Eastern Kern Air Pollution Control District

Similar documents
YOLO-SOLANO AIR QUALITY MANAGEMENT DISTRICT 1947 Galileo Court, Suite 103; Davis, CA Phone (530) ; Fax (530)

COUNTY OF LOS ANGELES

H. Dust Suppressant - water, hygroscopic materials, or non-toxic chemical stabilizers used

APPENDIX M CEQA Initial Study Checklist

Environmental Information Form

Asbestos Dust Mitigation Plan (ADMP) Application

City of Bishop. Environmental Checklist Form

Carpinteria Valley Water District Carpinteria Advanced Purification Project

SECTION 9.0 Effects Found Not To Be Significant

SECTION 2.0 PERMIT BY RULE: Asphalt Plants

Kern County Environmental Checklist Form Environmental Factors Potentially Affected

All of the following must be submitted before the Planning Department can process the application:

"LIST AND CRITERIA" INDEX INTRODUCTION Section 1 - General Application Information... 5

IMPACT ON LAND. 1. Will there be an effect as a result of a physical change to project site? Yes No

STATIONARY SOURCE APPLICATION INSTRUCTIONS

PROJECT INFORMATION QUESTIONNAIRE PLANNING DIVISION 214 SOUTH C STREET, OXNARD, CA (805) FAX: (805)

RULE 8021 CONSTRUCTION, DEMOLITION, EXCAVATION, EXTRACTION, AND OTHER EARTHMOVING ACTIVITIES (Adopted November 15, 2001; Amended August 19, 2004)

306 EAST GOBBI STREET UKIAH, CA (707) SMOKE MANAGEMENT PLAN AIR QUALITY BURN PERMIT APPLICATION FORM

GENERAL APCD PERMIT INFORMATION REQUIREMENTS LIST

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information

NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING FOR COALINGA OIL FIELD EIR No. 7180

[] Brochure, picture, drawing, etc., of the use to be conducted (if applicable).

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information

The following findings are hereby adopted by The Regents in conjunction with the approval of the Project which is set forth in Section III, below.

Environmental Information Worksheet

Draft Negative Declaration of Environmental Impact. Project Title: Environmental Review / Tentative Parcel Map No.388

(1) The proposed commercial solar energy generation facility is either

5.0 LONG-TERM CEQA CONSIDERATIONS

ENVIRONMENTAL APPLICATION (To be completed by Applicant) OFFICIAL USE ONLY. Planning Staff Name: Signature: Filing (CEQA and/or Coastal) No.

Application fee: $ payable to Stevens County Land Services A completed environmental checklist Any other supplemental information.

APPLICATION PROCESSING

RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT

APPLICATION FOR REVIEW OF IMPORT EXPORT (EFFECTIVE 5/17/2010) REV: 7/18 GGI-08

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information.

APPLICATION FOR AUTHORITY TO CONSTRUCT/OPERATE

Guidance for Filling Out An Application for an Earth Moving Permit / Dust Control Plan. Section 1 Applicant Information

ENVIRONMENTAL CHECKLIST (WAC )

ENVIRONMENTAL CHECKLIST

TOWAMENCIN TOWNSHIP GRADING PERMIT PROCEDURES. A grading permit is required for all earthwork of 100 cubic yards or more.

ENVIRONMENTAL INFORMATION FORM

ENVIRONMENTAL REVIEW PROCESS AND ADOPTION OF MITIGATED NEGATIVE DECLARATION

CEQA Impact Key Alta East Wind Energy Project DEIR/DEIS

RULE Federally Enforceable Limits on Potential to Emit - Adopted 1/25/96, Amended 1/12/12 (Effective 3/8/12)

ENVIRONMENTAL IMPACT FACT SHEET California Environmental Quality Act

GRADING GUIDELINES. Kern County Engineering, Surveying & Permit Services Department Floodplain Management Section January 1, 2011

5. OTHER CEQA CONSIDERATIONS

Where Community, Business & Tourism Prosper. Tree Removal Permit

Where Community, Business & Tourism Prosper. Tree Removal Permit

Rio Arriba County Planning & Zoning Department

C. Applicant (If Applicant is not owner, attach document confirming interest in property): Name: Address: City: State: Zip: Phone:

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit

San Joaquin Valley Air Pollution Control District

RULE 4550 CONSERVATION MANAGEMENT PRACTICES (Adopted May 20, 2004; Re-adopted August 19, 2004) 3.1 Administrative change: a change to a CMP Plan that

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES

James & Nanci Dobbins (PLN030106)

5.0 PROJECT ALTERNATIVES

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System

LYNNE MOUNDAY COUNTY OF MONTEREY. In the matter of the application of FINDINGS AND DECISION Randall Ricketts (PLN020164)

CITY OF SAN MATEO GENERAL PLAN MITIGATION MONITORING AND REPORTING PROGRAM

SUBMIT FOUR (4) COMPLETED COPIES AND A COPY OF THE ORIGINAL APPLICATION FOR AN ENVIRONMENTAL INITIAL STUDY (AEIS) TO PDS ZONING

CEQA Categorical Exemption Determination

JOINT PUBLIC NOTICE August 4, 2014

ENVIRONMENTAL INFORMATION FORM

Lower Elkhorn NRD Use Only. 1. Purpose of Variance Request and of New Well and/or Expanded Water Use (check all that apply): 1 mile. Acres.

RULE 701 EMERGENCY EPISODE PLAN Adopted (Amended , , , , , ) INDEX

Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE INFORMATION

APPLICATION PROCESSING. CHECK WITH STAFF - Development Services Staff will explain the requirements and procedures to you.

Pacific Wind Energy Project Draft Environmental Impact Report

DAIRY REVIEW LETTER APPLICATION GUIDELINES

ADDENDUM TO THE CITY OF LAKEPORT GENERAL PLAN EIR

3 CONSTRUCTION-GENERATED CRITERIA AIR POLLUTANT AND PRECURSOR EMISSIONS

Washoe County PLAN SUBMITTAL

Management of Kern County Erskine Wildfire Debris

4.10 LAND USE ENVIRONMENTAL SETTING

CHAPTER SURFACE MINING AND RECLAMATION PLAN REGULATIONS

GRADING PERMIT APPLICATION

Zoning Permit Application

GRADING PERMIT CITY OF RAPID CITY 300 SIXITH STREET RAPID CITY, SD ID NO: (605) PIN NO:

MUP72-650W4. David Hoffman. FOOTHILLS CHRISTIAN MINISTRIES, INC., Pastor. 350 B. Cypress Lane, El Cajon, C. El Cajon CA (619)

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED.

Regulation II Rule 201 Prohibitions, General Requirements and Burn Day Determinations

ADOPTION OF THE MITIGATED NEGATIVE DECLARATION

Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE INFORMATION

INSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION

4. The SEPA Checklist is reviewed in accordance with state and county environmental regulations.

From: City of Santa Cruz, Planning Dept., 809 Center Street, Room 206, Santa Cruz, CA 95060

Emergency Engine and Turbine Requirements

JOINT PUBLIC NOTICE December 1, 2014

JOINT PUBLIC NOTICE. 29 January Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana

DAMASCUS TOWNSHIP, WAYNE COUNTY, PENNSYLVANIA APPLICATION FOR BUILDING PERMIT ZONING & UCC #

CHAPTER 20.8 SURFACE MINING AND LAND RECLAMATION REGULATIONS

APPLICATION FOR A PERMIT TO CONSTRUCT A WATER WELL IN THE LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT

JOINT PUBLIC NOTICE December 16, 2013

IOWA STATE REVOLVING FUND FINDING OF NO SIGNIFICANT IMPACT. To: All Interested Citizens, Government Agencies, and Public Groups

CONCRETE BATCHING PLANT

Application fee of $150.00, payable to Stevens County Land Services A completed environmental checklist Any other supplemental information.

Non-Priority Projects WQMP Preparation Guidance Manual

RULE Federally Enforceable Limits on Potential to Emit - Adopted 1/25/96

Transcription:

Eastern Kern Air Pollution Control District Glen E. Stephens, P.E. Air Pollution Control Officer The Eastern Kern Air Pollution Control District (District) has determined Commercial Solar Power Generation Facilities (Commercial Solar) produce anthropogenic fugitive dust emissions (PM10) caused by land clearing, scrapping, grading, and on-site travel of high-wind regions of the District. Fugitive Dust Emission Control Plan All Solar Facilities ten (10) acres and larger must submit an approvable Fugitive Dust Emission Control Plan pursuant to District Rule 402 (Fugitive Dust), Section V.D. District Permit to Operate Commencing March 12, 2015, all Commercial Solar Facilities ten (10) acres and larger must apply for, and obtain a District issued Authority to Construct (ATC)/Permit to Operate (PTO). Fugitive Dust Emission Monitoring Plan Due to frequent high-wind/dust events, all Commercial Solar Facilities must submit an air monitoring plan to the District. The District recommends each Facility install and operate at least two (2) on-site PM10 air monitors. Facility benefits associated with use of PM10 air monitors are as follows: 1. PM10 monitoring data scientifically shows effectiveness of dust mitigation measures. 2. PM10 monitoring data can be used to show compliance even during high wind events. As long as PM10 concentration difference between upwind and downwind monitors is 50-µg/m 3 (micrograms per cubic meter) or less, the District will not issue a Notice of Violation (NOV). 3. An Owner/Operator of a Facility may petition to cancel District PTO, given 5-years of clean data (upwind/downwind concentration difference is 50-µg/m 3 or less {based on one-hour averages}). Please note: PM10 air monitors are not mandatory at this time. Be advised: An alternative air monitoring plan may require utilizing persons certified in EPA Reference Method 9, Visible Emissions Evaluations (VEE). CHECKLIST FOR COMPLETE APPLICATION PACKAGE A complete Commercial Solar Power Generation Facility Application Package Includes: A. Fugitive Dust Emission Control Plan B. ATC/PTO Application for Solar Plant (including acreage and wattage) C. Fugitive Dust Emission Monitoring Plan D. CEQA Environmental Evaluation or EIR reference number Administrative Office: 2700 M Street, Suite 302, Bakersfield, CA 93301-2370 Phone (661) 862-5250 Fax (661) 862-5251 www.kernair.org ekapcd@kerncounty.com

Qualifying Criteria (Complete All That Apply) An owner/operator of a Large Operation is required to submit a Fugitive Dust Emission Control Plan to the APCO prior to the start of any Large Operation as defined in Rule 402 (Fugitive Dust), or if a plan is required by a CEQA document, eg Negative Declaration, Mitigated Negative Declaration, or Environmental Impact Report. A Plan is Required for: Any construction activity on any site involving 10 or more contiguous acres of disturbed surface area, or any earthmoving activity exceeding a daily volume of 10,000 cubic yards, or relocating more than 2,500 cubic yards per day of bulk materials at least three days per year. Project Name: Project Address: City: EASTERN KERN AIR POLLUTION CONTROL DISTRICT 2700 M STREET SUITE 302, BAKERSFIELD, CA 93301-2370 PHONE: (661) 862-5250 FAX: (661) 862-5251 www.kernair.org FUGITIVE DUST EMISSION CONTROL PLAN Project commencement shall not begin until APCO has approved or conditionally approved the Plan. $120 Filing/Review fee is required upon submission of all Fugitive Dust Control Plans. Project Type Solar Plant Cement Plant Mining Operation Construction Other Project Name and Location Section: Township: Range: Expected Start Date: End Date: Project Description DATE RECEIVED Validation (for EKAPCD) use Filing Fee: $ Receipt No: Date: REP- Dust Plan Page 1 6/20/2017

FUGITIVE DUST CONTROL PLAN (Rule 402) Contacts List all persons responsible for the preparation, submission, and implementation of plan. Complete all applicable Who will have the primary responsibility for implementing this Dust ControlPlan? Primary Contact Name: Title: Company Name: Address: City: State: Zip: Phone: Email Address: Secondary Contact Name: Title: Company Name: Address: City: State: Zip: Phone: Email Address: This Fugitive Dust Control Plan was prepared by: Name: Title: Company Name: Address: City: State: Zip: Phone: Email Address: REP- Dust Plan Page 2 6/20/2017

FUGITIVE DUST CONTROL PLAN (Rule 402) Sources of Fugitive Dust and Reasonably Available Control Measures (RACM). You may attach your plan as a separate document. ATC No. (if applicable) Description and Location of Fugitive Dust Source List RACM for each Source Please include additional pages, as needed, and example of "If You See Blowing Dust" sign. REP- Dust Plan Page 3 6/20/2017

FUGITIVE DUST CONTROL PLAN (Rule 402) Plot plan is attached separately. Draw or Attach Plot Plan REP- Dust Plan Page 4 6/20/2017

KERN AIR POLLUTION CONTROL DISTRICT., APCO APPLICATION FOR AUTHORITY TO CONSTRUCT AND PERMIT TO OPERATE INSTRUCTIONS 1. Checks or money orders shall be made payable to Kern Air Pollution Control District. Filing fees apply toward initial Permit to Operate fee. Payment of initial permit fee, and application processing fee is required for issuance of an Authority to Construct (Rules 301 and 303). a. A filing fee of $120 paid by check or money order is required for each application. If the project is installation of gasoline storage tanks, a filing fee is required for each tank. b. In the case of a Transfer of Ownership of a PTO where no alteration, addition or change of location is to occur, the filing fee is $65 per permit. Documentation showing the transfer of ownership should also be provided; for example, escrow papers or a letter from the previous owner outlining the sale. c. The ownership of an ATC is not transferable. d. A transfer of location requires an ATC unless the original ATC or the current PTO has multiple locations. 2. A separate application is required for each distinct process consisting of the aggregation of equipment items operating together to perform a given function and having the potential to cause the emission of an air contaminant. Such a process may consist of one individual piece of equipment or several equipment items, including air pollution control devices, if any. Any given facility may require more than one Authority to Construct and Permit to Operate. 3. With each application for Authority to Construct and Permit to Operate, the following data, specifications, plans and drawings must be submitted: a. Equipment Location Drawing or Plot Plan Drawing or sketch submitted should show: 1. Property involved and outlines of all buildings and structures on it. Property lines. Quarter Section, Township and Range. Office: 2700 M Street, Suite 302, Bakersfield, CA 93301-2370 Phone (661) 862-5250 - Fax (661) 862-5251 www.kernair.org - apcd@kerncounty.com Rev 11 16 7

2. Location and identification of proposed equipment on property. 3. Whether property involved is within 1,000 feet of a school property boundary. If so, identify nearest school by name and address. 4. Location of property with respect to streets and all adjacent properties. Identification of adjacent properties. If in a business district or residential area, show all buildings outside property, but within ¼ mile of property line. Identify all such buildings (residence, apartment building, warehouse, retail store, etc.). Indicate direction north on the drawing. b. Equipment Description State: make, model, size, type, and serial number of entire unit or its major parts. List all electric motors (and electric horsepower rating) associated with all equipment. c. Process Description Each application must include a written description of each operation to be carried out in each process. Descriptions must be complete and in detail for all operations. Particular attention must be given to parts of process which may result in the emission of air contaminants. Similarly, operation of air pollution control equipment must be described in sufficient detail to allow the District to determine if it can be expected to consistently operate at required control efficiencies. d. Expected Emission of Air Contaminants Submit with each application calculated estimates of the emission of all air contaminants (criteria and toxic) from proposed equipment, including reference to source(s) of emission factors. Include test data (reference source) to support calculations. Well-documented, well-organized emissions calculations can expedite processing of applications. Failure to submit emissions calculations and supporting test data can significantly increase processing time. e. Operating Schedule Specify hours per day, days per week and months per year equipment is to be operated. f. Process Weight Detail type and total weight of each material charged to each operation on basis of pounds per hour or per other specified unit of time. Your Authority to Construct and Permit to Operate will be conditioned to limit process weight to specified amount. g. Fuels and Burners Used Indicate for gaseous fuel: source, type, heating value, sulfur content (total and as H 2 S), and maximum consumption (cubic feet per hour); for fuel oil: source, type, heating value, API gravity (degrees), sulfur content, nitrogen content, preheat temperature, temperature at which SSU viscosity is 150, type of atomization (steam, air or mechanical), amount (%) of excess combustion air to be utilized, and maximum consumption (gallons per hour); for solid fuels: type, heating value, sulfur content, ash content, and maximum consumption (pounds per hour). For all burners, indicate make, model, size, type, number of burners and maximum capacity of each burner. 2 of 3

h. Process and Instrumentation Diagram For continuous processes, show flow of materials and location and type of all instrumentation, including any stack gas monitors. Show all pertinent temperatures, pressures, volume flow rates and mass flow rates. i. Equipment Drawings Supply drawings, dimensioned and to scale, in plan, elevations and as many sections as are needed to show clearly design and operation of air pollution control devices. Drawings of basic equipment must be included if they are necessary for sizing and understanding operation of air pollution control equipment or if such equipment has potential air contaminant emission points. The following must be shown: 1. SCRUBBERS Interior dimensions of all parts; location and number of spray nozzles, if any; flow characteristics of nozzles (gpm @ psi); pump performance curves; mist eliminator performance data; scrubber liquid chemical analysis; and blow-down rate. 2. FABRIC COLLECTORS Dimensions of housing and compartments; number and size of filter tubes; filter media specifications (permeability, weave type, thread count, weight, etc.); cleaning mechanism specifications (air volume and pressure, reverse air flow valve arrangements, etc.); and fan performance curves. 3. INCINERATORS Dimensions of all components; refractory specifications; number, size, and model number for each burner; burner fuel specifications, including type, heating value, sulfur content, and maximum consumption; waste material specifications, including type, heating value, sulfur content, ash content, and maximum consumption; engineering design calculations showing expected gas residence time and combustion temperature. 4. ALL AIR POLLUTANT CONTROL EQUIPMENT Locations, size and shape details of all features that may affect collection or control of air contaminants of any kind. j. All data and calculations used in selecting or designing any equipment that may cause emission of an air contaminant. 4. A completed environmental information form and initial study evaluation. The California Environmental Quality Act (CEQA) requires this form. 3 of 3

2700 M STREET SUITE 302, BAKERSFIELD, CA 93301-2370 PHONE: (661) 862-5250 FAX: (661) 862-5251 www.kernair.org APPLICATION FOR COMMERCIAL SOLAR POWER GENERATION FACILITY AUTHORITY TO CONSTRUCT AND PERMIT TO OPERATE A $120 filing fee paid by check or money order is required for each application. Facility Information Business Name to Appear on Permit:: Site Operator: Site Phone No: Site Location/Address: District Permit No: FAX: City: Zip: Business E-mail Address: Assessors Parcel No: OR /4 SECTION TOWNSHIP RANGE Air Monitoring Plan Included: Yes No Total Acreage: Total Megawatts: Billing Information (Notify District as soon as possible if billing information changes) Business Site: Billing Contact: Billing Phone No: Billing Address: FAX: City: State: Zip: Complete this Section if application is being submitted by Contractor/Consultant Contractor/Consulting Company: Contact: Contact Phone No: Contractor/Consulting Address: Contractor/Consulting E-mail Address: City: State: Zip: FAX: Reason for Application (Check all that apply) New Facility Modifying Existing Facility Other Violation (List Number): Briefly describe project: Where should Authority to Construct be mailed? Facility Address Billing Address Contractor/Consultant Address Print Contact Name: Consultant? YES NO If YES, please attach Assignment of Agent Title: Phone: E-Mail Address: Print Signing Authority Name If Different: Title: Signature: Date: DATE RECEIVED Validation (for EKAPCD use) Filing Fee: $ Receipt No: Date: PER-02 Revised 4/28/2015

2700 M STREET SUITE 302, BAKERSFIELD, CA 93301-2370 PHONE: (661) 862-5250 FAX: (661) 862-5251 www.kernair.org FUGITIVE DUST EMISSION MONITORING PLAN Complete this form for fugitive dust emission monitoring strategy. Each plan that utilizes PM10 air monitoring equipment, shall include at least two (2) PM10 air monitors, one placed upwind and one place downwind, on adjacent corners of the project site, as close to property line as feasible, and in such a way that other sources of fugitive dust between the air monitors and property line is minimized. Facility Information Project/Facility Name: Project Address: City: Section: Township: Range: Contact Name: Phone #: Contact Email: Type of Monitoring Strategy: PM10 Air Monitors Alternative Air Monitoring Strategy PM10 Air Monitor Information Number of On-Site PM10 Air Monitors: At least one air monitor must be equipped with meteorological instrumentation (including: wind speed, wind direction and wind temperature). Make: Monitor Type: Model: Attach or sketch plot plan with PM10 monitor locations. Include additional sheet(s) if needed. Alternative Air Monitoring Strategy Alternative air monitoring plan may include daily, hourly, or at shift change visible opacity readings from a US EPA Reference Method 9 certified visible emission evaluator (VEE). Records of VEE readings must be kept and maintained on-site and made available to APCO upon request. Please describe alternative air monitoring plan: Include additional sheet(s) if needed. REP-12 1 4/23/14

FUGITIVE DUST AIR MONITORING PLOT PLAN Draw or Attach Plot Plan that includes PM10 air monitor locations REP-12 2 4/23/14

2700 M STREET SUITE 302, BAKERSFIELD, CA 93301-2370 PHONE: (661) 862-5250 FAX: (661) 862-5251 www.kernair.org ENVIRONMENTAL INFORMATION FORM AND INITIAL STUDY EVALUATION Applicant: Contact: Title: Phone: Project Description: Environmental Information Yes No Maybe Will the proposed project with regard to the proposed location: 1. Conflict with the adopted environmental plans and goals of the community? 2. Have a substantial, demonstrable negative aesthetic effect? 3. Substantially affect a rare or endangered species of animal or plant or the habitat of the species? 4. Interfere substantially with the movement of any resident or migratory fish or wildlife species? 5. Substantially diminish habitat for fish, wildlife or plants? 6. Breach published national, state, or local standards relating to solid waste or litter control? 7. Substantially degrade water quality or contaminate a public water supply? 8. Substantially degrade or deplete ground water resources or interfere substantially with ground water recharge? 9. Disrupt or adversely affect a prehistoric or historic archeological site or a property of historic or cultural significance to a community or ethnic or social group; or a paleontological site except as part of scientific study? 10. Induce substantial growth or concentration of population? 11. Cause an increase in traffic which is substantial in relation to the existing traffic load and capacity of the street system? 12. Displace a substantial number of people? PER 12 1 of 2 Revised 1/17/13

Environmental Information Yes No Maybe 13. Encourage activities which result in the use of large amounts of fuel, water or energy? 14. Use fuel, water or energy inefficiently? 15. Increase substantially the ambient noise level for adjoining areas? 16. Cause substantial flooding, erosion or siltation? 17. Expose people or structures to major geologic hazards? 18. Extend a sewer trunk line with capacity to serve new development? 19. Disrupt or divide the physical arrangement of an established community? 20. Create a potential public health hazard or involve the use, production, or disposal of materials which pose a hazard to people or animal or plant populations in the area affected? 21. Conflict with established recreational, educational, religious or scientific uses? 22. Convert prime agricultural land to non-agricultural use or impair the agricultural productivity of prime agricultural land? 23. Interfere with emergency response or evacuation plans? 24. Violate any ambient air quality standard, contribute substantially to an existing or projected air quality violation, or expose sensitive receptors to substantial pollutant concentrations? 25. Emits Greenhouse Gas (GHG) emissions greater than 25,000 tons? NOTE: Please attach any pertinent explanatory information. CERTIFICATION: I hereby certify the statement furnished above and in attached exhibits present the data and information required for this initial evaluation to the best of my ability, and that the facts, statements, and information presented are true and correct to the best of my knowledge and belief. Print Signing Authority Name If Different: Signature: Date: PER 12 2 of 2 Revised 1/17/13