Chapter 4 Bridge Program Drawings

Similar documents
Barriers, Parapets, and Railings

ROADSIDE SAFETY BARRIER ELEMENTS Module 3

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

PARAPET STANDARD & SPECIFICATION UPDATES

JULY 2016 LRFD BRIDGE DESIGN 11-1

AUGUST 2016 LRFD BRIDGE DESIGN 3-1

Product Manual REACT 350 (36") (3 foot [915 mm] wide Systems) Reusable Energy Absorbing Crash Terminal

LRFD BRIDGE MANUAL PART II: STANDARD DETAILS CONVENTIONAL CONSTRUCTION DRAWING NUMBER, DESCRIPTION, DATE OF ISSUE

NOTES ON THE SPECIFICATION FOR ROAD SAFETY BARRIER SYSTEMS

Design and Rating of Steel Bridges

Product Manual Release 05/17

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT

ArmorZone TL-2 Barrier and End Treatment

RAIL SYSTEMS FOR TIMBER DECKS

Short Span Steel Bridges

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

Crash-Tested Bridge Railings for Timber Bridges

Hamilton Rapid Transit Preliminary Design and Feasibility Study

D D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4" x 4" x 3/8" Brace. C8 x 4.25 Strut. WT9 x 17.5.

Roadside Design Guide. Update from the Technical Committee on Roadside Safety Chris Poole, Iowa DOT

Nu-Guard 31. Roadside and Median Guardrail System. MASH TL-3 & NCHRP TL-4 Product & Installation Manual

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES. Engineering Manual Preamble

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

Flexbeam Guardrail Roadside Safety Barrier

Chapter URBAN & RURAL FREEWAY DESIGN

Design studies of the Castle Bridge over Wislok River in Rzeszow with application of CAD System

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

JULY 2014 LRFD BRIDGE DESIGN 5-1

MIDAS Training Series

SECTION DECORATIVE METAL AND GLASS RAILING

500 Interchange Design

NOVEMBER 2017 LRFD BRIDGE DESIGN 14-1

Section 9 Guidelines for the Selection and Design of Crash Cushions

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS

P: F: Resi-Ply FORMING SYSTEM BY DAYTON SUPERIOR

PENNDOT e-notification

Bridge Replacement Study (Phase 1)

TRANSVERSE SECTION TABLE OF CONTENTS CHAPTER 9

PREFABRICATED STEEL TRUSS SPECIFICATIONS

Specifying a Vehicular Prefabricated Steel Truss Bridge

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION


EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

AASHTO- Load and Resistance Factor Design (LRFD) Railings. V 1.2 Rev

APPENDIX A GUIDELINES FOR THE USE OF BARRIER/CHANNELIZING DEVICES IN WORK ZONES INTRODUCTION

I-94/I-69 Interchange Bridge Construction

ATHABASCA RIVER BRIDGE REHABILITATION PROJECT

Designing Bridges for Inspectability

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

TL-2 Plastic Water Filled Barrier

Introduction to Decks and Deck Systems

2017 Highway Safety Improvement Program Call

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

CITY OF FARGO SPECIFICATIONS SIGNING

Smarter. Safer. Leaner.

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

Sponsored by the Iowa Department of Transportation and the Iowa Highway Research Board Iowa DOT Project HR-393 JUNE 1998 CTRE

American Metal Specialties, Inc.

RAILING DESIGN FOR NEW TRUSS BRIDGES. Texas Transportation Institute The Texas A&M University System College Station, Texas

Maine Turnpike Authority

LOCATION AND DESIGN DIVISION

Introduction to Structural Analysis TYPES OF STRUCTURES LOADS AND

Newton Group CANADACAR SYSTEM. Basic Construction of the CANADACAR System. CANADACAR Module Format

I-91 Viaduct Public Information Briefing

CASE STUDY. Amish Sawmill Bridge: An Innovative Steel Solution for Short Span Bridge Design

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

Sheikh et al. 1 PINNED-DOWN TEMPORARY CONCRETE BARRIER WITH TRANSITION SYSTEMS FOR LIMITED-SPACE WORK ZONE APPLICATIONS

Constructing Fixed Span Bridges From Floating Equipment

New Troja Bridge in Prague Structural Solution of Steel Parts

Code Compliance Research Report CCRR-0194

STATE AID GUIDE FOR: Updated: December 16, 2005

THE EUROPE BRIDGE, IN PORTUGAL: THE CONCEPT AND STRUCTURAL DESIGN

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER

1. Cast-in-place concrete is specified in Section

Bridge Manual - Part I - June CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE

The Europe Bridge in Portugal: concept and structural design

District Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016

Bijan Khaleghi, Ph, D. P.E., S.E.

Aluminum Beam Gang System

Section 1 OBC FADS /13 Access to Parking Areas

INDUSTRIAL GUARDRAIL SYSTEMS

Service life extension of existing precast concrete girders

600 Roadside Design. Table of Contents

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE

xiii Preface to the Fifth Edition Preface to the Second Edition Factors for Conversion to SI Units of

GlasGrid Asphalt Pavement Reinforcement. October 21, 2016

Accelerated and Innovative Bridge Construction In Washington State

Transcription:

Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles within the bridge roadway and protect vehicle occupants and pedestrians. Railing Types WYOMING TUBE-TYPE bridge railing is a two structural tube configuration with posts comprised of two plates. Two types of Wyoming tube-type bridge railing can be used on projects. The standard, or most commonly used railing, is designated as TL-3. This railing uses two HSS 6 x 2 x ¼ for the longitudinal rail sections. The TL-3 railing can be used on all city, county, state, primary, and Interstate highways. The second railing type is designated as TL-4. This railing uses a HSS 6 x 4 x ¼ and a HSS 6 x 3 x ¼ as the longitudinal rail sections. The TL-4 also incorporates a thicker plate for the post than the TL-3 railing. The TL-4 railing should be used on new construction, widenings, and rehabilitations (where the post anchorage can be placed in the deck) on Interstate 80, Interstate 25 between Cheyenne and the Colorado State line, urban areas, and at other locations where the truck volumes are a large percentage of the traffic. On new construction, the top rail is 2'-5" or 2'-8⅝" above the deck with posts mounted on 6 thick curbs or sidewalks for the TL-3 and TL-4 railings respectively. The following table lists the maximum and minimum top rail height above the wearing surface for rehabilitations. The table is based on a minimum curb height of 4" and a maximum of 9". Top Rail Height Above Wearing Surface Railing Minimum Maximum TL-3 2'-3" 2'-8" TL-4 2'-6⅝" 2'-11⅝" Both the TL-3 and TL-4 railing are FHWA crash tested. Any modifications to the railing, post, post base plate, or anchorages must be approved by the State Bridge Engineer. 4.10-1

Splash boards on bridges over railroads will be used only when requested by the railroad and approved by the State Bridge Engineer. Concrete BRIDGE BARRIER RAIL (New Jersey Barrier Rail) is a standard reinforced concrete barrier detailed on the Slab Details, Approach Slab Details, and any relevant Abutment Details. Bridge Barrier Rail Transition Details are to be used for the connection to the approach railing. Terminal Types The following terminal types will be used based on the approach railing the Project Development Program provides in conjunction with the Engineer's Recommendations. TERMINAL TYPE 1 connects bridge railing to an upper HSS 6 x 6 x 3 16 rail and a lower HSS 6 x 2 x ¼ rub-rail box beam approach railing combination. This terminal type may be used at entrance ends of interstate bridges or all four corners (usually) of primary and secondary bridges. TERMINAL TYPE 2 connects bridge railing to a HSS 6 x 6 x 3 16 or a HSS 8 x 6 x ¼ box beam approach railing. This terminal type is used only on exit ends of Interstate bridges when box beam guardrail is connecting the bridge railing. TERMINAL TYPE 3 connects bridge railing to corrugated beam approach railing or is used when no end connection is required. This terminal type may be used on secondary, county, and urban 4.10-2

bridges, and on Interstate bridges where traffic cross-overs and no permanent approach railing are required. TERMINAL TYPE 4 shall be used when railing turn-down terminates on the bridge or approach slabs. This terminal type should only be used when the design speed is less than 35 mph. TERMINAL TYPE 5 shall be utilized when railing turn-down terminates off the bridge or approach slabs. This terminal type should only be used when the design speed is less than 35 mph. When a railing turn-down terminates on bridge or approach slab, modification of concrete depth and/or reinforcing steel location may be required. Rail Splices EXPANSION SPLICES refer to the expansion joints placed in the railing, in the span between railing posts, that crosses over the bridge expansion joints. The standard expansion splice is designed to take up to 2¾" movement in each direction. The engineer must check the adequacy of this splice to handle required movement. STANDARD SPLICES are designed to take up to ½" movement in each direction, but are not to be used as expansion splices. DOUBLE BOLTED SPLICES are used when an individual rail is not continuous over a minimum of two posts. General Design and Detail Information Post locations for tube-type railing are governed by a MAXIMUM AND MINIMUM POST SPACING, the location of expansion devices and curb/sidewalk CONTRACTION JOINTS, and the MINIMUM CONCRETE COVER to post anchorages. Maximum Post Spacing: 9'-3" (Use 1" increments for post spacing when possible.) Minimum Post Spacing: 7'-0" Minimum Concrete Cover at end of slab and approach slab, cold joints, and expansion joints: 6" (This is not applicable at curb/sidewalk contraction joints on bridges with continuous decks.) The anchor bolt length will need to be verified for approach slabs with asphalt overlays. RAILING POST BASE PLATES must lie flat against concrete 4.10-3

over the entire length. Base plates may not have any portion of the plate extend onto or lie across curb/sidewalk contraction joints. On curved bridge decks, the bridge railing lengths shall be shown along the front face of the railing. Radius to the railing shall be shown to the inside of the curve. TERMINAL CANTILEVER past the centerline of end post for Terminal Types I through 3 shall be 2'-0" for all Wyoming tubetype railing. Distance from end post to end of curb/sidewalk is recommended to be 2'-0", minor variations up to 3" will be acceptable. Bridge barrier rail shall be made continuous, except for locations at bridge deck expansion joints, bents, and piers. At expansion joints, the railing shall match the end of the front face of abutment and/or the ends of the concrete deck. At bents and piers, a barrier rail CONTRACTION JOINT shall be used as shown below. For spans greater than or equal to 50, contraction joints shall be provided for shrinkage and shall be spaced at 25'-0" maximum. Reinforcing steel will be continuous through these joints 4.10-4

Standard Sheets Cells Name TL3_BR1 TL3_BR2 TL3_BR3 TL3_BR4 TL4_BR1 TL4_BR2 TL4_BR3 Name BOLTRP WBL1A Description Wyoming tube-type TL-3 bridge railing. Details of post on curb/sidewalk, anchorage, rail bolt, and sleeves. Bridge railing plan to be drawn on this sheet. Wyoming tube-type TL-3 bridge railing. Details of Terminal Types 1 through 3 and splices. Wyoming tube-type TL-3 bridge railing using turn-down Terminal Type 4. Details of terminal, end anchorage, and splices. Wyoming tube-type TL-3 bridge railing utilizing turn-down Terminal Type 5. Details of terminal, end anchorage, splices, and Bill of Reinforcement. Details of post on curb/sidewalk, anchorage, and rail bolt. Bridge railing plan to be drawn on this sheet. Details of Terminal Types 1 through 3. Details of splices. Description Rail Mod Repair Bolt Railing Weld AWS B-L1a 4.10-5