Hind Energy & Coal Beneficiation (India) Ltd.

Similar documents
Hind Energy & Coal Beneficiation (India) Ltd.

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

Mars Power & Steel Ltd.

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola

Simran Industries Pvt. Ltd.

Shri Girija Alloy & Power (I) Pvt. Ltd.

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds

Roquette Riddhi Siddhi Private Limited

INSPIRE INDUSTRIES PVT. LTD.

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Village : Taraimal, Tehsil : Gharghoda District : Raigarh

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

SUMMARY. for New Standalone Cement Grinding Unit. proposed at

J-11011/45/2009- IA II (I)

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

Telefax: 011: Dated:10 th May, 2013

TIRUMALA BALAJI ALLOYS PVT. LTD.

at Sarora Village, Tilda Tehsil, Raipur District, Chhattisgarh in 64 acres of land. Now

V: PROJECT SCOPING & METHODOLOGY

Rajasthan State Pollution Control Board

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Environmental Clearance Compliance Half Yearly Report

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

JANUARY Prepared by:

A. SPECIFIC CONDITION COMPLIANCE

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Dheeru Powergen Private Limited.

Calcom Cement India Limited

Mangalam Cement Ltd. (Unit-II) Stack No.

Revised FORM - I & PRE-FEASIBILITY REPORT

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

Capacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB)

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

COMPLIANCE STATUS REPORT

Proposed Terms of Reference for EIA studies

CHAPTER-10 SUMMARY AND CONCLUSION

Executive Summary. Vizianagaram District, Andhra Pradesh. Season : December 2016 to February 2017 File no.: J-11011/1129/2007-IA-II(I)

Environmental Clearance Compliance Half Yearly Report

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA

Janki Corp. Ltd., Six Monthly Compliance Report

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

Mangalam Cement Ltd.(Unit I)

Scanned by CamScanner

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

Environmental Clearance Compliance Half Yearly Report

Accord Energy Corporation India Pvt. Ltd.

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

CHAPTER 7 ADDITIONAL STUDIES

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

SINGHAL ENTERPRISES PRIVATE LIMITED

PROPOSED TERMS OF REFERENCE

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

Environment protection measures / technology

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017

MIEL/NP/EMD/ 303/2015 Date:

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report

The study area covers 10 km radius around the existing coal washery premises. The environmental setting of the expansion plant site is as follows:

EXECUTIVE SUMMARY 1. INTRODUCTION

Application of Low and Non Waste Technology in the production process;

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I

PRE-FEASIBILITY REPORT NEW KATHARA COKING COAL WASHERY (3.0 MTY)

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA

F. No. J-11011/196/2007- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~'" 'Its ~s 71 66

Proposed TOR Calix Industries

N.H. 6 is 50 km away from the proposed plant boundary; in N direction;

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

Rajasthan State Pollution Control Board

Proposed Terms of Reference for EIA studies

- 1 S. NO. PARTICULARS DETAILS

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated

Cement Manufacturing Company Ltd. Page 1

Environmental Clearance Compliance Half Yearly Report

M/S. HETERO INFRASTRUCTURE SEZ LIMITED

REPORT ON ENVIRONMENTAL IMPACTS & ENVIRONMENT MANAGEMENT PLAN

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

BRGD Ingot Private Limited 4, D.L. Khan Road, Block-C, Flat No. 201, 2 nd Floor, P.S. Kalighat, P.O. Bhowanipur, Kolkata

Executive Summary for R-EIA Report for 60

EXECUTIVE SUMMARY. (Approved Consultant)

PROPOSED TERM OF REFERENCE

District: Chhindwara (MP)

ENVIRONMENTAL MONITORING REPORT

Health and safety norms of CPWD should be followed during construction.

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE

Transcription:

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Raipur, Chhattisgarh

1.0 PROJECT DESCRIPTION Hind Energy & Coal Beneficiation (India) Ltd. is an existing plant coal washery at Hindadih Village, Masturi Tehsil, Bilaspur District, Chhattisgarh. It is proposed for change in technology in the existing plant i.e. from 2.4 MTPA DRY type coal washery to 2.4 MTPA WET type coal washery. Capacity of Coal Washery 2.4 MTPA (Dry type) 1.2 MTPA (Wet Type) EC obtained CTO details Change in technology E.C. accorded in 24 th June 2008 E.C. accorded in 21 st May 2014 CTO issued for both 2.4 MTPA (Dry type) & 1.2 MTPA (Wet type) Total Permitted Capacity of Coal Washery: 3.6 MTPA 2.4 MTPA (Dry type) to 2.4 MTPA (Wet Type) No change Proposed change in technology will be carried out in the existing plant premises of 27.42 acres. Total cost of the proposed project (for Change in technology) is Rs.12.00 Crores. As per the Ministry of Environment Forests & Climate Change, New Delhi notification, dated 14 th September, 2006 and its subsequent amendments, coal washery above 1 MTPA capacity has been classified under Category A. The Hon ble EAC has accorded Terms of Reference (TOR) for the proposed project vide letter no. J-11015/364/2009-IA-II (M) Dated 11 th February 2016. The EIA Report has been prepared by incorporating the TOR stipulated by the Hon ble EAC. Pioneer Enviro Laboratories & Consultants Private Limited, Hyderabad, which is accredited by NABET, Quality Council of India for conducting EIA studies for coal washery projects, have prepared Environmental Impact Assessment (EIA) report for the proposed project of Coal washery plant by incorporating the TOR approved by Ministry of Environment, Forest & Climate Change, New Delhi. The report contains detailed description of the following: Characterization of status of environment with in an area of 10 km radius from the plant for major environmental components including air, water, noise, soil, flora, fauna and socio-economic environment. Assessment of air emissions, liquid waste and solid waste from the proposed project along with the noise level assessment. 1

Environmental Management Plan comprising of emission control measures proposed to be adopted in the proposed project, solid waste management, Greenbelt development. Post Project Environmental Monitoring. 1.1 Raw Materials The following will be the raw material requirement for proposed project S.No. Raw Material Quantity Source 1. ROM Coal 3.6 MTPA Coal will be sourced from SECL mines namely Deepka, Gevra, Kusmunda and other mines [on DO basis] 1.2 Manufacturing Process Coal washery comprises of coal crushing & screening and washing of coal to produce clean coal with ash content less than 34%. Wet type of coal washery is proposed as it will have lesser environmental problems compared to the dry type of washery and to suit to client s specific requirement of lower ash content. Closed loop water system is proposed in the process. Zero effluent discharge will be maintained in the proposed project. The process consists of crushing of the ROM coal in a single toothed roll crusher. The crushed coal is then washed in Zig to produce clean coal and middling with the help of water stream and air pressure. 1.3 Water Requirement Total water requirement for 2.4 MTPA (Dry washery) & 1.2 MTPA (Wet process) for which EC has been accorded is 585 cum/day. After conversion of 2.4 MTPA DRY type coal washery to 2.4 MTPA WET type coal washery, an additional water of 475 cum/day will be required. The total water requirement after proposed change in technology will be 1085 cum/day only. This includes Make-up water for Coal Washery and for domestic water. Water permission has already been obtained from CGWA for drawl of 585 cum/day of ground water. 2

The source of additional water for the present proposal will be Lilagarh river (Bhawradih Anicut). Rain water harvesting will be taken up and this water will be utilised to meet plant water requirement which in turn will reduce the net water requirement for the plant. The following is the break-up of the water requirement for proposed project. S.No. Particular Daily Water Requirement 1. Process WATER REQUIREMENT Consumption / System Loss Wastewater Generation a Recycled 16400 --- --- b Fresh Make up 785 --- --- Sub Total 1 17185 785 16400 2. Dust Suppression & Plantation a Sprinkling on roads 110 110 --- b Dust Suppression 90 90 --- c Green belt & 70 70 --- Plantation Sub Total 2 270 270 -- 3. Domestic a Drinking Water 3 3 -- b Domestic use (washing, flushing, etc.) 27 27 20* Sub Total 3 30 30 --- Mode of utilization / Disposal Recycle, Close Circuit Water System --- Septic tanks followed by sub-surface dispersion trench Grand Total (1+2+3) 17485 1085 16400 Zero Discharge 1.4 Waste Water Generation No process wastewater is being generated in the existing Dry type coal washery. Only sanitary waste water is being generated and same is being treated in Septic tank followed by subsurface dispersion. There will not be any process wastewater will be generated in the proposed Wet type coal washery also, as closed loop water system will be followed. Zero effluent discharge is being maintained in the existing plant and same will be continued in the present proposal. 3

Sanitary waste water is being treated in septic tank followed by Subsurface Dispersion trench and same will be continued in the present proposal. 1.5 Wastewater Characteristics The characteristics of sanitary waste water (untreated) will be as following: PARAMETER CONCENTRATION ph 7.0 8.5 BOD 200 250 mg/l COD 300 400 mg/l TDS 800 900 mg/l 2.0 DESCRIPTION OF ENVIRONMENT Base line data has been collected on ambient air quality, water quality, noise levels, flora and fauna and socio economic details of people within 10 km radius of the plant. 2.1 Ambient air quality Ambient air quality was monitored for PM 2.5, PM 10, SO 2, NOx & CO at 8 stations including project site for one season as per MoEF&CC guidelines. The following are the concentrations of various parameters at the monitoring stations: Parameter Concentration PM 2.5 : 18.1 to 38.7 µg/m 3 PM 10 * : 31.2 to 64.5 µg/m 3 SO 2 : 10.5 to 19.8 µg/m 3 NO X : 10.8 to 21.5 µg/m 3 CO : 385 to 675 µg/m 3 * PAH in PM 10 were analyzed and their concentrations at all monitoring Stations are Below Detectable Level. 2.2 Water Quality Ground water samples were collected at 8 stations along with surface water samples and analyzed for various Physico-Chemical parameters. The water samples are within the permissible limits of IS: 10500 & IS: 2296. 2.3 Noise Levels Noise levels were measured at 8 locations during day time & Night time. The noise levels at the monitoring stations are ranging 45.3 dba to 63.8 dba. 4

3.0 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 3.1 Prediction of impacts on air quality The likely emissions from the proposed project are PM 10, SO 2, NOx & CO. The predictions of Ground level concentrations have been carried out using Industrial Source Complex (ISC- 3) model. Meteorological data such as wind direction, wind speed, max. and min. temperatures collected at the site have been used as input data to run the model. Present Scenario There is no change in the Air Emission sources, as present proposal is only change in technology from DRY process to WET process. However, the Air Quality Modelling has been carried out by utilizing the Baseline data collection from March 2016 to May 2016. The predicted max. Incremental rise in PM concentration (24 hourly) will be 0.62 µg/m 3 at a distance of 480 m from the origin stack in the down wind direction over the baseline concentrations. The predicted incremental rise in PM concentration due to the Vehicular emission will be 2.7 µg/m 3. Hence the total predicted incremental rise due to the emission from coal washery plant and due the vehicular emission will be 0.62 µg/m 3 + 2.7 µg/m 3 = 3.32 µg/m 3 The predicted incremental rise in NOx concentration due to the Vehicular emission will be 19.8 µg/m 3. The predicted incremental rise in CO concentration due to the Vehicular emission will be 12.6 µg/m 3. Net Resultant maximum concentrations due to the Project Item PM SO 2 NO X CO (µg/m 3 ) (µg/m 3 ) (µg/m 3 ) (µg/m 3 ) Maximum average baseline conc. in the study area 64.5 19.8 21.5 675 Maximum predicted incremental rise in concentration due to the proposed project Net resultant concentrations during operation of the plant 3.32 (0.62 + 2.7) --- 19.8 12.6 67.82 19.8 41.3 687.6 National Ambient Air Quality Standards 100 80 80 2000 5

The predicted results show that the net resultant concentration (max. baseline conc. + max. incremental rise in conc.) of PM 10, SO 2, NOx and CO will be well within the National Ambient Air Quality Standards after commissioning of proposed project. Hence there will not be any adverse impact on air environment due to the proposed project. 3.2 Prediction of impacts on noise quality The major sources of noise generation in the proposed project are DG set & Crusher. The ambient noise levels will be within the standards prescribed by MoEF&CC vide notification dated 14-02-2000 under the Noise Pollution (Regulation & Control), Rules 2000 i.e. the noise levels will be less than 75 dba during day time and less than 70 dba during night time. 9.1 acres of extensive greenbelt has been developed to further attenuating the noise levels. Hence no negative impact is envisaged due to proposed change in technology. 3.3 Prediction of impacts on Water Environment There will be no wastewater generation in the coal washery unit, as closed loop water system will be adopted. Sanitary waste water will be treated in septic tank followed by sub-surface dispersion trench. The water required for the proposed project will be met from Ground water source & Lilagarh river (Bhawradih). Hence there will not be any adverse impact on environment due to the proposed project. 3.4 Prediction of Impacts on Land Environment All the required air pollution control systems has been provided to comply with CPCB / CECB norms. All solid wastes will be disposed / utilized as per CPCB / CECB norms. 9.1 Acres of greenbelt is already been developed as per guidelines. Hence there will not be any adverse impact on land environment due to the proposed project. 3.5 Socio - Economic Environment There will be lot of opportunities in employment to local people during construction as well as in operation phase. There will be further upliftment in Socio Economic status of the people in the area. Hence there will be further development of the area due to the proposed project. 6

4.0 ENVIRONMENTAL MONITORING PROGRAMME Environmental monitoring is being carried as per the guidelines of CECB and MoEF&CC; which are tabulated below: MONITORING SCHEDULE FOR ENVIRONMENTAL PARAMETERS S.No. Particulars Frequency of Monitoring Duration of sampling Parameters required to be monitored 1.Water & Waste water quality A. Water quality Once in a month Grab sampling As per IS: 10500 (around storage yards) 2. Air Quality A. Stack Monitoring Once in a month PM B. Ambient Air quality Twice a week 24 hours continuously PM 2.5, PM 10, SO 2 & NO x C. Fugitive emission Once in a month 8 hours PM monitoring 3. Meteorological Data A. Meteorological data to Daily Continuous be monitored at the monitoring plant site. 4. Noise Levels A. Noise Levels Once in a month one day in a month on hourly basis Temperature, Relative Humidity, rainfall, wind direction & wind speed Ambient Noise levels in dba 5.0 ADDITIONAL STUDIES No Rehabilitation and Resettlement is involved in the proposed project. Hence no R & R study has been carried out. 6.0 PROJECT BENEFITS With the establishment of the proposed project employment potential will increase. Land prices in the area will increase. The economic status of the people in the area will improve due to the proposed project. Periodic medical checkups will be carried out. Top priority will be given to locals in employment. 7

7.0 ENVIRONMENT MANAGEMENT PLAN 7.1 Air Environment The following are air emission control systems are already installed in the plant: S.No. Stack attached Control Equipment PM emission 1. Coal Crusher Dust Extraction systems with Bag < 50 mg/nm 3 filters The main sources of dust pollution are raw material unloading areas, crushing operations of raw materials and their transfer points. Fugitive dust emissions are likely in the unloading areas, material transfer point, screening area etc. Fugitive emission in the material unloading area will be avoided by providing dust suppression system. Fugitive emission from material unloading operations, material transfer points is being controlled fully with total enclosure and all the transfer emission are connected with extractor inlet point and passed through a high efficiency Bag Filter before discharging into the atmosphere. Fugitive emissions are being regularly monitored in the plant area and CPCB stipulations regarding fugitive emission control and monitoring are strictly followed. 7.2 Water Environment There will not be any process waste water from the coal washery unit as closed loop water system will be adopted. The only waste water generation will be sanitary waste water of 20.0 cum/day and will be treated in septic tank followed by sub-surface dispersion trench. Zero effluent discharge will be maintained in the proposed project. 7.3 Noise Environment The major sources of noise in the proposed project will be DG set & crusher. All the machinery will be manufactured in accordance with MoEF&CC norms on Noise levels. The employees working near the noise generating sources will be provided with earplugs. The extensive greenbelt development proposed within the plant premises will help in attenuating the noise levels further. Noise barriers in the form of trees are recommended to be grown around administrative block and other utility units. 8

7.4 Land Environment There will not be any process waste water from the coal washery unit as closed loop water system will be adopted. All the required Air emission control systems are installed and operated to comply with CECB norms. Washery rejects will be given to reject based power plants. Extensive greenbelt has been developed in the plant premises. Desirable beautification and landscaping practices is followed. Hence there will not be any impact due to the proposed project. Solid waste generation and disposal S.NO TYPE OF SOLID WASTE QUANTITY (IN MTPA) DISPOSAL PROPOSED 1 Washery rejects 0.72 Will be given to Power plant of M/s. Prakash Industries Ltd. 7.5 Greenbelt Development Greenbelt of 9.1 acres has been developed in the in the plant. Capital cost for environment protection for the total project is Rs. 0.5 Crores. 7.6 Implementation of CREP Recommendations All the CREP recommendations will be strictly followed in the proposed coal washery plant. ********* 9