Pipe Jacking. Progress is built on ideas.

Similar documents
Microtunnelling. Building infrastructures and power supply systems underground, while life above continues unaffected.

Experts in tunneling with Tunnel Boring Machines

Expert in Tunneling Systems & Trenchless Technology (HDD, Microtunneling, Pipe Jacking, Thrustboring, Sheet Piling)

CC1602 Microtunneling

Grouting Bilfinger Spezialtiefbau GmbH

Pipe Jacking Association: Introduction Presentation. Lecture notes. Slide 1. Slide 2

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

TRENCHLESS SOLUTIONS FOR SEWER NETWORKS AND SEA OUTFALLS.

2 Support of the cavity and settlement Support of the face Natural support Mechanical support...

No-Dig Technology is the art and science of pipes, ducts and cables using techniques that minimizes / eliminates the need for excavation, i.e.

Trenchless Pipeline Crossings

Pipe Jacking. Japan Sewage Works Association

NO DIG BERLIN 2015 Symposium and Exhibition March. Paper 5-3. Increasing requirements move boundaries in Pipe Jacking

4th International Engineering and Construction Conference - July 28, 2006

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer

Martha Lake Gateway Sewer. An Introduction to Trenchless Methods and Evaluation for the Installation of New Pipelines

5/16/2018. New Jet Pump Technology for HDD & Long-distance Pipe Jacking in small diameters. Dr. Marc Peters, Herrenknecht AG. Highlights.

TRENCHLESS TECHNOLOGY. Department of Civil Engineering.

The new HDD Tooling from Herrenknecht Full Face Hole Opener / Down Hole Jet Pump

E-Power Pipe : A new trenchless method for underground cable installation

Brief Discussion on Application of Guided Boring Non-excavation Technology in Repair of Sewage Pipes Mei-Di SHAN1,a,*, Feng ZHOU2,b

Developed countries require a modern infrastructure Roads Railways Power Communications Water Wastewater

SPECIAL CONDITIONS FOR MICROTUNNELING (MT) October, 2006

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS

Pipejacking Tunnel Boring Machines TBMs. Michael Frenke, LOVAT Inc.

CS-13 TRENCHLESS TECHNOLOGY TABLE OF CONTENTS

An introduction to. pipe jacking

Design of pipeline installation D-GEO PIPELINE

Tel: Neil: Tony: Website:

PIPE JACKING. An introduction to pipe jacking prepared by the Pipe Jacking Association

Research on the Effects of Foundation Excavation by the Environment

Slurry MTBM in Alluvial Soils and 25k Rock Chris L. Windley, P.E. McKim & Creed Inc. Stephen D. Leitch, P.E. Hazen and Sawyer, P.C. Joshua P.

rapid tunnelling thanks to efficient SePArAtion. Low-impact mechanized tunnelling: Integrated solutions.

The Pilot Pipe method is a very simple method for trenchless installation of supply lines. It is done in several steps:

Design of pipeline installation. D-Geo Pipeline

The new Standard DWA-A 125E. Pipe jacking and related techniques. published in German and English by

Cutting-Edge Trenchless Technology Proposed for Challenging CSO Project

There are several types of trenchless technology applications for new installations. The following are some of the most prominent applications.

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL

Design Data 4M. Jacking Concrete Pipe

Sioux City Iowa Utilizes HDD to Install Twin 36 Casings for Sanitary Sewer Siphons

ON THE BEHAVIOR OF A STUCK CURVED PIPE JACKING

Pipeline and Sewer Building

UNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1

Trenchless Technology

Analysis of Microtunnelling Using Process Simulation Module

ITEM 432 TUNNEL CONSTRUCTION

CONTACTS LUCOP Sp. z o.o. Ul. Sejmu Czteroletniego 2 m Warszawa Tel

PMSA Regional Conference The role of innovative technology and PM in delivery of the Durban Harbour Tunnel.

Large-diameter bored piles and Large-hole drillings Applications

TBM rescue projects using shafts and ground freezing

Design Data 4. Jacking Concrete Pipe

PIPE JACKING & TUNNELING SYSTEMS DRIVEN FOR CUSTOMER SUCCESS

Horizontal Directional Drilling

YOUR GROUND DRILLING PARTNERS.

COMPETITIVENESS OF PIPE-JACKING TUNNEL LININGS

Walls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can be excavated to depths of 60m or more.

HERRENKNECHT Large-scale projects in small diameters win GSTT Award 2015.

Addendum Geotechnical Report Dewatering and Settlement Sanitary Sewer Improvements at Bush IAH, Project No. 699 HVJ Project No.

Dahlia Ponds Tunnel Project. Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless

13/05/2016. Introductions of Pipe Roof. Focuses. Application of Rectangular Shield Jacking

Ching Guan Kee ABSTRACT

USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA. Miranda Roman D. *, LaFaso Edward

Loshan pipe manufacturing Co. LOSHAN PROFILE

LGP800/1200/200PI-D Grout Station

Tunnel Boring Machines

CORRUGATED DRAINAGE PIPES FOR DRAINING UNDERGROUND AND SURFACE RUNOFF WATER 01 / 2017 CATALOGUE

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

Technology. Trenchless. Planning, Equipment, and Methods. Mohammad Najafi. Mc Gravu Hill

TRENCHLESS INSTALLATION OF ROAD DRAINAGE & SERVICE DUCTS

2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January

Full-text paper MAGLEV REQUIREMENTS FOR TUNNELS

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

Lesson Learned. Collapse of Diaphragm Wall Trench. Case study. Suez Canal Syphon Project

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

Hardrock Tunnel Boring Machines

Use of Jet Grouting in Challenging Infrastructure Renewal Situations in Hawaii

SPECIAL CONDITIONS FOR HORIZONTAL AUGER BORING (HAB) October, 2006

INFRASTRUCTURE TUNNELS

Scottish Water has recently commenced the first phase of construction on a 120m investment project designed

An Introduction to. By Michael L. Schumaker, P.E. An Introduction to Shaner Industries Metal Foundation System

Behavior of Surrounding Soil during Construction and Its Countermeasures Using Pipe Jacking Method in Deep Strata

Design, Specification and Selection of Concrete Jacking Pipes Who Decides? What Really Matters?

Tunnels. Introduction in Shield tunnelling Pipe jacking & tunnelling Slurry & hydroshield Slurry versus EPB Principles of support pressure

QUANTIFYING THE EFFECTS OF LUBRICATION ON JACKING FORCES

Heavy-Duty Rolling and Plain Bearings. for Mining, Processing, On- and Offshore Technology

Press Release. Rehabilitation of oil pipelines with flexible high pressure pipes

COMPANY PROFILE. HARKE Capability Statement. Insideout

Reinforced Concrete Microtunnelling Pipe Designed for Project Conditions and MTBM Machines

2 Technology of closed-face tunnelling machines

A number of abbreviations and technical terms have been used in this guideline:

Trenchless Technology The Missing Recipe for Sustainable Infrastructure s Construction and Maintenance in the Arab Countries

Presented By: Brenden Tippets, Project Executive

Design and Implementation of the South Hartford CSO Tunnel

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SPECIFICATION : BORING AND JACKING

Concrete Pipe Jacking

Transcription:

Pipe Jacking Progress is built on ideas.

Frankfurt airport, enlargement of hydrant-fuelling system elongation of southeast-sewer, Nuremberg U 55 subway station, Brandenburger Tor, Berlin subway station Marienplatz, Munich 2

southeast-sewer BA 4, Nuremberg A Company with profile Zertifikate in englisch? The trenchless installation of pipelines is making up an ever increasing portion of modern sewer and pipeline construction. Partially dilapidated sewer and pipeline systems in cities and increasingly dense development of our urban residential districts create in-creasing demand for modern construction methods. With expert technical knowhow and its own mechanical engineering department, Max Bögl Pipe Jacking Division, a specialist in the area of NO- DIG construction methods, plays a significant role in this development. The company located in Schwabach near Nuremberg offers technical, economical and environmentally friendly solutions in the areas of tunnelling, pipe jacking, microtunnelling, injections, boring, civil engineering and special mechanical engineering. The professional qualifications, innovative ideas and enthusiasm of the employees have enabled Max Bögl Pipe Jacking Division to become a specialist over the course of its 30-years old company history, recognized within the field as an expert in diverse underground and tunnel construction activities. In addition to the closed construction method, the sealing of structures, horizontal well construction, drilling of small steel pipes for ground freezing and the construction of tunnelling machines are important parts of the company s range of services. With about 70 employees, Max Bögl Pipe Jacking Division participates in numerous construction projects of all dimensions and difficulties both in Germany and abroad from the planning and performance of pipe jacking to the creation of alternatives to conventional solutions as well as design, construction, leasing and sale of complete tunnelling equipment. In addition, the company is engaged in several joint ventures beyond Europe in the Asian region, as well as in the east and Middle East area. 3

Mechanized Tunnelling and Pipe Jacking southeast-sewer BA 4, Nuremberg (above), start-shaft Wesseling, tunnelling-line east (below) Tunnelling in particular, currently the most environmentally friendly construction method has increasingly developed into an economically interesting alternative to conventional open pipe trenches. One special tunnelling process is the pipe jacking technology. There we have achieved optimal results in our construction projects already for decades. Not only did we contribute significantly to the development of this process, our extensive experience and comprehensive know-how in the area of modern tunnelling also put us in a position to fulfill all construction projects assigned to us to the fullest satisfaction of our customers. With special and state-of-the art control systems, tunnel pipes can be accurately laid in dimensions from ID 500 to ID 4000. Precise surveying technology makes it possible for us to exactly implement both perfectly straight stretches and specified curved drives. Even smaller cross-sections, such as for creation of building connections, are included within our range of activities. All the required machinery and equipment from manual mining to highly developed machinery use for all geological areas of DIN 18319 is developed, designed and manufactured in-house or adapted to the project-specific conditions at job site. The precise understanding of the soil conditions and exact advance planning guarantee the selection of the right machinery and logistics concept, thereby securing the technical and economic success of the project as well as punctual completion. systemdrawing tunnelling with muck skip conveyance systemdrawing tunnelling with slurry system 4

fullface cutting machine ID 1800, rock cutting head machine interior Mechanical Engineering Restructuring within the tunnelling mechanical engineering department resulted in economically and technically advanced solutions in the area of special mechanical engineering. This involves more than just the development and sale of innovative machines for the global market. With a perspective that is expanding to include the promising area of supply and disposal, this also applies internally to the conversion of machines for the special requirements at the construction site. Planned with an outside diameter of 2.20 meters, designed and built in-house, our newest development, the full face cutting machine VSM 1800, along with additional individual tunnel construction equipment, can be purchased directly from us and/or leased with personnel and at prices better than the machines previously available on the market. The driving systems available and used by Max Bögl include: Full face cutting machines for soft ground and hard rock Microtunnelling machines Open shields with excavator or road header Compressed air shields Mixshields and EPB-shields excavator ID 2000 fullface cutting machine ID 1600, road header ID 2000 soft-rock cutting head 5

Bentonite flowmeter Control console in the machine optional Bentonite-valve 1 Bentonite-valve X Bentonite-pipe Distance measurement wheel Bentonite pump 230 V supply-voltage profibus-cable 9 x Distance measurement 4 20 ma optional 9 x Distance measurement 4 20 ma optional pressure measurement 4 20 ma cable winch distance transmitter 4 20 ma Control unit Main control console 400 V supply-voltage optional Distance measurement for the grooves Pipe 1 3 Distance measurement for the grooves Pipe 4 6 Module for intermediate Jacking station 1 3 Automatic Bentonite Lubrication System At Pipe Jacking it s anxious to reduce the occurring tunnelling-forces and to minimize the settlement. One of the most important premises is a permanent, well dosed bentonite lubrication, which produces a constant bentonite-film in the annular gap. Most suitable is here the automatic bentonite lubrication system by Max Bögl, which distributes the bentonite lubrication by remote-controlled valves. There it s possible to programme individually the desired quantity, the time duration, the allocation and the aspired pressure in the control unit. In exceptional circumstances it s also possible to activate the valves and the bentonite-pump manually. A permanent visual display and recording of all data is in the control unit too. The complete data can be exported by USBport. Regarding a continuous documentation, as required in DWA-A 125, the following data is automatic measured and recorded: Date and Time of day Length of pipe jacking Tunnelling-forces separately for main press station and intermediate jacking station General space bending in the relevant pipe-groove (up to 6 pipe-grooves) 6 bentonite-mixer (above), arrangement of bentonite-valves in large-diameter pipes (right)

pilotboring subway Wehrhahn-Linie, Düsseldorf boring horizontaldrains, U3/3 Munich Boring Civil Engineering Another application is the creation (making, production) of horizontal boreholes using the pilot rod-application. Whether the drilling is linear or not, created as a flat bottom or through hole bearing, this application is practicable until a inner diameter of 300 mm both above and underneath groundwater. But at first it is used to get pipes for mediums like water, gas or cables into the ground. The small diameter allows miscellaneous possibilities of use like ground freezing etc. Another area of drilling is horizontal well construction such as for groundwater pipelines or drinking water collection. Whether using the pressure drilling process, Ranny-Fally process, Fehlmann process or pebble sheath process: we offer the optimal solution for the process preferred by you. In the area of underground civil engineering, our activities are focused on new construction of structures. Whether this involves the realization of smaller sewer shafts or expensive double vortex pressure wells we always offer our customers complete and thoroughly conceived solutions with planning, design and construction. With our know-how and the support of our other divisions, Max Bögl Group is capable of providing you with complete solutions from a single source. Injections Professional sealing injections are performed for underground structures, excavations or water reservoirs with poorly sealed joints. The areas in which our in-house injection department is active include the repair of: cracks in human-accessible sewers water entrances in tunnels poorly sealed joints and structures faulty sewer pipes defective multi-function sewers cracked sheet piling in the groundwater The resins that we use are environmentally friendly and do not contaminate the soil or the groundwater. They react completely with water, do not undergo any additional reactions and form, depending on the composition, a hard or elastic final product. Typical commercial products are used for restoring the joints. 7

Pipe Jacking Division Am Kiefernschlag 30 D-91126 Schwabach, Germany Phone +49 9181 909-11900 Fax +49 9181 909-11908 rohrvortrieb@max-boegl.de www.max-boegl.de die-jaeger.de BOENEX00166 09/14. Photo credits: Herrenknecht AG (p. 2); Max Bögl Group (title, p. 2, 4, 5, 6, 7); Reinhard Mederer (p. 5); Holger Puhl (p. 5, 6); Photographie Wolfgang Seitz (p. 2, 4, 5, 6); Michael Stibitz (p. 2); Patrick Zier (p. 7