1st International Conference on Large-Scale Grid Integration of Renewable Energy in India Durgesh Manjure, MISO Energy September 6, 2017

Similar documents
Evolution of the Grid in MISO Region. Jordan Bakke, David Duebner, Durgesh Manjure, Laura Rauch MIPSYCON November 7, 2017

Managing Flexibility in MISO Markets

Flexible Ramping Products

An Introduction to PJM: Focus on its Markets and Opportunities for Demand Resources OHA Annual Energy & Sustainability Conference

Industry Perspectives on FERC Standard Market Design

Renewables and electricity market design

CURRENT FEDERAL AND REGIONAL ELECTRIC POLICY ISSUES FOR THE ILLINOIS COMMERCE COMMISSION

RTO Overview and Day 2 Markets. EAI Technical Conference May 26, 2011

Future Market Implementation

PJM PROMOD Overview. August 1, PJM

Wind Update. Renewable Energy Integration Lessons Learned. March 28, 2012

Key Issues and Consideration in Market Design, Operational and Oversight

Opportunity Cost of Flexible Ramping Constraint. Draft Final Proposal

PJM Wholesale Markets. Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia

Status Update Assessment of ICT/RTO Options and Issues

2012 Grid of the Future Symposium. Evolution of the US Power Grid and Market Operations through the next Decade

2010 RTO Metrics Report: NESCOE Data Summary

PJM Markets. Energy and Ancillary Services. PJM State & Member Training Dept. PJM /29/2014

With funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development

Design Considerations for an Alberta Capacity Market

ERCOT ISO: Current Market and Trends in Future Market Design

Energy Imbalance Market Overview

Eligible Intermittent Resource Dispatch Operating Target EIR DOT

Peak Reliability/PJM Connext West-Wide RC and Market Services. Webinar January 16, 2018

The Future From One RTO s Window The Institute for Regulatory Policy Studies. Dave Hadley VP, State Regulatory Relations Midwest ISO

Energy Uplift (Operating Reserves)

The New Jersey Clean Energy Conference September 26, PJM Overview. Kenneth W. Laughlin VP Markets Coordination PJM

Open Access Technology International, Inc. (OATI)

Advancing Renewable Alternatives

LMP Implementation in New England

Dispatching Variable Generation Resources

2018 CAISO Policy Initiatives Roadmap

Applying Robust Optimization to MISO Look-ahead Unit Commitment

Renewable Integration: Market & Product Review Phase 1

MIDWEST ISO UPDATE. Sherman Elliott Manager State Regulatory Affairs

U. S. SPOT MARKET REGULATION

Illinois State Institute for Regulatory Policy Studies Conference

Wholesale Electricity Markets. New England Independent System Operator. Commissioner Mark Vannoy Maine Public Utilities Commission

Electricity market design with thoughts for New Zealand. Peter Cramton University of Cologne and University of Maryland 12 February 2018

Conseptualizing Flexibility In Power Systems

IMM Quarterly Report: Spring 2012 March May

Joint and Common Market PSEUDO TIE UPDATE AUGUST 22, 2017

Overview of PJM: Looking Back to Look Forward Tokyo Power Market Summit

Midwest ISO TDU Sector October 2010 Midwest ISO Advisory Committee Hot Topic Adequate Price Signals

Recent Development in Reliable Energy Market in the US and Singapore

Gas-Electric System Needs and Reliability

Price Formation Education 3: Reserves and Co-optimization

Senate Bill 350 Study

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

The Year to Date in PJM: Operations and Markets

Regional Impact of Renewables: ERCOT

Energy Storage Integration in Alberta s Energy Only Market. Kevin Dawson Director, Market Design Alberta Electric System Operator

Day-Ahead Market Enhancements Phase 1: Fifteen-Minute Granularity. Second Revised Straw Proposal

Canadian Wind Energy Association Operations and Maintenance Summit

IMM Quarterly Report Supplement: December Highlights and Other Issues

Single Schedule Market Pricing Issues

Technologies to Enable Wind Power Integration. John Kehler Technical Lead System Performance

Regional Flexibility Markets

Dispatchable Intermittent Resource (DIR) Workshop

Energy Imbalance Market Design Straw Proposal and Issue Paper. Stakeholder Meeting April 11, 2013

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

The Future of Power? Power is the Future!

Mountain West Transmission Group Frequently Asked Questions Updated through September of 2017

Straw Proposal. Post-Release 1 MRTU Functionality for Demand Response

A Brief Introduction to EIM Bidding and Market Design 9/7/2017

CALIFORNIA INDEPENDENT SYSTEM OPERATOR ANCILLARY SERVICES REQUIREMENTS PROTOCOL

Supporting Documentation for Volume 1, Chapter 11. Table 12-1 Definition of key ancillary services

MARKET EFFICIENCY STUDY PROCESS AND PROJECT EVALUATION TRAINING

Integrating High Levels of Variable Renewable Energy Sources

Outage Coordination Training MISO Training

Joanne Flynn David Cormie NFAT Technical Conference July 15, 2013

Dispatch Signal & Locational Marginal Pricing (LMP)

Introduction to the Energy Imbalance Market (EIM Module 1)

Ancillary Services Matrix

EIM Settlements Load Customer Training September 13, 2016

Ancillary Services from Wind and Solar. Power Plants. CanWEA O&M Workshop January 30, 2018 Toronto, Ontario. J. Charles Smith Executive Director UVIG

APS Stakeholder Meeting. September 9 th 2016

SPP at a Glance. Located in Little Rock. Approximately 600 employees

Draft Whitepaper to Platte River Board of Directors

The Evolution of the PJM Market in the United States: Looking Back to Look Forward

Better Markets, Better Products, Better Prices

Stepped Constraint Parameters. Issue Paper

Mid-Continent Independent System Operator (MISO) Overview. INCMA February 15, 2017

Briefing on intertie deviation settlement proposal

FirstEnergy Solutions Energy Market Update AEE Meeting March 20, John Ogurchak PE/CEM Manager, Commercial/Industrial Energy Sales

Demand Response. US experiences, German challenges and market barriers

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Market design for large shares of renewables: time and space

Price Formation in Energy and Ancillary Services Markets Operated by Regional Transmission Organizations and Independent System Operators

Day Ahead Market Enhancements. Issue Paper/Straw Proposal

Overview of Renewables in the ERCOT System. Julia Matevosyan Lead Planning Engineer, Resource Adequacy

Distributed Energy Resources Roadmap

California ISO Energy Imbalance Market Operations Overview. June 10, 2014 Webinar

National Council on Electricity Policy Annual Meeting & Workshop Denver, CO. May 8, Jeff Bladen Executive Director Market Development

MISO Energy Storage Study Phase 1 Report

Energy Management and Planning in Greek Non Interconnected Islands

Are the British Electricity Trading and Transmission Arrangements Future-Proof?

Decision on intertie deviation settlement proposal

Introduction to RRG Drafting Team Proposal

California ISO. Q Report on Market Issues and Performance. February 10, Prepared by: Department of Market Monitoring

Transcription:

Centralized Energy & Operating Reserves Markets: A MISO perspective 1st International Conference on Large-Scale Grid Integration of Renewable Energy in India Durgesh Manjure, MISO Energy September 6, 2017 1

MISO manages one of the world s largest energy markets Scope of Market Operations US $25.3 billion gross market charges 437 market participants, 42 million customers 5-minute security constrained economic dispatch Generation Capacity: 191,062 MW Historic Peak Load: 130,917 MW Wind generation capacity: 16,326 MW Instantaneous Wind Peak: 13,731 MW 65,800 miles of transmission Footprint: 15 US States, 1 Canadian Province Control centers 2

Markets span a broad time continuum to ensure reliable and efficient operations 3 ARR: Auction Revenue Rights

Evolution of DA & RT market operations at MISO Pre- Energy Market (prior to April 2005) Decentralized bi-lateral market and unitcommitment & dispatch Sub-optimal dispatch and congestion management Individual BAs carried own regulation and spin reserves Regulation requirement: ~1600 MW Spin requirement: ~1500 MW Post-Energy market, pre-asm Centralized, optimal unit commitment and dispatch Transmission congestion managed through SCED Individual BAs still carried their own regulation and spin reserves Regulation requirement: ~1600 MW Spin requirement: ~1500 MW Post-ASM (January 2009) Centralized, co-optimized energy and operating reserves dispatch One centralized regulation target Pricing mechanism for regulation moved to market pricing Regulation requirement: ~400 MW Spin requirement: ~935 MW Enhancements for renewable integration Dispatchable Intermittent Resource product Ramping product Under consideration Requirements for variable resources to provide ancillary service (efforts through MISO stakeholders, FERC and NERC) Market enhancements 4 DA: Day Ahead RT: Real-time

Day-Ahead and Real-Time Markets Include Four Products Operating reserves are settled using Market Clearing Price (MCP) A separate MCP is calculated for each product Energy is settled using Locational Marginal Prices (LMP), which include congestion and loss components as well. 5

Energy and ancillary service products are cleared using co-optimized dispatch Co-optimization ensures that there is enough energy online and available for the system demands Energy and Operating Reserves clear in a manner that maximizes margin (payment above offered costs) to the resources Market Product Description Product Highlights Energy Market Energy Ensures there is enough capacity to meet demand for the operating day Based on demand bids and resource offers in DA Based on offers and system demand in RT Operating Reserves Market Regulating Reserve Contingency Reserves Spinning Reserve Supplemental Reserve Allows MISO to physically balance supply and demand on real-time basis Provides energy to meet demand in the event of an unexpected loss of a generation or transmission resource Similar to Spinning Reserve, but can be supplied by offline Resources 5 Minute Response Time Must be on-line Automatic Generation Control Equipped (AGC) 10-Minute Response Time Must be on-line 10 Minute Response Time Can be off-line or on-line 6

Centralized energy market provides over $150 million 1 in annual benefits to MISO s members Before MISO market, the region operated as a decentralized, bilateral market resulting in limited transmission utilization, pancaked transmission rates and low market transparency. MISO s energy markets use centralized security-constrained unit commitment and economic dispatch to optimize resource use based on market participant provided bids and offers. Bilateral transaction Transmission Lines 1: Based on MISO s 2016 Value proposition study

Regulating and spin reserves market provides annual 1 benefits of around $75 million to MISO s members Prior to MISO s reserves market each BA maintained their own regulation & spin reserves With the reserves market the MISO BA as a whole has a common regulation & spin reserves target Individual regulating needs often resulted in BAs working against each other Reduction in regulation and spinning reserves frees up generation to serve the energy needs more economically Regulation Up Regulation Down Transmission Lines 1: Based on MISO s 2016 Value proposition study

Wind and solar generation are dispatchable in MISO s market, just like traditional generation Pre-DIR, dispatch target equal to observed output in previous state estimator snapshot which could be ineffective, as shown below DIR adjusts dispatch target based on realtime forecast and recognizing transmission limitations, as illustrated below The blue trace is what the wind resource is capable of producing, and the green trace is what the transmission system can accommodate. 9 DIR: Dispatchable Intermittent Resource RT: Real-time

Optimal dispatch in the MISO market considers system ramping capability needs Ramp-capability product considers system ramping needs while optimally dispatching generation in real-time Market dispatch is fine-tuned by withholding faster ramping resources even though they may be more economic, to ensure that the system isn t ramp-constrained during times of need These generators are then paid their opportunity cost as compensation for the duration that they are withheld. There is no offer price for the ramp product when the ramp product is binding it is cleared at a price which is equal to the opportunity cost of the marginal resource Participation in the ramp product is voluntary and resources can opt out 10

Real-time stability assessments maximize utilization of renewables while minimizing market congestion costs Online assessment (green) provides consistently higher limits compared to offline studies (red). More efficient utilization of the transmission system by: minimizing real-time congestion and reducing costs accommodating higher wind generation by minimizing curtailments Avoided real-time congestion due to higher limits available through online assessment Contributes to overall market efficiency while ensuring reliable operations Online stability assessment reduced congestion costs by ~$31 million in 2016! 11

In Summary MISO manages one of the world s largest energy markets with over 190,000 MW of generation and over US $25 billion in gross market charges Day-ahead and real-time markets for energy and ancillary services cumulatively save the MISO membership ~US $225 million annually Need for efficient and reliable integration of bulk quantities of renewable resources has driven enhancements to the MISO market such as dispatchable intermittent resources, ramp-capability product and online stability assessment 12

Contact Durgésh Manjuré Sr. Manager, System Operations MISO dmanjure@misoenergy.org +1-651.632.8410