SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

Similar documents
SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN & CONSTRUCTION LOBBY AND CAFETERIA FLOORING INSTALLATION EVERETT MIDDLE SCHOOL ADDENDUM NO.

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN AND CONSTRUCTION ADDENDUM NO. 1

All Plan Holders 3/3/

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

Addendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO:

ADDENDUM NO. B. TO THE BID DOCUMENTS, dated 1/5/16 FOR THE

The Town will coordinate with the adjacent property Owner for access allowing work to the East side of the building.

Haywood County Auxiliary Services and Haywood County Auxiliary Services: Building Shell Renovation Waynesville, North Carolina

ST. PETERSBURG COLLEGE ADDENDUM #1

SECTION ADDENDUM NUMBER ONE

ADDENDUM NO. 1. PROJECT: Lowell High School DATE: January 28, Eucalyptus Drive, SF, CA 94132

A D D E N D U M. REPLACE: Project Summary with attached revised Project Summary. 1 Specification Section Project Summary

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

ADDENDUM #3. GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4

CONTRA COSTA COMMUNITY COLLEGE 500 Court St, Martinez, CA 94553

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1

The Housing Authority of the County of Marin ( MHA ) 4020 Civic Center Drive. San Rafael, CA Addendum #1. Released October 3, 2016

The Bid Date has changed to 03/16/2010 at 2:30 PM.

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM RAPHAEL WEILL EARLY EDUCATION SCHOOL STRUCTURAL STRENGTHENING ADDENDUM NO.

TELEPHONE: (215) Addendum No. 1

Project Number BID NO. CAG 18 2 ROOF REPLACEMENT FOR HARFORD COUNTY PUBLIC SCHOOLS NORTH HARFORD ELEMENTARY. Addendum # 2

LSCC MISC. PROJECTS (PACKAGE D) MILLSAP BUILDING ROOF REPLACEMENT Addendum 3

CERVANTES COMMUNITY CENTER RE-ROOFING NEW MEXICO STATE UNIVERSITY

ADDENDUM NO. 3 February 28, 2017

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

ADDENDUM NO. 3 REQUEST FOR PROPOSALS HANGAR 1610/1612 FIRE SUPPRESSION RETROFIT PROJECT

1. Meeting minutes from the pre-bid conference are attached for inclusion in the Bid Documents.

Requests for Information pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 2018

Disclaimer for Review of Plans

The following shall be incorporated into the Contract Documents dated 12 MARCH 2018.

333-90TH STREET DALY CITY. CA ADDENDUM #1 CONTRACT BID DOCUMENTS FOR DOELGER SENIOR CENTER BOILER REPLACEMENT (101 LAKE MERCED BOULEVARD)

ADDENDUM NO. 1 FOR CITY OF CUMMING 900-HP RAW WATER INTAKE PUMP. ADDENDUM DATE: February 10, BID DATE: February 15, 2017, 11:30 a.m.

BID PROPOSAL FORM C.I.P. NO PROJECT: VETERANS PARK SHOOTING RANGE LEAD ABATEMENT/DEMO

PAWLEYS ISLAND TOWN HALL

Dayton Metropolitan Housing Authority Rosemont/Hoch Electrical Upgrades

Hays CISD IH 35 Kyle, Texas ext August 2018

2014 ARTICLE III IMPROVEMENTS IN THE CITY OF EL CENTRO ADDENDUM NO. 02

ADDENDUM NO. 1 DES MOINES PUBLIC SCHOOLS WINDSOR ELEMENTARY SCHOOL EXTERIOR MASONRY RESTORATION PROJECT 5912 UNIVERSITY AVENUE DES MOINES, IOWA 50311

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

REROOFING THE CAREER TECHNICAL SCHOOL FOR THE CLEBURNE COUNTY BOARD OF EDUCATION HEFLIN, ALABAMA

August 19, Addendum No. 2 Roosevelt Hall Interior Renovation Brooklyn College Project No.: BY

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

PLEASE ACKNOWLEDGE RECEIPT OF THIS ADDENDUM 1 AND RETURN WITH YOUR BID. FAILURE TO ACKNOWLEDGE THIS ADDENDUM COULD CONSTITUTE REJECTION OF YOUR BID.

Addendum No ALPINE ROAD HOUSE REMODEL PROJECT

Junior High Science Upgrades Phase II Puyallup School District #3 Project #07661

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR

April 4, ADDENDUM NO. 1 This Addendum and attachments consists of: 47-Pages. ITB Northwood ABC Elementary School Roof Replacement

The Tender Documents shall be amended and will become part of the Contract Documents.

LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA Phone (916) FAX (916) Purchasing Department

ADDENDUM #2. Design/Build Contractor RFP Bid # for the. Joint-Use 21 st Century Post-Century Education Center.

The bid is being postponed to comply with State rules requiring 4 calendar days for receipt of bids after an addendum.

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM VISITACION VALLEY ELEMENTARY SCHOOL MODERNIZATION ADDENDUM NO.

DOCUMENT BID FORM - STIPULATED SUM (MULTIPLE-PRIME CONTRACTS) Bidder:.

DATE: August 22, All Proposers

COUNTY OF SAN JOAQUIN

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO

Proud of its Heritage, Preparing for its Future

1. Revise Section Alternates, 2.1.A.1 and 2.1.A.2 to include the following.

Proud of its Heritage, Preparing for its Future

SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 2

REQUEST FOR PROPOSAL (RFP) No.: J-19 PRECONSTRUCTION AND CONSTRUCTION SERVICES, MEDIUM VOLTAGE SUBSTATION REPLACEMENT, LAS POSITAS COLLEGE

PURCHASING DEPARTMENT. Project # Addendum # # of pages Original Issue Date April 24, 2015

MEMORANDUM. Taylor Schoel with Walter Schoel Engineering. DATE: August 29, Addendum 1 - Green Drive Culvert Replacement.

TRIAD ENGINEERING CONSULTANTS, INC.

revisions to project manual Bid Form: Added deduct alternate 07. Refer to written responses below for explanation.

SECTION SUPPLEMENTARY GENERAL CONDITIONS

TELEPHONE: (215) Addendum No. 03

Addendum No. 3 Borough of Manhattan Community College Roof Replacement Project No: MC

Dick s Sporting Goods Demolition Package

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.

BOONE COUNTY PUBLIC LIBRARY (859) 342-BOOK (2665)

ALL PROSPECTIVE CONTRACTORS, PLAN ROOMS AND SUPPLIERS

Spring Lake Public Schools. Spring Lake, MI. March RE: High School Storage Buildings

City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN AND CONSTRUCTION ADDENDUM NO. 1

Memphis Housing Authority Capital Improvements Department 700 Adams Street, Room 107 Memphis, Tennessee

2016 SAN FRANCISCO EXISTING BUILDING CODE AB-110 ADMINISTRATIVE BULLETIN. Building Façade Inspection and Maintenance

COUNCIL ROCK SCHOOL DISTRICT ADMINISTRATION & BUSINESS OFFICES The Chancellor Center 30 North Chancellor Street Newtown, PA ADDENDA No.

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

THE HOUSING AUTHORITY OF THE BOROUGH OF HIGHLAND PARK 242 SOUTH SIXTH AVENUE, HIGHLAND PARK, NJ PHONE (732)

2. Clarification: The building address is 801 Henderson Street.

SOLICITATION ADDENDUM NO. 1 RFP THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED.

ADDENDUM NO. 1 - OUTLINE AND SUMMARY INFORMATION

TYPICAL APARTMENT FLOOR PLAN

2012 International Building Code 2011 National Electrical Code Local amendments to the codes are in Chapter 6 of the Code of City Ordinances

JEFCO GYM HVAC ADDITIONS TO ARCHITECT'S NO AES, BES, CES, PGES, SRES B.C. NO

ADDENDUM #1. A non-mandatory site visit has been scheduled for Thursday, January 5, 2017 at 1:30 p.m.

ADDENDUM NUMBER ONE (1) December 6, The following Addendum shall be incorporated into the Contract Documents for the above referenced project.

PORTLAND COMMUNITY COLLEGE SW 49 th Avenue Portland, Oregon ADDENDUM NO. 4

ADDENDUM NO. 1 January 13, 2012

CITY OF OCEAN CITY COUNTY OF CAPE MAY, NEW JERSEY ADDENDUM #1 FEBRUARY 16, 2016 CITY CONTRACT NO

SAN ANTONIO WATER SYSTEM DOS RIOS WATER RECYCLING CENTER (DRWRC) DIGESTER MIXING AND SYSTEM ENHANCEMENTS - PHASE 1

HISD DAVILA ELEMENTARY SCHOOL ROOF REPLACEMENT ADDENDUM #1 JOB NO A PAGE 1

Addendum No. 1 Issue Date: March 29, 2016

See attached sketches showing clarifications to Gaylord Entry Roof and Bridge Roof per review and on site and with Central States Roofing.

Transcription:

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 3: Roofs 1 & 3 DATE: December 29, 2017 1235 Mission Street San Francisco, California SFUSD Project No. 11860.3 San Francisco Unified School District 135 Van Ness Avenue San Francisco, CA 94103 Notice is hereby given to all prospective bidders that plans and specifications on the subject project are modified as hereinafter set forth. This Addendum shall be attached to and form a part of the plans and specifications. All bidders must acknowledge receipt of this addendum on the Bid Form. In case of difference with previous addenda or communications, this addendum takes precedence. It is the responsibility of all bidders to notify all subcontractors from whom they request bids and from whom they accept bids of all changes contained in this addendum. PROJECT MANUAL 1. Item No. PM1-1 Reference: Description: 00 4000 Bid Form Refer to attached Bid Form revised (12-29-2017) and updated to indicate actual due date for bid submittal, Thursday, January 4, 2018 at 3:00 p.m. The Contractor shall include a Bid Allowance of $1,000.00 to cover costs of the building permit fee. The Contractor is expected to pay the building permit fee as provided by this Allowance and apply and pick-up the building permit from the City of San Francisco Building Inspection Department. Use this Bid Form as part of bid submittal package and Project Manual. 2. Item No. PM1-2 Reference: 00 8000 Special Conditions, Part 1.3 Description: Add Paragraph 1.3.S. as follows: S. Facility is opened by Tenant at 7:00 a.m., on regular work days. Work may not commence before this time. Standard work hours shall be 7:30 a.m. 4:30 p.m., Mondays through Fridays. Noise ordinance (SF Police Code, Article 29: Regulation of Noise) is to be observed by the Contractor at all times. Weekend work will be a Change Order. 3. Item No. PM1-3 Reference: 01 1400 Work Restrictions, Part 1.2 Description: Add Paragraph 1.2.C. as follows: C. On-site staging / parking areas to be negotiated with Tenant representative. Refer to AD1-SK1 Page 1 of 2

4. Item No. PM1-4 Reference: Description: (none) Contractor access to Virtual Site Access, for bid purposes: VSA Login http://epicscan.com/virtual-site-access/ U: 1235 Mission P: Mission *Case sensitive DRAWINGS 1. Item No. AD1-1 RFI RESPONSES 1. (no RFIs received) Reference: Sheet A2.25 Description: Add General Note 4, clarifying extents of roof coating application below rooftop mounted equipment. Add keyed note 2271, pertaining to existing cap sheet. END OF ADDENDUM ITEMS ATTACHMENTS: Project Manual: Section 00 4000 Bid Form (revised 12-29-2017) 2 Pages Drawings: AD1-SK1 1 Page A2.25 1 Page Page 2 of 2

William Duff Architects SECTION 00 4000 SHELL AND CORE IMPROVEMENTS PROJECT NO. 11860.3 SAN FRANCISCO UNIFIED SCHOOL DISTRICT BID FORM Contractor: Bid Opening : To the San Francisco Unified School District, 135 Van Ness Avenue, San Francisco, CA 94102. San Francisco Unified School District will date/time stamp each bid upon receipt at the SFUSD District Offices front lobby located at 135 Van Ness Avenue, San Francisco, California. Bid proposal must be received and time stamped by: Thursday, January 4, 2018, 3:00 p.m. Bid for: SFUSD Project: Shell and Core Improvements-1235 Mission Street, Scope 3: Roofs 1 and 3 SFUSD Project Number: 11860.3 The undersigned hereby declares that he has fully investigated the existing conditions at the Project site and carefully examined all of the Contract Documents as prepared by William Duff Architects The undersigned has examined all Bidding Documents and the site for the above Project and agrees to furnish and pay for all labor, material, equipment, plant, appurtenances, services, sales, consumer and use taxes required by law, and including utilities and transportation required to complete this Project according to all the requirements of the Contract Documents, including all addenda, at and for the price(s) stated below regardless of any increase in wage scales or material prices. The Contractor in submitting its bid guarantees the following prices for Ninety (90) calendar days. TOTAL BASE BID (Sum of Bid Breakdown Items 1,2,3 + Allowance) Dollars BID BREAKDOWN: 1. Division 1 General Requirements Dollars 2. Demolition/Hazardous Materials Abatement and all associated work Dollars SCOPE 3 ROOFS 1 & 3 BID ISSUE: 12/29/17 00 4000-1 Bid Form

William Duff Architects SHELL AND CORE IMPROVEMENTS PROJECT NO. 11860.3 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 3. Roofing (roof coatings, metal flashings, sealants, expansion joint assemblies and all associated work) Dollars ALLOWANCE: 4. Building Permit Fee (include this amount to the sum of the Total Base Bid above) ONE THOUSAND DOLLARS $1,000.00 Acknowledge receipt of Addenda issued for this Project (Indicate the Addendum Numbers): (Company) (Contractor License Number) (License Expiration date) (San Francisco Business Tax Certificate Number) (Signature of Bidder) (Printed Name) (Title of Bidder) (Business Address) If a Corporation, incorporated In the State of: (Telephone Number) (Fax number) By (Officer) (Printed name) (Title) END OF SECTION 00 4000 SCOPE 3 ROOFS 1 & 3 BID ISSUE: 12/29/17 00 4000-2 Bid Form

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A 2259 2259 2260 TYP 2264 B NOT FOR CONSTRUCTION 2270 2254 SOUTH PENTHOUSE ACCESS FROM (E) ROOF HATCH ROOF 4 NIC C Revision No. @ PENTHOUSE TYP ALL SIDES D 2250 E 2250 F Written dimensions on these drawings shall have precedence over scaled dimensions. Drawings shall not be scaled. Contractors shall verify, and be responsible for, all dimensions and conditions shown by these drawings. Shop details must be submitted to this office for approval before proceeding with fabrications. The drawings and their design content are the sole property of William Duff Architects, Inc. and may not be reused or reproduced in any manner without our express written consent. 11/27/2017 2:23:53 PM BID ADD 1 ROOF PLAN LEGEND EXISTING COLUMN COVER AREA NIC GENERAL ROOF PLAN NOTES 1. REPLACE (E) METAL PIPE SUPPORTS WITH RUBBER ROOFTOP SUPPORTS. 2. FULLY ENCAPSULATE (E) TO REMAIN CURBS / SLEEPERS / SUPPORTS THAT ARE ANCHORED TO THE ROOF AND IN GOOD CONDITION, SIM TO 10/A7.00 3. PROVIDE SILICONE ROOF COATING PER 1/A7.00 AT ALL UNATTACHED AND SET ASIDE MECHANICAL EQUIPMENT / PIPING / DUCTING SUPPORTS. REINSTALL SUPPORT WITH SEPARATATION SHEET / PROTECTION BOARD UNDERNEATH TO PROTECT ROOF COATING. 4. ROOF COATING SHALL EXTEND COMPLETELY AND CONTINUOUSLY BELOW ALL ROOFTOP MOUNTED EQUIPMENT, WITHOUT EXCEPTION. KEYED NOTES F.2 2250 (E) MECHANICAL UNIT TO REMAIN, SEE GENERAL NOTE #2 AND #3 (N) REPLACEMENT ROOF DRAIN DOME AT (E) ROOF DRAIN, SEE DETAIL 15/A7.00 (N) PAINTED G.S.M. COPING AT TOP OF PARAPET, SEE DETAIL 3/A7.00 (N) WALL TERMINATION, SEE DETAIL 9/A7.00 2254 INSTALL (N) ROOF COATING AT (E) STUCCO BASE TERMINATION, REPAIR (E) FLASHING AS NECESSARY AFTER INSTALLATION, SEE 5/A7.00 (N) FLUID APPLIED SILICONE ROOFING COATING, SEE SPECS AND DETAIL 1/A7.00 2256 (N) EXPANSION JOINT COVER AT LOW ROOF PARAPET, SEE DETAIL 4/A7.00 2257 REPLACE (E) COLUMN TOP COVER WHERE OCCURS, REPLACE DAMAGED OR DETERIORATED COVERS AS NECESSARY, SEE DETAIL 13/A7.00 2258 INSTALL (N) ROOF COATING AT (E) HISTORIC FAÇADE PER DETAIL 6/A7.00 2259 (N) G.S.M. CAP FLASHING AND ROOFING COATING ASSEMBLY AT (E) CURB, PROVIDE PT WD BLOCKING/PLYWOOD SUBSTRATE SUPPORT FOR CAP FLASHING AS NECESSARY, SEE 10/A7.00 2260 (N) ROOF COATING AT (E) SCUPPER, SEE DETAIL 12/A7.00 2261 (N) PT WD CURB INFILL, SILL PAN, DOOR/FRAME AND THRESHOLD, SEE 1/A7.01 (N) ROOF COATING AT (E) GRAVEL STOP, SEE 7/A7.00 2263 (N) ROOF COATING TERMINATION AT (E) GUTTER, SEE DETAIL 8/A7.00 2264 (N) ROOF COATING AT MECHANICAL PLATFORM, SEE DETAIL 14/A7.00 2265 EXTENTS OF (E) TO REMAIN STOREFRONT SYSTEM AND ROOF 3 ACCESS, COORDINATE WORK THIS AREA WITH PROPOSED TENANT ROOF DECK UNDER SEPARATE PERMIT, LAP ROOF COATING UNDER BASE FLASHING SIM TO 5/A7.00, TENANT ROOF DECK TO BE COMPATIBLE WITH SILICONE ROOF COATING, PROVIDE SEPARATION SHEET/PROTECTION BOARD AT PROPOSED DECK PEDESTALS/SLEEPERS, WATERPROOFING UPGRADES TO THE STOREFRONT SILL AND EXPANSION JOINT MAY BE REQUIRED UNDER TENANT'S SCOPE OF WORK 2266 (N) PT WD CURB EXTENSION AND EXPANSION JOINT COVER, SEE 4/A7.00 2267 (N) MFR WALK PAD, COORDINATE EXTENTS WITH TENANT HVAC WORK ON UNDER A SEPARATE PERMIT (N) PAINTED G.S.M. GRAVEL STOP AT PARAPET, SEE DETAIL 11/A7.00 2269 (E) PENTHOUSE DOOR, (N) ROOF COATING AND WALL TERMINATION AT SILL, SEE DETAIL 9/A7.00 2270 (E) ROOF HATCH TO REMAIN, (N) ROOF COATING AT CURB, SIM TO 9/A7.00 2271 (N) ROOF COATING TO ENCAPSULATE (E) CAP SHEET & ADHESIVE, THIS AREA: PROVIDE MANUF'S RECOMMENDED L.2 SUBSTRATE AS REQ'D. TO PREVENT TELEGRAPHING OF ASPHALTIC MATERIAL THROUGH COATING BID ADD 1 6.6 ROOF 2 NIC 2269 2267 2258 2261 2263 ROOF 1 UPPER ACCESS FROM NORTH PENTHOUSE 2257 TYP 2263 2254 NORTH PENTHOUSE 2269 2256 2266 2265 2271 2256 BID ADD 1 2267 ROOF 3 LOWER ACCESS FROM 3RD FLOOR 2250 G H J K L ROOF PLAN 1/8" = 1'-0" 1 Job Title 1235 MISSION - ROOFING MAINTENANCE & REPAIR - R1 & R3 Job Address SAN FRANCISCO, CA 94103 12/01/17 Issued For BID Job No. 15003 Drawn By: JH Scale 0 Sheet Title Checked By: DP As indicated 2' 4' 8' 16' PROPOSED ROOF PLAN Sheet No. A2.25

MINNA STREET NOT FOR CONSTRUCTION Revision No. SCOPE OF WORK 1 STORY HEIGHT: 21'-7" ADJACENT BUILDING 3 STORIES (E) PARKING ADJACENT BUILDING 3 STORIES 8TH STREET ACCESSIBLE PARKING Written dimensions on these drawings shall have precedence over scaled dimensions. Drawings shall not be scaled. Contractors shall verify, and be responsible for, all dimensions and conditions shown by these drawings. Shop details must be submitted to this office for approval before proceeding with fabrications. The drawings and their design content are the sole property of William Duff Architects, Inc. and may not be reused or reproduced in any manner without our express written consent. 4 STORIES HEIGHT: 48'-6" ACCESSIBLE ROUTE PARKING LOT ADJACENT BUILDING 1 STORY 1225 MISSION ST 1 STORY HEIGHT: 14'-0" SCOPE OF WORK 2 STORIES HEIGHT: 22'-0" (E) PATIO Job Title 1235 MISSION - BARRIER REMOVAL - STAIR RAILING Job Address SAN FRANCISCO, CA 94103 CONCRETE SIDEWALK 12/01/17 Issued For BID MISSION STREET Job No. 15003 Drawn By: JH Checked By: DKP / DP Scale 1/16" = 1'-0" 0 4' 8' 16' 32' 11/27/2017 2:28:47 PM SITE PLAN 1/16" = 1'-0" 1 Sheet Title SITE PLAN Sheet No. A1.00