Mauritania a model response planning process

Similar documents
The IMO/IPIECA Global Initiative Project in West and Central Africa Keeping the focus, changing the strategy

O I L SPILL RES PO NSE TRA INING SERVICE S

Oil Spill Preparedness and Response

Best Practices in Oil Spill Contingency Planning

REVIEW OF THE AUSTRALIAN NATIONAL PLAN POST DEEPWATER HORIZON, MONTARA AND OTHER NOTABLE MARITIME INCIDENTS

ASX ANNOUNCEMENT (ASX: WPL)

Country Profile Cabo Verde

Environmental Management in Oil Spills

February 2012 Tweneboa, Enyenra, Ntomme T.E.N. Development Project Environmental Impact Assessment Scoping Report and Terms of Reference (ToR)

Improving Oil Spill Risk Assessment

Oil Spill Trajectory Modeling & Visualization Geeva Varghese. Copyright Oil Spill Response Limited.

Country Profile Nigeria

8. Risk Assessment Process

IUCN ISRP FOLLOW UP WORKSHOP OIL SPILLS

Oil Spills in Oman: Environmental Protection, Planning and Response Case Study

Recent Oil Spill Preparedness Developments in the Caspian Sea Region

Country profile South Africa

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

Oil Spill Preparedness Regional Initiative (Caspian Sea Black Sea Central Eurasia) OSPRI

The overall objectives of the monitoring activities are to:

7 MONITORING PLAN 7.1 INTRODUCTION

WELL CONTROL AND SPILL RESPONSE PLANNING

WE RE HERE FOR THE LONG HAUL.

Contents. Non-Technical Summary. 1. Introduction. 2. Policy, Regulatory and Administrative Framework. 3. Impact Assessment Methodology

Newfoundland and Labrador Offshore Spill Preparedness and Response Initiatives

Scoping Document for the Environmental Assessment Statoil Waverley 3D Seismic Survey Exploration Licenses 2435 and 2436

Cap & Contain (Flow) Defining Success!

4. Development Alternatives

PLUTO OFFSHORE FACILITY OPERATIONS

Scoping Document for the Environmental Assessment. BP Exploration (Canada) Ltd. Tangier 3D Seismic Survey

AD-7 Drilling Program: Quarterly Environmental Monitoring Report

European Maritime Safety Agency

T.E.N. EIA COMMUNITY CONSULTATION: POTENTIAL STAKEHOLDER QUESTIONS (QUESTIONS AND ANSWERS SHEET)

The challenges and complexities of impact assessment for a seismic survey in a remote coral reef environment

APPENDIX 1 SUMMARY OF DFO S HADD COMPENSATION PROCESS

Draft Structure of the Environmental Report for the Spatial Offshore Grid Plan of the German Exclusive Economic Zone (EEZ) in the Baltic Sea 2013

Organisation of the Norwegian preparedness against acute pollution. Norwegian Coastal Administration department for emergency response

Abate on Site This involves adding something to the design to abate the impact eg pollution controls.

HOW OIL AND GAS COMPANIES WILL APPROACH THE ESIA PROCESS Mitigating potential impacts

Tuesday, December 9, 2014 ACES Conference

Greece Operations Base

CAIRN ENERGY PLC ( Cairn or Company or Group )

Deep Panuke Offshore Gas Development. Comprehensive Study Report

Preparedness for oil spill environmental monitoring: An international perspective. Nicky CARIGLIA, Technical Adviser, ITOPF

Jubilee field. development - the story so far. June 2010

Resilience in Lebanon: Getting ready for Oil & Gas Activites

Shelburne Basin Venture Exploration Drilling Project Oil Spill Response Plan

Challenges. Readiness Evalua-on Tool for Oil Spills (RETOS ) Closing the Gaps in Spill Planning and Preparedness

An ARPEL Tool to Assist the International Oil Spill Community in Bridging Response Planning and Readiness Gaps

Collecting environmental baseline knowledge: the importance of partnerships and transparency

Everything you need to know about Oil Spill near the Chennai coastline (GS -3,Disaster Management)

SHELL FLNG TECHNOLOGICAL BREAKTHROUGH AND INNOVATIVE APPLICATION OF EXISTING TECHNOLOGIES

2. General Information

Mitigating Environmental Impacts in the Offshore Oil and Gas Industry

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

Presentation to the Timor-Leste. International Petroleum Conference. Woodside Energy Ltd Dili - March 2003

EXPERIENCE THE ENERGY

Keith M. Donohue Commander, U.S. Coast Guard, Seconded as a Consultant for the International Maritime Organization

AT A GLANCE. $17 billion $52 billion 41 million 5,300

Ichthys Project OUR STRENGTH AND DETERMINATION IS DRIVING ONE OF THE WORLD S LARGEST AND MOST COMPLEX PROJECTS

A GUIDE TO CONTINGENCY PLANNING FOR OIL SPILLS ON WATER

Scoping Document. for the. Strategic Environmental Assessment. for Exploration Activities. on the Southwestern Scotian Slope

Liquids Pipeline Emergency Response

Disclaimer. Copyright Note

Elastopor Sustainable solution for cryogenic insulation

Prelude Floating LNG Project Draft Environmental Impact Statement. Shell Development (Australia) Proprietary Limited EPBC 2008/4146

THIRD QUARTER REPORT FOR PERIOD ENDED 30 SEPTEMBER 2014

Shipowners Perspective on Preparedness for Oil Spill Response

For personal use only

Scoping Document. for the. Strategic Environmental Assessment. for Exploration Activities. on the Southwestern Scotian Slope

Responsible Canadian Energy: Continuous Improvement in Environmental Performance in Atlantic Canada s Oil and Gas Industry

National Workshop for the Development of the National Contingency Plan, Liberia

Net Environmental Benefit Analysis: An Overview. Dr Tom Coolbaugh, ExxonMobil Geeva Varghese, Oil Spill Response Limited

Investor Briefing - Ichthys LNG Project

South Asian Seas Programme. S M D P Anura Jayatilake/Director General, South Asia Cooperative Environment Programme

1 Abstract. 2 Norwegian contingency today

Oil Spill Response. October 2006

RE: RESPONSE TO COMMENTS AND FINALISATION OF COVA EIS AND EMP

"The preparation and execution of the National Plan for the protection of the marine environment in the State of Kuwait"

The Convention on Wetlands (Ramsar, 1971)

HERE IN AUSTRALIA, WE RE HARNESSING THE MOST POWERFUL ENERGY IN THE WORLD

ICM Solutions. Reducing Risks from Oil Spills: The Dongying Experience

- Additional sampling efforts for under-surveyed groups (i.e. benthic fauna)

Integrated Actions to Mitigate Environmental Risks in the Mediterranean Sea

KOGI REPORTS BARGING STUDY COMPLETED

Session 3: Evidence & Decommissioning

Adani Australia Lessons and Opportunities

Emerging long term effects:

Barossa Gas Export Pipeline Installation

Safety and Environment Management Plan

Pollution preparedness and response

Final draft. Revised NATIONAL OIL SPILL CONTINGENCY PLAN

TEMA LIQUEFIED NATURAL GAS PROJECT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT

EXECUTIVE SUMMARY RISK ANALYSIS (VOLUME 1)

Compliance Assessment Report 2017: Ministerial Implementation Statement No. 873

Source Control Planning, Practice and Execution

AD-7: Quarterly Environmental Monitoring Report

OIL POLLUTION RESPONSE & RHODOLITHS / CORALLINE ALGAE. Dr Mark Whittington Technical Team Manager

OIL POLLUTION EMERGENCY PLAN

National Oil Spill Contingency Plan in the Lebanese Waters

Transcription:

Mauritania a model response planning process Chinguetti Project An Operator s Perspective Dr. Jeremy Colman Manager Environmental & Social Affairs (Africa) Woodside Energy Ltd Dr. Rob Holland Senior Consultant Oil Spill Response Ltd Interspill 2006 Overview Process & outcomes WACAF GI role for IMO/IPIECA/Industry Woodside background & activities in Mauritania Development of OSCP Environmental impact assessment Spill risk assessment Spill risk management 2

Process & outcomes 1. Operator OSCP Tier 1-3 Project EIA Spill Risk Assessment Spill Risk Management Catalyst to achieving significant progress against WACAF-GI objectives in NW Africa region 2. Cooperation with Govt Agencies 3. Enhanced Response Capability at National Level 4. Progress on Mauritania & Senegal National OSCPs 3 WACAF GI (1) principles GI - Partnership between IMO & IPIECA to: Encourage & promote co-operation and partnership with shipping & oil industry Assist countries in developing national structure for dealing with oil spills through mobilization of external assistance & industry support at national / regional levels Encourage ratification & implementation on OPRC and conventions relating to liability & compensation 4

WACAF GI (2) opportunities in NW Africa region Increase level of preparedness at Government level: International Conventions Mauritania & Senegal have not ratified CLC & FUND 92 National contingency plans Neither country has National OSCPs in force Identification of Competent National Authority Improve cross border co-operation Improve levels of training and equipment 5 Woodside Australia's largest publicly traded oil & gas exploration and production company Assets, projects, development opportunities and exploration interests in Australia, Asia, Africa & US Sales of liquefied natural gas, natural gas, crude oil, condensate & liquid petroleum gas Formed in 1954, HQ in Perth, Western Australia. More than 3000 staff, listed on the ASX (WPL) 6

Woodside in Africa Canary Islands (2002) Non Operator Algeria (2002) Non Operator Libya (Q4 2003) Operator Mauritania (1999) Operator Sierra Leone (2004) Non Operator Liberia (2005) Operator Kenya (2003) Operator Proven Province Frontier Acreage 7 Woodside in Mauritania Operator of 6 PSCs covering 5 offshore blocks & 2 onshore blocks Chinguetti oil field discovered 2001 Other discoveries under evaluation (Tiof, Banda, Tevét, Labeidna) 15% equity (nonoperator) in Block 7 8

Chinguetti project (1) Woodside-operated Chinguetti oilfield located ~ 90km west of Nouakchott, in 800m water depth First oil production Feb 2006, field life ~10 years, peak production ~75,000 barrels a day Oil produced through subsea wells to an FPSO (Berge Helene) permanently moored (turret) over the field Oil periodically offloaded to trading tankers 9 Chinguetti project (2) Participating interests in the Chinguetti field: Woodside group companies 47.4% Hardman Chinguetti Production Pty. Ltd. 19.0% Société Mauritanienne des Hydrocarbures 12.0% Mauritanian Holdings B.V. (BG group) 10.2% Premier Oil group companies 8.1% ROC Oil group companies 3.3% 10

Chinguetti project (3) 11 Chinguetti environmental impact statement Explains the Project, outlines environmental effects, describes management measures Focuses on five key environmental hazards 1. Accidental oil spills 2. Produced water discharges 3. Drilling discharges 4. Fisheries interactions 5. GHG emissions 12

Regional values & sensitivities (1) Commercially-important demersal and pelagic fish in coastal and offshore waters Up to 32 cetacean species Several species of marine turtles and nesting areas Diverse populations of migratory and resident waterbirds and seabirds Deep-water seafloor features - carbonate mud mounds & underwater canyons 13 Regional values & sensitivities (2) Population of Mediterranean monk seals Seagrass beds and remnant mangroves Marine and coastal wetlands and bird habitats within declared protected areas and reserves Bird habitats in coastal wetlands and lagoons Major industrial and artisanal fisheries 14

Spill risk assessment Primary Risk Assessment Secondary Risk Assessment Risk Qualification Spill Risk Assessment Spill Risk Management Existing Spill Risk Change to Risk Profile Existing Response Capability 15 Spill modelling HYDROMAP + OILMAP + SIMAP Determination of a range of oil spill scenarios, including surface and seabed releases Model outputs provide information on expected probabilities of oiling and minimum potential time before exposure Model outputs represent conditional probabilities Single trajectory plots vs stochastic modelling 16

Single trajectory plots vs stochastic modelling Risks of misinterpretation of probability contours from stochastic modelling 17 Probability results Conditional probabilities do not take into account: Likelihood of spill will occur in the first place Any response measures to eliminate / minimize consequences 18

Modelling validation Deployment of 12 satellite-tracked drifter buoys over 12 month period 19 Existing spill risk (1) (2000-2002) Chinguetti Project will add ~3.3 million tonnes per annum (average), or ~5.7% by volume, at peak production 20

Existing spill risk (2) 21 Chinguetti oil properties Assessment of environmental consequences of spills based on: Local & regional values and sensitivities Oil spill modelling Oil properties: potential for natural evaporation and dispersion Weathering testing Ecotoxicity testing Dispersability testing 22

Spill risk assessment outcomes Most oil spill risk in Medium to Low categories, except for hypothetical development well blowout (High to Medium) 23 Spill risk management Prevention Measures Spill Risk Management Response Measures Equipment Systems / Procedures Training / Inductions Checks / Audits Trading Tanker Vetting Navigational Management Fisheries Interactions OSCP Interfacing with National OSCPs Stakeholder Consultation Sensitivity Mapping NEBA Response Strategies Equipment Deployment Capabilities & Preparedness Training / Exercises 24

Oil spill contingency plan EIS identified need for effective measures to respond to oil spills under framework of an OSCP Woodside drilling operations since 2001 covered by existing OSCP Decision taken to develop new OSCP based on changing oil spill risk profile (commencement of production) Oil Spill Response Ltd contracted to write new OSCP 25 Spill response strategies Key elements that were considered in developing response strategies: Requirements relating to Mauritanian draft national OSCP (POLMAR) Need for capacity building to develop national spill response capability under POLMAR Concerns & issues arising from stakeholder engagement Trans-boundary spill risk Evaluation of most appropriate spill response techniques 26

OSCP (1) structure PLAN 1. Purpose & Scope of Plan 2. Initial Action Procedures 3. Spill Assessment 4. Response Strategies 5. Organisation & Management 6. Response Equipment 7. Contact Details 8. Forms HANDBOOK 1. Introduction 2. Summary of Legislation 3. Operational Risk Assessment 4. Response Techniques 5. Oil Weathering & Fate 6. Environmental Sensitivities & Impacts 7. Tier 3 Logistics 8. Forms 9. Oil Spill Training & Exercises 27 OSCP (2) equipment stockpiles 28

OSCP (3) 2006 activities Sensitivity mapping of coastline (LandSat; ASTER; QuickBird) Decision support mechanism for chemical dispersant application (NEBA process) Training & deployment exercises Audits 29 Key outcomes Chinguetti Project response capability established for Tier 1-3 spills consistent with industry best practice & IPIECA guidelines Cooperation with Govt agencies in Mauritania & Senegal Mauritania national oil spill response capacity enhanced with additional equipment & trained personnel Progress on Mauritania and Senegal draft national OSCPs. More work needed on interfaces 30

Acknowledgements Government of the Islamic Republic of Mauritania Mauritania Joint Venture Participants: Hardman Resources Société Mauritanienne des Hydrocarbures BG Group Premier Oil Roc Oil OSRL IPIECA IMO 31