Line Balancing through Cycle Time Reduction

Similar documents
INDUSTRIAL MANAGEMENT

A Machine Setup Model for TFT-LCD Cell Back-End Process

Improvement Techniques in Manufacturing Industry

TOPIC 2 : WORK METHODS 2.1 Elemental breakdowns 2.2 Performance rating 2.3 Personal, fatigue, unavoidable delay allowances 2.4 Workload and line balan

Continuous Improvement Toolkit

COST REDUCTION THROUGH WASTE MANAGEMENT IN AUTO PARTS INDUSTRY: A CASE STUDY

STUDY ON CONSTRUCTION LABOUR PRODUCTIVITY USING LEAN PRINCIPLES

Outline. Pull Manufacturing. Push Vs. Pull Scheduling. Inventory Hides Problems. Lowering Inventory Reveals Problems

İŞL 343 Üretim İşlemler Yönetimi Bahar Dönemi. Chapter 6. Melike Meterelliyoz Kuyzu

EDMM Cycle Time Definitions and Line Balancing (Yamazumi) Charting

International Journal of Technical Research (IJTR) Vol. 5, Issue 1, Mar-Apr 2016

Productivity Improvement in Assembly Line of an Automobile Industry

Operations and Production Management GPO300

Lean manufacturing concept: the main factor in improving manufacturing performance a case study

A CASE STUDY OF PRODUCTION LINE BALANCING WITH SIMULATION

Harold s Hot Dog Stand Part I: Deterministic Process Flows

LEAN PRODUCTION SYSTEM

The Goal is Lean. MTA English

A Computer based novel approach of ergonomic study and analysis of a workstation in a manual process

Continuous Improvement Toolkit. Standard Work. Continuous Improvement Toolkit.

International Journal of Research in Advent Technology Available Online at:

Continuous Improvement Toolkit. Value Analysis

Work System Design Dr. Inderdeep Singh Department of Mechanical and Industrial Engineering Indian Institute of Technology Roorkee

Ch 16 Automated Production Lines

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

Balance Analysis of Many Varieties Small Batch Workshop Production Line

Methods Engineering. Methods Engineering

APPLICATION OF LEAN MANUFACTURING IN DEVELOPING BEST PRACTICES FOR PRODUCTIVITY IMPROVEMENT IN AN AUTO- ASSEMBLY PLANT

PRODUCTIVITY IMPROVEMENT IN APPLIANCE MANUFACTURING

8 Tools to Over Manage the Bottleneck

Planning and Management Tools

Productivity Improvement By Maynard Operation Sequence Technique

IMPROVEMENT OF OVERALL EFFICIENCY OF PRODUCTION LINE BY USING LINE BALANCING

Thorough Elimination Of Muri, Mura And Muda To Achieve Customer Satisfaction

Product Process & Schedule Design

METHOD STUDY. Definition: WHY:

International Journal of Advance Engineering and Research Development LINE BALANCING OF OPERATIONS IN AN AUTOMOBILE BODY BUILDING SHOP

Where to Use Automated Production Lines. Automated Production Lines. Benefits of Automated Production Lines. Automated Production Line - Defined

Line Balancing on AUDI B8 Cable Assembly Line using MUDA: A Case Study

Methods of Solving Assembly Line Balancing Problem

Tech 45: Unit 2. Manufacturing Facilities Design Procedures and Analysis Tools

Re-engineering a Helping Hand

Reducing the Manufacturing Lead Time of Export Pump Components in an Indian Pump Industry

IT 470a Six Sigma Chapter X

Learning Objectives. Facility Layout. Layout. Strategic Importance of Layout. Layout Strategy Concerns. Importance of Layout Decisions

10 Steps to become a Lean Enterprise. Level 2 Lean Practitioner In Manufacturing Training Course. Step 1 - Part 2

An Application of Value Stream Mapping In Automobile Industry: A Case Study

USING SIMULATION TO SUPPORT IMPLEMENTATION OF FLEXIBLE MANUFACTURING CELL. Kambiz Farahmand

ELEMENTS OF MANUFACTURING BASICS

Manufacturing Information Systems. deden08m.com 1

RPW Method for Simple Assembly Line Balancing

Optimization of Cycle Time for Wire Harness Assembly Line Balancing and Kaizen Approach

Chapter 17. Synchronizing and Balancing Processes. Level the master production schedule. Production. Time

Industrial Engineering

LEAN MANUFACTURING & TPM.

Some Definitions. Introduction to Work Measurement

Student: 2. As a general rule, continuous processing systems produce products for inventory rather than for customer order.

Application of Two Sided Assembly Line Balancing for Lean operations - A Case Study

Lean Manufacturing Implementation in Small and Medium Industry

Justifying Simulation. Why use simulation? Accurate Depiction of Reality. Insightful system evaluations

11 th North-West QualTech Awards For Excellence in Quality

Assembly Line Efficiency Improvement by Using WITNESS Simulation Software

The Realities of Modern Manufacturing

Overall Equipment Efficiency (OEE)

Process Strategy Chapter 4

Productivity Improvement by Designing Storage Systems in a Manufacturing Industry

MODELING AND SIMULATION OF A LEAN SYSTEM. CASE STUDY OF A PAINT LINE IN A FURNITURE COMPANY

Lab Quality Confab LEAN Principles. 4 Fundamental LEAN Tools to Transform your Laboratory. Rita D Angelo, Bonnie Messinger, Bill Krzisnik

Productivity Improvement Techniques in Apparel Manufacturing Industry

Motion and Time Study

Use of Spaghetti Diagram for Identification and Elimination of Waste Movements in Shop Floor for OEE Improvement: A Case Study

The Improvement of Production Bottleneck Process in J Company Automobile Assembly Line Yan-Hua MA 1,a, Tian-Rong BAI 1, Ling-Yu LI 1,b,*, Zhen LI

Analysis of a Manual Mixed-Model Assembly Line in Food Processing Industry: A Case Study

ANALYSIS ON THE PROCESSING TIME REDUCTION FOR AN AUTOMOTIVE INDUSTRY PRODUCTION FLOW

Modeling and Analysis of a Manufacturing Plant Using Discrete Event Simulation

MANUFACTURING RE-ENGINEERING DESIGN IN AUTOMOTIVE ASSEMBLY OPERATION USING COMPUTER SIMULATION MODEL

Figure 2: Industrial robots performing spot-welding operations in a respot line.

Part 3 : 11/10/10 21:33:42. The four factors that derive from a company's distinctive competencies and which create competitive advantage are

Description of the Rear-Axle Assembly Demo Model for Tecnomatix Plant Simulation March 2013 CONTENT

JUST IN TIME. Manuel Rincón, M.Sc. October 22nd, 2004

Reducing Turnaround Time on Mobile Detailing

The entire presentation kit is having 2 main directories as below. Just in Time. 01 Introduction

Continuous Improvement Toolkit. Pugh Matrix. Continuous Improvement Toolkit.

SDML Workers' Compensation Fund Creating

Manufacturing Systems & Single Station Manufacturing. Lecture 2

ENHANCEMENT OF OVERALL EQUIPMENT EFFECTIVENESS BY REDUCTION OF LEAD TIME THROUGH DIFFERENT LEAN APPROACHES

TM012: Best Practices in Multi-Shift Operations: Maximizing Productivity Through Round-The- Clock Operations

A term used to embrace the techniques of method study and work measurement, which are employed to ensure the best possible use of human and material

Improvement in Line feeding System in Assembly Plant using Lean Manufacturing Techniques

Six Sigma Black Belt Week 3. Six Sigma Black Belt Week 3. Six Sigma Black Belt Week 3. Project Management. Chapter 3-4

Lean manufacturing implementation in reducing waste for electronic assembly line

Barriers and Solutions of TPM Implementation In PNG Distribution Company

CLASSIFICATION OF LAYOUT ( )

Journal of American Science 2015;11(5) Implementation of Lean Logistics in Apparel Manufacturing

IMPROVEMENT OF A MANUFACTURING PROCESS FOR SUSTAINABILITY USING MODELING AND SIMULATION Thesis

Structured Approach to Project Execution, Monitoring and Control at Operational Level

Implementation of Quality Control Tools and Techniques in Manufacturing Industry for Process Improvement

MATERIAL HANDLING CHAPTER OUTLINE

Methodology of Evaluating the overall Equipment Effectiveness in Machine Shop Manufacturing Industry through Total Productive Maintenance

Transcription:

International Journal of Advance Industrial Engineering E-ISSN 2320 5539 2016 INPRESSCO, All Rights Reserved Available at http://inpressco.com/category/ijaie/ Research Article Kanagaraj A #, Vivek C #, Vigneshraj C T # and RajeshKannan K $ # Dept of Mechanical Engineering- R.M.K Engineering College, Chennai, India $ Dept of Mechanical Engineering- Sri Sairam Engineering College, Chennai, India Accepted 14 Sept 2016, Available online 17 Sept 2016, Vol.4, No.3 (Sept 2016) Abstract Poor layout design is determined as a major problem in small and medium industry. These particular problems thus affect the productivity and the line efficiency as well. In automotive industries, assembly line is the major area to be taken into consideration for increasing productivity. The focus of this project is to identify the bottleneck workstations in the current layout and eliminate those activities that are taking time on those workstations. The time study is done manually by us. The current layout is redesigned by computing take time and processing times in each workstation. The case study shows how the takt time calculation is done and from this takt time, the processing time is decided for all workstations. The time consuming activities are reduced and thus the processing times at all workstations is made possibly equal. The time reduction increases productivity in the form of increased number of units of production in the same previous time. Line efficiency is also found to be improved which is described in terms Overall Line Efficiency (OLE). Keywords: Line Efficiency, Line Balancing, Bottleneck, Cycle time, Workstation, Idle time, Productivity. Introduction Process Flow 1 The aim of this project is to increase the production. If the level of output is increased faster than that of input, productivity will increase. Conversely, productivity will be increased if the level of input is decreased faster than that of output. Also, an organization may realize a productivity increase from reducing more output with the same level of input. Finally, producing more output with a reduced level of input will result in increased productivity. Productivity is the ratio between output and input. It is quantitative relationship between what we produce and what we have spent to produce. Productivity is nothing but reduction in wastage of resources like men, material, machine, time, space, capital etc. It can be expressed as human efforts to produce more and more with less and less inputs of resources so that there will be maximum distribution of benefits among maximum number of people. Productivity denotes relationship between output and one or all associated inputs. We use cycle time as the tool to measure each workstation s productivity. The workstation which takes the longest cycle time will be the critical process. This will decide the overall output in terms of units. So the productivity can be increased only if we debottleneck the critical process. *Corresponding author: Vigneshraj CT 102 International Journal of Advance Induatrial Engineering, Vol.4, No.3 (Sept 2016)

631 492 367 600 647 384 1230 2236 631 492 308 600 647 447 1230 2236 Kanagaraj A et al Observations The cycle time for each process in door frame assembly line is calculated manually by us. The cycle time study report is made with the help of stop watch. Each process is studied in detail by taking ample number of recordings on various sessions. By taking into account of the available time for each shift, the number of output products is found out for each shift. The process which takes the longest cycle time is regarded as the critical process and considered as the bottleneck for productivity. The longest cycle time also decides the minimum number of output products that can be produced per shift. So in order to increase the productivity, we have to increase the number of output products produced per shift. This can be achieved by reducing the cycle time for that critical process. Further, it is found that the front door frame takes some more time to produce than rear door frame assembly. This is because of a provision to locate rear view mirrors in the front door panels, which is why latch Co2 welding process takes the longest cycle time in the assembly, leaving rest of the process to be same for both the frame assemblies. Also the assembly line is found to be balanced, leaving us to take only the cycle time reduction approach to improve the productivity. FRONT DOOR FRAME BEFORE CYCLE TIME REDUCTION NAME DESCRIPTION VALUE(AVG) IN SECS AVL TIME IN SECS OUTPUT PER SHIFT STRETCH BENDING STRETCH BENDING 39 0 631 63T PRESS P01 UPPER PRESS OPN-1 10 0 63T PRESS P02 UPPER PRESS OPN-2 11 0 2236 63T PRESS P03 UPPER PRESS OPN-3 10 0 SAW CUTTING SAW CUTTING UPR + VERTICAL 43 0 CMT WELDING UPR+VRTL 50 0 492 LATCH CO2 WELDING REINF + C FRAME 80 0 308 GRINDING GRINDING FRT 43 0 BUFFING BUFFING FRT 41 0 600 BACK FILING BACK FILING 40 0 SIDE FILING SIDE FILING 38 0 647 PRE-CF PRE-CF 20 0 1230 BELT WELDING FRT BELT + C FRM ASSY 55 0 447 FINAL CF FINAL CF 40 0 FRONT DOOR FRAME AFTER CYCLE TIME REDUCTION NAME DESCRIPTION VALUE (AVG) IN SECS AVL TIME IN SECS OUTPUT PER SHIFT STRETCH BENDING STRETCH BENDING 39 0 631 63T PRESS P01 UPPER PRESS OPN-1 10 0 63T PRESS P02 UPPER PRESS OPN-2 11 0 2236 63T PRESS P03 UPPER PRESS OPN-3 10 0 SAW CUTTING SAW CUTTING UPR + VERTICAL 43 0 CMT WELDING UPR+VRTL 50 0 492 LATCH CO2 WELDING REINF + C FRAME 67 0 367 GRINDING GRINDING FRT 43 0 BUFFING BUFFING FRT 41 0 600 BACK FILING BACK FILING 40 0 SIDE FILING SIDE FILING 38 0 647 PRE-CF PRE-CF 20 0 1230 BELT WELDING FRT BELT + C FRM ASSY 64 0 384 FINAL CF FINAL CF 40 0 Fig.1 Cycle Timings CURRENT STATE CYCLE TIME PROCESS DAY 1 DAY 2 DAY 3 FRONT DR FRM BEFORE CYCLE TIME REDUCTION FRONT DR FRM AFTER CYCLE TIME REDUCTION OVERALL AVG IN SECS STRETCH BENDING 39.1 39.4 37.7 39 63T PRESS OPN 1 10.2 10.8 10.7 10 63T PRESS OPN 2 11.4 10.7 11.35 11 63T PRESS OPN 3 10.65 10.4 10.85 10 Methodology Cycle Time improvement World class companies that are finding a concentrated effort to reduce cycle time is one way to do the following: Enhance their competitive positions Increase profitability Achieve these results in a short period of time with minimal investment Major cycle-time improvement is not achieved by working faster, but through improved processes and the application of proven techniques and tools Organizational culture transformation is usually set in motion by a high-level assessment to set a strategy for action. Although such an assessment has not been made part of the deployment process presented, it is important that all senior management have a clear understanding of the company s readiness to move into CTI activities. This includes understanding the following: How the financial success of the company is linked to cycle and lead times What the priority of CTI should be relative to other improvement activities Which cycle or cycles (business processes) need to be addressed How committed you are to improving competitiveness through CTI Problem-solving tools applied to cycle time improvement (CTI) These tools are used for developing a complete picture of all the possible causes of a problem and to reach agreement on the basic one(s). There are numerous tools in this category. For CTI, typical problem-solving tools include: SAW CUTTING 1 & 2 45.5 42.45 44.7 43 CMT WELDING 49.85 49 49.65 50 LATCH CO2 WELDING 80.65 80.25 80.25 80 GRINDING 42.95 41.45 43.4 43 BUFFING 40.5 40.65 40.25 41 BACK FILING 40.05 41.25 39.05 40 SIDE FILING 37.85 36.8 37.35 38 PRE-CF 19.7 21 21.5 20 BELT WELDING 54.7 54.75 54.55 55 FINAL CF 40.7 40.75 41.3 40 Fig.2 Current state cycle time Brainstorming Cause and Effect Diagrams Force Field Analysis Nominal Group Technique Pareto Chart Histogram Affinity Diagram Interrelationship Diagram Prioritization Matrices Analytical Matrices 103 International Journal of Advance Industrial Engineering, Vol.4, No.3 (Sept 2016)

Kanagaraj A et al Brainstorming Ideas Table 1: Brainstorming ideas seconds. This is the longest cycle time noted in the assembly line. The number of product coming out from this station is going to decide the number of output for the whole line. Hence, cycle time reduction is done to increase output of this station. It is proposed to reduce the number of spot welds done by this robot and can be compensated by another robot in the same assembly line which performs belt spot welding. By doing so, the productivity can be increased and at the same time line also gets balanced. Future Scenario Improvements made 1. CO 2 Latch welding station Fig.5 Future scenario Current Scenario Fig.3 Co 2 Latch Welding Station Cycle time for latch welding = 67 secs No. of spot welds = 6 spots Effective output = 330 units The weld spots 1 and 2 will be removed from latch welding machine and going to weld by belt spot welding robot at its station. Therefore cycle time for 8 spots welding gets reduced. Hence, production rate is increased from 270 units to 330 units per shift, which is a 22% increase in the same assembly line. 2. Belt spot welding station Fig.4 Current scenario Cycle time for latch welding = 80 secs No. of spot welds = 8 spots Effective output = 270 units Initially, the latch welding is done wholly by this welding robot. For that, the cycle time would be 80 Fig.6 Belt Spot Welding Station 104 International Journal of Advance Industrial Engineering, Vol.4, No.3 (Sept 2016)

Kanagaraj A et al Current Scenario that, cycle time would be 55 seconds. Now, the belt welding station is proposed to perform some additional task to balance the assembly line. This can be done by performing additional spot welds carried out by Co2 welding station. Hence the number of output from the critical station gets increased. Results Line Balancing Fig.7 Current scenario Cycle time for spot welding = 64 Sec No. of spot welds = 8 spots Effective output = 380 units In the belt welding station, the frame contains the latch welded on only 6 spots, done by earlier latch welding robot. The remaining two spots is going to be weld by belt welding robot Future Scenario Productivity of a manufacturing system can be defined as the amount of work that can be accomplished per unit time using the available resources. Line balancing (LB) is usually undertaken to minimize imbalance between machines or personnel while meeting a required output from the line. Line balancing is a tool to improve the throughput of a work cell or line which at the same time reducing manpower and cost needed. It is often used to develop product based layout. Line Balancing job description is to assign tasks to a series of connected workstations where the number of workstations and the total amount of idle time are minimized for a given output level. The line is balanced if the amount of work assigned to each workstation is identical. Line balancing is commonly used technique to solve problems occurred in assembly line. Line balancing is a technique to minimize imbalance between workers and workloads in order to achieve required run rate. This can be done by equalizing the amount of work in each station and assign the smallest number of workers in the particular work Generally, Line Balancing technique is used by many companies to improve the productivity, decreases the man power, decreases idle time and buffer or even to produce more than two products at the same time. Line balancing technique is used to achieve the minimization of the number of workstations, the minimization of cycle time, the maximization of workload smoothness and the maximization of work relatedness. Fig.8 Future scenario Cycle time for spot welding = 55 secs No. of spot welds = 6 spots Effective output = 440 units Initially, the belt welding station performs the welding of c-frame assembly with the belt reinforcement. For Parameters in line balancing 1. Cycle Time = available time period / output units required per period 2. Production = no. of outputs made 3. Productivity = no. of outputs made / input (time) 4. Line efficiency = total station time / (cycle time * no. of workstations) Overall Equipment Effectiveness (OEE) is a preeminent practice for monitoring and improving efficiency of the manufacturing processes such as machines, cells, assembly lines and etc. OEE when applied to assemblies is called as Overall Line Efficiency (OLE). OEE is simple and practical yet a powerful calculation tool. It takes the most common sources of manufacturing productivity losses and places them into three understandable categories which are Availability, Performance and Quality. 105 International Journal of Advance Industrial Engineering, Vol.4, No.3 (Sept 2016)

80 270 Kanagaraj A et al Reasons to have balanced production line Productivity Improvement Keeping inventory cost low results in higher net income. Keeping normal inventory levels lets the operator work all day long giving him/her the opportunity to earn more money by increasing his/her efficiency. Keeping the line balanced lets the supervisors improve other areas because they can use their time better. Balanced production keeps prices low which turns into repeat sales. Balanced assembly line reduces much of the idle time Balanced production means better production Allowances Table 2 Routine Time Table Day plan 10 Morning tea break 10 Lunch break 30 Afternoon tea break 10 M/c cleaning time 10 Total time Productivity before cycle time reduction 70 mins Table 3 Productivity before Cycle Time S.No Contents Duration 1 Total shift timing 8 hrs 2 Shift timing 480 mins 3 Exemptions 70 mins 4 Available timing 410 mins 0 secs 5 Cycle time 80 secs 6 Output 308 Units 7 OEE efficiency @90% 277 Units 8 Rounded off to 270 Units Productivity after cycle time reduction Table 4 Productivity after Cycle Time S.No Contents Duration 1 Total shift timing 8 hrs 2 Shift timing 480 mins 3 Exemptions 70 mins 4 Available timing 410 mins 0 secs 5 Cycle time 67 secs 6 Output 367 Units 7 Oee efficiency@90% 330 Units 8 Rounded off to 330 Units Conclusion Fig.9 Productivity Improvement This project describes assembly line balancing by cycle time reduction, is one of the major step to be taken into consideration while increasing productivity of automotive industries. Line balancing is done with taking in account the take time, cycle time and downtime and thus reduces the production lead time with increased number of output. Continuous improvement is the step to reduce unnecessary downtime losses. The productivity of assembly line is thus found to be increased. The cycle time is noted for each workstation with the help of stopwatch. And successfully identified the bottleneck in the assembly line, which is Co2 latch welding station. Also, suitable countermeasures were proposed to eliminate the bottleneck to improve the productivity. At last, cycle time reductions in done in two steps to increase the present production rate. The results are: Productivity Improvement The number of parts produced in front door frame assembly before cycle time improvement is 270 units per shift. Now it can be increased to 330 units per shift by adapting cycle time reduction which is a 22% increase in productivity. Overall Line Efficiency The line efficiency before cycle time improvement and line balancing is 45%. Now it can be improved to 55% after employing line balancing by cycle time reduction. References 67 cycle time productivity improvement www.asq.org/quality-progress/1999/07/ www.beyondlean.com/line-balancing.html www.fetsystem.com/ www.ijtra/140390-151007105359-lva1-app6891.pdf www.mdpi.com/2071-1050/5/11/4637/ www.misweb.cbi.msstate.edu/ -COB1/ www.sixsigma-material.com/line-balancing.html www.slideshare.net/josephkonnully/assemly-line-balancing www.tarrani.net/share/cycletimeimprovement.pdf 106 International Journal of Advance Industrial Engineering, Vol.4, No.3 (Sept 2016) 330 output per shift