INCLUDE IN ALL PAVING PROJECTS UNLESS OTHERWISE DIRECTED BY TSB

Similar documents
603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

Pay Schedule for Ride Quality

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

Prepaving Conferences

Evaluation of Smoothness of Louisiana Pavements Based on International Roughness Index and Ride Number

ASTM Definition of Roughness

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

IGGA Guide Specification: Conventional Diamond Grinding for Pavement Preservation Introduction

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

Ohio Department of Transportation

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction

Regional Engineers. Jack A. Elston

PAVEMENT CONSTRUCTION QA PROCEDURES RIDEABILITY TESTING CONSTRUCTION PRACTICE

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS.

Annexure PSTS31.1 Heavy Duty Dense Graded Asphalt

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

NYSDOT TRANSPORTATION MAINTENANCE DIVISION PAVING PROJECT QUALITY ASSURANCE ASSESSMENT Rating Guidelines (Revision #1)

Mix Design & Construction -1-

39 HOT MIX ASPHALT, SUPERPAVE

53.20 PAINTED ROADWAY LINES

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

500 Interchange Design

Best Practices. Dennis Clausen Director of Training GOMACO Corporation

4-07 Asphalt Treated Permeable Base (ATPB)

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

550 Surface Treatments

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING

Cement Stabilized Soil (CSS) (Portland cement)

UNDERSTANDING PMIS: RIDE, PATCHING, AND OTHER FACTORS. Darlene C. Goehl, P.E. Dist. Pavement-Materials Engr. TxDOT - BRY

Review of Cold In-Place Recycling: Environmental, Economical, and Performance Analysis

SECTION BITUMINOUS CONCRETE PAVEMENT

Pavement Management Systems

AMENDMENTS TO OPSS 914 (SEPT 88) CONSTRUCTION SPECIFICATION FOR WATERPROOFING BRIDGE DECKS ASPHALTIC MEMBRANE 1

Special Provision for Hot-Mix Asphalt Prime Coat

SUPERPAVE ASPHALT CONCRETE END PRODUCT SPECIFICATION (EPS)

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

HOT MIX ASPHALT PAVEMENT

AMENDMENTS Manual of STANDARD SPECIFICATIONS. Adopted by Standard Specifications Committee. Amendment. No. 4. Published by

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

TEMPORARILY SUSPENDED

Accessibility for Ontarians with Disabilities Act (AODA), 2005

MIDLAND COUNTY ROAD COMMISSION

Nova Scotia 2009 Pavement Preservation. Jim Chisholm Highway Construction Services

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

CITY OF ATLANTIC BEACH BID NUMBER PURCHASING DEPARTMENT 800 SEMINOLE ROAD ATLANTIC BEACH, FLORIDA (904)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR QUALITY CONTROL AND ACCEPTANCE OF PORTLAND CEMENT CONCRETE

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier

BID # REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER

LOCATION AND DESIGN DIVISION

SPECIFICATION FOR NOISE MITIGATION

SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK MATERIAL REQUIREMENTS CONSTRUCTION AND INSTALLATION REQUIREMENTS...

SERIES 1100 KERBS, FOOTWAYS AND PAVED AREAS

AMERICA RIDES ON US KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS

EXPANDED POLYSTYRENE (EPS GEOFOAM) EMBANKMENT DIVISION 31 EARTHWORK

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

NCAT PAVEMENT TEST TRACK

PAVING SLABS ON A CONCRETE BASE

Section 504. MICRO-SURFACING

Estimating Concrete Strength by the Maturity Method

Issues in Pavement Smoothness:

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

PERMEABLE INTERLOCKING PAVERS

Design-Builder Quality Control System Paul Moyer, P.E., Gill Engineering. July 17, 2011

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

ROOF BALLAST MATERIALS ARCHITECTURAL CONCRETE PAVING SLABS SRS LEVELING BLOCK SYSTEM INSTALLATION PART GENERAL 1.

CW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Item 20 ASPHALT PAVEMENT MATERIALS

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION

INSPECTION SYSTEM REQUIREMENTS

Scoping & Design Project Level. By Robert J. Blight Principal Engineer Pavement Management & Technology

ITEM 25 CHIP SEAL MATERIALS 2 A. Non-Polymer Modified Asphalt Emulsion (Fog Seal) 2 B. Polymer Modified Asphalt Emulsion Binder 2

INDOT/ACPA Technical Committee 2009 Specification Revisions 2009 Test Method Revisions Studies

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

SECTION 616 TEMPORARY TRAFFIC CONTROL

Maintenance & Rehabilitation. Treatments. Crack Sealing. Sealant Types. Asphalt Pavement Preservation: Identification of Alternative Treatments

ROAD MAINTENANCE MANAGEMENT SYSTEMS IMPLEMENTATION OF THE ROAD MENTOR 4 SYSTEM IN THE CENTRAL ZONE

REQUEST FOR PROPOSAL Asphalt & Concrete Repair

TRANSPORTATION & PUBLIC WORKS DEPARTMENT TECHNICAL STANDARDS

Curb Ramps [ 4.7.3] [ 4.7.2; 4.8.2; 4.1.6(3)(a)] [ 4.3.7] ADA Accessibility Survey Instructions Curb Ramps Page 1 of 6

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

Bituminous Concrete Base Course (Type HB, Black Base, B-25.0, and B-37.5)

INTELLIGENT CONSTRUCTION

1. Evolution of Screeds in the USA A. Fixed Screeds with Hydraulic Strike-off, Becoming Obsolete B. Rear Mount Screeds with & without strikeoff C. Fro

Performance Floors for Warehouses and Distribution Centres. Kevin Dare, Managing Director, Face Consultants Ltd.

Successful Implementation of Warm Mix Asphalt in Ontario

A. Product Data shall be provided for each type of product indicated.

DOT-FHWA QA/QC Plan Sample Selected pages (not a complete plan)

INVITATION TO BID ON TOWN PAVING PROJECTS

Flexbeam Guardrail Roadside Safety Barrier

Transportation Management

Transcription:

1.1 TESTING AND EVALUATION OF FINISHED PAVEMENT SURFACE SMOOTHNESS USING INTERNATIONAL ROUGHNESS INDEX (IRI) CRITERIA 1.1.1 General Contrary to the requirements of Specification 3.50, Asphalt Concrete Pavement - EPS, of the Standard Specifications for Highway Construction, testing and evaluation of the finished pavement surface for smoothness shall be carried out using International Roughness Index (IRI) criteria. Using a high speed Inertial Profiler (IP), the Contractor shall carry out this work in accordance with the following Provisions and as directed by the Consultant. Smoothness testing shall be carried out by firms which are currently pre-qualified by the Department in the category of QA Pavement Smoothness - Inertial Profiler. Unless previously approved by the Consultant, smoothness testing shall be carried out only in the presence of the Consultant at a mutually agreed upon schedule. Smoothness tests carried out without the Consultant present shall be re-done by the Contractor at his expense. The smoothness evaluation shall consist of an assessment for Ride Quality and an assessment for Areas of Localized Roughness (ALR). The Contractor shall use the most recent version of the FHWA Profile Viewing and Analysis software program (ProVAL) to conduct a profile analysis to determine Ride Quality and ALR. The ProVAL software and user's guide are downloadable, free of charge, from www.roadprofile.com. IRI values shall be reported in units of m/km and expressed to the nearest 0.01 m/km using conventional rounding procedures. The Ride Quality assessment shall be on a 0.1 km sublot basis and shall use the Mean IRI (MIRI) as being the average of the left and right wheel path IRI values. The Ride Quality module in ProVAL is located within the Analysis tab. Assessment for ALR will be completed using the short continuous analysis within the Smoothness Assurance module of ProVAL. Analysis will involve a continuous IRI calculation in the right wheel path only using a moving base-length of 7.62 m. 1.1.2 Equipment Requirements The high speed IP shall meet the requirements of ASTM E 950 Class I equipment, and shall be calibrated to the Manufacturer's recommendations. Prior to being used on each project, the horizontal and vertical calibrations for the equipment shall be verified using the Manufacturer's recommended procedures. Documented verification shall be provided to the Consultant upon

request. IP equipment shall be capable of measuring the profiles of two wheel paths simultaneously during a single pass, at a minimum sampling frequency of 16 khz. The sampling interval shall be less than or equal to 25.4 mm, and the accelerometer shall have a minimum range of " 2.5 g. The spacing between laser sensors shall be 1.75 m. The high speed IP shall contain an automated triggering system capable of detecting reference marks to start, stop and event mark the data collection process. Profiler equipment shall include an onboard computer system capable of storing all profiler measurement data, calculating the real time International Roughness Index as per ASTM E1926, and displaying profile plots. The equipment shall be capable of exporting raw profile data in unfiltered electronic Pavement Profile File standard (.ppf) format. 1.1.3 Areas Excluded for Assessment or Testing 1.1.3.1 General Inertial profiler testing and smoothness assessment shall be carried out on all main alignment lanes, interchange ramps, passing, climbing, deceleration and acceleration lanes subject to the following exclusions. 1.1.3.2 Excluded Assessment Areas The following main alignment lanes and interchange ramps shall be tested, profile analyzed and assessed for ALR but are excluded from Ride Quality assessment: - Pavements with a posted speed limit of less than 70 km/h. The following main alignment lanes shall be tested and profile analyzed but are excluded from bonus/penalty assessments for Ride Quality and ALR: - Portions of pavement which are within 10 m of obstructions such as manholes, water valves or other embedded hardware. - Pavements that are within an approach distance of 15 m from the junction between pavement and bridge decks, bridge approach panels and railway tracks, or 30 m after leaving in the direction of travel. - Horizontal curves with a radius of less than 340 m. - Portions of pavement where testing was undertaken at speeds of less than 20 km/h due to the inertial profiler starting from or coming to a Stop sign condition. - (Identify other areas of exclusion, if applicable) Delete Bullet if N/A Areas of Localized Roughness excluded from bonus/penalty assessments may be subject to remedial work at the discretion of the Consultant.

1.1.3.3 Excluded Testing Areas The following lanes are excluded from profile testing: - Ramps; and acceleration and deceleration lanes less than 300 m in length. - Loops, turn lanes, storage lanes, tapers and median crossovers. - Pavements with a posted speed limit of less than 60 km/h. Areas excluded from profile testing may be evaluated by the Consultant using a 3.0 m straightedge placed in any direction and at any location within the travel lane. Pavement surfaces shall show no variation greater than 6.0 mm from the edge of the 3.0 m straightedge, excluding deviations due to crown breaks at locations shown on the Drawings. 1.1.3.4 Sublot Adjustment Sublots that are less than 100 m but greater than 50 m in length, will be assessed for Ride Quality on a pro-rated basis. Sublots that are 50 m or less in length will not be assessed for Ride Quality but will be assessed for ALR. 1.1.4 Pavement Surface Testing The Contractor shall remove all objects and foreign material on the pavement surface by hand or power brooming, as necessary, prior to smoothness testing. Prior to testing, the Contractor shall obtain the kilometre limits for testing, including limits for the excluded testing and assessment areas as described herein, from the Consultant. The profiler operator shall operate the IP within the optimum speed range as recommended by the Manufacturer. The IP shall be operated in the direction of traffic only. Longitudinal profiles shall be measured within the left and right wheel paths of the lane. Each lane shall be tested and evaluated separately. Each pass shall be carried out in an uninterrupted, continuous run; and shall include areas excluded for smoothness assessment. Notwithstanding this requirement, the Contractor may test portions of the work completed prior to the full project completion. The profiler operator will be permitted to make up to three individual passes, and will be allowed to choose which single pass is submitted and used for smoothness acceptance and assessment purposes. Sublots and the assessment for Ride Quality and ALR shall begin 10 m onto the new ACP and end 10 m before the end of the new ACP. Sublots or ALR identified as reject shall be jointly inspected by the Consultant and Contractor prior to undertaking remedial work.

Smoothness testing and profile analysis of intermediate lifts will not be required, but may be completed by the Contractor if desired. Payment assessments for sublot Ride Quality and ALR will not apply to intermediate lifts. No payment will be made for smoothness testing of intermediate lifts carried out by the Contractor. 1.1.5 Report Submission Requirements 1.1.5.1 Day of Profiling The Contractor shall submit the following to the Consultant on the day of profiling: - A printout containing the inertial profiler's settings. - IRI values for each wheel path on a sublot basis. - An electronic copy of the raw unfiltered profile data in.ppf or.erd format. Hard copy documentation noted above shall be signed by the IP operator. 1.1.5.2 ProVAL Summary Reports The Contractor shall submit ProVAL summary reports in.pdf format for each lane indicating the results of the Ride Quality and Smoothness Assurance analyses to the Consultant within five days of initial profiling, and after re-profiling following corrective repairs where required. Units of measure to be used within ProVAL shall be mm for elevation and kilometres for distance. Testing and report stationing shall match the Alberta Transportation linear reference system. The inputs for the Ride Quality analyses shall include the Fixed Interval option with a base line length of 100 m (0.1 km) and shall include both wheel paths. All analyses shall apply the 250 mm filter. The Ride Quality report shall be generated in.pdf format by the ProVAL software. The Contractor shall indentify ALR using the Smoothness Assurance analysis by calculating the IRI with a continuous short interval of 7.62 m using the right wheel path profile with the 250 mm filter selected and an IRI limiting value of 2.75 m/km. A Continuous Short Interval report shall be provided for each lane listing the km limits and length for all ALR in excess of the limiting IRI. Portions of ALR which are to be excluded from assessment as noted herein shall be reported, but clearly identified as being excluded areas. If no remedial work is identified by the Consultant, then this submission will be considered the Final ProVAL Report and the Contractor shall then submit the completed smoothness summary spreadsheet as outlined in the Smoothness Summary Spreadsheet Subsection. Profiler re-testing shall be completed following repairs for rejected sublots or corrective work done on ALR. The Contractor shall submit the final ProVAL reports for Ride Quality and Smoothness Assurance, as applicable, and the Smoothness Summary Spreadsheet to the Consultant within five days of completing the repairs. An electronic copy of the raw unfiltered profile data shall also be provided for the re-tested areas.

1.1.5.3 Smoothness Summary Spreadsheet The Contractor shall provide Ride Quality and ALR data in EXCEL format spreadsheets provided by the Department for the purpose of determining bonus/penalty assessments. The header information shall include the following as a minimum: - Contract number. - Highway number and control section. - Contractor name. - IP operator - Smoothness testing firm name. - Lane number and direction. IRI data for Ride Quality shall be reported for each wheel path on a 0.1 km basis. Sublots and ALR which are to be excluded for assessment shall be identified as such in the Excluded Areas column, with remarks provided in the Comments section detailing the reason(s) for exclusion. 1.1.6 Inspection and Repairs for Rejected Work The pavement limits for ALR, as identified in the ProVAL reports, may be marked in the field by the Contractor. Prior to undertaking repairs, the ALR and sublots indentified as reject for Ride Quality may be jointly inspected by the Consultant and the Contractor. Sublots identified as reject and/or Individual sites of ALR may be accepted by the Consultant at his discretion after driving these areas to evaluate the ride. When repairs for rejected sublots and ALR are required, they shall be in accordance with Subsection 3.50.6.2, End Product Acceptance, of Standard Specification 3.50, Asphalt Concrete Pavement - EPS. Upon approval by the Consultant, corrective work may be carried out using a surface diamond grinding device consisting of multiple diamond blades. When directed by the Consultant, pavement surfaces that have been diamond ground shall be fog coated. All costs associated with the supply and application of fog coat, if required, will be considered incidental to the Work, and no separate or additional payment will be made. All sublots with repaired areas shall be re-tested and profile analyzed by the Contractor. The results of the re-tested sublots shall be included in the ProVAL Summary Reports and Smoothness Summary spreadsheet provided to the Consultant. 1.1.7 Assessments for Ride Quality and Areas of Localized Roughness 1.1.7.1 General Pavement smoothness will be assessed using MIRI criteria for Ride Quality and IRI criteria for Areas of Localized Roughness in accordance with the following.

1.1.7.2 Ride Quality The assessment for ride quality will be on a sublot basis as outlined in Table 3.50 C1 and according to the type of construction as outlined in Table 3.50 C2. MIRI (m/km) Average of left and right wheel paths Assessment for Ride Quality of Top Lift ($ per Sublot) Table 3.50 C1 LUMP SUM SUBLOT ASSESSMENT FOR RIDE QUALITY ASSESSMENT FOR RIDE QUALITY S I S II S III <0.55 50 50 50 0.55-0.70 30 30 30 0.71-0.80 0 30 30 0.81-1.04 0 0 0 1.05-1.20 740 - (740 x MIRI) 1.21-1.54 740 - (740 x MIRI) 0 0 1090 - (930 x MIRI) 1.55-1.85 Reject (1) Reject (1) 740 - (490x MIRI) >1.85 Reject (1) Reject (1) Reject (1) (1) Sublot may be accepted without corrective work, subject to the approval of the Consultant, with an assessment of -$500. Ride Quality and ALR will be assessed based upon the type of construction as follows. Table 3.50 C2 TYPE OF CONSTRUCTION FOR SMOOTHNESS ASSESSMENTS 0 TYPE OF CONSTRUCTION Two or more paver laid lifts, minimum design lift thickness of 20 mm Mill full pavement width or re-profile by cold milling full pavement width; followed with one or more paver laid lifts TABLE 3.50 C1 ASSESSMENT COLUMN S I S I

greater than or equal to 45 mm TYPE OF CONSTRUCTION Mill and inlay of entire lane; followed with one or more paver laid lifts greater than or equal to 45 mm Mill full pavement width or re-profile by cold milling full pavement width; followed with one paver laid lift of less than 45 mm All pavement with a posted speed limit less than 70 km/h TABLE 3.50 C1 ASSESSMENT COLUMN S I S II ALR assessment only (S II) Single lift with design lift thickness greater than or equal to 45 mm Hot In-Place Recycling or Mill and Inlay Curb and Gutter Single Lift with design lift thickness less than 45 mm S II S III S III S III 1.1.7.3 Areas of Localized Roughness Areas of Localized Roughness will be measured on a per metre basis as calculated through the ProVAL Smoothness Assurance analysis. Payment reduction for ALR will be $15.00 per metre for S II and S III construction, and $40.00 per metre for S I construction. Payment reduction for ALR will be based upon the initial inertial profiler test results; however, sites of ALR which have been repaired and re-tested by the Contractor with results indicating that the short continuous roughness is less than 2.75 m/km will not be subject to a payment reduction. 1.1.8 Department Verification Testing The Contractor is advised that the Department may carry out independent verification testing on the entire project or portions of the project at any time. Verification testing and profile analysis by the Department will be carried out in accordance the procedures described in these Provisions. If verification testing by the Department is to occur, the Consultant will provide the Contractor with a minimum of 48 hrs. advance notice in order to provide the Contractor an opportunity to witness the testing. If the verification testing indicates that the MIRI value of the re-tested sublots differs by no more than 10% from the original results, then the Contractor's results will be considered acceptable. If the MIRI value of the re-tested sublots differs by more than 10%, then the Consultant and Contractor shall review all aspects of the smoothness testing, both quality control and verification, to determine a solution that is mutually agreeable to the Contractor and the Department. If a mutually agreeable solution is not achievable, and the resulting dispute could

result in incorporating nonconforming pavement, the Department will use third party testing for resolution of a dispute. The results of the third party testing will be binding, and will be used to determine product acceptance and payment assessments. 1.1.9 Payment 1.1.9.1 Contractor Testing All costs associated with pavement smoothness testing, data analysis and report submissions; including the re-testing of repaired sublots or areas of localized roughness, will be considered incidental to the Work, and no separate or additional payment will be made. 1.1.9.2 Verification and Third Party Testing All costs associated with verification testing will be the responsibility of the Department. In the event that third party testing is required, costs associated with this testing will be assigned in accordance with the following: - If the results from this testing match more closely to the verification test results obtained by the Department, the Contractor will be invoiced for all costs associated with the third party testing. - If the results from this testing match more closely to the original test results obtained by the Contractor, the Department will assume all costs associated with the third party testing.