Mill Creek/Peaks Branch/State- Thomas Drainage Relief Tunnel

Similar documents
Mill Creek/Peaks Branch/ State Thomas Drainage Relief Tunnel. Parkdale / Lawnview Avenue Neighborhood April 26, 2016

Memorandum. CITY OF DALLAS Report Number E18-001

Mill Creek / Peaks Branch / State Thomas Drainage Relief Tunnel. Pre-Bid Meeting July 25, 2017

Bond Program Project Delivery

MILL CREEK / PEAKS BRANCH / STATE THOMAS DRAINAGE RELIEF TUNNEL PROJECT

THUNDER BAY AREA DRAINAGE MASTER PLAN

ARLINGTON COUNTY, VIRGINIA

Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement

Title (28 pt Black Font, Arial) Title Line 2

SFPUC Flooding Workshop Tuesday, February 9, 2016

DC Clean Rivers Project

Anacostia River Tunnel Briefing For: ANC 6B

DESIGN CRITERIA PACKAGE

CITY OF FALL RIVER STORMWATER UTILITY AND THE CSO PROGRAM. OCTOBER 22, 2015 Terrance Sullivan Administrator of Community Utilities

Synergy: Addressing Combined Sewer Overflows and Nitrogen

Department of Street Services

SPRR TUPELO ST. R UNION CITY BLVD. ZON PADRE PASEO DEEP CREEK ROAD ARDENWOOD COYOTE HILLS REGIONAL PARK PROJECT LIMITS PATTERSON RANCH ROAD BLVD. COMM

MINUTES ENGINEERING AND OPERATIONS COMMITTEE Special Meeting May 3, 2018

REQUEST FOR CONSTRUCTION BIDS February 22, 2010

5/25/2017. Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon. Lumpkin Basin. Lumpkin Road Overall Description

DOCUMENT BID FORM. Village of Middle Point

City of Katy Pine Forest Public Workshop. November 7, 2017

REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Permit Application Review Permit No Received complete: March 19, 2019

SUBDIVISION CHECKLIST. Subdivision Name. Prior To Review. Preliminary plan approved by Planning Commission / Council as required.

FLORIDA DEPARTMENT OF TRANSPORTATION

PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR

City of Maize Industrial Park Phase III Report Infrastructure Assessment December 16, Maize Land Use Study

Request for Proposals and Bids for Civil Engineering Services for Off-site Improvements for a Residential Neighborhood

CITY OF HOBOKEN ADDENDUM #1 TO RFP DOCUMENTS RFP 17 07

Long-Term Control Plan Orientation. July 1, 2009

FLORIDA DEPARTMENT OF TRANSPORTATION

Department of Administration State Construction Office SITE PREPARATION AND GRADING CRITERIA

JUDD STREET LIFT STATION DEWATERING CONTRACT

PRINCIPAL ENGINEER. 4. Prepare plans and studies to forecast section and division needs; implement recommendations.

SOUND TRANSIT STAFF REPORT MOTION NO. M

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

Goals of today s presentation

Challenges and results of Using hand mining to tunnel the mcalpine creek relief sewer

Case 1:85-cv RGS Document 1708 Filed 09/15/2008 Page 1 of 24. UNITED STATES DISTRICT COURT for the DISTRICT OF MASSACHUSETTS

FY2018 CIRP Detailed Summary

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information

CHARLES COUNTY GOVERNMENT ITB NO PINEFIELD DRAINAGE IMPROVEMENTS

Papillion Creek South Combined Sewer Backup and Major Street Flooding Recommended Approach TM

The purpose of this addendum is to respond to RFI s submitted to the County and issue a revised SECTION BID FORM.

SECTION TEMPORARY SEWER BYPASS PUMPING

DEVELOPMENT REPORT UNION PACIFIC PROPERTY SAN ANTONO INTERMODAL YARD AREA

Good Housekeeping. Phones Weather related emergencies Breaks and facilities. Introductions

Wilmette - Background

Community Open House

sewers ANd storm drains Storm Drain Under Construction, 1916

London Tideway Tunnels Modernising London s Sewerage System Rob Furniss

Answer: Yes additional labor classifications can be added to the Staff and Fee Schedule (Exhibit 2-6). Yes all rates are to be completed.

Spanish Wells Plantation Sewer Extension Project. July 2012

CONSTRUCTION CLAIMS & ENGINEERING AUDITS

BROAD CREEK AUGMENTATION PROJECT Conveyance System North Contract Community Meeting March 4, 2015

1:00 PM ON FRIDAY, THE

DRAINAGE STUDY PHASE 2 REPORT HORRY COUNTY STORMWATER DEPARTMENT HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: APRIL 07, 2016 J

DC Water s Green Bond Report DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY FISCAL YEAR 2017

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

Panel 2 Public Initiatives and Return on Investment. Clean Rivers Project

ADDENDUM CITY COUNCIL MEETING WEDNESDAY, JANUARY 27,2016 CITY OF DALLAS 1500 MARILLA COUNCIL CHAMBERS, CITY HALL DALLAS, TX :00A.M.

Purchasing and Procurement Policy

Case 1:85-cv RGS Document 1792 Filed 12/16/13 Page 1 of 11. UNITED STATES DISTRICT COURT for the DISTRICT OF MASSACHUSETTS

St. Anthony Falls (I-35W) Bridge

Consultant for Municipal Engineering Services

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

C I T Y O F S A N A N G E L O

ADDENDUM NO. 1 CITY OF FORT MORGAN OUTPOST SEWER LIFT STATION CONVERSION PROJECT (DOLA EIAF 07494) January 22, 2015

Notice to Bidders (REV 1)

RESOLUTION NO A RESOLUTION ESTABLISHING POLICY ON SUMP PUMP CONNECTIONS TO THE CITY STORM SEWER SYSTEM.

COMMUNITY BOARD EIGHT

ADDENDUM #1 RFP WOLFTRAP CREEK STREAM RESTORATION

US 69 RELIEF ROUTE STUDY

Deep Tunnel, Shallow Pipe - How the City of Hamilton, OH plans to save millions on SSO control. Glenn Weist, P.E.

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE

STORAGE BASIN AND PUMPING PLANT DESIGN (G 500)

Association of State Floodplain Managers May 2, 2017 Rob Davis, P.E., ENVSP Flood Control System Program Manager

Stevens & Associates, Inc. Tunnel Construction Projects. Fact Sheets

Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE:

3.9 times the average 3.8 times the average 3.6 times the average

Prior Lake Stormwater Management & Flood Mitigation Study

3.0 Planning and Submittal Requirements

BMP FACT SHEET DF-1 HOA Annual Self-Certification Report

PROJECT MANUAL for Phantom Canyon Tunnel Repair Project. Location On Fremont County Road miles North of Intersection US Highway 50 with FCR 67

IC Chapter 19. Abandoned Mines

DC CLEAN RIVERS PROJECT Northeast Boundary Tunnel and WMATA Coordination. Florida Avenue Site

ENGINEER S REPORT MAIN TILE IMPROVEMENTS DRAINAGE DISTRICT NO. 131 WRIGHT COUNTY

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

Belmont Mill Renovation Project. February 23, :30 P.M. Informational Session

Long-Term CSO Control Plan for North Dorchester Bay and the Reserved Channel

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016

Tim Tucker, City Engineer Veronica Nebb, Senior Assistant City Attorney Karen Majors, Assistant City Manager Community and Economic Development

Jefferson November 1998

CITY OF PANAMA CITY BEACH WWTF INFLUENT SCREENS REPLACEMENT April 14, 2017

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

PROPOSED STORMWATER PROJECT IMPLEMENTATION PLAN. o Execution of New and Expanded Flood Control Projects o Program Options

Report to the Zone Commissioners Design and Construction Projects for Calendar Year 2009 GENERAL

Transcription:

Mill Creek/Peaks Branch/State- Thomas Drainage Relief Tunnel Mobility Solutions, Infrastructure & Sustainability Committee January 22, 2018 Sarah Standifer, Director Trinity Watershed Management

Overview Project Summary Project Benefits Project Background/Concerns Project Timeline Project Bid Information Staff Recommendation 2

Mill Creek/Peaks Branch/State-Thomas Drainage Relief Tunnel 3

Project Summary Consists of five-mile, 30-foot diameter tunnel Constructed 70-100 feet below ground Minimum disturbance to surface properties Construction costs approximately $200 million Construction will last around five years Approved by voters in two bond elections (2006 and 2012) 4

Deep Tunnel Construction Utilizes Tunnel Boring Machine to mine deep tunnel Advantages to tunneling Minimizes street and traffic impacts Minimizes utility relocations 5

Benefits of the Drainage Tunnel Increases public safety Relieves repeated flooding Protects residential and commercial properties Reduces impacts to mobility networks Upgrades drainage system 6

Drainage Basin Information Basin Areas Mill Creek (2,200 ac.) Peaks Branch (3,100 ac.) East Peaks (1,100 ac.) State-Thomas (450 ac.) 7

Areas Currently Subject to 100-Year Flood 8

Areas Subject to 100-Year Flood after Tunnel Construction 9

Project Drivers Drainage studies in these areas conducted in 1970s, 1980s, and 1990s Initial phase of larger drainage master plans for Mill Creek and Peaks Branch Existing storm sewers from the 1930s are inadequate for large storms Many areas flooded in 1995, 2006, 2007, 2009, 2012, and 2015 10

Project Drivers, cont d Tunnel provides outfall for future improvements M Streets Upper Peaks Branch Tunnel reduces flooding in areas including: 2,200 properties $4B property value (2015) Project approved by voters in two bond elections (2006 and 2012) 11

Project Timeline 2006 Mill Creek, Peaks Branch and State-Thomas drainage improvements approved as separate projects in Bond Program 2009 Mill Creek and Peaks Branch tunnel plans approved 2012 State-Thomas tunnel extension approved 2012 Construction funding approved in Bond Program 2015 Construction advertised and bids received 2016 Construction bids rejected and readvertisement approved 2017 Construction re-advertised and bids received 12

Project Specifications Revisions From First Advertisement to Second Included deductive alternatives State-Thomas tunnel extension Dewatering pump station Dewatering pump station shaft Inlet shaft C Expanded bidder experience qualifications to possibly attract more bidders Revised number of completed projects from three within a five-year period to two within a 10-year period Added minimum tunnel length of 5,000 feet Revised diameter of tunnel from 20 feet to 18 feet 13

Project Safety Requirements Contractor requirements Provide written, sealed Health and Safety Plan Established safety training program Emergence response procedures Provide certified safety professional dedicated to implementation and supervision of work safety Provide safety representative at shaft and tunnel sites Construction Manager oversight Review contractor s Health and Safety Plan Inspect contractor work areas for safety compliance Provide on-site safety reviews by Safety Manager 14

Project Bid Information Received three bids on September 8, 2017 Southland Mole JV $206,700,000 Michels Tunneling $224,870,637 C.M.C. di Ravenna $237,072,871 Received bid protest from a bidder Unbalanced bid protest evaluated by staff and consultants Found bid protest to be without merit 15

Project Bid Review City Auditor s Attestation Report on Agreed-Upon Procedures for Construction Bid Evaluation Project was bid as a low-bid construction project Found exceptions that were remedied by departments during the bid review Found exception in experience requirement of low bidder As documented for project #2, tunnel construction was completed in 2005 Other work, including shaft, was ongoing in 2007, within the experience timeframe 16

Staff Recommendation Proceed with award of construction to low bidder Southland Mole JV $206,700,000 Funding from General Obligation bonds Project is ready to award for construction Funding is available Right-of-way and subsurface easements are acquired One subsurface easement pending City Council consideration of construction award on February 14, 2018 17

Mill Creek/Peaks Branch/State- Thomas Drainage Relief Tunnel Mobility Solutions, Infrastructure & Sustainability Committee January 22, 2018 Sarah Standifer, Director Trinity Watershed Management