By and US mail

Concept of WSM Country Status on Watershed Management Planning Institution and Legislation relevant to WSM in Laos Application of Watershed Management

Water resource benefit trade-off and hydropower development

Chiang Mai University. June 14, 2008

Laos Country Report on Environmental Management in the Lao PDR Mining Sector. International Conference A Greater Mekong?

MRC's role in relation to planning and implementation of mainstream dams and its strategic assessment framework

RIVER HEALTH, ENVIRONMENTAL FLOWS AND CASCADE MANAGEMENT IN LAO PDR

The Continuing Impacts of the ADB-Funded Nam Song Diversion Project, Lao PDR

The Role of the Mekong River Commission (MRC) in Conflict Management. SATIT PHIROMCHAI Mekong River Commission Secretariat

WELCOME TO. The First General Meeting Network of Asian River Basin Organisation

The Living Mekong Programme Goal :

Proposed Nam Theun 2 Hydroelectric Project in Lao PDR World Bank Responses to IRN-EDF Technical Reviews

SUSTAINABLE HYDROPOWER DEVELOPMENT A NORWEGIAN-GEORGIAN COOPERATION PROGRAM. A Citizen s Guide. Communication and Hydropower EIA

WWF-LAOS STRATEGY STRATEGY LAOS. Xe Sap National Protected Area Thomas Calame

Broad aims of the SEA. SEA SUMMARY OVERVIEW REGIONAL MITIGATION ASSESSMENT WORKSHOP Ho Chi Minh City June The context for the SEA

Joint Environmental Monitoring (JEM)

Networks of Power: Development Banks and Energy Security in the Mekong Region in the Mekong Region

TABLE OF CONTENTS. General information about the human population living along the Se San, Sre Pok and Lower Sekong Rivers

COMPLIANCE REPORT ASSESSING APPLICATION OF ARTICLE 11 b (6) OF EMISSIONS TRADING DIRECTIVE TO HYDROELECTRIC PROJECT ACTIVITIES EXCEEDING 20 MW

10 Project Cost Estimation

Food, Water, Energy Security Tradeoffs: 3-S River Basin and Tonle Sap

UPDATE ON LAO PDR: NAM THEUN 2 (NT2) HYDROELECTRIC PROJECT INTERIM PROGRESS REPORT

DR. STEPHEN SPARKES VICE PRESIDENT, STATKRAFT INTERNATIONAL HYDROPOWER, E & S GOVERNANCE

Equitable and Low-Carbon Society: Aspiration and Strategies for Southeast Asia

Climate change impacts, vulnerability and adaptation in drought severity in the Lower Mekong Basin

Integrating Pro-poor Development into Biodiversity Strategic Planning: Lessons from the UNEP-UNDP Poverty- Environment Initiative

ANNEX 1: PROJECT DESCRIPTIONS

ICEM and MRC - SEA of hydropower on mainstream Mekong River 1

Xayaburi Hydropower Project

MRC ASSESSMENTS ON FLOODS, DROUGHTS AND CLIMATE CHANGE

TECHNICAL ASSISTANCE DESCRIPTION, COST ESTIMATES AND OUTLINE TERMS OF REFERENCE

Fisheries and Aquaculture in a Changing Climate

Promoting Cooperation on Ecosystem-based Approaches in the Greater Mekong Subregion (GMS)

The Niger: a lifeline. Effective Water Management in the Upper Niger River

SEMINAR ON CUMULATIVE IMPACT ASSESSMENT & MANAGEMENT

ENVIRONMENT ASSESSMENT TOOLS FOR IMPROVING THE SUSTAINABILITY OF DEVELOPMENT IN THE MEKONG REGION

Failure to Restore: An Assessment of the Impacts of the Theun-Hinboun Hydropower Dam Projects on Downstream Communities in Laos

Ranking significance of impacts 7/13/2010. SEA OVERVIEW OF CONCLUSIONS REGIONAL MITIGATION ASSESSMENT WORKSHOP Ho Chi Minh City June 2010

A CITIZEN S GUIDE. Awareness Raising on Hydropower Project Development and EIA for Citizens (part I)

I C E M - I n ternat i o n a l C e n tre fo r E n v i ro n m e n t a l Manage m e n t

Adam Oswell / WWF-Greater Mekong LEAFLET MARCH. WWF-Greater Mekong. WILDLife, landscapes and livelihoods

GEO-DRI Drought Monitoring Workshop, May 10-11, 2010, Winnipeg, Manitoba Drought in Southeast Asia

Benefit sharing in hydropower development. Initiative on Sustainable Hydropower

Trends and long-term outlook for the Mekong region

Environmental and Social Impact Assessment for Rogun Hydro Power Plant

Environmental Performance Assessment in the Greater Mekong Subregion

Profiles of 12 proposed Mainstream developments in the LMB

Water Issues in Asia with special reference to the Greater Mekong Region and Thailand

Lao People s Democratic Republic

HYDROPOWER DEVELOPMENT IN THE MEKONG BASIN

Mekong 2 Rio International Conference on Transboundary River Basin Management. Conference Brief

THE FIRST MEKONG RIVER COMMISSION SUMMIT Hua Hin, Thailand

Lancang Jiang To The Mekong Delta: Questions of Dams, Development Impact And Integrity

PRoACC2. (First Draft) Research Proposal. Risk Perception and Livelihoods under Climate Change. in the Mekong Cambodia. Royal University of Phnom Penh

Clean Development Mechanism CDM

WWF Dams Initiative Improving Outcomes by Comprehensive and Integrated Water and Energy Planning

Identifying and Valuing the Benefits: the Experience of Mekong River Basin

UPDATE ON THE LAO PDR: NAM THEUN 2 (NT2) HYDROELECTRIC PROJECT

Issues associated with wetland biodiversity and. agriculture globally. and the extent of agriculture in Ramsar wetlands.

COUNTRY REPORT ENVIRONMENTAL IMPACT ASSESSMENT MAY 02 TO JUNE 02 YEAR 2000

Guiding Principles on Sustainable Hydropower Development in the Danube River Basin

Fresh Water Treaty. International Setting and Issues in Water, Environment and Development

Potential Impacts of Climate Change on Food Security in the Lower Mekong Basin. Mekong ARCC

Mekong Climate Change and Adaptation Initiative of the Mekong River Commission

THE WORLD BANK APPROACHES TO SOCIAL, ENVIRONMENTAL, GOVERNANCE AND FINANCIAL ISSUES IN THE NAM THEUN 2 HYDROPOWER PROJECT. Lao PDR

Geopolitical benefits of transboundary water cooperation. The Mekong River Basin Case

DRAINAGE. Actions for Tomorrow. Drainage. Actions Today

Columbia River Treaty Frequently Asked Questions (FAQs)

Constitutive Meeting of the Network of Transboundary Basin Organizations Thonon-Les Bains (France)

ROLES AND EFFORTS OF THE IRRIGATION SECTOR IN MYANMAR AGRICULTURE PRACTICE

Transcription:

Thai-Lao Hydro Projects Should Meet International Standards Shannon Lawrence, Lao Program Director, International Rivers Statement given at Media briefing on Thai-Lai Hydropower Projects Thursday December 13th, 10 am, Foreign Correspondents Club of Thailand (FCCT) Laos plans to become the battery of Southeast Asia are now well known. There are six large hydropower plants operating in Laos today. According to the latest figures from the Lao Ministry of Energy and Mines, four projects are under construction and five to ten more are at advanced planning stages. The Lao government has announced its intentions to attract enough foreign investors to build close to 30 new dams by 2020. Thailand is still the biggest consumer of Lao hydroelectricity. New power purchase agreements for four hydro projects, totaling almost 1,500 megawatts, are expected to be signed between Thailand and Laos before the elections. Thai companies, such as the Electricity Generating Company of Thailand (EGCO), Ratchaburi and GMS Power, are some of the main dam builders in Laos. And Thai financial institutions, including Thai Exim and private banks, are also important players. Recognizing the significance of this bilateral relationship, in September, officials from Thailand and Laos gathered with the World Bank at a High-Level Forum on Sustainable Hydropower Development to affirm the need for environmental and social standards for hydropower projects. This was an important dialogue at which commendable commitments were made by both countries. The Thai Energy Ministry, project developers, financiers, and the Electricity Generating Authority of Thailand (EGAT) 1

acknowledged their responsibility to ensure that the Lao dams they support meet international environmental and social standards. Across the Mekong, the Lao government affirmed the importance of strengthening its regulatory institutions and policies to secure maximum benefits for Lao people. This follows on the Lao government s adoption, in 2005, of a National Policy on the Environmental and Social Sustainability of the Hydropower Sector. Yet with the number of proposed dams and the track record of past projects, there are significant risks that these commitments won t keep pace and be translated into timely action. Environmental and social standards are important, but implementation is key. Right now, Laos s largest project, Nam Theun 2, is facing a number of challenges in that regard. I ve just visited the project area and will briefly highlight some key issues. Erhard Floether will elaborate further in his presentation, and we ll be happy to answer questions or provide more details during the discussion. Downstream, the Nam Theun 2 project will cause food and income losses for more than 120,000 people who depend on the Xe Bang Fai and Nam Theun rivers. Fish, a staple food item, will decline. There will be more flooding which will likely impact people s ability to grow rice. There will also be increased erosion along parts of the river and water quality problems. Implementation of Nam Theun 2 s Downstream Livelihood Restoration Program has been initiated in only about 20 percent of the more than 220 villages that will be affected in two years when power production begins. Nam Theun 2 s official monitors, the Panel of Experts, state in their September 2007 report: The problem [with the Downstream 2

Program] at this point is that many of the impacts of the project will be felt well before comprehensive counter measures are in place (p. 33). The Panel of Experts also points to the program s short and long term funding gap; the protein deficiency that is likely to emerge when fish supplies decrease; and notes that the existing programs do tend to look more like a series of essentially unrelated if useful sub-projects than the product of a coherent plan (pp. 34-35). Furthermore, the Nam Theun 2 Power Company and the Lao government have still not reached an agreement on biomass clearance from the reservoir area. Time is running out, with just over four months remaining before the onset of the rainy season and reservoir impoundment. While the high-value timber has been removed, additional biomass clearance is critical to minimize water quality problems in the reservoir and downstream, and reduce greenhouse gas emissions from the reservoir. Resettlement on the Nakai Plateau has also suffered from significant delays, although progress has been made in the construction of resettlement infrastructure in the last several months. But the key question remains: how will these 6,200 resettlers feed their families and earn an income when two-thirds of the land they used for farming, animalgrazing and collecting forest products is under water? And Nam Theun 2 is just one of four existing or proposed dams in the Nam Theun-Nam Kading river basin. About 40 kilometers downstream from Nam Theun 2, the Thai- Norwegian Theun-Hinboun Hydropower project has been generating electricity for Thailand since 1998. A report released last month by Norwegian NGO FIVAS details increasingly severe flooding along the Hai and Hinboun Rivers over the last nine years, largely due to water releases from the project. Around 30,000 people have suffered 3

declines in fish and other aquatic resources, for which the company has paid no compensation. They have also been forced to abandon their paddy fields due to the repeated loss of wet season rice crops. The flooding has caused water contamination, skin diseases, drinking water shortages, death of livestock from drowning and disease, and other temporary food shortages. Yet the project s operators, Statkraft and GMS Power of Thailand, are now proposing an expansion to account for the reduction in flows caused by Nam Theun 2 s development upstream. The Theun-Hinboun Expansion Project would double the diversion to the Hai and Hinboun, making life for tens of thousands of people living along those rivers increasingly intolerable. This new project does not include adequate measures to mitigate the flooding and erosion problems, nor does it provide compensation to address villagers past and ongoing losses. The Theun-Hinboun Expansion Project is one of the four power purchase agreements with Thailand that are expected to be signed by the end of this year. But it should not go forward until and unless the Company has resolved the problems with the existing project. Murray Watson will discuss these issues in more detail. Another one of these four projects, the Nam Theun 1 dam, would be built downstream from Nam Theun 2 and Theun-Hinboun, just about 30 kilometers from the Mekong confluence. This Thai-Malaysian dam sponsored by Gamuda and EGCO would be built in the middle of Laos remote Nam Kading National Protected Area, in an area classified by conservation organizations as one of 35 global biodiversity hotspots. Its reservoir would effectively divide the protected area in two, destroying large swathes of riverine and terrestrial wildlife habitat. Hunting and poaching pressures are already on the rise; 4

and even before an environmental impact assessment has been approved, roads constructed for the project have reached the national park. Reports indicate that more than 3,500 people will be displaced to make way for Nam Theun 1, and that communities downstream can expect decreases in water flows, water quality, and fisheries. Nam Theun 1 s economic viability has also been questioned, especially considering the development of the Theun-Hinboun Expansion Project upstream. Given Nam Theun 1 s significant social and environmental costs many of which simply cannot be mitigated -- this project undermines the sustainable hydropower pledges made by the Thai and Lao governments in September. The Theun-Hinboun Expansion Project, with its failure to address the legacy of downstream livelihood losses, also fails to meet these standards. Committing to and implementing high social and environmental standards benefits all parties. It reduces the financial and reputational risks for Thai project developers and their financial backers. It shields the Thai government from criticism that it has externalized the social and environmental costs of its energy consumption to its Lao neighbors. Most importantly, it reduces the potentially devastating effects of these projects on Lao people and the threat they pose to the Lao government s poverty reduction plans. New hydropower projects that fall short of these standards, such as the Theun-Hinboun Expansion Project and Nam Theun 1, should be dropped. 5