FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Similar documents
FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY 2019 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

NJTPA Transportation Improvement Program Fiscal Years

Transportation Conformity

Overview of Maintenance and Construction Programs. Mike Holder, PE, Chief Engineer Jennifer Brandenburg, PE, State Asset Management Engineer

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

I-91 Viaduct Public Information Briefing

2311 Egg Harbor Road Susan Shin-Angulo Lindenwold, NJ Freeholder Liaison Phone Fax

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 29, Resurfacing of Aldrich Road West Contract # 11-06

NJDOT: Asset Management Strategies and Tools

Fall 2018 Engineer Trainee Recruitment Preference Sheet

Michael Lamplugh, Sr., PLS Vice President

Berkshire Region TIP Project Data Form

House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions. March 28, 2016

SAMPLE. in Comments section the structure number and the

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities

SUPPLEMENTAL ECMS ADVANCED INFORMATION AUGUST 10, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

BID RESULTS FOR THE CTB

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MARCH 1, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ENGINEERING DEPARTMENT

New Jersey Department of Transportation. Local Freight Impact Fund Handbook. Procedures and Criteria for Local Freight Impact Fund Grant Program

[In Conformance with N.J.A.C. 7:50-5.4]

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

Information for File # RJH

PUBLIC NOTICE. From: Corporate Services Date: March 26, 2012 Re: Federal Gas Tax Reporting

CONTENTS EXECUTIVE SUMMARY... 1

Farmington Metropolitan Planning Organization. Federal Fiscal Year Transportation Improvement Program (TIP)

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

Project Initiation Form

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

SMITHCO. ENGINEERING GROUP, INC.

KRISTOPHER J. KRZYSTON, CEI, CEM

Public Works Department Five Year Capital Improvement Plan FY PROPOSED

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT AUGUST Resurfacing of Aldrich Road West Contract # 11-06

Capital District Transportation Committee November 6, Unit Costs for Non-State Highway Reconstructions with Federal Funds

Shore Connection Committee Report Route 55/47 Corridor Transportation Study

Infrastructure Financing Programs (DIF)

on the eastbound side of Route 29). identified in the table.

Construction Cost Estimation Preparation Manual (Metric Units)

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07

MISCELLANEOUS PAVING PROJECTS & SIGNAL INSTALLATION

The Main Street Bridge - Supporting Transportation Systems

From Paper to Practice: Putting Risk-Based Asset Management to Work

Corridor Planning Standards + Potential Performance Measures

Maintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013

CONSULTANT OF THE YEAR

Going Forward The Plan to Maintain & Improve Mobility Frequently Asked Questions (FAQs)

BL ENGLAND & RELIABILITY PIPELINE PROJECT. September 27, 2013

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director

IMPROVING I 81 IN MARYLAND

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No.

ENGINEERING DEPARTMENT

GREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017

Concept Development Report NJ Route 33 Pavement Resurfacing Manalapan & Freehold Townships, Monmouth County

NAME STREET ADDRESS CITY, STATE & ZIP CODE. GAS ELECTRIC TELEVISION TELECOMMUNICATION OTHER (check one) UNDERGROUND OVERHEAD BOTH (check one)

connections 2040 the waco metropolitan transportation plan amendment 1

Tax Increment Finance: An Emerging Community Revitalization Tool

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems

NJTPA 2014 Local Concept Development Study Hudson & Essex Counties Clay Street Bridge over the Passaic River. Public Information Center

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

Public Meeting. SD 37 James River Bridge Beadle County P 0037(140)140 PCN 04FH. Steve Johnson, PE Chief Bridge Design Engineer.

Categorical Exclusion (CE)

NLA New Jersey Lakes 2012

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

STATE TRANSPORTATION COMMISSION PUBLIC HEARING 2013 TRANSPORTATION PROGRAM UPDATE

DESIGN PUBLIC HEARING APRIL 3, 2017 THE LEE MEMORIAL (TOWN) HALL LEE, MASSACHUSETTS :00 PM FOR THE PROPOSED

Appendix C. Wetland Impact Assessment and Two-Part Finding. I-94 St. Michael to Albertville Minnesota Department of Transportation

APPENDIX E: Capital Programs and Descriptions

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Transit Project Descriptions ($ millions)

CENTRAL FLORIDA EXPRESSWAY AUTHORITY. SR 408 Eastern Extension PD&E Study

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

STORMWATER MANAGEMENT REPORT FOR THE BORGATA OUTDOOR EVENT AREA POOL ADDITION


Coordinating Minnesota s Transportation Assets and Climate Change and Extreme Weather Vulnerability

Surface Transportation Block Grant Program

Appendix A Approval Path Flowchart

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS

STATE TRANSPORTATION COMMISSION PUBLIC HEARING 2013 TRANSPORTATION PROGRAM UPDATE

Re-Visioning Falmouth Route One: Financing Public-Private Stormwater Management through Creative Collaboration

For Public Input Period

Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan

Proposed Transportation Capital Program Fiscal Year 2013

Transcription:

South Inlet Transportation Improvement Project DBNUM: 09361 / UPC: 093610 The Casino Redevelopment Authority (CRDA) has identified certain road improvements to be performed in Atlantic City on certain feeder roads, that will maintain, operate and support Atlantic City Expressway Projects of the South Jersey Transportation Authority, including on Melrose Avenue in between Delaware and Connecticut Avenues, on Connecticut Avenue from Melrose to Oriental Avenues, and on Massachusetts Avenue and various other intersection and capital improvements in connection with the South Inlet Transportation Improvement Project. NJDOT has agreed to provide one third of the eligible costs up to $17 M, plus the additional needed to finance bonds. Approximately $1.5 M TTF funding will be provided to SJTA by NJDOT annually for 20 years for this purpose, except for the first year which will be $1.7 M TTF. SJTA will issue debt based on NJDOT s funding guarantee and provide the funding to CRDA. This project is multi year funded. Total construction funding needed is expected to be $24,996,000. MUNICIPALITY: Atlantic City MILEPOST(S): N/A AIR QUALITY CODE (NON EXEMPT/EXEMPT): 2015 (Non Exempt) SPONSOR: SJTA/CRDA ASSET MANAGEMENT CATEGORY: Mobility and Congestion Relief (Local System Support: Local Mobility Improvements) $1.504 $1.504 $1.504 $1.504 $1.504 $1.504 $1.504 $1.504 $1.504 $1.504 $16.233

Route 30, Atco Avenue to Route 206 DBNUM: 11416 / UPC: 114160 Initiated from the Pavement Management System, this project will resurface within the project limits. The project will include guiderail replacement, installation of handicapped ramps and crosswalks and upgrading of traffic signals. Total construction funding needed is expected to be $13,821,100. COUNTY: Camden, Atlantic MUNICIPALITY: Waterford Twp, Chesilhurst Boro, Winslow Twp, Hammonton Town MILEPOST(S): 19.51 29.70 LEGISLATIVE DISTRICT: 8, 4 ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Road Assets: Highway Resurfacing) DVRPC $11.448 $11.448 $2.373 $2.373

Route 30, Bridge over Duck Thorofare DBNUM: 14428 / UPC: 144280 Initiated from the Bridge Management System, the project will rehabilitate/replace the bridge. Total construction funding needed is expected to be $9,500,000. MUNICIPALITY: Atlantic City MILEPOST(S): 56.25 STRUCTURE NO.: 0103153 AIR QUALITY CODE (NON EXEMPT/EXEMPT): S19 (Exempt) ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Bridge Assets: Bridge Rehab and Replacement) PE $0.700 $0.700 DES $1.000 $1.000 $9.500 $9.500

Route 30, Elmwood Rd/Weymounth Rd (CR 623) to Haddon Ave. DBNUM: 11337 / UPC: 113370 Initiated from the Pavement Management System, this project will resurface within the project limits. The project includes; corrections made to deficiencies in the sidewalks, curbing, curb ramps, intersections, and swales and some inlets will be constructed to eliminate ponding. Guiderail will be brought up to current standards. This project is multi year funded. Total construction funding needed is expected to be $19,500,000. MUNICIPALITY: Mullica Twp, Absecon City, Galloway Twp MILEPOST(S): 36.4 50.82, 9 ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Road Assets: Highway Rehab and Recon) DES $1.900 $1.900 $9.500 $10.000 $19.500

Route 30, Illinois Avenue (CR 631) to Grammercy Avenue DBNUM: 12403 / UPC: 124030 Initiated from the Pavement Management System, this project will resurface within the project limits. Total construction funding needed is expected to be $5,075,000. MUNICIPALITY: Absecon City, Atlantic City MILEPOST(S): 52.3 56.7 ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Road Assets: Highway Resurfacing) $5.075 $5.075

Route 40, Atlantic County, Drainage DBNUM: 08371 / UPC: 083710 Approximately one mile of Rt 40/322 will be raised from 2.5 to 4 feet above existing to reduce flooding. Construction will include new pavement, new curbs and sidewalks, relocation of aerial and underground utilities and new drainage. At Mile Post 63.4, steel sheeting and new drainage will be installed. Total construction funding needed is expected to be $10,200,000. MUNICIPALITY: Egg Harbor Twp, Atlantic City MILEPOST(S): 60.4 63.5 ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Road Assets: Drainage) PE $1.200 $1.200 DES $1.400 $1.400 ROW $1.000 $1.000 $10.200 $10.200

Route 40/322, Median Closures, Delilah Road to East Fire Road DBNUM: 196A5 / UPC: 068095 This project is a break out from ʺRoute 40/322 Cologne Ave to Fire Roadʺ. A recent crash analysis for Route 40/322 Median Closure Delilah Rd. to Fire Rd. project from the Bureau of Safety Programs for years 2010 2012 was completed. The analysis reveals the need for a Concept Development study to address safety concerns for the remaining part of the Route 40/322 Delilah Rd. to Fire Rd. Total construction funding needed is expected to be $4,200,000. MUNICIPALITY: Hamilton Twp, Egg Harbor Twp MILEPOST(S): 53.21 58.11 AIR QUALITY CODE (NON EXEMPT/EXEMPT): S6 (Exempt) ASSET MANAGEMENT CATEGORY: Mobility and Congestion Relief (Congestion Relief: Highway Operational Improvements) PE $0.300 $0.300 DES $0.700 $0.700 ROW $0.100 $0.100 $4.200 $4.200

Route 49, Estelle Manor Drive to Dam Road DBNUM: 14367 / UPC: 143670 Initiated from the Pavement Management System, this project will resurface within the project limits. This is a Mill X Pave X project. Total construction funding needed is expected to be $3,200,000., Cumberland MUNICIPALITY: Maurice River Twp, Estell Manor City LEGISLATIVE DISTRICT: 1 MILEPOST(S): 44.2 49.8 ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Road Assets: Highway Resurfacing) $3.200 $3.200

Route 54, Route 322 over Cape May Point Branch, Contract B DBNUM: 01339A / UPC: 148020 Environmental mitigation for Route 54, Route 322 over Cape May Point Branch project. Due to project associated impacts, requires the NJDOT to purchase land for plantings of vegetation and trees due to overall land disturbances due to the project in accordance with NJDEP riparian and reforstation mitigation requirements. Total construction funding needed is expected to be $784,000. MUNICIPALITY: Folsom Boro MILEPOST(S): 6.2 6.9 AIR QUALITY CODE (NON EXEMPT/EXEMPT): O5 (Exempt) STRUCTURE NO.: ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Bridge Assets: Bridge Rehab and Replacement) STP $0.784 $0.784

Route 152, Bay Avenue to Seaview Drive DBNUM: 14371 / UPC: 143710 Initiated from the Pavement Management System, this project will resurface within the project limits. Total construction funding needed is expected to be $5,350,000. MUNICIPALITY: Somers Point City, Egg Harbor Twp MILEPOST(S): 0.0 3.16 ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Road Assets: Highway Resurfacing) $5.350 $5.350

Route 322, Route 50 to Leipzig Avenue DBNUM: 12433 / UPC: 124330 Initiated from the Pavement Management System, this project will resurface within the project limits. Total construction funding needed is expected to be $8,980,000. MUNICIPALITY: Hamilton Twp MILEPOST(S): 45.9 50.0 ASSET MANAGEMENT CATEGORY: Infrastructure Preservation (Road Assets: Highway Resurfacing) STP $8.980 $8.980