CORPORATE QUALITY SYSTEM PROCEDURE

Similar documents
NON-CONFORMING MATERIAL

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

JOHN WOOD UNCONTROLLED COPY: THE JOHN WOOD COMPANY PO BOX HIGHLAND AVENUE OAKS, PENNSYLVANIA 19456

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

INS QA Programme Requirements

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

Appendix QI. Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items

FAA Conformity Inspection Checklist Form N/C 10JAN16

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

Quality Assurance Policy and Procedures

In case of of differences or inconsistencies with texts in the Main Contract, the stipulations in this Appendix I will prevail.

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

External Provider Quality Requirements QCS-001 Processing Sources

Flooring Contractor QA/QC Plan Sample Selected pages (not a complete plan)

Quality Manual ISO 9001:2000

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

ROTEK. IIInnInstI Instrument Corp. ISO 9001 Quality System Manual

How to Set Up a Quality Assurance System A Step by Step Guide to Quality Control Management System


Nonconforming Material System Procedure

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

DEC STD ISO Quality Systems - Model for Quality Assurance in Final Inspection and Test

Instructions for Supplier Survey

ZODIAC INTERCONNECT US ZODIAC AEROSYSTEMS SEGMENT ZODIAC INTERCONNECT DIVISION

QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008

ASA-100 QUALITY MANUAL

Supplier Quality Manual

SUPPLIER QUALITY SYSTEM SURVEY

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

Vendor Qualification Survey

Vendor Qualification Quality Audit Checklist

Quality Management System Manual

INSPECTION SYSTEM REQUIREMENTS

Approved Supplier Guidance

Supplier Quality Manual PREPARED AND MAINTAINED BY FIRESTONE INDUSTRIAL PRODUCTS COMPANY DIVISION OFFICE 250 W. 96 th Street INDIANAPOLIS, IN 46260

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES

Facilities Planning and Construction (FP&C)

QM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope

Quality Management System

Objective Evidence Record (OER)

Quality Assurance Program for CDA / Design-Build Projects with a Capital Maintenance Agreement with Three Optional 5-Year Terms.

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA

Mantor Aviation Company

FAA REPAIR STATION NO.: OGYR627Y

STATEMENT OF SPECIAL INSPECTION FORM

QUALITY OPERATIONS STANDARD

Quality Management System

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

I. In-Plant Quality Control Manual Specifics

Supplier Quality Manual

West Star Aviation 796 Heritage Way Walker Field Airport Grand Junction, Co 81506

SHELTON INDUSTRIAL PATTERN INC.

QUALITY ADMINISTRATIVE PROCEDURE

ELECTRONIC REPAIR STATION MANUAL

ISO 14001:2015 Gap Analysis Check Sheet

Quality Manual Revision: C Effective: 03/01/10

Webster - Hoff Corporation. Quality Manual

12. Inventory - Receiving & Shipping

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock

Page 1 / 11. Version 0 June 2014

Protocol for Third Party Validation of Manufacturer s Certification

APPENDIX B. PROJECT CONTRACTOR QUALITY CONTROL PLAN March 6, 2009

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

Copyright 2012 Aeronautical Repair Station Association

STATE OF SOUTH CAROLINA Employee Performance Management System

Supplier Requirements Retail Information Svcs LLC Fastener Division

Supplier Quality Agreement

Definitions contained in the above mentioned document and industry regulations are applicable herein.

Supplier Quality Manual

FIRST ARTICLE INSPECTIONS

Quality Manual ISO 9001:2015 Quality Management System

Plastics and Concepts of Connecticut Inc. Quality Manual

Supplier Quality Manual

Quality Clauses F Rev. I West Brooks Avenue North Las Vegas, NV Phone (702) Fax (702)

Number Control SQRM 1.0 Appendix N/A Date Issued. E-Location DocuShare / Internet Approval Manager Quality Assurance

VENDOR EVALUATION REPORT. Supplier Name: Type of Business: Manufacturer Service Distributor Other: Vendor Address:

4. SPLITTING QUANITITES OF DEFECTIVE MATERIAL IN CAMSTAR

EVANS CAPACITOR COMPANY

Required Elements of a Quality Management System

ISO 9001 QUALITY MANUAL

Bulk Metals Qualified Suppliers List for Distributors (QSLD) Criteria and Provisions

PRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK

CERTIFICATE OF REGISTRATION

ENVIRONMENTAL LABORATORY APPROVAL PROGRAM CERTIFICATION MANUAL DATE 5/06/08

Design-Builder Quality Control System Paul Moyer, P.E., Gill Engineering. July 17, 2011

ZOLL Document Number: 90E0004 Page 5 of 15 Maintenance of Quality Records

NUMBER STATE OF WASHINGTON DEPARTMENT OF CORRECTIONS PRISON/PRE-RELEASE/ DOC WORK RELEASE/FIELD SIGNATURE DATE EFFECTIVE DATE

BS EN ISO 9001 QUALITY ASSURANCE MANUAL

ALCO Plastics, Incorporated SUPPLIER QUALITY SYSTEM REQUIREMENTS MANUAL

2

Sections of the Standard. Evidence / Comments. (Y) / Nonconforming (NC)

Quality Assurance Manual

Clause "A" Subcontractor Controls, General Requirements (Applicable when Clause "A" is invoked in the Purchase Order "Remarks")

Definitions contained in the above mentioned Specifications and Industry Standards are applicable herein.

Quality Program For Inspection Organizations

ISTA Accreditation Standard for Seed Testing and Seed Sampling

DOT-FHWA QA/QC Plan Sample Selected pages (not a complete plan)

Materion AMTS Supplier Quality Manual

Document No.: INS Rev: B Origination Date: 10/30/2013

Limited Shelf Material Control Procedure

Transcription:

Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 1 of 10 Approvals Author Quality System Manager Name: Randy Bennett Doyle Cassity Signature: Date: 11/29/2011 11/29/2011 Electronic versions of this procedure are considered the latest revision and a Controlled Copy when viewed from the JVIC Corporate site. When printed, this procedure is considered an uncontrolled copy unless signed by the Corporate Quality System Manager or his Designee. Doyle Cassity Corporate Quality System Manager TABLE OF CONTENTS BULLET POINT AND FLOW CHART 1.0 SCOPE/FIELD OF APPLICATION 2.0 REFERENCES 3.0 RESPONSIBILITIES 4.0 DEFINITIONS 5.0 6.0 REPORTS/RECORDKEEPING 7.0 FORMS AND ATTACHMENTS 8.0 RECORD OF REVISION

Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 2 of 10 BULLET POINT AND FLOW CHART Important Questions Is an NCR Required? Assign a unique number and notes in an NCR Log Recommended a disposition, review with the Client, AI, and JVIC Has the client accepted the disposition and plan? Was the Item corrected, Scrapped or Returned to Vendor Place the NCR in the project file and send copies to the Area QC Manager and Corporate Office

Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 3 of 10 Flow Chart

Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 4 of 10 1.0 SCOPE/FIELD OF APPLICATION 1.1 Scope This procedure applies to all quality activities performed by JV Industrial Companies, Ltd. (Corporate) in support of all projects. Non-conformances identified as a result of quality activities. 1.2 Field of Application This procedure applies to all quality activities performed by JV Industrial Companies, Ltd.(Corporate) in support of all projects when required, unless directed otherwise by client specifications, contract obligations or the JVIC Quality Department. 2.0 REFERENCES JVIC Quality Manual JVIC Quality Control Manual (Code Work) 3.0 RESPONSIBILITIES This procedure is approved by the JVIC Quality System Manager. All Quality personnel shall follow this procedure. 4.0 DEFINITIONS 4.1 Non-conformance A condition or action in which specified requirements for quality have not been met. A deficiency in characteristic, procedure or documentation that renders the quality of an item, service or process to be unacceptable or indeterminate. 4.2 Repair The process of restoring a non-conforming characteristic to a condition such that the capability of an item to function reliably and safely is unimpaired, although that item still may not conform to the original specified requirements. 4.3 Rework The process of restoring a non-conforming characteristic to a condition such that the item conforms, without exception, to the originally specified requirements. 4.4 Use-as-is A disposition which may be imposed for a non-conformance when it can be established that the

Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 5 of 10 discrepancy will result in no adverse conditions and that the item under consideration will continue to meet all engineering functional requirements including performance, maintainability, fit and safety. 4.5 Scrap/Return to Vendor A condition which may be imposed on a non-conformance when the item cannot be made to meet all engineering functional requirements, such as performance, maintainability, fit and safety or it is not feasible. 5.0 5.1 The JVIC Supervising Inspector or his/her designee will be expected to document all nonconformances detected by QC or other project groups. 5.2 The Non-conforming item shall be tagged with a Do Not Use tag and placed in a Hold Area until a final disposition can be carried out. 5.3 The Supervising Inspector will assign a unique NCR number and record it in a project NCR log (Exhibit # 2) the unique NCR number should be the job number plus NCR 001, 002, etc. Example: 104000 NCR-001 5.4 The JVIC Supervising Inspector or his/her designee will be expected to fill out the Nonconformance Report (Exhibit 1). 5.5 All data blanks/fields are to be completed or marked N/A, if not applicable. Ex: 104000 NCR-001 5.6 The recommended disposition should be approved by the Client and/or AI (if required). Their approval is documented by signature on the Non-conformance Report. 5.7 Disagreements with regard to the applicability or suitability of proposed dispositions will be referred to the JVIC Area Quality Manager. 5.8 Once the final disposition is carried out, the JVIC Supervising Inspector or designee will verify that the disposition has been completed and then fill in the NCR Closure Date on the Nonconformance Report. 5.9 A signature from the client and AI (if required) should be obtained indicating approval of NCR Closure. 5.10 A copy of the completed form will be sent to the Client representative and a copy will be sent to the JVIC Area QC Manager. The original will be put in the project QC file as applicable.

Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 6 of 10 6.0 REPORTS/RECORDKEEPING 6.1 The JVIC Supervising inspector or designee, files and maintains in suitable files (hard copies or electronically) Non-conformance Reports for turnover to the Project and the JVIC Area QC Manager and Corporate Quality office. 6.2 Record forms may be modified or revised without revision to this procedure. 7.0 FORMS AND ATTACHMENTS 7.1 Exhibit 1 Non-conformance Report 7.2 Exhibit 2 NCR Log

Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 7 of 10 EXHIBIT 1

Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 8 of 10

Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 9 of 10 EXHIBIT 2

Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 10 of 10 8.0 RECORD OF REVISION Revision Date Description 0 02/24/2005 Initial Issue 1 06/21/2005 Revised NCR Form and Text 2 06/17/2008 Revised NCR Form and Text, Changed Title 3 01/26/2009 Changed Format, added revised form Added Bullet Points, Flow Chart and Changed Responsibilities 4 04/05/2010 5 07/01/2010 Format Change, and added revised forms JVIC form# 2.7.8 and 2.7.18 6 11/29/2011 Revised sections 5.3 and 5.5, changed unique NCR number requirements.