SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 3: Roofs 1 & 3 DATE: December 29, 2017 1235 Mission Street San Francisco, California SFUSD Project No. 11860.3 San Francisco Unified School District 135 Van Ness Avenue San Francisco, CA 94103 Notice is hereby given to all prospective bidders that plans and specifications on the subject project are modified as hereinafter set forth. This Addendum shall be attached to and form a part of the plans and specifications. All bidders must acknowledge receipt of this addendum on the Bid Form. In case of difference with previous addenda or communications, this addendum takes precedence. It is the responsibility of all bidders to notify all subcontractors from whom they request bids and from whom they accept bids of all changes contained in this addendum. PROJECT MANUAL 1. Item No. PM1-1 Reference: Description: 00 4000 Bid Form Refer to attached Bid Form revised (12-29-2017) and updated to indicate actual due date for bid submittal, Thursday, January 4, 2018 at 3:00 p.m. The Contractor shall include a Bid Allowance of $1,000.00 to cover costs of the building permit fee. The Contractor is expected to pay the building permit fee as provided by this Allowance and apply and pick-up the building permit from the City of San Francisco Building Inspection Department. Use this Bid Form as part of bid submittal package and Project Manual. 2. Item No. PM1-2 Reference: 00 8000 Special Conditions, Part 1.3 Description: Add Paragraph 1.3.S. as follows: S. Facility is opened by Tenant at 7:00 a.m., on regular work days. Work may not commence before this time. Standard work hours shall be 7:30 a.m. 4:30 p.m., Mondays through Fridays. Noise ordinance (SF Police Code, Article 29: Regulation of Noise) is to be observed by the Contractor at all times. Weekend work will be a Change Order. 3. Item No. PM1-3 Reference: 01 1400 Work Restrictions, Part 1.2 Description: Add Paragraph 1.2.C. as follows: C. On-site staging / parking areas to be negotiated with Tenant representative. Refer to AD1-SK1 Page 1 of 2
4. Item No. PM1-4 Reference: Description: (none) Contractor access to Virtual Site Access, for bid purposes: VSA Login http://epicscan.com/virtual-site-access/ U: 1235 Mission P: Mission *Case sensitive DRAWINGS 1. Item No. AD1-1 RFI RESPONSES 1. (no RFIs received) Reference: Sheet A2.25 Description: Add General Note 4, clarifying extents of roof coating application below rooftop mounted equipment. Add keyed note 2271, pertaining to existing cap sheet. END OF ADDENDUM ITEMS ATTACHMENTS: Project Manual: Section 00 4000 Bid Form (revised 12-29-2017) 2 Pages Drawings: AD1-SK1 1 Page A2.25 1 Page Page 2 of 2
William Duff Architects SECTION 00 4000 SHELL AND CORE IMPROVEMENTS PROJECT NO. 11860.3 SAN FRANCISCO UNIFIED SCHOOL DISTRICT BID FORM Contractor: Bid Opening : To the San Francisco Unified School District, 135 Van Ness Avenue, San Francisco, CA 94102. San Francisco Unified School District will date/time stamp each bid upon receipt at the SFUSD District Offices front lobby located at 135 Van Ness Avenue, San Francisco, California. Bid proposal must be received and time stamped by: Thursday, January 4, 2018, 3:00 p.m. Bid for: SFUSD Project: Shell and Core Improvements-1235 Mission Street, Scope 3: Roofs 1 and 3 SFUSD Project Number: 11860.3 The undersigned hereby declares that he has fully investigated the existing conditions at the Project site and carefully examined all of the Contract Documents as prepared by William Duff Architects The undersigned has examined all Bidding Documents and the site for the above Project and agrees to furnish and pay for all labor, material, equipment, plant, appurtenances, services, sales, consumer and use taxes required by law, and including utilities and transportation required to complete this Project according to all the requirements of the Contract Documents, including all addenda, at and for the price(s) stated below regardless of any increase in wage scales or material prices. The Contractor in submitting its bid guarantees the following prices for Ninety (90) calendar days. TOTAL BASE BID (Sum of Bid Breakdown Items 1,2,3 + Allowance) Dollars BID BREAKDOWN: 1. Division 1 General Requirements Dollars 2. Demolition/Hazardous Materials Abatement and all associated work Dollars SCOPE 3 ROOFS 1 & 3 BID ISSUE: 12/29/17 00 4000-1 Bid Form
William Duff Architects SHELL AND CORE IMPROVEMENTS PROJECT NO. 11860.3 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 3. Roofing (roof coatings, metal flashings, sealants, expansion joint assemblies and all associated work) Dollars ALLOWANCE: 4. Building Permit Fee (include this amount to the sum of the Total Base Bid above) ONE THOUSAND DOLLARS $1,000.00 Acknowledge receipt of Addenda issued for this Project (Indicate the Addendum Numbers): (Company) (Contractor License Number) (License Expiration date) (San Francisco Business Tax Certificate Number) (Signature of Bidder) (Printed Name) (Title of Bidder) (Business Address) If a Corporation, incorporated In the State of: (Telephone Number) (Fax number) By (Officer) (Printed name) (Title) END OF SECTION 00 4000 SCOPE 3 ROOFS 1 & 3 BID ISSUE: 12/29/17 00 4000-2 Bid Form
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A 2259 2259 2260 TYP 2264 B NOT FOR CONSTRUCTION 2270 2254 SOUTH PENTHOUSE ACCESS FROM (E) ROOF HATCH ROOF 4 NIC C Revision No. @ PENTHOUSE TYP ALL SIDES D 2250 E 2250 F Written dimensions on these drawings shall have precedence over scaled dimensions. Drawings shall not be scaled. Contractors shall verify, and be responsible for, all dimensions and conditions shown by these drawings. Shop details must be submitted to this office for approval before proceeding with fabrications. The drawings and their design content are the sole property of William Duff Architects, Inc. and may not be reused or reproduced in any manner without our express written consent. 11/27/2017 2:23:53 PM BID ADD 1 ROOF PLAN LEGEND EXISTING COLUMN COVER AREA NIC GENERAL ROOF PLAN NOTES 1. REPLACE (E) METAL PIPE SUPPORTS WITH RUBBER ROOFTOP SUPPORTS. 2. FULLY ENCAPSULATE (E) TO REMAIN CURBS / SLEEPERS / SUPPORTS THAT ARE ANCHORED TO THE ROOF AND IN GOOD CONDITION, SIM TO 10/A7.00 3. PROVIDE SILICONE ROOF COATING PER 1/A7.00 AT ALL UNATTACHED AND SET ASIDE MECHANICAL EQUIPMENT / PIPING / DUCTING SUPPORTS. REINSTALL SUPPORT WITH SEPARATATION SHEET / PROTECTION BOARD UNDERNEATH TO PROTECT ROOF COATING. 4. ROOF COATING SHALL EXTEND COMPLETELY AND CONTINUOUSLY BELOW ALL ROOFTOP MOUNTED EQUIPMENT, WITHOUT EXCEPTION. KEYED NOTES F.2 2250 (E) MECHANICAL UNIT TO REMAIN, SEE GENERAL NOTE #2 AND #3 (N) REPLACEMENT ROOF DRAIN DOME AT (E) ROOF DRAIN, SEE DETAIL 15/A7.00 (N) PAINTED G.S.M. COPING AT TOP OF PARAPET, SEE DETAIL 3/A7.00 (N) WALL TERMINATION, SEE DETAIL 9/A7.00 2254 INSTALL (N) ROOF COATING AT (E) STUCCO BASE TERMINATION, REPAIR (E) FLASHING AS NECESSARY AFTER INSTALLATION, SEE 5/A7.00 (N) FLUID APPLIED SILICONE ROOFING COATING, SEE SPECS AND DETAIL 1/A7.00 2256 (N) EXPANSION JOINT COVER AT LOW ROOF PARAPET, SEE DETAIL 4/A7.00 2257 REPLACE (E) COLUMN TOP COVER WHERE OCCURS, REPLACE DAMAGED OR DETERIORATED COVERS AS NECESSARY, SEE DETAIL 13/A7.00 2258 INSTALL (N) ROOF COATING AT (E) HISTORIC FAÇADE PER DETAIL 6/A7.00 2259 (N) G.S.M. CAP FLASHING AND ROOFING COATING ASSEMBLY AT (E) CURB, PROVIDE PT WD BLOCKING/PLYWOOD SUBSTRATE SUPPORT FOR CAP FLASHING AS NECESSARY, SEE 10/A7.00 2260 (N) ROOF COATING AT (E) SCUPPER, SEE DETAIL 12/A7.00 2261 (N) PT WD CURB INFILL, SILL PAN, DOOR/FRAME AND THRESHOLD, SEE 1/A7.01 (N) ROOF COATING AT (E) GRAVEL STOP, SEE 7/A7.00 2263 (N) ROOF COATING TERMINATION AT (E) GUTTER, SEE DETAIL 8/A7.00 2264 (N) ROOF COATING AT MECHANICAL PLATFORM, SEE DETAIL 14/A7.00 2265 EXTENTS OF (E) TO REMAIN STOREFRONT SYSTEM AND ROOF 3 ACCESS, COORDINATE WORK THIS AREA WITH PROPOSED TENANT ROOF DECK UNDER SEPARATE PERMIT, LAP ROOF COATING UNDER BASE FLASHING SIM TO 5/A7.00, TENANT ROOF DECK TO BE COMPATIBLE WITH SILICONE ROOF COATING, PROVIDE SEPARATION SHEET/PROTECTION BOARD AT PROPOSED DECK PEDESTALS/SLEEPERS, WATERPROOFING UPGRADES TO THE STOREFRONT SILL AND EXPANSION JOINT MAY BE REQUIRED UNDER TENANT'S SCOPE OF WORK 2266 (N) PT WD CURB EXTENSION AND EXPANSION JOINT COVER, SEE 4/A7.00 2267 (N) MFR WALK PAD, COORDINATE EXTENTS WITH TENANT HVAC WORK ON UNDER A SEPARATE PERMIT (N) PAINTED G.S.M. GRAVEL STOP AT PARAPET, SEE DETAIL 11/A7.00 2269 (E) PENTHOUSE DOOR, (N) ROOF COATING AND WALL TERMINATION AT SILL, SEE DETAIL 9/A7.00 2270 (E) ROOF HATCH TO REMAIN, (N) ROOF COATING AT CURB, SIM TO 9/A7.00 2271 (N) ROOF COATING TO ENCAPSULATE (E) CAP SHEET & ADHESIVE, THIS AREA: PROVIDE MANUF'S RECOMMENDED L.2 SUBSTRATE AS REQ'D. TO PREVENT TELEGRAPHING OF ASPHALTIC MATERIAL THROUGH COATING BID ADD 1 6.6 ROOF 2 NIC 2269 2267 2258 2261 2263 ROOF 1 UPPER ACCESS FROM NORTH PENTHOUSE 2257 TYP 2263 2254 NORTH PENTHOUSE 2269 2256 2266 2265 2271 2256 BID ADD 1 2267 ROOF 3 LOWER ACCESS FROM 3RD FLOOR 2250 G H J K L ROOF PLAN 1/8" = 1'-0" 1 Job Title 1235 MISSION - ROOFING MAINTENANCE & REPAIR - R1 & R3 Job Address SAN FRANCISCO, CA 94103 12/01/17 Issued For BID Job No. 15003 Drawn By: JH Scale 0 Sheet Title Checked By: DP As indicated 2' 4' 8' 16' PROPOSED ROOF PLAN Sheet No. A2.25
MINNA STREET NOT FOR CONSTRUCTION Revision No. SCOPE OF WORK 1 STORY HEIGHT: 21'-7" ADJACENT BUILDING 3 STORIES (E) PARKING ADJACENT BUILDING 3 STORIES 8TH STREET ACCESSIBLE PARKING Written dimensions on these drawings shall have precedence over scaled dimensions. Drawings shall not be scaled. Contractors shall verify, and be responsible for, all dimensions and conditions shown by these drawings. Shop details must be submitted to this office for approval before proceeding with fabrications. The drawings and their design content are the sole property of William Duff Architects, Inc. and may not be reused or reproduced in any manner without our express written consent. 4 STORIES HEIGHT: 48'-6" ACCESSIBLE ROUTE PARKING LOT ADJACENT BUILDING 1 STORY 1225 MISSION ST 1 STORY HEIGHT: 14'-0" SCOPE OF WORK 2 STORIES HEIGHT: 22'-0" (E) PATIO Job Title 1235 MISSION - BARRIER REMOVAL - STAIR RAILING Job Address SAN FRANCISCO, CA 94103 CONCRETE SIDEWALK 12/01/17 Issued For BID MISSION STREET Job No. 15003 Drawn By: JH Checked By: DKP / DP Scale 1/16" = 1'-0" 0 4' 8' 16' 32' 11/27/2017 2:28:47 PM SITE PLAN 1/16" = 1'-0" 1 Sheet Title SITE PLAN Sheet No. A1.00