Work Plan for the End to End Review of the Development Review Process

Similar documents
Impact of Enforcement Actions and Revisions to the Tree Bylaws

Meeting Date: May 21, 2013 Agenda Item #: 9.1. Report Purpose To provide Council with a response to the In Pursuit of Excellence Report.

Auditor General s Office REVIEW OF THE CITY SAP COMPETENCY CENTRE APPENDIX 1. June 1, 2010

CSR / Sustainability Governance and Management Assessment By Coro Strandberg President, Strandberg Consulting

CONSERVING OUR FUTURE

Manitoba Health, Seniors and Active Living Transformation Program Charter. February 16, 2018 Version 1.0

Saskatoon North Partnership for Growth (P4G) Draft Work Plan

Toronto Transit Commission Board. City Manager and Chief Executive Officer, TTC

City of Saskatoon Business Continuity Internal Audit Report

PROJECT SUSTAINABILITY FRAMEWORK

Guide to Strategic Planning for Schools

Indigenous and Northern Affairs Canada. Internal Audit Report. Audit of Performance Measurement. Prepared by: Audit and Assurance Services Branch

Permitting Improvement Project Update Stakeholders Group. Luz Borrero, Deputy Chief Operating Officer January 28, 2014

NPAAMB Labour Market Study

Improving Health and Safety at Entertainment Events

Appendix 4. City of Toronto. Peer Review of the City s Emergency Management Program Review. Prepared for City of Toronto.

Audit of Human Resources Planning

Director Procurement & Value Delivery

the council initiative on public engagement

Accountability Report

Ministry of Education. Toronto District School Board Follow-up Report to the Operational Review

Provision of Proprietary Software, Support, Maintenance and Professional Services from CSDC Systems Inc.

Project Charter. Academic Toolbox Renewal Project. Project Manager: Haniyeh Yousofpour. Division: CIO Department: Project Management Office

REQUEST FOR EXPRESSIONS OF INTEREST INDIVIDUAL CONSULTANT GOVERNANCE AND PUBLIC FINANCIAL MANAGEMENT COORDINATION OFFICE

System Framework Governance (GV) Component Draft updated August 30, 2014

PG February 23, 2016

BUSINESS SECTOR STRATEGY:

REQUEST FOR PROPOSALS Business and Organizational Development Consultant

SEARCH PROFILE. Assistant Deputy Minister Transportation Services. Alberta Transportation. Executive Manager II

State of Minnesota IT Governance Framework

Planning Act - Proposed Amendments Introduced Through Bill 73, Smart Growth for Our Communities Act, 2015

PHASE TWO FOLLOW-UP REPORT ON THE AUDIT OF CONTRACTS (2008)

Investing in our Local Labour Market. Strategic Plan T o r o n t o W o r k f o r c e I n n o v a t i o n G r o u p

West Toronto Collaborative Agreement

East Toronto Collaborative Agreement

North Toronto Collaborative Agreement

West Toronto Collaborative Agreement

Bill Proposed Amendments to the Planning Act and the Province s Land Use Planning Appeal System

Where Education, Industry and Culture Come Together

TORONTO COMMUNITY HOUSING CORPORATION CHARTER OF THE BOARD OF DIRECTORS

Procurement Functional Leadership Progress Report October 2015 to March 2016

Government Relations Strategies and Lobbyist Rules Compliance Item 6 September 14, 2018 Governance, Communications and Human Resources Committee

HEALTH PURCHASING VICTORIA STRATEGY. December 2017

Metro Denver Partnership for Health. Roadmap 2016

Sponsor/CRO Partnership Optimization

INTERNAL AUDIT DIVISION REPORT 2017/047. Audit of the coordination and response function in the Office for the Coordination of Humanitarian Affairs

This report can be found on CNSC s website at:

City of Toronto STRATEGIC ACTIONS

West Toronto Collaborative Agreement

TransformTO: Climate Action for a Healthy Equitable, and Prosperous Toronto Report #1

Proposed Public Sector and MPP Accountability and Transparency Act, 2014: Implications for Toronto's Ombudsman Function

LIFELINE GOVERNANCE CHARTER

FREQUENTLY ASKED QUESTIONS BY ELECTED OFFICIALS FOR THE CAMA CAO PERFORMANCE EVALUATION TOOLKIT

Strategic Scorecard Service Grant

SEARCH PROFILE. Executive Director Enterprise Data and Analytics. Service Alberta. Executive Manager 1

Town of Bowden Province of Alberta Policy Document ( ) PUBLIC PARTICIPATION POLICY

The Alberta Library. Strategic Plan Together. One Card. One Click.

ALBERTA ADAPTS TO A CHANGING CLIMATE

Belfast Health and Social Care Trust (BHSCT) Personal and Public Involvement (PPI) Monitoring Report September 2017

Audit and Advisory Services Integrity, Innovation and Quality

14 Municipal Comprehensive Review, Regional Official Plan Update and Vision Consultation Plan

2018 CEO Appraisal Process

Open Government Committee Terms of Reference

EVALUATION FRAMEWORK 2017

Township of Wellesley

ISC: UNRESTRICTED AC Attachment. Human Resources - Succession Planning Audit

Final Audit Report. Audit of Information Technology (IT) Planning. June Canada

PDD Program. Change Initiative #1: One Program, One Organization Approach. Phase 1 Report: Common Organization Approach

Capital Regional Waste Minimization Advisory Committee Integrated Regional Solid Waste Management Strategy

1.5 Model based Conceptual Design

POSITION NO: DATE APPROVED:

Request for Consulting Services For the Preparation of an Economic Development Strategy EXECUTIVE SUMMARY

The Corporation of the TOWN OF MILTON

REPORT TO THE BOARD OF GOVERNORS

Implementing Africa s Ambitious Commitments on Food Security, Agriculture and Nutrition

STRATEGIC PLAN. FISCAL YEARS 2018 to 2022 SAFETY WORKS

VERSION HISTORY CHANGES DATE AUTHOR

Corporate Strategic Plan Annual Report and 2017 Priorities

REVIEW OF THE VICTORIAN INSTITUTE OF TEACHING GOVERNMENT S RESPONSE TO RECOMMENDATIONS

Performance Audits of Ontario Waste Diversion Programs

Executive Board of the United Nations Development Programme and of the United Nations Population Fund

Renewing the Work Plan of the FPT DMs Table

3. That a copy of Report PDS BE CIRCULATED to the Local Area Municipalities and the Niagara Peninsula Conservation Authority.

HYA Signature Search Process

Establishing a Medical Licensing Assessment Programme Board

The Regional Municipality of Halton. Chair and Members of the Planning and Public Works Committee

INTERNAL AUDIT DIVISION REPORT 2018/105. Audit of strategic support to the global humanitarian inter-agency coordination mechanisms

TERMS OF REFERENCE CONSULTANCY TO DEVELOP STRATEGIC PLAN FOR THE CANADIAN RACE RELATIONS FOUNDATION

MAGNA INTERNATIONAL INC. BOARD CHARTER

PRIVY COUNCIL OFFICE. Audit of PCO s Accounts Payable Function. Final Report

Foreword. We would like to thank the dedicated organisations who participated in this work. On behalf of the Get It Right Initiative

BRITISH COLUMBIA INSTITUTE OF TECHNOLOGY

Establishing Governance to Achieve Statewide Communications Interoperability. Office of Emergency Communications January 2009

Conservation Authorities Act under Bill 139

Board performance evaluation

FAWE REGIONAL OFFICE ORGANISATIONAL DEVELOPMENT (OD) ROADMAP FOR MCF PROGRAM IMPLEMENTING CHAPTERS & RS

Financial Internal Controls Initiative. Martha Kerner Assistant Vice Chancellor for Business Services

LEGAL AID BOARD BOARD EVALUATION FINAL REPORT

Alberta Insurance Council - Strategic Plan

Transcription:

PG22.11 REPORT FOR ACTION Work Plan for the End to End Review of the Development Review Process Date: August 23, 2017 To: Planning and Growth Management Committee From: Chief Transformation Officer Wards: All SUMMARY As directed by Planning and Growth Management Committee at its meeting of May 31, 2017, this report proposes a work plan for an End to End Review of the Development Review Process. This work plan will commence upon approval of the recommendations below and will conclude with a report to the Planning and Growth Management Committee at its meeting in April 2018. An outside consultant will be retained to support the End to End Review of the Development Review Process. This work will be led by a Working Group of key development review stakeholders, including: Deputy City Manager, Cluster B; Chief Planner and Executive Director, City Planning; City Solicitor; Chief Building Official and Executive Director, Toronto Building; General Manager, Transportation Services; General Manager, Solid Waste Management Services; General Manager, Parks, Forestry and Recreation; Chief Information Officer; General Manager, Economic Development and Culture; Chief Engineer and Executive Director, Engineering and Construction Services; Fire Chief and General Manager, Fire Services; General Manager, Toronto Water; and Director, Energy and Environment. The Working Group will be chaired by the Chief Transformation Officer. It is expected that a report on this initiative will be presented to the Planning and Growth Management Committee at its April, 2018 meeting. RECOMMENDATIONS The Chief Transformation Officer recommends that: 1. Planning and Growth Management Committee approve the Terms of Reference and Work Plan as described in Attachment 1. Work Plan for Development Review Process Review Page 1 of 9

FINANCIAL IMPACT An outside consultant will be retained to undertake the end to end review of the City's development review process. This requires the preparation and issuance of a Request for Proposals (RFP) containing a detailed scope, timelines and deliverables based on the key elements of Attachment 1. The review is expected to cost up to $400,000. The funding for this work is contained in the City Planning Development Application Review Reserve Fund (Account XR1307). The Deputy City Manager & Chief Financial Officer has reviewed this report and agrees with the financial impact information. DECISION HISTORY At its meeting of January 31, 2017, City Council directed the Deputy City Manager, Cluster B, the Deputy City Manager, Cluster A, the Deputy City Manager & Chief Financial Officer and the City Solicitor to conduct an end to end development process review and to report to the Planning and Growth Management Committee by September 27, 2017. City Council also directed staff to report to the Planning and Growth Management Committee at its April 5, 2017 meeting on the steps for conducting the review, including information on which divisions involved in the development application review process have Key Performance Indicators. http://app.toronto.ca/tmmis/viewagendaitemhistory.do?item=2017.pg17.4 Subsequently, at its meeting of May 31, 2017, the Deputy City Manager, Cluster B, the Deputy City Manager, Cluster A, the Deputy City Manager & Chief Financial Officer and the City Solicitor presented a recommended work plan for the end to end development process review to the Planning and Growth Management Committee. At that time, the Planning and Growth Management Committee made the following decision: 1. Referred the item to the Chief Transformation Officer with the request that he: a. report to the September 7, 2017 meeting of Planning and Growth Management Committee on revised terms of reference for an end to end review of the City's Development Review process. b. lead a Working Group comprised of, but not limited to, the Chief Planner and Executive Director, City Planning, the City Solicitor, the Chief Building Officer and Executive Director, Toronto Building, General Manager of Transportation Services, General Manager of Solid Waste Management Services, General Manager of Parks, Forestry and Recreation, Chief Information Officer and representatives of all other City agencies and divisions which comment on development applications, to conduct the end to end review of the City's development review process. c. ensure that the end to end review of the City's development review process be holistic in nature and consider best practices for planning applications from inquiries Work Plan for Development Review Process Review Page 2 of 9

regarding proposed development and Committee of Adjustment applications through the review process up to and including the issuance of building permits. http://app.toronto.ca/tmmis/viewagendaitemhistory.do?item=2017.pg21.5 COMMENTS City Planning Division Program and Organizational Review 2009/10 In 2009 and 2010, City Planning undertook an assessment of the Divisions' strengths, issues and gaps through a divisional program and organizational review. This review led to a number of business process improvements and the creation of the Developing Toronto Steering Committee that has a mandate to provide strategic leadership and management oversight on development related issues for the City. It also led to the creation of City Planning's Business Performance and Standards unit to operationalize the directions of the Steering Committee. The 2009 review did not include a fulsome examination of the City's development review process but rather focussed on organizational improvements that could be implemented to provide for more effective delivery of the broader Divisional work program. As an outcome of the previous review, the Developing Toronto Steering Committee, its associated Working Group and the Business Performance and Standards team continue to develop service improvements and find efficiencies by reducing non-value added steps, harmonizing business practices, developing guidelines, implementing the Committees directives and creating additional policies. Recent examples of these improvements are identified below. Recent Development Review Process Improvements In alignment with the ecity strategy and vision of "Your local government, anytime, anywhere" and the Customer Service Excellence: Channel/Counter Strategy Project, City Planning as the Developing Toronto Lead, has undertaken a number of recent process improvements to find efficiencies, raise awareness of the development team approach to development review and to advance the eservice Delivery Program. These include: Committee of Adjustment eservice delivery program; Harmonized Committee of Adjustment application intake; ecirculation of Community Planning applications; Posting of all application material online; Formalized pre-application consultation process; Active leadership in development review, including the Planner as Team Lead initiative; Developing Toronto intranet website for staff; and Developing a specialized OMB team and precedent file. Work Plan for Development Review Process Review Page 3 of 9

City Planning Division Service Efficiency Study - 2012 As part of the City's overall Core Services Review, City Planning undertook a study in 2012 to provide an assessment of the current state of the Division, to review specific services and functions to assess service efficiency and costs and to identify recommendations to improve efficiencies and achieve cost savings. One component of this study was the review of the development review process. The study found that previously recommended changes had been made to the review process and that any further changes would have limited cost savings. The study noted opportunities for improvement which the Division acted upon, such as standardizing best practices for application intake and file management and enhancing the development application status webpage. City Planning Division Strategic Plan - 2013 The Divisional 2013-2018 Strategic Plan aligns with the City's Strategic Plan and creates a vision, mission and charter for City Planning as the key implementer of the Official Plan through the development review and study processes. It outlines five strategic directions for the Division and 44 actions to achieve these directions, including actions to measure the Division's success through key benchmarks and indicators. City Planning will be updating the Divisional Strategic Plan starting in 2018 to include new directions as many of the previous directions have been implemented. The Development Review Process Divisions involved in development review include: City Planning; Toronto Building; Parks, Forestry & Recreation; Economic Development & Culture; Legal Services; and Engineering & Construction Services (ECS). Fire Services, Solid Waste Management Services, Transportation Services and Toronto Water also undertake the review of development applications and report to City Planning through ECS. In addition to the above Divisions, there are approximately forty (40) external commenting partners that are also included in the development review process on an as needed basis. It is important to note that the Developing Toronto Steering Committee is in the process of refining Key Performance Indicators for all Divisions involved in development review to track performance on the first circulation of development applications streamed Complex and Routine. This includes application intake, circulation and response back to the applicant with comments within an established timeframe. City Planning, Toronto Building, ECS, Transportation Services, Parks Planning, Urban Forestry and Legal Services all report quarterly to the Developing Toronto Steering Committee on these KPI's. The process to collect this data and align all internal tracking of the application dates of receipt and response from all Divisions is currently being refined. End to End Review of Development Review Process In response to the direction of City Council at its meeting of January 31, 2017 an End to End Review of the Development Review Process will be undertaken and an outside consultant will be retained to provide an external objective perspective, relevant expertise conducting similar reviews, knowledge of industry standards and best Work Plan for Development Review Process Review Page 4 of 9

practices and context from other jurisdictions. This work will be led by a Working Group of key development review stakeholders. The Working Group will be chaired by the Chief Transformation Officer. The Working Group will coordinate with other preestablished committees to ensure alignment with other related initiatives, including: IBMS Steering Committee and Developing Toronto Steering Committee. It is expected that a report on this initiative will be presented to Planning and Growth Management Committee at its April, 2018 meeting. The overall goal of the review will be to examine opportunities for improvement with respect to the development review process that are aligned with the City's desired development review process outcomes. This will include an examination of: The degree of alignment and understanding of the City's desired development review process outcomes, including consideration of official plan indicators currently being implemented. The development review process: activity steps, hand-offs, inputs, outputs, decision steps, approval steps, Standard Operating Procedures (SOPs), pre and post process steps, etc. The current KPIs/service levels/standards management approach including consideration of KPIs/service levels/standards related to timing, quality, social, environmental and economic outcomes for the City and all key stakeholder groups (applicants, residents, Councillors, etc.). This will include recommended KPIs/service levels/standards, going forward. How the City interacts with and incorporates the perspective of all key stakeholder groups (applicants, residents, Councillors, etc.) with respect to the development review process. How the City collaborates with all key stakeholder groups (applicants, residents, Councillors, etc.) at a strategic planning/governance level. The City's customer service culture and customer interaction model with respect to the development review process. The City's level of transparency and communication internally, with applicants and the public. Opportunities for enhanced use of data and advanced analytics in support of the City's desired outcomes. The levels of consistency across Divisions in reporting on their development application activity. The potential for new structures for development review to establish an optimum process, including the opportunity to more effectively reinforce the role of Planners as Team Leads with enhanced authority. Potential technology solutions that will enable a streamlined process, management of KPIs and timely access to information for commenting partners, applicants and the public, including a review of the appropriateness and workability of the current development application information and tracking system (IBMS). The capacity management model with respect to development review activity across all participating divisions and agencies. The degree to which staff resources/expertise are being utilized appropriately and how staff expertise gaps are identified and addressed. Work Plan for Development Review Process Review Page 5 of 9

The development process fees management model. While the specifics of the work program and budget for the review will be refined and finalized with the retained consultant, in consultation with all Divisions noted above, it is expected this review will include the following steps: 1. Project Initiation and Finalization of Terms of Reference 2. Retain Consultant 3. Final Scoping 4. Data Collection and Stakeholder Consultation (internal and external) 5. Analysis and Assessment of Current State 6. Development and Testing of Future State Options 7. Development of Implementation Roadmap 8. Development of Report and Recommendations Additional details on these steps are provided in Attachment 1. As part of the recent budget announcement, the Province will be creating a Land Development Facilitation Team to work with the development industry and municipalities to review the development process to determine ways to improve the process in a manner consistent with the desired outcomes. The City's end to end review will provide an opportunity for input into this process and aligns the City with the Province's intent. As noted above, a report on this initiative is expected to be presented to Planning and Growth Management Committee at its April 2018 meeting. CONTACT Michael Kolm Chief Transformation Officer 416-397-0533 Michael.Kolm@toronto.ca SIGNATURE Michael Kolm Chief Transformation Officer ATTACHMENT Attachment 1: Terms of Reference and Work Plan Work Plan for Development Review Process Review Page 6 of 9

Attachment 1: Terms of Reference and Work Plan A.) Purpose: The End to End Review of the Development Review Process will examine the current process, undertake jurisdictional scans, consider other best practices/industry standards and consult with external stakeholders, City staff and existing working groups to identify the optimum future state to achieve the City's desired outcomes. Items to be considered through this exercise include, but are not limited to: The degree of alignment and understanding of the City's desired development review process outcomes, including consideration of official plan indicators currently being implemented. The development review process: activity steps, hand-offs, inputs, outputs, decision steps, approval steps, Standard Operating Procedures (SOPs), pre and post process steps, etc. The current KPIs/service levels/standards management approach including consideration of KPIs/service levels/standards related to timing, quality, social, environmental and economic outcomes for the City and all key stakeholder groups (applicants, the residents, Councillors, etc.). This will include recommended KPIs/service levels/standards, going forward. How the City interacts with and incorporates the perspective of all key stakeholder groups (applicants, residents, Councillors, etc.) with respect to the development review process. How the City collaborates with all key stakeholder groups (applicants, residents, Councillors, etc.) at a strategic planning/governance level. The City's customer service culture and customer interaction model with respect to the development review process. The City's level of transparency and communication internally, with applicants and the public. Opportunities for enhanced use of data and advanced analytics in support of the City's desired outcomes. The levels of consistency across Divisions in reporting on their development application activity. The potential for new structures for development review to establish an optimum process, including the opportunity to more effectively reinforce the role of Planners as Team Leads with enhanced authority. Potential technology solutions that will enable a streamlined process, management of KPIs and timely access to information for commenting partners, applicants and the public, including a review of the appropriateness and workability of the current development application information and tracking system (IBMS). The capacity management model with respect to development review activity across all participating divisions and agencies. The degree to which staff resources/expertise are being utilized appropriately and how staff expertise gaps are identified and addressed. The development process fees management model. Work Plan for Development Review Process Review Page 7 of 9

B.) Objective: To implement improvement recommendations, as necessary, and to provide clarity and certainty to applicants and the public that the development review process is efficient, effective and results in good Toronto Building outcomes. The End to End Review of the Development Review Process will focus on the processing of all types of applications from prior to application intake to Planning approval and follow up. The review will take into account interdivisional dependencies, who is involved, what is done, how it is done, what gaps in process or expertise exist, the expected timing to complete the task and how this information is tracked (accounted for). The review will also consider the following: Who is circulated development applications? How do they review applications? Are all Divisions using the same tracking, KPIs and/or reporting system? Are the STAR timelines reasonable? Are there consequences when STAR targets are not met? Can there be incentives to review applications and respond before target dates? Is there duplication between Divisional reviews? Is the ECS one-window response system working? Is IBMS the best tracking system? Can/should IBMS be modified to reflect current state? What are the best practices and/or industry standards being used by other municipalities? What are the impacts of eservices on the development review processes? Can technology be better leveraged and employed to improve the process? C.) Process Steps: Proposed Work Plan Steps 1. Project Initiation, Finalize Terms of Reference and Retain Consultant Working with the Working Group, a detailed Terms of Reference (reflecting the key elements noted here) will be established to scope the work required for this review. Based on the final Terms of Reference and scope of work, an RFP will be prepared to retain an external consultant to undertake the comprehensive End to End Review of the Development Review Process. 2. Retain Consultant Conduct the RFP and proposal evaluation process to select and retain an external consultant to support the review. Develop and apply the proposal evaluation criteria in consultation with the Working Group. Timeline September 2017 October 2017 Work Plan for Development Review Process Review Page 8 of 9

3. Final Scoping To ensure the selected consultant fully understands the scope of work and brings focus to priority areas outlined in the Terms of Reference, a preliminary round of meetings will be held with the Working Group members to establish a common base of understanding and agreement for the scope and direction of the study. 4. Data Collection and Stakeholder Consultation Data collection and stakeholder consultation activities, such as but not limited to interviews, surveys, focus groups and roundtables with key stakeholders (e.g. industry, staff, Councillors, etc.), will be undertaken to review the key aspects of the development review process as outlined above. 5. Analysis and Assessment of Current State Preliminary feedback will be prepared regarding the current state of the development review and approval process, including key issues, gaps, service levels and appropriateness of Key Performance Indicators based on analysis of interviews, data collected and the best practices of other municipalities. November 2017 December 2017 January 2018 January February 2018 6. Development and Testing of Future State Options To help map out future enhancements to the development review process based on data analysis in previous step, consultation meetings with member of the Working Group, as well as other key stakeholders, will be held. A set of recommendations will be developed with the Working Group. February March 2018 7. Development of Implementation Roadmap Based on the recommendations, develop an implementation roadmap. March April 2018 8. Development of Report and Recommendation The report would be developed in consultation with the Working Group. The report would outline the following components: April 2018 Recommendations on enhancement/improvement options; Implementation Roadmap for implementing the enhancement/improvement options, which would include costs (if any) and timing; Indicators to measure success on enhancement/improvement options; and Roles, responsibilities and actions required to embed and facilitate continuous improvement in the development review process on an ongoing basis. Work Plan for Development Review Process Review Page 9 of 9