A. This Section includes administrative and procedural requirements for quality assurance and quality control.

QUALITY REQUIREMENTS

C. Requirements of this Section relate to customized fabrication and installation procedures, not production of standard products.

Facilities Planning and Construction (FP&C)

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION QUALITY REQUIREMENTS

SECTION CONTRACTOR QUALITY CONTROL

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

Arbitration Consolidation or Joinder AIA Document A

ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR WOOD WALL PANELS AC196. April 2017 (Effective June 1, 2017) PREFACE

SECTION CONTRACTOR QUALITY CONTROL

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

Chapter 3 Other Stakeholders Duties

QUALITY ASSURANCE AND QUALITY CONTROL MANUAL

SECTION QUALITY CONTROL

WEST GATE ENTRANCE EXTERIOR IMPROVEMENTS BEXAR COUNTY ARENAS - FENCING PACKAGE

DRAFT ITEM GP-100 ITEM GP-100 CONTRACTOR QUALITY CONTROL PROGRAM 1.1 GENERAL

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

Pricing Set 2 12/21/2012 PROJECT MANUAL FOR: MAPLE RANCH LODGE PROJECT NUMBER: # AT: STATE LINE ROAD BATES COUNTY MISSOURI OWNER: TIFEC, LLC

SECTION COMMUNICATIONS SYSTEMS QUALITY ASSURANCE & TESTING

QUALITY CONTROL INSTRUCTION

SPECIAL INSPECTION & TESTING AGREEMENT CITY OF NORTON SHORES BUILDING DEPARTMENT Michigan Building Code 2015

Document B252TM 2007

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

CONTROL OF WORK 1.02 AUTHORITY AND DUTIES OF THE ENGINEER S AUTHORIZED REPRESENTATIVE

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

I. Development, Submittal, and Acceptance of a Quality Management System

Special Inspections Instructions

Trident Precision Manufacturing

SCDOT QUALIFIED PRODUCTS POLICY 2

WOODS CONTRACTING QUALITY ASSURANCE QUALITY CONTROL QA/QC MANUAL VERSION: REV.2

Appendix 1 SCDOT Aggregate QC/QA Policy

San Antonio Water System Standard Specifications for Construction

EXHIBIT G TECHNICAL SPECIFICATIONS TABLE OF CONTENTS

CHAPTER 10 FACILITIES EVALUATIONS (PRE-AWARD) SURVEYS PART 1 INTRODUCTION

PROJECT SPECIFICATIONS PENSACOLA INTERNATIONAL AIRPORT PARKING GARAGE REHABILITATION

These requirements apply to all suppliers:

Quality Control and Quality Assurance for Installation of Steel Deck

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Chapter 1, Introduction

Prototype Integration Facility SUPPLIER QUALITY SYSTEM REQUIREMENTS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

PURCHASING QUALITY CLAUSES

This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

CITY OF SAN ANGELO. Concession Building #2

TURBO MACH A DIVISION OF VT SAA

BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL PRACTICE

INSPECTION SYSTEM REQUIREMENTS

To establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC.

NAPA SANITATION DISTRICT

INSPECTION REQUIREMENT ACKNOWLEDGEMENTS. Job Site Address:

PROJECT MANUAL UNIVERSITY HALL BOILER REPLACEMENT PROJECT NO. EM 610

Town of Poughkeepsie BUILDING DEPARTMENT 1 OVEROCKER ROAD POUGHKEEPSIE, NY12603 (845)

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

Educational Use Only S A M P L E S A M P L E

RANDOLPH COMMUNITY CENTER GYMNASIUM FLOOR REPLACEMENT

GENERAL REQUIREMENTS

Quality Clauses F Rev. I West Brooks Avenue North Las Vegas, NV Phone (702) Fax (702)

Quality Assurance Policy and Procedures

DeKalb County Library Dunwoody Library Staff Area Renovation

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

PROCUREMENT QUALITY REQUIREMENTS

LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA Phone (916) FAX (916) Purchasing Department

Supplier Quality Requirements (ASQR)

Conflict of Interest Language

(To be printed on Professional s Letterhead) PRE-CONSTRUCTION MEETING AGENDA (Professional to provide attendance sign-up sheet

DIVISION 1- GENERAL REQUIREMENTS

University of Oklahoma Sarkeys Energy Center Atriums Waterproofing Project mass project no Set no. project manual.

ISO 9001:2008 and AS9100 Rev. C. Supplier Quality Manual

SECTION SUBSTITUTION PROCEDURES

Capital Projects Group Mechanical Work Commissioning Specification

Purchase Order Quality Clauses

FACILITIES MANAGEMENT

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

STANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS

The Home Depot U.S.A., Inc. Instructions to Bidders

PROCUREMENT QUALITY REQUIREMENTS

QUALITY ASSURANCE REQUIREMENTS

Saint Anselm College Lower Level Cooling Carr Center Manchester, New Hampshire. Project No April 18, % Review.

1.07 SUPPLEMENTS PRODUCTS (NOT USED) EXECUTION (NOT USED) END OF SECTION

Supplier Quality Requirements SQR-1.0 Rev. 3

Beverly Gardens Park City of Beverly Hills, CA. Block #9: Elm Foothill Garden

Welding ASME Quality Manual Sample - No Field Installation Selected pages (not a complete plan)

ThinKom Purchase Order Quality Provisions Number: Q4000 Revision: D

Quality Assurance Program for Design-Build Projects with an Optional 15-Year Capital Maintenance Agreement

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM

SECTION CONSTRUCTION PROGRESS DOCUMENTATION SECTION CONSTRUCTION PROGRESS DOCUMENTATION

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R.

Attachment 1 Architectural Services

Janitorial QA/QC Manual Sample

REQUEST FOR PROPOSALS

APPENDIX D CONSTRUCTION PHASE CRITERIA

[JURISDICTION] S AMENDMENTS TO AIA DOCUMENT B , STANDARD FORM OF ARCHITECT S SERVICES: DESIGN AND CONTRACT ADMINISTRATION

JULY 10, 2013 INTRODUCTION

REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES

B. OPR and BoD documentation may be included by reference for information only.

Transcription:

SECTION 01 40 00 QUALITY REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Quality control and control of installation. Tolerances. References. Labeling. Mock-up requirements. Testing and inspection services. Manufacturers' field services. Examination. Preparation. 1.2 REFERENCES A. Related Sections: 1. Section 013300 Submittal Procedures. 2. Section 017000 Execution and Closeout Requirements. 1.3 QUALITY CONTROL AND CONTROL OF INSTALLATION A. Work Package Contractor is responsible to produce Work of the required quality as specified in the Contract Documents. To ensure quality of the Work the Contractor shall be responsible for the following duties: 1. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship. 2. Comply with manufacturers' instructions for handling, storage, installation, and start-up, including each step in sequence. 3. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship. 4. Perform Work by persons qualified to produce required and specified quality consistent with other prominent installers in comparable business. 5. Verify field measurements are as indicated on Shop Drawings or as instructed by manufacturer. 6. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, or disfigurement. CH2M HILL 01 40 00-1

1.4 TOLERANCES A. Monitor fabrication and installation tolerance control of products to produce acceptable Work. Do not permit tolerances to accumulate. Notify CH2M HILL immediately if an item is installed outside of manufacturer s tolerances. B. Comply with manufacturers' tolerances. When manufacturers' tolerances conflict with Contract Documents, immediately request clarification from CH2M HILL before proceeding. 1.5 REFERENCES A. For products or workmanship specified by association, trades, or other consensus standards, comply with requirements of standard, except when more rigid requirements are specified or are required by applicable codes. B. Conform to reference standard by date of issue current on date of Owner-Work Package Contractor Agreement, except where specific date is established by code. C. Obtain copies of standards where required by product specification sections. D. When specified reference standards conflict with Contract Documents, immediately request clarification from CH2M HILL before proceeding. E. Neither contractual relationships, duties, nor responsibilities of parties in Contract, nor those of CH2M HILL shall be altered from Contract Documents by mention or inference otherwise in reference documents. 1.6 LABELING A. It is the Work Package Contractor s responsibility to verify that labeling per the approved authority having jurisdiction is attached to products, assemblies, and systems where a label is required by applicable code. B. Labels should include the following information as applicable: 1. Manufacturer or fabricator 2. Approving agency 3. Safety labels. 4. Model number. 5. Serial number. 6. Performance data. 7. PO number. 8. Build number. C. Contractor must replace any missing or damaged labels at no additional cost to Owner. CH2M HILL 01 40 00-2

1.7 THIRD PARTY TESTING AND INSPECTION SERVICES A. If required, Owner will employ and pay for specified services of an independent firm to perform testing and inspection. 1. Prior to start of Work, Work Package Contractor will submit a testing laboratory name, address, and telephone number, and names of full time registered Engineer and responsible officer for approval by Owner and CH2M HILL. 2. Submit copy of report of laboratory facilities inspection made by Materials Reference Laboratory of National Bureau of Standards during most recent inspection, with memorandum of remedies of deficiencies reported by inspection. Owner will not pay for this facility inspection or cost to correct reported deficiencies. B. The independent firm will perform tests, inspections, and other services specified in individual specification sections and as required by CH2M HILL. 1. Laboratory: Authorized to operate in State of Texas. 2. Laboratory Staff: Maintain full time registered Engineer or specialist on staff to review services as required by code. 3. Testing Equipment: Calibrated at reasonable intervals with devices of accuracy traceable to National Bureau of Standards or accepted values of natural physical constants. C. Testing, inspections and source quality control may occur on or off project site. Perform off-site testing as required by CH2M HILL. D. Reports will be submitted by independent firm to CH2M HILL and Work Package Contractor, indicating observations and results of tests and indicating compliance or noncompliance with Contract Documents. 1. Submit final report indicating correction of Work previously reported as noncompliant. E. Work Package Contractor shall cooperate with independent firm; furnish samples of materials, design mix, equipment, tools, storage, safe access, and assistance by incidental labor as requested. 1. Notify CH2M HILL and independent firm at least 24 hours prior to expected time for operations requiring services. 2. Make arrangements with independent firm and pay for additional samples and tests required for Work Package Contractor's use. F. Testing and employment of testing agency or laboratory shall not relieve Work Package Contractor of obligation to perform Work in accordance with requirements of Contract Documents. G. Re-testing or re-inspection required because of non-conformance to specified requirements shall be performed by same independent firm on instructions by CH2M HILL. Payment for re-testing or re-inspection will be charged to Work Package Contractor by deducting testing charges from Contract Sum/Price. Work Package Contractor to submit corrective action plan and completion dates for review by CH2M HILL within two days of receiving of a testing report indicating a non-conformance. CH2M HILL 01 40 00-3

H. Agency Responsibilities: 1. Test samples of mixes submitted by Work Package Contractor. 2. Provide qualified personnel at site. Cooperate with CH2M HILL and Work Package Contractor in performance of services. 3. Perform specified sampling and testing of products in accordance with specified standards. 4. Ascertain compliance of materials and mixes with requirements of Contract Documents. 5. Promptly notify CH2M HILL and Work Package Contractor of observed irregularities or non-conformance of Work or products. 6. Perform additional tests required by CH2M HILL. 7. Attend preconstruction meetings and progress meetings. I. Agency Reports: After each test, promptly submit copies of report to CH2M HILL and Work Package Contractor. When requested by CH2M HILL, provide interpretation of test results. Include the following: 1. Date issued. 2. Project title and number. 3. Name of inspector. 4. Date and time of sampling or inspection. 5. Identification of product and specifications section. 6. Location in Project. 7. Type of inspection or test. 8. Date of test. 9. Results of tests. 10. Conformance with Contract Documents. J. Limits on Testing Authority: 1. Agency or laboratory may not release, revoke, alter, or enlarge on requirements of Contract Documents. 2. Agency or laboratory may not approve or accept any portion of the Work. 3. Agency or laboratory may not assume duties of Work Package Contractor. 4. Agency or laboratory has no authority to stop the Work. 1.8 MANUFACTURERS' FIELD SERVICES A. When required by individual specification sections, Work Package Contractor shall arrange for material or product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of equipment, conditions of surfaces and installation, quality of workmanship, start-up of equipment, and test, adjust and balance of equipment as applicable, and to initiate instructions when necessary. B. The presence of any supplier s service is subject to the approval of CH2M HILL. The Work Package Contractor must submit a summary of qualifications for each person that shall include, but not be limited to, job title, qualifications, certifications, experience, and length of service with supplier and in current position. The summary shall be submitted 3 weeks prior to schedule work activities. This requirement can be shortened in the case of unexpected needs for supplier support. CH2M HILL 01 40 00-4

C. The supplier staff s use of the site is restricted to that of a Work Package Contractor employee. Work Package Contractor is responsible for safety and behavior of supplier s service personnel. D. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions. E. Refer to Section 01 33 00 Submittal Procedures, Manufacturers' Field Reports article. PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION (NOT USED) END OF SECTION CH2M HILL 01 40 00-5