Higher Education Experience

Similar documents
0B MAGNOLIA HALL. Scale: 1:110. Date: Feb Time: 7:40 pm. User: brady. 10 ft

Sustainable Development at the University of Regina

Coach House: Hunziker Hall:

CONSTRUCTION REQUIREMENTS

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

East Los Angeles College Project Priority List Occupancy Date

2014 ENERGY REPORT. Mark J. Ferguson, P.E. Campus Operations & Plant Manager

Submitted to. Texas A&M University - Kingsville The Texas A&M University System. Submitted by. Yeqiao Zhu John Bryant Dan Turner David Claridge

Applying Geothermal Technology for Large Scale Projects

Olivet Nazarene University Student Life and Recreation Center Project By Elara Engineering

Energy Conservation and Finances Using NYPA Performance Contracts. SUNY Sustainability Conference September 19-20, 2011

Project #1 (Prioritized): Proposed Project Title:

Energy Reduction Strategy Through 2020

Sustainability: Solar and Green Building Projects

Bronx Community College. Five-Year Capital Plan FY through FY

Executive Order RP 49 Quarterly Energy Report for Texas A&M University September 2012

Grunenwald Science and Technology Building

Janice Reedus, Director of Business & Auxiliary Services Campus Center Building A, Room Houbolt Road Joliet, IL 60431

Representative Educational Projects MDP Engineering Group, P.C.

SYRACUSE UNIVERSITY ENERGY CONSERVATION

2018 ENERGY REPORT. Mark J. Ferguson, P.E. Campus Operations & Plant Manager

Collaborative Life Sciences Building & Skourtes Tower

Mirza Shah, PhD, P.E. Dr. Shah has worked on a wide variety of projects. His work has included:

Energy Management Report

Implementing Low-Cost Energy Savings Projects & Conducting Energy Audits

Thesis Proposal. Clemson University Advanced Material Research Laboratory Anderson, SC. David Anderson Mechanical Option. Photo by Fred Martin

Uniform Construction Code

ETTINGER ENGINEERING

Bridgewater State College. Energy and Water Conservation Project

CHILLED WATER SUB-ELEMENT Goal 1 To provide heating water and chilled water to satisfy the building demands to support the mission of the University.

Integration of Mechanical System Redesign. The New Learning Center Lutheran Theological Seminary at Philadelphia

2013 ENERGY REPORT MARK J. FERGUSON, P.E. CAMPUS ENERGY MANAGER 1125 GLEN AVENUE COLORADO SPRINGS, CO 80905

2017Annual Energy and Utilities Report

DESIGN & CONSTRUCTION SERVICES FOR K-12 FACILITIES

ENERGY AND WATER CONSERVATION AND DEMAND MANAGEMENT PLAN

SANTA ROSA JUNIOR COLLEGE

Georgetown University New Science Center

The Ed Roberts Campus

Residence Hall Retrofit: A Project to Reuse, Renew, Revive, Recycle, Recruit and Retain

School of Business Project # Overall Project Cost: $26,700, Architect: Urbahn. Scheduled Completion Date: 10/2014.

Mather Dunster Kitchen Case Study LEED-CI Silver August 2005

Winchester High School

FACILITY COMPONENTS - ELEMENTARY SCHOOL

Infrastructure Improvements Begin in the Classroom

2017 STRATEGIC ENERGY AND WATER ANNUAL REPORT

TABLE AND

New York State Contract Reporter

NEWMOA June 30, Fran Boucher LEED AP, Certified Energy Manager Senior Energy Engineer

New Jersey s Clean Energy Program

Deferred Maintenance Plan

design build at UCDAVIS Design- Build Institute of America WPR February 23, 2012 Luncheon

Changes to the Minnesota Commercial Energy Code. Presented by: Andy Thielen, PE

WARWICK TOWNSHIP Dept. of Planning & Zoning

FACILITIES UPDATE REPORT

ECO-AMBASSADORS SESSION #2. Medford Campus February 18, 2014

BUILDING PERMIT FEE SCEDULE

EADQUARTERS. Thesis Revised Proposal. Stephanie Kunkel Mechanical Option

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 18, 2016

Hinsdale Township High School District 86 Referendum Project Listing April 2, Approved

Control Systems Train-the-Trainer June 12-15, Commercial Food Equipment Maintenance June 19-21, 2018

Gerald R. Ford Museum

Laker Hall Program Study Intercollegiate Athletics. Preferred Concept & Project Phasing SUCF Project No

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED

M $336M .73 S/L/A/M CONSTRUCTION SERVICES BY THE NUMBERS A BETTER WAY TO BUILD. YEARS OF CONSTRUCTION SERVICES DESIGN-BUILD PROJECTS

45% 39% 17% 92% 100% All paints and adhesives are low VOC

Energy Assessment Report Clayville Elementary School DRAFT October George Washington Highway, Clayville, RI DRAFT

30% 85% 37% PROJECT HIGHLIGHTS LEED Facts. Lecture Hall BioLabs Building

1 1 - Your Master Source: o Mechanical o Electrical o Piping o Value o Integrity o Experience. PGA Mechanical Contractors Inc.

Minuteman Regional Vocational Technical School

sustainable teaching and research facilities

Building Condition Report. Building Condition

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance Consent ******************************************************************************

BOARD OF TRUSTEES OCTOBER 13, 2014

Program Update. Chino Health Science Parking Lot

Mission Critical Commissioning for Healthcare Facilities

Awarded Projects TBD Electric Vehicle Charging Station $ 114,554 TBD TBD Planning PO TBD

Lance Nichols Isaiah Patterson Nick Peterson Kyle Sala

Skidmore College Geo-thermal District Story

FIRM PHILOSOPHY. Energy Engineering Project Management

SUSTAINABILITY An Energy & Emissions Case Study

CONTRA COSTA COMMUNITY COLLEGE DISTRICT

It s easy being green

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX

Thesis Proposal for Berks Classroom and Lab Building

Facilities Services Newsletter Summer 2012

Auburn Facilities Energy Reduction Plan

Energy Efficiency Planning. June 30, 2009

Hawaii Energy Policy Forum and Energy Industries Energy by Example Audit Awards Status Report October 2006-November 2007

Green Star - Education v1

County of Ventura General Services Agency Maintenance Division Energy Action Plan April Policy

MODULE #5 MECHANICAL, ELECTRICAL, PLUMBING II

A Consulting Engineer s Perspective of the Geothermal Industry Geothermal Live Keith Horsley - Associate Hoare Lea Consulting Engineers

PROJECT HIGHLIGHTS 49% 74% 15% 51% 45% CLASS OF 1959 MEMORIAL CHAPEL HARVARD BUSINESS SCHOOL HARVARD UNIVERSITY

ABS Group of Companies. Thermal Energy Rejector.

Texas Tech University Energy Savings Program FY 2017 Update

MEP Team s Mechanical, Electrical and Plumbing (MEP) Design Projects

LUFacilities Policy Service Level Agreement v1.1

HVAC SYSTEM DESIGN PROCESS

Hotels: Water and Energy

Summary of Greening of State Government Executive Orders

Transcription:

Pine Tree Cottage Renovation Skidmore College Saratoga Springs, NY Complete HVAC, Plumbing and Fire Protection design for conversion of 19th century cottage into office space. Restoration of existing garage into office area. Palamountain Hall / Anthropology Department Renovations Renovation of existing classroom spaces into new state of the art Anthropology Lab with the latest in MEP technology. Solid state LED lighting throughout. Hall / Anthropology Department Renovations Renovation of existing classroom spaces into new state of the art Anthropology Lab with the latest in MEP technology. Solid state LED lighting throughout. President s Office Suite Reconstruction Renovation of existing office space into new President s Office suite. Design highlights included DDC temperature controls and solid state LED lighting. Waring House Renovation Renovation of existing 19th century mansion into mixed use office. Complete mechanical, electrical, plumbing and fire protection systems design. Foreign Language Department Renovation Renovation of existing classroom/office spaces in Palamountain Hall. Upgrades to existing MEP infrastructure to improve comfort and efficiency. Exercise Physiology Lab Renovation Renovation of existing racquetball courts into new state of the art laboratory space. Design included LED lighting and specialized ventilation systems. Lucy Scribner Library Design of the Mechanical and Electrical system for The Lucy Scribner Library. This project involved expansion and total renovation with new 20,000 sq. ft. additions at each end of the existing structure, and renovation of some 67,000 square feet of library space. Library new additions (4-story), extensive building reconstruction work included construction of new campus chiller plant building. Winner of a 1996 GBC Build New York Award. 646 Plank Road #104 Clifton Park, NY 12065 518.280.2410

Carbon Monoxide Detection - Campus Wide College of Saint Rose ALBANY, NY Upgrade of existing campus buildings to new CO detection standards. Centennial Hall Renovation of existing café area. Upgrade to existing water source heat pump HVAC system. Wellness Center Complete mechanical, electrical and plumbing design of renovation of existing residential property to College Wellness Center. Picotte Digital Photo Lab Renovation of existing photography studio into digital photo lab. Upgrade of building wide smoke damper systems. Security Office Renovation Addition and renovation to existing security building. 2 South Main Renovation Conversion of existing two-family house into student housing. Upgrade of all mechanical, electrical and life safety systems. President s House Provided new high-efficiency air conditioning system to President's residence. 646 Plank Road #104 Clifton Park, NY 12065 518.280.2410

Union College Schenectady, NY Renovation of Olin Science Center Complete HVAC renovation of Science Center including ventilation upgrades. Conversion to LED lighting systems. Visual Arts Renovation Upgrade of all mechanical and electrical systems to current standards. Coordination with campus facilities department to optimize new cogeneration system. State of the art ventilation and lighting systems. Rathskeller Renovations MEP design of renovated dining area following flood damage. Karp Hall Renovations Complete MEP design of renovated classroom building. Design highlights include heat recovery ventilation and dehumidification system, and energy efficient lighting. Student Housing Fire Protection Upgrades - Campus Wide Design of complete fire protection systems for (15) campus buildings. Coordination with college and city of Schenectady to upgrade student housing to current life safety standards. Wicker Wellness Center Design of electrical and plumbing systems for new state of the air healthcare facility. Coordination with mechanical design-build contractor. Webster Hall Boiler Replacement Replacement of original heating system with new high-efficiency boiler design. 646 Plank Road #104 Clifton Park, NY 12065 518.280.2410

Siena College Loudonville, NY Renovation of Hines Hall ITS Department / Security Suite MEP design for technology rich IT department renovation beneath existing chapel. Design of new standby generator system. New chilled water system design for entire facility. Renovation of Siena Hall Renovation of classroom and office space. MEP design includes 4-pipe fan coil system, DDC controls and energy efficient lighting. New Rosetti Hall - LEED Certification New three-story academic building for the Education, Social Work & Sociology departments, including geothermal HVAC design, photovoltaic solar panels and full solid state LED lighting. The building features classrooms complete with the latest in teaching technology, offices, seminar rooms, meeting rooms and collaborative learning spaces throughout. It will also have computer labs, a video editing suite and the Center for Urban Education. Pool Filter Room Renovation Mechanical design of new pool filtration system including; high efficiency filter, pool pump, variable frequency drive, automatic chemical feed system, pool heat exchanger, main drain diverter valve, water level control pool piping, stainless steel gutter grating and filter room ventilation system, power and lighting. New pool filter system is estimated to save 104,650 gallons of heated and chemically treated pool water a year. The new pumping system will also provide power savings allowing the owner to ramp down the pool pump motor speed during long periods of non use. J. Spencer & Patricia Standish Library New three floor library building with plumbing, sprinkler fire protection, HVAC, electrical systems and technology infrastructure. The building is equipped with flextube boilers and chilled water system with external cooling tower. Serra Dining Hall Boiler/Domestic HW Feasibility Study; Reviewed multiple options for boiler replacement in Serra Dining Hall. Foy Hall Reconstruction Designed new HVAC, Electrical and Plumbing systems for the renovation of the art teaching space in the lower level of Foy Hall. 646 Plank Road #104 Clifton Park, NY 12065 518.280.2410

Phase I - Energy Upgrades Community College of Rhode Island Warwick, RI Engineered Solutions performed design services for HVAC renovation work at the Knight Campus, Providence Campus and the Newport Campus. The design included reconstruction of the geothermal system at the Warwick Mega Structure. The project also included complete HVAC upgrade of the Field House including all HVAC and ventilation systems. Lincoln campus energy upgrades including a high efficiency condensing boiler system, domestic hot water conversion and control upgrades. Newport and Providence Campus Energy and Control upgrades. Phase II - Energy Upgrades Lincoln Campus High efficiency domestic water heating systems for Field House and Main Building. 646 Plank Road #104 Clifton Park, NY 12065 518.280.2410

Energy and Water Upgrades Roxbury Community College Roxbury Crossing, MA Implementation of campus wide geothermal heat pump system, conversion of existing water source heat pump to geothermal use. Lab area ventilation upgrade to current standards. Conversion of heating, ventilation and air conditioning systems in campus buildings to current efficiency standards. Upgrade of domestic hot water heating systems throughout campus. 646 Plank Road #104 Clifton Park, NY 12065 518.280.2410

Energy Performance Contract Rhode Island College Providence, RI Design and modernization of existing central steam heating plant. Design of steam/flue gas heat recovery and economizer system for central plant. Kitchen ventilation upgrade. Rooftop heating, ventilation and air conditioning units replacement. Campus wide digital controls upgrade. 646 Plank Road #104 Clifton Park, NY 12065 518.280.2410

New Science Center: Hudson Valley Community College Engineered Solutions was the communications engineer for the $47.4 Million, 100,000 square foot new Science Center, completed 2013. This new building consisted of (25) laboratories, (11) student classrooms, (45) faculty and staff offices, conference and computer lab spaces, a science study center and a greenhouse. The communications design included: A New Data Network Wireless Ethernet Network IP security System including Door Access Electronic Presentation System Troy, NY Marvin Library: Basement Emergency Lighting System Upgrades [2016] Higbee Hall: Complete MEP renovations to the Data Center in Higbee Hall [2014] Fitzgibbons Hall: First Floor Renovation Project [2015] Reconstruction and Alterations of Second & Third Floors [2014] 646 Plank Road #104 Clifton Park, NY 12065 518.280.2410

Cornell University Ithaca, NY Structured Cable Design for six (6) buildings on the University s main campus. The project included Lab Buildings, Lecture Halls, the Student Union and Computer Center. The Computer Center work included upgrades to the campus data center Suffolk County Community College Long Island, NY Energy Upgrades Engineering for $2 million of electrical power distribution and energy upgrades. Design support for installation of new high efficiency boilers and cooling towers. 646 Plank Road #104 Clifton Park, NY 12065 518.280.2410

Eric Sheffer of was the Principal-in-Charge of electric engineering for major mechanical, electrical and plumbing renovations to (3) dormitories on the SUNY Geneseo Campus. The buildings each consisted of (3), three-story pods. The renovations included power distribution and branch circuit replacements and additions, heating plant upgrades and toilet room renovations. State University at Geneseo Geneseo, NY Academic Building Addition State University at Binghamton Binghamton, NY Programming phase for communications, technology and A/V systems for a new 70,000 square foot Academic Building to be located in downtown Binghamton. Dining Hall Electrical design for expansion of main dining hall on SUNY Binghamton campus. 646 Plank Road #104 Clifton Park, NY 12065 518.280.2410

Electrical design for new four (4) story dormitory building, 2012 construction Adirondack Community College Gansevoort, NY Electrical design for site lighting and power distribution for new sports fields and courts Genesee Community College Genesee, NY Electrical design for site lighting and power distribution for new sports fields and courts. Purchase College Purchase, NY NCAA/USTA Farmingdale State College Electrical design for site lighting and power distribution for new sports fields and courts. Farmingdale, NY 646 Plank Road #104 Clifton Park, NY 12065 518.280.2410

Engineered Solutions has worked on multiple projects at the University of Rochester campus. ResNet and ResLife University of Rochester Rochester, NY ResNet and ResLife, which were structured cable plant for the University s Student Housing Division (19 Residence Halls). Cable plant and PBX design for multiple off-site medical office locations. Hutchinson Hall Designed modifications to the NMR and Mass Spectrometer Research Space, the Laminar Flow Hood Laboratory, the Monolayer Laboratory, the Confocal Microscope Room, the Plasma Mass Spectrometer Laboratory and the Laser Lab Room #220. Master plan for Electric and Plumbing upgrades Laboratory for Laser Energetics A 100,000-square-foot addition to the existing Laser Laboratory on the South Campus of the University of Rochester. 646 Plank Road #104 Clifton Park, NY 12065 518.280.2410

State University at Albany Albany, NY Engineered Solutions performed electrical consulting for a comprehensive study with detailed options to build a new Data Center for the State University of New York at Albany. Design criteria was to utilize existing warehouse space for the data center conversion. The Study was completed in October 2008. Eric Sheffer was Principal-in Charge for the renovation to the University Theater. State University at Canton Canton, NY State University Construction Fund Engineered Solutions performed design services for State University Construction Fund project included new network infrastructure for the campus. The project included work in (18) buildings and was completed in 2011. Payson Hall Renovations MEP design for renovation of existing office and classroom areas, completed 2006. State University at Brockport Brockport, NY Electrical design for power to site lighting. 646 Plank Road #104 Clifton Park, NY 12065 518.280.2410

Kearney Hall Renovations St. John Fisher College Rochester, NY Project included campus-wide voice, data and video underground cabling and manhole system audit for the entire campus and satellite buildings (total 20). Data Center Relocation Data center relocation project included full M/E/P design, comprehensive backbone fiber system modifications for 500+ strands of fiber supporting LAN/WAN, DCC and fire alarm systems. 646 Plank Road #104 Clifton Park, NY 12065 518.280.2410