The Virtues of A Virtual RTO

Similar documents
RTO Overview and Day 2 Markets. EAI Technical Conference May 26, 2011

U. S. SPOT MARKET REGULATION

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO)

Midwest ISO EIM Start-up and Exiting Issues Todd Ramey, Executive Director Market Administration. March 7-8, 2011

Draft Whitepaper to Platte River Board of Directors

Industry Perspectives on FERC Standard Market Design

Summary of the Enron Trading Strategies in California

Market Monitoring Dr. Robert Sinclair Georgian Energy Policy Delegation

NEW YORK INDEPENDENT SYSTEM OPERATOR

Federal Energy Regulatory Commission Working Paper on Standardized Transmission Service and Wholesale Electric Market Design

PROPOSALFOR INCLUSION OF A TRANSCO INCLUDING ENTERGY WITHIN THE SPP RTO

PJM M2M Market Flow Proposal. October 2014

Federal Energy Regulatory Commission/RTO Training Session

Energy Imbalance Market Design Straw Proposal and Issue Paper. Stakeholder Meeting April 11, 2013

Broader Regional Markets

With funding provided by the US Department of Energy, NREL, and the Utah Office of Energy Development

ELECTRIC TRANSMISSION 201: Markets, ISO/RTOs and Grid Planning/Operations

Lessons Learned from Past Electricity Market Design Models and Road Map for the Next Generation Design Models

Alternatives for Addressing the Interface Pricing Flaw

Wholesale Electricity Markets. New England Independent System Operator. Commissioner Mark Vannoy Maine Public Utilities Commission

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

Joint and Common Market PSEUDO TIE UPDATE AUGUST 22, 2017

Key Issues and Consideration in Market Design, Operational and Oversight

Analysis of the Broader Regional Markets Initiatives

CURRENT FEDERAL AND REGIONAL ELECTRIC POLICY ISSUES FOR THE ILLINOIS COMMERCE COMMISSION

Energy Imbalance Market

Contents. DRAFT Capacity Deliverability Fact Finding Summary Report

PJM Wholesale Markets. Hisham Choueiki, Ph.D., P.E. Ohio PUC Staff October 20-24, 2014 Tbilisi, Georgia

MIDWEST ISO UPDATE. Sherman Elliott Manager State Regulatory Affairs

Introduction to RRG Drafting Team Proposal

MOD-001-1a Available Transfer Capability Implementation Document

New York Independent System Operator, Inc. NYISO Tariffs. OATT Schedules

Advancing Renewable Alternatives

Joint and Common Market ITEM 4 PSEUDO TIES

Outage Coordination Training MISO Training

Update on Northeast Seams Issues. February 20, 2008 NYISO Business Issues Committee Meeting

Congestion Revenue Rights Auction Efficiency Track 1B Straw Proposal

FERC & Electric Industry Restructuring

Integrating High Levels of Variable Renewable Energy Sources

NYISO/PJM Market-to-Market Coordination

Congestion Management Requirements, Methods and Performance Indices

Standard Market Design in the Electric Market: Some Cautionary Thoughts. June 20, Prepared by: Philip Hanser Metin Celebi Peter Fox-Penner

Power Markets and Renewables Deployment in Developing Countries

Interface Pricing Approach Whitepaper May 2015

Investigation of Loop Flows Across Combined Midwest ISO And PJM Footprint. May 25, 2007

ELECTRICITY MARKET RESTRUCTURING: REFORMS OF REFORMS

DEVELOPMENTS IN WESTERN MARKETS: RENEWABLES AND EXPANSION OF ORGANIZED MARKETS IN THE WEST

Price Formation in Energy and Ancillary Services Markets Operated by Regional Transmission Organizations and Independent System Operators

MISO-PJM Interface Pricing Post Implementation Metrics and Criteria

Interchange Transactions

PJM Organization and Markets. Saudi Delegation Columbus Ohio May 22, 2012

Full Network Model Expansion Second Revised Straw Proposal

Peak Reliability/PJM Connext West-Wide RC and Market Services. Webinar January 16, 2018

Pseudo-Tie Congestion Overlap

JCM Drill Down Report -- Draft. March 21, 2014

Midwest ISO TDU Sector October 2010 Midwest ISO Advisory Committee Hot Topic Adequate Price Signals

2015 ISO/RTO Metrics Report. Summary. November 2015

JCM Drill Down Report. February 19, 2015

Competitive Markets 1

Future Market Implementation

Energy Imbalance Market

Illinois State Institute for Regulatory Policy Studies Conference

Billing Line Items PJM /23/2017

THE RTO MILLENNIUM ORDER: FOLLOWING THROUGH OR FALLING APART?

Price Formation. Eric Ciccoretti Attorney-Advisor Office of Energy Policy and Innovation Federal Energy Regulatory Commission June 13, 2017

During 2009, the PJM geographic footprint encompassed 17 control zones located in Delaware,

Competitive Markets. Facilitated Dialogue: Market Restructuring & Renewable Energy. June 10-12, 2013 Mexico City, Mexico. Hisham Choueiki, Ph.D., P.E.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

BILLING CODE P DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission. [Docket No. RM ]

Joint and Common Market ITEM 4 PSEUDO TIES

Coordination with PJM

Exhibit A. Reliability Standards Proposed for Approval

Recent Development in Reliable Energy Market in the US and Singapore

TODAY S ORGANIZED MARKETS A STEP TOWARD COMPETITION OR AN EXERCISE IN RE-REGULATION?

Energy Markets - The Basics

Design Considerations for an Alberta Capacity Market

A Market Solution to the Duck Curve

INTERREGIONAL COORDINATION OF ELECTRICITY MARKETS

PJM Manual 27: Open Access Transmission Tariff Accounting Revision: 88 Effective Date: November 16, 2017

Transmission Constraint Relaxation Parameter Revision ISO Straw Proposal

Status Update Assessment of ICT/RTO Options and Issues

JCM Drill Down Report. May 27, 2015

Energy Imbalance Market Year 1 Enhancements Phase 2. Draft Final Proposal

Mountain West Transmission Group Frequently Asked Questions Updated through September of 2017

Congestion and Marginal Losses

Closer Look At EPA Proposed Rule 111D: Utility Perspective

2007 State of the Market Report Midwest ISO. Midwest ISO

MISO-PJM Joint and Common Market Drill Down Report

Congestion and Marginal Losses

Southern California Edison Stakeholder Comments. PacifiCorp s Energy Imbalance Market (EIM) Entity Proposal Dated October 18, 2013

INTRODUCTION TO WHOLESALE ELECTRICITY MARKETS: RTOs AND ISOs

MISO-PJM Joint and Common Market Drill Down Report

Dave LaPlante Vice President, Markets Development September 18, 2002

Regional Transmission Organizations. D. William VanderLaan Illinois Commerce Commission January 30, 2014

Introduction to the Energy Imbalance Market (EIM Module 1)

MISO-PJM Joint and Common Market Drill Down Report

Single Schedule Market Pricing Issues

2010 RTO Metrics Report: NESCOE Data Summary

PJM Markets. Energy and Ancillary Services. PJM State & Member Training Dept. PJM /29/2014

IMM Quarterly Report: Fall 2017

Transcription:

The Virtues of A Virtual RTO Jim Mayhew Mirant September 26, 2003 Harvard Electricity Policy Group 1

A Virtual RTO? An Organization That is a RTO in All but Name? Minimum Attributes? Regional Security Coordinator-Single OASIS Congestion Management Using a Bid Based Security Constrained Economic Dispatch Process with Locational Nodal Pricing LMP-Or is There Some Other Financial Settlement Process? Operates a Central Real Time Spot Energy Market Coordinates Seams-Loop Flows and Moves to Operate With and Monitor a Joint Congestion Dispatch with Neighboring Regions Other Elements to Include for Consideration? Day Ahead Energy Market-Congestion Rights-FTR Mitigation-Market Monitoring Regional Tariff-Elimination of Rate Pancaking-Export Charges Virtual Regional Dispatch What Now Exists--What Might be Feasible? 2

What We Have in Various Stages 3

Who Can Coordinate with Whom and How? NY-NE-PJM RTO/ISOwith LMP Security Constrained ReDispatch-provide Shadow Prices Existing or Possible Nodal LMP Pricing- Incorporate Shadow Prices in ReDispatch NY-NE-PJM RTO/ISO with LMP MISO RTO Developing Physical TLR Internal Redispatch- TLR at Interfaces PJM RTO with LMP West NON ISO PTP -Physical Scheduled UnScheduled Flows Internal Zonal Balanced -Schedule Flow Relief at Interfaces CAISO ISO All Others But Tx & SPP NON ISO PTP -Physical TLR/Unscheduled Flows PTP -Physical TLR Unscheduled Flows NON ISO 4

A Pragmatic View - For Regional Cooperation A National Market with Regional Differences The RTO Concept--The Pluses? The Practical Next Steps for NE-NY What of PJM & MISO? The Political California-Governance & Functional Market Rules The South & the Northwest-Can We Accommodate SMD & Regional Interests? The Possible Regional RTO Heavy-NE-MidAtlantic-Midwest-SPP-West Connect Single State RTO-ISO Hybrid-NY -California-Florida Minimal Regional Standards for South-Northwest Real Time System Administration Role for the New Electric Reliability Organization (ERO)? 5

SMD--There Were Some Positive Points The Reality of the Interconnection Reliability Requirements for the Eastern and Western Regions of the USA An Independent Central Security Coordinator Role Overseeing Competitive Energy Markets Relieving Congestion-Reliability Issues- Through an Integrated Security Constrained Economic Dispatch Management System-Spot Energy Market Wholesale Price Transparency--Market Liquidity for Efficient Pricing Optimize Savings Through Joint Operating Rules and Business System Commonality Increase Incentives for Regional Transmission and Generation Expansion Regional Market Monitoring and Market Efficiency Optimization 6

A Regional Virtual RTO-The Minimum Features? Independence Governance Independent Entity Running Real Time Operations of the Grid Operational Authority One Regional Security Coordinator for the Grid Short-Term Reliability ERO Standards & Enforcement Security Constraint Regional Unit Commitment and Economic Dispatch Congestion Management Elimination of TLR A Real Time & DA Energy Market Congestion Hedges Centralized OASIS with TTC/ATC Market Monitoring Regional with Commonality in Mitigation Rules Interregional Coordination Seam Identification & Resolution Elimination of Export Fees- Regional Through & Out Fees Parallel Path Flows Identification & Monitoring 7

A Harvard Professor s Warning* The Separation Fallacy California Dreaming Operation Oversight Only An Energy Market Only The Enron Legacy Balanced Energy Schedules do not Guarantee Reliability An Energy Market Alone will not Provide Price Transparency & Market Liquidity Integrated Regional System Operations A Central Coordinated Regional Congestion Management System Bid Based Security Constrained Economic Dispatch Real Time Locational Nodal Prices That Are Transparent & Liquid Combining Short Term Reliability ReDispatch with Nodal Pricing Allows an Incentive for the Market to Provide the Feasible Solution Rather than a Central ISO Operator *Avoiding The Separation Fallacy: Comments by Dr. Hogan before the FERC, RM01-12, March 12, 2002 8

The Practical Landscape The Northeast-New York Markets NE-NY-PJM has Shown the Successful use of LMP Pricing with Respect to Transmission Congestion Management & Short Term Reliability NE has the Ability to Converge on an Operational-Financial Basis Many Joint Market Functions with New York Including a Capacity Market Virtual Regional Dispatch May Provide Some of These Synergies Elimination Of Export Fees- A Market Advantage to NE Consumers $21 Million Savings to NE-$12 Million Loss to NY Consumers; Possible Uplift Through a Seams Elimination Cost Adjustment (SECA) Mechanism Virtual Regional Dispatch has Significant Opportunity for Consumer Savings for Economic Transfer of Generation Between the Two Regions* Modest Production Cost Savings in Economic Dispatch * *D.Patton Presentation to NY Structures Working Group-ISO NE Markets Committee, September 11, 2003 9

Virtual Regional Dispatch -Joint Operations and Obstacles to Success Governance Tariff Differences Export Charges Scheduling Rules Auction -Allocation of FTR Credit Requirements Mitigation Measures Uplift Allocation & Make Whole Provisions Virtual Regional Dispatch Is the RTO/ISO Taking a Market Position in the Real Time Energy Market to Optimize it or to Achieve a Desired Outcome? Operational Joint Models-Joint Scheduling Node Identification & Dispatch Ancillary Market Requirements Timing of Settlements Proxy Busses to External Flowgate Monitoring Virtual Bids-Shadow Prices & ReDispatch Determinations Nomenclature-Using the Same Terminology 10

The Practical Landscape MISO The Existing Regulatory Limbo With Respect to the Old Alliance Companies is Preventing the Ability of MISO to Move to an Integrated Operating Model Regional Footprint has Some State PSCs with Opposite Positions With Respect to Transmission Owner Membership in RTO The Worst of Two Worlds-No Real Time Centralized ReDispatch-No Real Time Regional Coordination Among 23 Control Areas FERC Must Decide on the Status of AEP-Commonwealth Edison in the MISO- PJM Market if a LMP Type Market is to Occur Elimination of Through & Out Rates is a Concern With Respect to Uplift Among Differing Transmission & Load Entities Ability of MISO Members to Withdraw & Transmission Companies (ITCs) with Differing Layers of Responsibility a Concern 11

Where We Really Need A Virtual RTO PJM-MISO Coordination MISO Region is Contractual Rather Than Electric Topological Between PJM and MISO They Have Identified Over 300 Flowgates That Have an Impact on Each Other Integration of Commonwealth Edison Into PJM Without AEP is Problematic Loop Flows Between Two Regions Are and Can Create Congestion Without a Corresponding Match in LMP Prices--Huge Potential for FTR Shortfall Market Monitoring-Many Seam Issues in Coordinating LMP Market Between Two Systems If AEP Is Not Operating Under Same Rules Must Move Beyond Joint Regional Coordination Congestion on One Impacts Another-Requires a Single Operating Market Can One RTO Run the Spot Energy Market for Both While Allowing for Two RTOs? 12

FERC and SMD The Political Energy Title Status and the Delay in RTO Implementation Administration Voluntary RTO Approach States Rights in the South and the West Governance with Respect to the California ISO RTO Heavy/RTO Light Reconsider National Requirements Versus Regional Demands Those That Want-Keep-Those That Don t-can We Set a Minimum Base Line? Can We Separate Real Time Operation/Market Requirements From Expansion Planning and Native Load Concerns? Electric Reliability Organizations-ERO Are They the New RTO-Light? Will the Imposition of Reliability Penalties Demand Real Time Regional Control? Beware the Separation Argument-Must Not Separate Regional Operational Control From a Real Time Congestion Management Pricing System 13

California The Issues Board of Directors and CAISO Independence Must Be Settled Existing and Proposed Market Design Remains Confused and Is Still Tilted Towards a Zonal-Balanced Physical Schedule Mode Is MDO2 a True Intent Towards Creating an Optimal Market Design to Overcome the Existing Market Mitigation Approach? A Restrictive Energy Cap and No Corresponding Capacity Market-How Do You Recover Long Run Marginal Cost of New Investment? How To Better Coordinate California and the Remainder of the West The Opportunity A Spot Market Using LMP Based Security Constraint Dispatch A Regional Virtual Dispatch Coordination With Arizona -Nevada-Northwest With Respect to Economic Dispatch A Regional Capacity Market to Meet Capacity Planning Requirements 14

Virtual RTOs in the South? Southern & Entergy Do Operate Many Functions of an RTO Each Independently Operates a Regional Joint Transmission System Southern (Ga, Al, Parts of Fl, Miss) Entergy (Ark, La, Parts of Tx, Miss) Economically Dispatch Their Units Joint Tariff for Their Operating Companies Regional Planning for Transmission Expansion 15

Getting Around Just Say No Can We Get The Best Attributes of SMD Open Access & Independent Oversight of Grid Regional Economic ReDispatch of Generation Operation of a LMP Spot Market in Lieu of TLR Regional Market Monitoring Is the Entergy Weekly Procurement Process Proposal a Start? Can We Satisfy States Rights? Recognition of Bundled and Unbundled Transmission Access. Transmission Expansion on a Participant Funding Basis. Regional & State PSC Oversight & Governance Grid Florida Status? 16

Non-jurisdictional TVA Resolution of TVA Inside the Ring Status Participation in Either MISO or PJM-Beyond the Existing MOUs? Develop A Spot Regional Energy Market With The Southern RTOs BPA Recognize that They and PacifiCorp are the RTOs in the NW Overcome the Hydro Concern With Respect to Congestion Management Coordinate a Joint Economic Dispatch With California- Nevada Can the ERO Process Be a Way to Overcome Non- Jurisdictional Issues? 17

The ERO ERO in Lieu of NERC Regional Councils Governance Changes-Funding-FERC Backstop Legislation to Move to a Regulatory-Penalty Mode Can You Have the Ability to Levy Penalties Without a Real Time Monitoring and Control of the Spot Market? NERC Recently Announced Dropping of MRD Standards for the Eastern Interconnect Stating that: As the Commission has surmised, a comprehensive market-based congestion management solution, such as that offered by location-based marginal pricing is a practical and effective solution and far superior to MRD for dealing with congestion * Senate Energy Title Language: Allows for development of and enforcement of standards that provide for an adequate level of reliability of the bulk power system. A Role as a Real Time Independent System Administrator of the Markets--RTO Light? *NERC Final Report on MRD-FERC ER02-033 9-11-2003 18

The New Paradigm RTO-Heavy* The Minimum RTO-Light Existing NE MISO-PJM Other NY CAISO Forming SPP West Connect Independent Governance Open Access Bid Based Security Constrained Economic Dispatch Locational Pricing Market Oversight Regional Market Monitor The South Grid FL TVA BPA/Northwest ERO with Operational/Market Oversight Responsibilities *ERCOT--State Jurisdictional Only 19