Installation and Maintenance of Erosion Control BMPs

Similar documents
PART 1 GENERAL REQUIREMENTS

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Sediment Basin. Fe= (Depends on soil type)

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Richland County Department of Public Works Engineering (Land Development) Division

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

At least 2 feet above the seasonal high water table Overflow path or structure provided

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

JEFFERSON COUNTY STORM WATER MANAGEMENT

Storm Drain Inlet Protection

C. This project shall be designed to meet LEED Silver design criteria. Construction activity pollution prevention is a mandatory requirement.

Filter Tube Barriers (Instream)

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

City of Charlotte BMP Maintenance and Inspection Check List Grassed Channels / Swales [Note: a separate form must be used for each BMP]

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

Erosion & Sedimentation Control Policy

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

City of Bozeman. Construction Site Management Program

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

Constructed Wetland Pond T-8

KDOT TEMPORARY EROSION - CONTROL MANUAL

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE

Sediment Basins and Skimmers. Jay Dorsey/John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Outline of Presentation. Inspecting Construction Site BMPs. Inspector. Back to Basics. Erosion Control. Erosion Control

Stormwater Management and Sediment and Erosion Control Plan Review Checklist For Design Professionals

Storm Drain Inlet Protection for Construction Sites (1060)

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Brush layering construction

Module 4 Regulatory requirements for Land Disturbing Activities

U.S. ARMY CORPS OF ENGINEERS. Little Rock District

C. Foundation stabilization for pipe and utility structures.

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist

Nevada Contractors Field Guide for Construction Site BMPs

E. STORMWATER MANAGEMENT

AEC Premier Straw Double Net Quick Mow EROSION CONTROL BLANKET SPECIFICATION

BMP #: Infiltration Basin

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

1.1.2 NOI & NOT Notice of Intent and Notice of Termination for TPDES permits TPDES Texas Pollutant Discharge Elimination System

Stormwater Best Management Practice Handbook Portal: Construction

Curlex II EROSION CONTROL BLANKET SPECIFICATION

Chapter 12 Erosion and Sediment Control

Lump Sum L.S. (15") EA

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

LANDSCAPE RETAINING WALLS

MODEL Stormwater Local Design Manual. City of Centerville

SECTION TRENCHING & BACKFILLING

28 February 2017 ATTENTION: MR HENNIE WOOD AND MS MAGGIE VON RONGE NORTHAM BOOYSENDAL CC: AMANDA PYPER AMEC FOSTER WHEELER NOTE FOR THE RECORD

Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

Stormwater Local Design Manual For Houston County, Georgia

Construction of Dariali HEPP. Reinstatement Plan

Presented by Henry L. Barbaro Stormwater Management Unit Supervisor MassDOT Highway Division

SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY

SOIL EROSION CONTROL PERMIT APPLICATION

Appendix A. Best Management Practice Toolbox

SACHSE EROSION CONTROL GUIDELINES

10.1 INTRODUCTION 10.1 DRAINAGE

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

Constructed Wetland Channel T-9

WYOMING DEPARTMENT OF TRANSPORTATION. Pollution Controls and Best Management Practices for Storm Water During Construction FIELD GUIDE

PERMEABLE INTERLOCKING PAVERS

Attachment D-1: Civil/Structural Scope of Work

TYPE "A" CATCH BASIN

Temporary Watercourse Crossing: Culverts

DIVISION 5 STORM DRAINAGE CRITERIA

Extended Detention Basin (EDB) Sedimentation Facility

Sand Filter T-6. Description. Site Selection

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

ITEM 506 Temporary Erosion Control

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

Concrete Waste Management

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide

UTILITY NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: TREE PROTECTION NOTES

Complying with the Edwards Aquifer Rules Technical Guidance on Best Management Practices

CONSTRUCTION EROSION AND SEDIMENT CONTROL PLAN APPLICANT PACKAGE

SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO)

Mecklenburg County Land Development Standards Manual (MCLDSM)

11 Ways to Avoid Storm Water Fines. No Exceptions!

Municipal Stormwater Ordinances Summary Table

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

Stormwater Construction Inspection Guide

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

CHAPTER 2 EROSION CONTROL

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

Constructed Wetland Use in Nonpoint Source Control

CHAPTER 9 STORMWATER MANAGEMENT PLAN REQUIREMENTS

Converting Temporary Sediment Basins to Permanent Stormwater Detention Ponds in Tennessee

Review of State and Federal Stormwater Regulations November 2007

SECTION FACILITY SANITARY SEWERS

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION

SYNTHETIC GRASS INDOOR SURFACE SPECIFICATIONS: K9GRASS LITE

9.2 STANDARD CONSTRUCTED WETLANDS

Riverside County. Stormwater Quality Best Management Practice. Design Handbook

REROUTING DRAINAGE SYSTEMS

Transcription:

Installation and Maintenance of Erosion Control BMPs Or Common BMPs Applications Specifications Installation Problems Maintenance Utility Design Professionals Clarifications, proactive problem solving Contractors Installation, maintenance and function Inspectors Common deficiencies, documentation Owners Specifications required by approved plan 1

Woogie just wants a few things You ever had a whitehead on your eyeball, Mary? Hmm? Sediment Fence Fence Outlets Construction Entrances RECP Slope Drains Baffles Grade Control Skimmers Basins Extras?? E&SC Planning and Design Manual Silt Fence (6.62.1) 2

Applications Sediment Fence Specs Treat small disturbed areas Flow diversion (2% grade) Metal Posts (1.33 lb/ft; minimum 5 length) 8 on center w/wire (14 ga., 6 spacing) 12 buried (8 down, 4 flap)* Less than 2% slope No concentrated flows Treats ¼ acre per 100 feet (refer to Table 6.62a) Additional requirements for high-hazard Recommendations Place along contours and tie to grade Do not use as stand-alone measure beneath denuded slopes higher than 10 feet Mechanical compaction for anchoring Place 12 #5 stone along toe when using fence to divert flows to treatment areas J-hook to treat perimeter slopes Follow specifications Installation Adapt to conditions Do not use to intercept concentrated flow 3

4

Maintenance Inspect weekly and after rain Restore storage area when sediment accumulation reaches 9 Replace worn or damaged sections Stabilize/repair drainage areas 5

Sediment Fence Outlet Known to NCDOT as Special Sediment Control Fence Applications Treat small disturbed areas where sediment fence in insufficient to function as a standalone device Short-term Design Specs TRIVIA QUESTION No State Spec? Without deviation progress is impossible Who said it? 6

Installation Offset from low point Appropriately spaced Hardware cloth and washed stone Additional reinforcement 7

Maintenance Inspect weekly and after rain Restore storage area when sediment accumulation reaches ½ the storage area or no greater than 1 foot Replace worn or damaged sections Stabilize/repair drainage areas Construction Entrances 8

Construction Entrance (6.06.1) Specs 2-3 washed stone > 6 thick Min. width = 12 50 min. length If not sufficient, State Manual directs to wash* Installation Tire Wash (CLDS) Compacted subgrade Stone base or fabric Minimum length? Course aggregate on surface Locate on high side Cut-off swale if necessary Allow for turning movements Put them where needed 9

10

11

Construction Entrance Maintenance Replace/refresh WHEN NECESSARY Require subcontractors/site workers to sweep/shovel at curb and street daily Ensure cut-off swale integrity (if needed) Consider conditions Enlarge if necessary Add entrances if necessary 12

Rolled Erosion Control Product (RECP) Applications Long or steep slopes When mulch cannot be adequately tacked Where immediate ground cover is needed Vegetated channels (check shear stress) Specifications Design specifications (use the right RECP correctly) Ground contact Seed bed preparation Manufacturer-specific directions Spoils from Trench Trench Approx. 10 Wide x 8 Deep Installation Flow Top of Blanket 1 Row of Staples, 12 O.C. 2 Rows of Staples Staggered, 6 O.C. Flow 2 Rows of Staples Staggered, 6 O.C. Soil from Trench 13

Applications Maintenance Below small Inspect weekly and after rains for signs of undermining or washout Correct deficiencies and repair damaged areas immediately 14

Slope Drains Detail Convey flows at denuded slopes while permanent vegetation is established Convey flows at denuded slopes while permanent drainage is addressed Convey diversion ditches to basin forebays Installation Earthen diversion with storage area and energy dissipation Berm 1 above top of pipe at all locations Hand compaction around inlet pipe Ensure connections are watertight Drain Area Pipe Diameter 0.50 acres 12 0.75 acres 15 1.00 acres 18 Maintenance Inspect inlet area Repair washouts Remove accumulated sediment at inlet Inspect discharge area Inspect berm/slope 15

16

Porous Baffles Prevent basin short-circuiting Promote plug flow for most effective trapping efficiency Installation Installation Install perpendicular to the direction of flow Ensure baffle elevation = spillway elevation Coir fabric (700g/m2) or equivalent 9 ga. suspension wire Tie to basin sides 17

Maintenance Check Dams / Grade Control Inspect baffles weekly and after every rain Maintain access for repairs Replace when torn, collapsed, decomposed or ineffective Remove sediment when half full Design life of 6-12 months Reduce velocity Reduce rill/gully erosion Reduce basin maintenance Can provide dosing method for PAM Do not use in jurisdictional waters 18

Rock Check Dam Installation 19

Wattle/Log Check Dam Installation Landscape staples Log/Wattle check dam Finished grade d Edge of dam Take a bough! Blanket spillway d = >9 Diversion lined or unlined Spillway Note: ensure secure contact with the ground. Use scrap erosion control blanket to plug gaps. Maintenance Inspect weekly and after rain Expect damage from high flows washing around edges of the dam; repair immediately Remove accumulated sediment as necessary to prevent damage to channel vegetation Adjust elevations as necessary Do not use in jurisdictional waters 20

Skimmers Dewater from the top of the water surface Provide most efficient removal for gravitytreatment basins Dewatering rate controlled by orifice plate (drawdown in 2-5 days) Can be re-used Require more frequent maintenance Skimmer Schematic Common Problems L/W ratio Failure at outlet pipe Inflow armoring Orifice size Orifice size Orifice fouling Spillway damage 21

Maintenance Inspect weekly and after rain Check orifice plate for blockage Ensure skimmer floats freely Use rope to bob skimmer to remove debris from screen Inspect inlets Inspect skimmer assembly for any damage Check spillway and outfall Basin Construction Installation Installation PHASE 1 EROSION CONTROL! Ensure basin floor is flat Ensure basin floor is one foot below skimmer invert Ensure that a permanent outlet structure doesn t change storage capacity or surface area Locate inlets opposite of outlet Armor inlet zones Provide landing pad for skimmer, account for sway Check seals at first rainfall Cut-off trench (2 deep, max 1:1 sideslope) Embankment top width: Height less than 10 feet, top width > 8 feet Height 10 to 15 feet, top width > 10 feet Freeboard 1 foot from settled embankment Allowance for settlement (build 10% above design) Basin slopes 2.5:1 or flatter Stabilize embankments (except bottom half) Non-erosive discharge 22

23

24

25

Maintenance Check inlets for scour/stability Vegetation Discharge clarity/turbidity impacts Offsite impacts? 26

27

28