CITY OF PALM DESERT FRED WARING DRIVE PALM DESERT, CALIFORNIA TEL: (760) FAX: (760)

RULE 8021 CONSTRUCTION, DEMOLITION, EXCAVATION, EXTRACTION, AND OTHER EARTHMOVING ACTIVITIES (Adopted November 15, 2001; Amended August 19, 2004)

H. Dust Suppressant - water, hygroscopic materials, or non-toxic chemical stabilizers used

FUGITIVE DUST CONTROL PLAN HUNTLEY GENERATION STATION 3500 RIVER ROAD TONAWANDA, NEW YORK. PREPARED FOR: Huntley Power, LLC Tonawanda, New York

I. Site Name and Location

I. Site Name and Location

CITY OF NAPERVILLE, ILLINOIS TREE REMOVAL PERMIT APPLICATION LOCATION: PROJECT CONTACT: VARIETY NUMBER SIZE CONDITION

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Appendix D. Valley Fever Considerations (Memorandum)

PART 1 GENERAL REQUIREMENTS

SACHSE EROSION CONTROL GUIDELINES

Sections:

E. STORMWATER MANAGEMENT

Module 4 Regulatory requirements for Land Disturbing Activities

Project Monitoring & Air Sampling

RECYCLED ASPHALT PAVEMENT AND ASPHALT MILLINGS (RAP) REUSE GUIDANCE MARCH 2013 (VERSION 1.0)

MAINE MEDICAL CENTER

Alma Offsite Landfill Phase IV S2180 State Hwy 35 Alma, Wisconsin

Storm Drain Inlet Protection for Construction Sites (1060)

Rock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon

Zoning Permits 11-1 ZONING PERMITS

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

MITIGATED NEGATIVE DECLARATION & MITIGATION MONITORING PROGRAM CITY OF CHICO PLANNING DIVISION

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

ODOR MANAGEMENT PLAN. Bridgeton Landfill St. Charles Rock Road Bridgeton, Missouri

MANAGEMENT OF SONOMA COUNTY WILDFIRE DEBRIS

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

INFECTION CONTROL ISSUES IN CONSTRUCTION AND RENOVATION

EROSION AND SEDIMENT CONTROL PLAN (ESCP) FOR PROJECT TITLE

DUST CONTROL PLAN. Condit Hydroelectric Project Decommissioning FERC Project No Prepared by. Prepared for. and

5. Partially filled fuel tanks within the building shall be pumped empty. The oil and tanks shall be removed and deposed of in a legal manner.

Concrete Waste Management

UI Procedures for Asbestos Management

SP Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS # )

Department of Public Health Proposed Rules and Regulations for the Handling and Storage of Bulk Material Piles (Proposed December 19, 2013)

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

PERMIT TO EXCAVATE IN HIGHWAY CHESHIRE, CONNECTICUT

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION TRENCHING & BACKFILLING

File No Supplemental November Geotechnical and Environmental Consulting Engineers

TRENCHING AND EXCAVATION

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703)

BASE CONSTRUCTION MATERIALS A Aggregate

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

CITY OF ORANGE MANUAL OF GRADING DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

ASH AND BURN DEBRIS CLEAN UP AND REMOVAL PROCESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000

TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK

PRESSMAN ACADEMY ECC PROJECT TEMPLE BETH AM

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation

Welcome to Douglas County PUD

Comments on Draft Permit #12-POY-079. FTS International Proppants, LLC. Acadia, Trempealeau, Wisconsin. March 15, 2013

CHAPTER 7: TREE PROTECTION DURING CONSTRUCTION 7.1 TREE PROTECTION AREAS

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

PERMEABLE INTERLOCKING PAVERS

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

UNHSC Bioretention Soil Specification February, SOIL PREPARATION (PERFORMANCE SPECIFICATION) for Bioretention Systems

Eastern Kern Air Pollution Control District

COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY NEVADA COUNTY CDA GUIDELINES FOR ASH AND BURN DEBRIS CLEAN UP AND REMOVAL AFTER A FIRE

# 17 ) UN DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING

ADAMS COUNTY ROAD STANDARDS

MOBILE FOOD VENDOR LICENSE APPLICATION

PART 1 - GENERAL 1.01 General Provisions A. The Conditions of the Contract and all Sections of Division 1 are hereby made a part of this Section.

Project & Environmental Review. Guidelines Demolition. May 2016

Outline of Presentation. Inspecting Construction Site BMPs. Inspector. Back to Basics. Erosion Control. Erosion Control

Elements of the Storm Water Management Plan. Storm Water Pollution Prevention Plan (SWPPP)

TREE PRESERVATION AND PROTECTION SPECIFICATION FOR CONSTRUCTION NEAR TREES

Full Depth Reclamation

CLASS I AND II ABATEMENT PROJECT SUBMITTALS

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG):

Coal Mine Particulate Matter Control Best Practice Site-specific determination guideline. November 2011

Lead Management Program for Building Maintenance and Construction Projects. Office of Environmental Health and Safety University of Toronto

11 Ways to Avoid Storm Water Fines. No Exceptions!

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.

I-91 Viaduct Public Information Briefing

Storm Drain Inlet Protection

Preferred Elevated Tank Site

53.20 PAINTED ROADWAY LINES

CITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES

Figure 1. Report of Inspection Process Flowchart.

Protecting Existing PCCP Subject to External Transient Loads. 200, Fort Worth, Texas 76109; phone (817) ;

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING

Application Requirements for obtaining a Building Permit

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS

Boise City Public Works General Drainage Plan Review Requirements Checklist

HEAVY-DUTY HAUL ROAD APPLICATION BULLETIN

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

Erosion & Sedimentation Control Policy

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

SECTION 14 - GENERAL INDUSTRIAL ZONE (M2) REGULATIONS

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

Particulate Matter Rules Update BAAQMD BACWA Meeting

Transcription:

ASBESTOS AIRBORNE TOXIC CONTROL MEASURE FOR CONSTRUCTION, GRADING, QUARRYING AND SURFACE MINING OPERATIONS 93105, Title 17, California Code of Regulations Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE INFORMATION Size of Project Estimated Size of entire Project (total acres) Fees (See Rule 304, Section 303.1 for current base fee) $415 L Base Fee + $25 / Acre Total Fees Due 2. GEOLOGIST INFORMATION Address City/State Zip Contact Phone Fax Email 3. CONTRACTOR AND OWNER INFORMATION Contractor Information Address Owner Information Address City/State Zip City Zip Contact Email Contact Email Phone Fax Phone Fax 4. PROJECT INFORMATION Location Number of NOA Samples Taken Address Number of NOA Samples 0.25% City/State Date of Asbestos Discovery Start Date Zip Thomas Guide Page(s) Estimated Completion Date

5. MAP INFORMATION Map(s) clearly indicating the following MUST be included: Property lines / boundaries Rights of way / easements Areas to be cleared or graded Trenching areas Excavation sites Storage areas / piles Staging areas for removal Truck routes On-site parking lots Landmarks and roads Sampling locations (label as positive or negative for asbestos) 6. PROJECT TYPE Activity: (Check all that apply) Construction Grading Road or Railway Construction Road Maintenance Housing Development Commercial Property Development Quarrying Surface Mining Trenching / Utilities Work Other (please describe) 7. TRACK-OUT PREVENTION Any visible track-out on a paved public road where vehicles enter and exit the work area must be removed at the end of the work day or at least one time per day. Removal shall be accomplished by using wet sweeping or a HEPA filter equipped vacuum device. Other control measures: (Check all that apply) A gravel pad designed using good engineering practices to clean the tires of exiting vehicles A tire shaker A wheel wash system Pavement extending for not less than fifty (50) consecutive feet from the intersection with the paved public road 2

8. ACTIVE STORAGE PILES Keeping active storage piles adequately wetted or covered with tarps (please describe) 9. INACTIVE STORAGE PILES Control for disturbed surface areas and storage piles that will remain inactive for more than seven (7) days shall include one or more of the following: (Check all that apply) Keep the surface adequately wetted Establish and maintenance of surface crusting sufficient to satisfy the test in subsection 93105(h)(6) Application of chemical dust suppressants or chemical stabilizers according to the manufacturer s recommendations Covering with tarp(s) or vegetative cover Installation of wind barriers of fifty (50) percent porosity around three (3) sides of a storage pile Installation of wind barriers across open areas 10. TRAFFIC CONTROL ON ON-SITE UNPAVED ROADS, PARKING LOTS AND STAGING AREAS A maximum speed limit of fifteen (15) miles per hour (mph) or less Additional control measures: (Check all that apply) Water every two hours of active operation or sufficiently often to keep the area adequately wetted Apply chemical dust suppressants consistent with manufacturer s directions Maintain a gravel cover with a silt content that is less than five (5) percent and asbestos content that is less than 0.25 percent, as determined using an approved asbestos bulk test method, to a depth of three (3) inches on the surface being used for travel 3

11. EARTHMOVING ACTIVITIES Controls for earthmoving activities will include: (Check all that apply) Pre-wetting the ground to the depth of the anticipated cuts Suspending grading operations when wind speeds are high enough to result in dust emissions crossing the property line, despite the application of dust mitigation measures Application of water prior to any land clearing 12. BLASTING Is Blasting Required? Yes No (if Yes, Check all that apply.) Pre-wetting the ground Concurrent misting or water application during blast Application of soil overburden Blast mats Suspending blasting operations when wind speeds are high enough to result in dust emissions crossing the property line, despite the application of dust mitigation measures 4

13. OFF-SITE TRANSPORT The owner and/or operator must ensure that no trucks are allowed to transport excavated material off-site unless: Trucks are maintained such that no spillage can occur from holes or other openings in cargo compartments Loads are adequately wetted AND either: (Check all that apply) Covered with tarps Loaded such that the material does not touch the front, back or sides of the cargo compartment at any point less than six inches from the top and that no point of the load extends above the top of the cargo compartment 14. POST CONSTRUCTION STABILIZATION OF DISTURBED AREAS Upon completion of the project, disturbed surfaces shall be stabilized using one or more of the following: (Check all that apply) Establish a vegetative cover (detail type of vegetative cover to be used below) Placement of at least three (3.0) inches of non-asbestos-containing material Paving Any other measure deemed sufficient to prevent wind speeds of ten (10) miles per hour (mph) or greater from causing visible dust emissions (please describe) NOA ATCM Form.pdf (revision 3/13) 5