New Castle County, DE. Floodplain Regulations

Similar documents
NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No.

Will County Site Development Permit Submittal Checklist TAB 1 PROJECT OVERVIEW

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

Chapter 105 Dam Safety and Waterway Management

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

COON CREEK WATERSHED DISTRICT PERMIT REVIEW

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Riparian Setback- What is that and what should I be doing? October 25th, 2016 Presented by: Anil Tangirala, PE, CFM, ENV SP

Municipal Stormwater Management Planning

KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

CCSD#1 Stormwater Standards

COON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot

Appendix A Stormwater Site Plan Report Short Form

Municipal Stormwater Ordinances Summary Table

Chapter 5: Water Quality Buffer Requirements

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

Holly Swartz and Jason Shirey

Background. Literature Review

Programmatic General Permit Army Corps of Engineers Connecticut Addendum

Attachment H: Engineering Documentation

CITY OF NEW WESTMINSTER. Bylaw No. 7033, 2005 RIPARIAN AREAS PROTECTION BYLAW

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

COON CREEK WATERSHED DISTRICT PERMIT REVIEW th Ave NE Ham Lake, MN 55304

Stormwater Local Design Manual For Houston County, Georgia

3.3 Acceptable Downstream Conditions

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

Local Stormwater Design Manual. City of Fairburn

Ordinance No Lot Surface Drainage

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228

Instructions for Notice of Ground Disturbance Form:

Warner Robins Stormwater Local Design Manual

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

Appendix B Stormwater Site Plan Submittal Requirements Checklist

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

I. Welcome & Introductions WPAC History (Paul Racette, PEC)

MODEL Stormwater Local Design Manual. City of Centerville

STATE ENVIRONMENTAL POLICY ACT MITIGATED DETERMINATION OF NONSIGNIFICANCE

BARTOW COUNTY RESIDENTIAL DRAINAGE PLAN or RDP

Stream Buffers Sharpest Tool in the SWM Toolbox Tom Hegemier, PE, D.WRE, CFM

ORDINANCE # 854. Stormwater Management / Operation and Maintenance Requirements

Innovative Stormwater Master Planning for the Town of Cary

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT

CRYSTAL LAKE FLOODING STUDY EXECUTIVE SUMMARY

Charter Township of Garfield Grand Traverse County

SECTION 11: REGULATORY FLOODWAYS

CONSTRUCTION PLAN CHECKLIST

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES

Suffolk Downs Redevelopment. Appendix G: Stormwater Management Supporting Documentation

Jason R. Vogel, Ph.D., P.E. Biosystems and Agricultural Engineering Oklahoma State University

Town of Hyde Park FLOOD DAMAGE PREVENTION CHAPTER 60

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION. GENERAL APPLICATION FORM (Please TYPE or PRINT CLEARLY all information)

Section 6: Stormwater Improvements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

Old Mill School Stream Restoration

Storm Water & Drainage Projects 2011 Program Update

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY

Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan

Cook County Watershed Management Ordinance. Public Review Draft June 24, 2013

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA

STORM DRAINS AND IRRIGATION

ODOT Floodplain Management. Jeffrey Syar, P.E., Administrator, Central Office,Hydraulic Engineering

Chapter 21 Stormwater Management Bylaw

RIPARIAN AREAS REGULATION

Drainage Criteria Manual Review

CHESAPEAKE BAY PRESERVATION AREA PROGRAM CHESAPEAKE BAY PRESERVATION AREAS

COON CREEK WATERSHED DISTRICT PERMIT REVIEW th Lane NE East Bethel, MN 55005

3F. Hydrology and Water Quality

Redevelopment Introduction

SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS

CITY OF SPRING HILL Water Quality Buffer Zone Policy (Adopted April 22, 2008)

Memo. To: From: cc: For further assistance please contact Ben Ruzowicz, GSWCC Technical Specialist at (706)

4. Present Activities and Roles

4.2 Cherry Creek & Stillhouse Branch

Resource Protection Areas: Nontidal Wetlands Guidance on the Chesapeake Bay Preservation Area Designation and Management Regulations June 18, 2007

Little Bear Brook Flood Hazard Assessment and Redevelopment Area Regional Stormwater Management Analysis. Progress Meeting

Lake Elmo, MN Code of Ordinances STORM WATER AND EROSION AND SEDIMENT CONTROL

STATE ENVIRONMENTAL POLICY ACT MITIGATED DETERMINATION OF NONSIGNIFICANCE

REGULATORY USE OF BROWARD COUNTY S FUTURE GROUNDWATER ELEVATION MAP

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1

TOWN OF SMYRNA Water Quality Buffer Zone Policy

Legal Description Part of the Southwest Quarter of the Southeast Quarter of Section 17, Decoria Township

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies

2. DEFINITIONS. American Association of State Highway and Transportation Officials.

PUTNAM COUNTY COMPREHENSIVE PLAN EXHIBIT DD INFRASTRUCTURE ELEMENT

Guidance on each of the 23 basic elements follows: Plan Index showing locations of required items: The plan index should include a list of the

MARION COUNTY COMPREHENSIVE PLAN 2035

Hydrology and Flooding

Municipal Separate Storm Sewer System (MS4) Permit and Program Ordinance Update. City of Fairmont March, 2018

Chapter 3 Dispersion BMPs

CHATHAM PARK EXCEPTIONAL DESIGN EVALUATION

DRAFT LOCATION HYDRAULIC REPORT

Transcription:

New Castle County, DE Floodplain Regulations John J. Gysling, PE CFM Department of Land Use New Castle County, DE February 26, 2009

Today s Presentation Floodplain Protection and Uses Terms and Definitions Site Design Examples Building and Floodplains

100% protected resource Netted out of base site area (not buildable land) UDC restricts uses in resource areas

Permitted: Field crops, orchards, pastures, ball fields, fishing areas, natural areas, trails

Limited: Nursery, golf courses, day camps, playgrounds, pools, courts (means they must comply with additional standards in Article 10)

Certain uses require an Environmental Impact Assessment e.g. public/private roads, bridges, essential access, fish hatchery, sewage and water treatment plants, stormwater management practices

EIA addresses: Site character Avoidance Minimization Mitigation Conservation Design

A variance may be sought from the Board of Adjustment after review by the environmental committee for any use not permitted by the UDC e.g. parking in the floodplain.

UDC defines floodplain, floodway, flood fringe and non-delineated floodplain. UDC requires a 50 foot minimum riparian buffer area adjacent to all floodplains and wetlands of certain size and 100 foot buffer from all streams.

Floodplain Flood fringe Floodway Nondelineated floodplain Riparian Buffer Areas

Floodplain A relatively flat or low-lying land area adjoining a river, stream or watercourse which is subject to periodic partial or complete inundation by water from any source during the base flood.

Stream CL Floodplain

Definitions Flood fringe Those portions of the Zone AE floodplain, outside of the floodway, subject to inundation by the 100 year recurrence interval flood or base flood and generally associated with standing or slowly moving water, rather than rapidly flowing water. Floodway The portion of the floodplain district required to carry and discharge the waters of the 100 year flood or base flood without increasing the water surface elevation at any point more than one (1) foot above existing conditions as demonstrated in a Flood Insurance Study.

Floodway and Flood Fringe Stream CL Floodfringe Floodway

Non-delineated floodplain Area subject to a 100 yr. flood: FEMA has not delineated a floodplain; Adjacent to a watercourse as identified by a blue line on the current USGS topographic maps of the County, Adjacent to a watercourse that is defined as a stream in the detailed maps of the NRCS NCC Soil Survey.

Riparian Buffer Area (RBA) An RBA consists of land which forms a transition zone between aquatic and terrestrial environments. RBA s include: 100 feet on either side of perennial or intermittent streams, lakes and tidal wetlands. All of the floodplain plus an additional 50 feet of adjacent land. All of a non-tidal wetland greater than 20000 sf in area plus and additional 50 feet of adjacent land. All of any size non-tidal wetland classified as a Piedmont Stream Valley Wetland.

Site Design Examples

FEMA Floodplain

Buildings and Floodplains

Permitted construction in floodplains: 1) Where approved as a Beneficial Use; 2) Replacement or substantial repair of an existing non-conforming structure.

Floodplain Development Permit Compliance with sections in Article 10 Beneficial Use application and Board of Adjustment hearing Typically used in coastal communities

Structure still must be elevated 18 inches above base flood elevation Applies to reconstruction and substantial repair and substantial improvement Can be expanded as long as footprint is not increased (i.e. second floor)

Criteria for Building in Floodplain No net fill Only areas below finished floor including basement to be used for parking, building access and storage may be wet flood proofed (one square inch per square foot) Wet flood proofing above the lowest floor is not permitted New and substantially improved non-residential buildings may be flood proofed (i.e. floodwalls and doors)

Criteria for Building in Floodplain (continued) All service utilities must be elevated or flood proofed in accordance with Chapter 6 of the New Castle County Code (Building Code). Any fill placed must be clean, compacted and stabilized to prevent erosion.

Finished floors (including basements) elevated 18 above base flood elevation No new lots within floodplain unless sufficient buildable area provided outside of the floodplain Provisions for redevelopment in floodplains for Brownfield.

No Adverse Impact New Castle County Perspective

New Castle County Drainage Code Citations (June, 1998) 12.04.001 Conveyance System Stipulations A. Any person who engages in land disturbing activity shall control the contribution of off-site runoff through the site by adequately sizing the conveyance system. On-site runoff shall be collected and an adequate conveyance system provided to transport the runoff to an existing watercourse or pipe system of adequate capacity to accommodate the peak rate of stormwater flow for the maximum design storm of the drainage area.

New Castle County Drainage Code Citations (June, 1998) 12.04.001 Conveyance Systems Stipulations (cont.) D. Conveyance systems shall outfall to a stormwater management facility or watercourse capable of accepting the design runoff.

New Castle County Drainage Code Citations (June, 1998) 12.04.001 Conveyance System Stipulations (cont.) F. The drainage system shall be designed so that parcels over which the surface waters are conveyed from the development site to existing watercourses or pipe systems are not adversely affected and that the developed property may continue to discharge runoff without offsite modification

Delaware Sediment and Stormwater Regulations (10/11/06) 10.3.1 It is the overall goal of the Department to utilize stormwater management as a means to minimize water quantity and water quality impacts due to land disturbing activities and to mimic pre-development hydrology, to the maximum extent practicable, in regards to the rate, volume and duration of flow.

Delaware Sediment and Stormwater Regulations (10/11/06) 10.3.4.4 In addition to the peak flow control design criteria contained in this Section, projects in the Mill Creek, Little Mill Creek, Red and White Clay Creeks, Persimmon Creek and Shellpot Creek watersheds shall demonstrate successful management of any increase in stormwater runoff from pre-development land use conditions. Successful management of increased stormwater volume shall include but not be limited to; recharge, infiltration and re-use where soils and site are applicable. For any increase in volume that cannot be recharged, infiltrated or re-used, volume management may be achieved by modifying the release rate for the increase in volume so as not to increase the flood elevation for all storms up to and including the 100 year return period.

Delaware Sediment and Stormwater Regulations (10/11/06) 10.3.8 Where ponds are the proposed method of control, the developer shall submit to the approving agency, when required, an analysis of the impacts of stormwater flows downstream in the watershed for the 100 year frequency storm event.

Delaware Sediment and Stormwater Regulations The Regulations are currently undergoing revision. The revisions will incorporate requirements to infiltrate the resource protection storm event (1 year storm) and further manage post-developed storm events to reduce impacts in watersheds.