Case study on a deep excavation in Baku: Flame Towers project earth retaining system

Similar documents
EFFECT OF DEEP EXCAVATION SUPPORTED BY CONCRETE SOLIDER PILE WITH STEEL SHEET PILE LAGGING WALL ON ADJACENT EXISTING BUILDINGS

Estimation of Lateral Earth Pressure on Cantilever Sheet Pile using Flat Dilatometer Test (DMT) Data: Numerical Study

EXCAVATION WITHOUT INTERNAL SUPPORT AND ITS IMPLICATIONS IN CONSTRUCTION MANAGEMENT: A CASE STUDY

Analysis and Design of the Kingdom Tower Piled Raft Foundation

NPTEL Course GROUND IMPROVEMENT USING MICROPILES

Downloaded from Downloaded from /1

Sheeting Wall Analysis by the Method of Dependent Pressures

Comparison of the results of load test done on stone columns and rammed aggregate piers using numerical modeling

SETTLEMENTS DUE TO TUNNEL CONSTRUCTION

Testing of ground anchorages for a deep excavation retaining system in Bucharest

Pile foundations Introduction

Typical set up for Plate Load test assembly

INTERPRETATIONS OF INSTRUMENTED BORED PILES IN KENNY HILL FORMATION

Back Analyses and Performance of Semi Top-Down Basement Excavation of 11m Deep in Sandy Alluvial Deposits overlying Kenny Hill Formation in Malaysia

Favorable of grouted micropiles for the load transfer in weak sandy soils

Ching Guan Kee ABSTRACT

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL

Evaluation of negative skin friction on sheet pile walls at the Rio Grande dry dock, Brazil

Optimization of Supports in a Road Tunnel through Conglomerate during Construction

STATIC ALTERNATING CYCLIC HORIZONTAL LOAD TESTS ON DRIVEN

Enabling Work Package for Emirates Pearl Tower and Bab Al Qasr Hotel

A Dynamic Behavioural Study of Structure and Foundation for 25 Storey Structure with Variable Sub-Soils by Time History FEM Model

The experience in applying of static load and O-cell pile testing geotechnologies in problematical soil conditions of Astana

Mechanical and Hydraulic Behavior of Cut off-core Connecting Systems in Earth Dams

GEO-SLOPE International Ltd, Calgary, Alberta, Canada Tie-back Wall

Skirted Spudcan Sheet Pile Wall Interaction during Jack- Up Rig Installation and Removal in a Harbour Area

Modules for Graduate Certificate in Geotechnical Engineering

The design of soil nailed structures to AS4678

Challenges of quick clay excavation in urban area with sloping ground

Influence of unloading soil modulus on horizontal deformation of diaphragm wall

PILE RAFT FOUNDATION BEHAVIOR WITH DIFFERENT PILE DIAMETERS

Analyzing and Investigating the Effect of Nailing on Stabilization Soil Trenches of Sand with Medium Density via Analytical Limit Equilibrium

Case Studies on Soil Nailed Retaining Systems for Deep Excavations

Prof. Dipl.-Ing. H. Quick Ingenieure und Geologen GmbH provides geotechnical engineering services e. g. for high-rise buildings in Germany and abroad.

Steel screw settlement reduction piles for a raft foundation on soft soil

GEOTECHNICAL RESISTANCE FACTORS

Modelling of a pile row in a 2D plane strain FE-analysis

DHANALAKSHMI COLLEGE OF ENGINEERING, CHENNAI DEPARTMENT OF CIVIL ENGINEERING 2 MARK QUESTIONS WITH ANSWERS CE FOUNDATION ENGINEERING UNIT 1

Sabah Shawkat Cabinet of Structural Engineering 2017

Field Static Load Testing of Concrete Free Reticulated Micropiles System

Evaluation of Geosynthetic Forces in GRSRW under Dynamic Condition

SOIL PRESSURE IN EMBANKMENT STABILIZATIONS

Northport Berth 3 design and construction monitoring

Two-dimensional finite element analysis of influence of plasticity on the seismic soil micropiles structure interaction

Verification of a multi-anchored wall

Behaviour of Raft Foundation with Vertical Skirt Using Plaxis 2d

Comparison of geotechnic softwares - Geo FEM, Plaxis, Z-Soil

Use of Concrete Cross Walls to Reduce Movements Induced by Deep Excavation

Pump Station Excavation

Rewa Engineering College, Rewa. Rewa

Overburden Effect on the Axial Resistance of Instrumented CFA Piles. Knoxville, TN 37922, ph ,

USE OF DIPP PILES FOR A NEW SUP BRIDGE IN WEST MELBOURNE

Performance of high capacity jack-in pile for high-rise building with preboring in weathered sedimentary rock formation

Temporary Structures. Excavations and Excavation Supports

Effects of Wall Embedded Length Ratio and Wall Thickness Ratio on Undrained Stability of Cantilever Piled Walls

FOUNDATION DESIGN AND CONSTRUCTION ON KARSTIC ROCK FOR A 92-STOREY TOWER IN KUALALUMPUR, MALAYSIA

Challenges in Design and Construction of Deep Excavation With Case Studies - KVMRT in KL Limestone

Study of Rock-Lining Interaction for Circular Tunnels Using Finite Element Analysis

Axially Loaded Behavior of Driven PC Piles

Compressibility of Soil. Chapter 11

Influence of Orientation of Piles on Seismic Response of Pile Groups

Design of Soil Nailed Walls According to AS

Foundations for infrastructure projects in MENA an approach to reduce risk and construction costs

GROUND ENGINEERING. Vibro Ground Improvement

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

Foundation Engineering

Three-dimensional computer simulation of soil nailing support in deep foundation pit

Study on the settlement and the load-bearing capacity of Long An soft ground reinforced by the stone columns

Earthquake Design of Flexible Soil Retaining Structures

Repair and Retrofit of a 17 th Century Library Structure in Istanbul

PARAMETRIC STUDY OF SHALLOW FOUNDATION BEARING CAPACITY IN CLAYEY SOIL

Using Load Testing to Save Money and Time on the I-35W Bridge Project

Brochure E. Deep Vibro Techniques

Modelling issues for numerical analysis of deep excavations

Modelling of Piled Raft Foundation on Soft Clay

3-D finite element modeling and construction aspects for vertical shafts in Metro C Rome

A Case Study: Foundation Design in Liquefiable Site

COMPARISON OF MALAYSIAN PRACTICE (BS) VERSUS EC7 ON THE DESIGN OF DRIVEN PILE AND BORED PILE FOUNDATIONS UNDER AXIAL COMPRESSION LOAD

Effect of Seismic Reinforcement of Sheet Pile Quay Wall Using Ground Anchor

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

Behaviour of a Highway Embankment on Stone Columns Improved Estuarine Clay

Test of bored piles and the outcome of the Danish standard for designing bored piles

Numerical Analysis for High-rise Building Foundation and Further Investigations on Piled Raft Design

Misan University - College of Engineering Civil Engineering Department

THE STUDY OF t-z AND q-z CURVES ON BORED PILE BASED ON THE RESULTS OF INSTRUMENTED PILE LOAD TEST IN MEDIUM AND STIFF CLAYS

DISPLACEMENT OF DIAPHRAGM WALL FOR VERY DEEP BASEMENT EXCAVATION IN SOFT BANGKOK CLAY

TUNNEL LINER PLATE INTRODUCTION GENERAL APPLICATIONS CHAPTER 11

BEARING CAPACITY IMPROVEMENT USING MICROPILES A CASE STUDY

[Kouravand Bardpareh* et al., 5(6): July, 2016] ISSN: IC Value: 3.00 Impact Factor: 4.116

Safe, fast and simple: the DUKTUS pile is loadtested in South Africa

NUMERICAL STUDY OF INVESTMENT BEHAVIOR CONTAINMENT WALLS (CASE STUDY STRUCTURAL GUARDIAN SYSTEMS PROJECT OF HABIB HOTEL OF MASHHAD)

UNDERPINNING A CRANE FOUNDATION

An Introduction to Spread Footings and Mat Foundations

EFFICIENCY OF MICROPILE FOR SEISMIC RETROFIT OF FOUNDATION SYSTEM

SEISMIC DESIGN OF THE STATIONS AND THE INTER-STATION TUNNELS OF A METRO-LINE IN SOFT GROUND: A CASE STUDY

JERSEY FUTURE HOSPITAL CO004 SITE OPTION REPORT. APPENDIX 6 Technical Site Appraisal TN-STR TECHNICAL NOTE STRUCTURAL CONSIDERATIONS

A Vacuum Consolidation Method Application Case for Improving Dredging Slurry

DESIGN-BUILD-TEST PROCESS FOR HIGH CAPACITY MICROPILES: CONSTRUCTION CASE STUDY ON DUTCHESS RAIL TRAIL BRIDGE FOUNDATIONS, POUGHKEEPSIE, NEW YORK

SEISMIC SOIL-PILE GROUP INTERACTION ANALYSIS OF A BATTERED PILE GROUP

Geoguide 6 The New Guide to Reinforced Fill Structure and Slope Design in Hong Kong

Transcription:

Case study on a deep excavation in Baku: Flame Towers project earth retaining system H. A. Afatoglu 1 ENAR Engineers Architects & Consultants, Istanbul, Turkey ABSTRACT Baku Flame Towers Project, consisting of three high-rise towers, a shopping mall and an underground car park is being constructed in Baku, Azerbaijan. The project site is located on the city center neighboring two major boulevards, and some important buildings such as National Assembly of Azerbaijan, General Staff Building and Central Clinic Hospital. The soil profile at the site generally consists of a fill layer and slope debris with varying thicknesses from the ground surface, and very stiff hard clayey silt underlying the fill layer. Below the silt layer, a poorly cemented sedimentary rock layer with a poor rock quality is encountered. Due to the inclined topography of the project site, excavation slopes with depths varying between 2.0m and 29.0m have been foreseen in accordance with the architectural design. In order to carry out the foundation excavation safely an earth retaining structure consisting of bored piles tied-back by temporary ground anchors has been designed and constructed successfully. The retaining system constructed within Baku Flame Towers Project has the distinction to support the deepest foundation excavation ever made in Baku, Azerbaijan. Due to high structural loads, tower buildings have been designed to rest on raft foundations with large diameter piles. Bored piles with a diameter of D=1.20m and length of L=36.0m have been designed in accordance with the required load capacities, and anticipated pile capacities have been proved successfully with pile loading tests performed by using Osterberg Cells. Keywords: deep excavation, retaining system, ground anchors, bored piles, piled raft 1 INTRODUCTION Flame Towers Project is one of the most prestigious projects in Baku, Azerbaijan (Figure 1). The project stands out among Baku s ongoing investments in terms of its location, architectural concept and investment value. Besides, it is distinct from other projects in the sense of geotechnical engineering, since many different geotechnical engineering subjects have been studied during the foundation excavation of the towers. The project site is located in the heart of the city, surrounded by some important buildings and two major boulevards. Due to the neighboring structures and the depth of the foreseen foundation excavation, the necessity for the construction of a retaining system has risen. Therefore, an earth retaining system composed of bored piles laterally supported by temporary ground anchors has been constructed at the project site. Besides, due to high structural loads that were predicted to be exerted from the superstructures, foundations of the Towers were designed to be constructed on raft foundations with bored piles of large diameters. 1 Enargeo Engineers, Architects and Consultants, Nispetiye cad. Toren sok. Tura apt. no. 1/11 levent, Istanbul, Turkey. haafatoglu@enarggeo.com

Figure 1. Flame Towers 2 SUBSURFACE INVESTIGATION In order to evaluate the foundation types of the proposed buildings and to design the earth retaining system, soil investigation works were conducted by Enar Eng. Arch. and Consultants (ENAR) in 2007. Nine soil borings with a total length of 380m were drilled within the soil investigation works. Standard laboratory tests were performed on disturbed and undisturbed samples taken from the borings. Besides, four seismic refraction tests, up to a depth of 12-15m were performed by ENAR in order to confirm the stratification of the subsurface layers and determine the thickness of the fill layer that was encountered during the soil borings. Additional soil investigation works, containing soil borings (a number of 25 with a total length of 1390m) and geophysical investigations (up to 100m depth) were performed on the site by Ministry of Emergency Situations (MES) in July, 2008. 2.1 Soil Profile According to the subsurface investigations, the soil profile of the investigation site consists of four main soil layers. There is a 3.50 m to 9.00 m thick artificial fill layer and slope debris on the ground surface. These layers are heterogeneous and they contain from fine to coarse-grained materials. A 20.0m thick very stiff clayey silt layer with occasional sand belts is encountered during soil borings below the fill layer. This layer generally consists of 2-3% gravel, 20 to 40% sand, 60 to 80% silt+clay. Percentage of clay-sized grains is around 20%. The liquid limit and plastic limit values are approximately w L = 30% and w p = 15%, respectively. Plasticity index is about I p = 12 to 15%. This layer is classified as low plasticity clay (CL) or low plasticity silt (CL-ML) based on the Unified Soil Classification System (USCS) [4]. Below the brown, very stiff clayey silt, there is a dark gray or dark brown colored, hard clayey silt layer containing sea shells. The thickness of this layer varies between 3.0m to 10.0m along the investigation site. This unit contains 5 to 9% gravel in patches. The sand percentage changes between 15% to 50%, silt+clay is around 50 to 85%. Clay percentage is generally around 20-25%. The consistency limits of this layer are w L = 30%, w P = 15%, I p = 15% and this soil layer is classified as CL or CL-ML in accordance with USCS. There is a 10.0m-15.0m thick layer of white colored, poorly cemented seashells featuring limestone with very weak rock properties encountered at 25.0m to 30.0m depth from the ground surface. A sandy clayey silt layer is encountered again below this weak cemented zone, and all soil borings are terminated within this layer. In accordance with the data gained from insitu and laboratory tests performed during the subsurface investigations, soil parameters given in Table 1 are used in the design of the retaining system. The soil model is given in Figure 2. Table 1. Soil parameters used in the design of earth retaining system Soil Layer Fill-Slope Very stiff Weak Hard Silt Debris Silt Rock Unit Weight, γ n 18kN/m 3 20kN/m 3 20kN/m 3 22kN/m 3 SPT N 60 20 - >50 20-25 30-35 >50 Cohesion, c 5 kpa 20 kpa 35 kpa 5 kpa Internal Friction Angel, φ 28 30 32 40 Modulus of Elasticity, E ref (Unload-Reload 15MPa 45MPa 60MPa 150MPa Condition) Poisson s Ratio, ν 0.33 0.33 0.33 0.25

3 EARTH RETAINING SYSTEM The design of the retaining wall and the methodology of the foundation excavation have been executed in accordance with the soil profile encountered at the construction site. The retaining system had to fulfill the following requirements: - to be a rigid system so as to minimize the effects on the neighboring structures - to keep displacements in a limited range - to be economical and applicable - to provide safety against global stability of the construction site Figure 2. Soil model In this sense, a retaining system composed of bored piles with various diameters (D = 80cm and D = 100cm) and various depths (L = 7.5m to L = 33.0m), and temporary ground anchors as lateral supports was designed for the foundation excavations of Towers by using Plaxis 8.6 Finite Element Program. Depth of the foundation excavation varies between 1.0m to 29.0m due to the inclined topography of the project site. 3.1 Design of the Retaining System The retaining system has been designed as a rigid system so as to accommodate the deformations that may emerge in clayey sandy silt layers due to stress relief during foundation excavations. Therefore, the retaining system has been laterally supported with multi-level temporary ground anchors with horizontal and vertical spacing selected based on the allowable anchor capacity limitation. Maximum pre stress load that would be applied to ground anchors installed in clayey sandy silt layer has been selected in accordance with FHWA-IF-99-015 Ground Anchors and Anchored Systems [5]. According to FHWA-IF-99-015 Ground Anchors and Anchored Systems, the value of ultimate skin friction between cement and slightly sandy silts may be taken as 250kPa. Under these circumstances, with a bond length (L bond ) of 8.0m and a drill diameter (D) of 0.125m, maximum allowable anchorage load can be calculated: T max = 8.0m*(0.125*3,14*250)/(2) = 390kN 40tons (Fs = 2.0) As calculated above, pre-stressing loads of the anchors have been limited with 40 tons in the design. For this reason, in order not to exceed limit loads, iterative pre-calculations have been done and approximate design sections have been obtained. Anchor grids have been selected as 3.0m 2 where the height of the retaining system varies between 16.0m to 29.0m, and 4.5m 2 for the remaining facades. These assumptions coincided with the calculation results in terms of anchor loads. Sections having less than a height of 5.0m were retained with cantilever soldier piles. A typical section of the retaining system is given in Figure 3. The diameter of the vertical structural element of the retaining system has been selected at D = 100cm where the excavation depth varies between 16.0m to 29.0m. For shallow excavations D = 80cm bored piles has been selected. Piles spacing (s) of D = 80cm and D =

100cm were selected as s = 94cm and s = 120cm so as to prevent spillage of silt layers between piles, respectively. 4 TOWER FOUNDATIONS RESTING ON LARGE DIAMETER BORED PILES The hotel, residence and office towers, within the Flame Towers Project, were planned to be constructed on raft foundations with bored piles. Thus, allowable pile capacities for different pile diameters and lengths have been calculated and submitted to the structural designer. During the pile capacity analyses, piles were assumed to be friction piles and end bearing capacities were reduced considering the construction methodology of bored piles and possibility of remaining sediments at the pile tip that may lead to capacity losses under structural loads. Figure 3. A typical section of the retaining system 3.2 Monitoring of the Retaining System In order to monitor horizontal displacements that may occur on the earth retaining wall during foundation excavation and to evaluate whether displacements are under the allowable limits or not; a total number of 15 inclinometers were installed around the retaining system. Installations of the inclinometers have been made prior to foundation excavation. Additionally, optical reflectors were placed on the cap beams so as to verify inclinometer readings. During the excavation works, readings were taken from inclinometers and optical reflectors on weekly basis. According to inclinometer readings, the excavation has been accomplished with a maximum horizontal displacement of 11mm. This displacement value is much below the allowable limits considering the size and depth of the excavation pit. No unfavorable effects on the retaining system itself and the neighboring structures have been recorded. Figure 4. An inclinometer readings Pile capacity analyses were performed using the soil model given in Figure 2. During the analyses, the unit shaft friction that is expected to be mobilized within very weak limestone layer was calculated by William-Pells method [6]. According to the calculated pile bearing capacities, the structural designer has determined the diameter, length and disposition of the

foundation piles for each tower structure. As foundation piles, a total number of 654 bored piles with a diameter of D = 120cm and with length of L = 28.0m and L = 36.0m were constructed. Allowable pile capacities predicted for D = 120cm, L = 28.0m and L = 36.0m piles were Q all = 850tons and Q all = 1150 tons, respectively. In order to prove the predicted pile capacities, three pile loading tests have been performed at the construction site. Due to high test loads, Osterberg Cells were used for pile load tests. Load tests were executed successfully under supervision of ENAR Engineers Architects and Consultants and LoadTest International Inc. The equivalent top-loaded load-settlement graph for L=36m long bored pile is given in Figure 5. Figure 5. Load-settlement Based on data gathered during the pile load test, shaft frictions measured via strain gauges verified the predicted shaft frictions used in the pile capacity analyses, and the predicted pile capacities have been proved and found convenient. 5 GLOBAL STABILITY OF THE PROJECT SITE Extensive slope stability analyses were carried out in order to study the landslide potential of the project site considering the inclined topography of the area. Static and seismic stability analyses were carried out by using GeoStudio SLOPE/W 2007 software. The cross section, used in the stability analyses was prepared by Client s survey team, and the soil profiles were determined in accordance with subsurface investigations. In the seismic analyses, a horizontal seismic coefficient of k h = 0.2g (half the maximum ground acceleration of 0.4g), was applied. Vertical seismic effects were neglected in the stability analyses to consider more conservative cases. A minimum factor of safety Fs = 1.5 and Fs = 1.1 were considered for static and seismic loading conditions, respectively. The initial condition of the site before any excavation and the final condition where all the structures have been completed were evaluated in the stability analyses. The results of the stability analyses are summarized in Table 2. Table 2. Results of the slope stability analyses Soil Layer Static Loading Condition (FS) Seismic Loading Condition (FS) Initial Condition 6.403-8131 1.870-2.656 After construction of the Towers 8.598-8.652 2.987-3.079 As can be seen from Table 2, safety factors for static and seismic analyses of potential critical sliding surfaces are greater than the minimum safety factors given in the previous paragraph. Therefore, no potential slope stability problems were expected at the site after all the proposed buildings have been constructed. 6 CONCLUSIONS In order to perform the foundation excavations of the towers within Flame Towers Project safely, a retaining system is constructed which is composed of D = 80cm and D = 100cm bored piles laterally supported by temporary ground anchors. Since the Project site is located on an inclined topography, the global safety of the site against slope stability has been analyzed. Both analyses and optical - instrumental monitoring (performed during foundation excavation) have proved that no potential slope stability problems are expected at the project site. Considering the neighboring structures such as Parliament Building, General Staff Building and Central Clinic Hospital, it has become a

necessity to minimize the displacement during the design and the construction phases of the retaining system. Therefore, during the construction phase, retaining system and the neighboring structures have been monitored, and construction sequence has been coordinated in accordance with the results of instrumental monitoring. Prove tests have been applied to all ground anchors constructed within the retaining system. Besides, pile constructions have been performed under the supervision of QA/QC engineers. Retaining system construction and the foundation excavation have been carried out successfully at the project site. Foundation excavation has been accomplished with a maximum horizontal displacement that is much below the allowable limits when considering the size and the depth of the excavation pit. Piled raft foundations have been constructed at each tower. D = 120cm and L = 28.0m to 36.0m bored piles have been constructed under the foundations of the towers. Anticipated pile capacities have been proved by pile loading tests that were performed by means of Osterberg Cells. ACKNOWLEDGEMENT The author acknowledges the support of Enar Engineers Architects & Consultants and the permission of Dia Holding FZCO to publish this paper. REFERENCES [1] ENAR Engineers Architects & Consultants, Dia Holding FZCO - Geotechnical Evaluation Report for Baku Flame Towers Project, 2007 [2] ENAR Engineers Architects & Consultants, Dia Holding FZCO Calculation Report for Earth Retaining System of Baku Flame Towers Project, 2007 [3] Ministry of Emergency Situations, Tikintide Tehlükesizliyi Nezaret Dövlet Agentliyi - Hesabat, 2008 [4] Casagrande, A., Classification and Identification of Soils, Trans. ASCE, vol. 113, pp.901-991, 1948 [5] P.J. Sabatini, D.G. Pass, and R.C. Bachus, Ground Anchors and Anchored Systems, Geotechnical Engineering Circular No.4, Publication FHWA-IF- 99_015, Federal Highway Administration, Washington, D.C., 1999 [6] Williams, A.F. and Pells, P.J.N., Side Resistance Rock Sockets in Sandstone, Mudstone and Shale, Canadian Geotechnical Journal, 18, 502-513, 1981