Project Type: Drainage and Storm Systems

Similar documents
CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

Richland County Department of Public Works Engineering (Land Development) Division

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, :30 PM 600 S. Commerce Ave. Sebring, FL AGENDA

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

ENGINEERING DESIGN & IMPROVEMENT STANDARDS


SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008

Project Need and Evaluation

CITY OF SAFETY HARBOR ENGINEERING

Design-Build Capital Infrastructure Project

Municipal Stormwater Ordinances Summary Table

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

10:00 AM, Wednesday, April 8, 2015

Table of Contents for Guide Specifications

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

Attachment D-1: Civil/Structural Scope of Work

City of Naples Utilities Department Wastewater Collections Division

ADDENDUM NO. 1 APRIL 24, 2017

EXCAVATION / RIGHT OF WAY PERMIT

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

10.0 Storm Sewer Systems

Task Order Authorization

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS

For Public Input Period

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

SECTION TRENCHING & BACKFILLING

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017

Cass County Soil Erosion & Sedimentation Control Program

PERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers

[Rev - 1] 06/

UTILITY NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: TREE PROTECTION NOTES

VIRGINIA UTILITY PROTECTION SERVICE, INC. Title: Ticket Entry - Work Type List Working Document

E. STORMWATER MANAGEMENT

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements

NORTH OF THE PROPERTY ON BOYETTE ROAD, PUBLISHED ELEVATION 92.29' (NAVD88).

Storm Drain Inlet Protection

Preliminary Engineering Study. Richland Avenue Pedestrian Crossing. Volume I: Preliminary Report

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2

HIGH SCHOOL #2 Severance, CO MANAGEMENT PLAN November,

Drainage Report for US-50 Camino Corridor Safety Project

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT

City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012

DIVISION 5 STORM DRAINAGE CRITERIA

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

D-1 THE CITY OF HARRISBURG 1 1/2" MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2" MIN. ID-2 BINDER COARSE

A.3 Concrete Cross gutter 18

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

Greenfield Pond B Rehabilitation

A City Project Review of Eagles Edge subdivision water system and drainage improvements.

TRANSPORTATION & PUBLIC WORKS DEPARTMENT TECHNICAL STANDARDS

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

The City of North Las Vegas (CNLV) does not allow valley gutters to be constructed across streets with right-of-way widths of 80 feet or greater.

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

Storm Drain Inlet Protection for Construction Sites (1060)

Mecklenburg County Land Development Standards Manual (MCLDSM)

MOA Project # Golden View Drive Intersection & Safety Upgrades

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Gwinnett County Stormwater System Assessment Program

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER 4 INDEX DRAINAGE

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

ISSUED: 1/16/15 REVISION: 1.0 REVISION: STANDARD DETAIL COMBINATION 6'' CURB & GUTTER CITY OF FALLS CHURCH VA PUBLIC WORKS

CITY OF BURLINGTON REGENT STREET ALLEY SEWER AND STREET IMPROVEMENTS

MODEL Stormwater Local Design Manual. City of Centerville

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

Transportation, Engineering and Development Business Group Standard Construction Plan Notes for Development Projects January 2013

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

Alternative No. 1 Total Cost DRAFT

MONROE COUNTY ZONING OFFICE

STANDARD TECHNICAL SPECIFICATIONS

SANITARY SEWER FEASIBILITY STUDY AND REPORT NORTH SEBASTIAN AREA

Stormwater Local Design Manual For Houston County, Georgia

CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Preferred Elevated Tank Site

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

PARKING LOT AND ROADWAY MAINTENANCE

Transcription:

580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install additional access manhole; repair storm sewer lateral connection, replace damaged sections of culvert; relocate water mains & replace sanitary sewer that cross through the culvert. 573 BP-036, Airfield Stormwater Drainage Improv. Phase 5 @ OEA $529,892 Greater Orlando Aviation Authority Repairs to the existing Airfield Stormwater Drainage System @ Orlando Executive Airport. Work involved complete inspection and desilting of approximately 4040 lf of storm water lines. After inspection repairs were made based upon line condition. Pipe liner was installed, joint repairs were made, or new CIPP was installed. Nine storm inlets were replaced. Chemically grouted 314 joints. Trenching, stormwater sewer pipe installation, inlets, cast-in-place pipe liner & pavement replacement for open trenches. 566 Winter Park Drive North Realignment $5,661,289 City of Casselberry Construct approx. 1.5 miles of two lane roadway through an undeveloped ROW along with supporting drainage & utility infrastructure. Work included excavation, embankment, stabilization, base, asphalt, reinforcing steel, lift station, mast arm assembly, signalization, MOT, irrigation. Drainage system included approx. 11,250 lf RCP 24"-42", 32 inlets and 28 manholes; utilities included approx 2,361 lf 8" potable water main with 14 service connections, approx 2,334 lf 8" reclaimed water main with 12 service connections and approx 4,487 lf of 6"-10" PVC sanitary sewer with 17 manholes and 25 service connections. 563 Lake Tyler Sediment Removal Structures $1,089,616 Orange County Highway Construction Project consists of the installation of three pre-fabricated Stormwater Treatment Units, 3 cfs and 14 cfs capacity. Two of the sediment removal structures were installed within a residential condominium complex and one was installed within an apartment complex. Installation of 1,148 LF of 15", 30" 36" concrete pipe along with three end treatments. Performed chemical grouting of soil to stabilize structures close to excavation area. Replaced 3500 SY of sod to match existing landscape conditions. Wednesday, November 17, 2010 Page 1 of 5

549 Rockledge Road Area Sanitary & Storm Sewer Construction $2,170,568 Construction of Sanitary and Storm Sewer in an existing subdivision. Work included installation of approx 1,110 LF of RCP Storm Sewer pipe from 18" to 24", installation of 10 structures, 43 manholes, 9,387 LF of 8" PVC Sewer Main, 200 4" lateral services and clean-outs, remove and replace approximately 2265 LF of curb and gutter, remove and replace 1000 SY of 4" concrete sidewalk, 2000 SY of 6" concrete driveway, installation of approx 24,500 SY of reclaimed asphalt and approx 10,000 SY of sod. 516 Tohopekaliga Avenue Extension $3,056,408 Project included the construction of a new four lane roadway, 4,000 lf of storm pipe from 60" to 18" and under drain, communication ducts, fencing, striping, geoweb, MOT. 514 Parktowne Industrial Center Ph-1 Drainage and Utility Improvements $1,400,443 City of Edgewater Project included the construction of two (2) stormwater ponds which entailed about 50,000 CY of earth and rock excavation, a 1,100 lf drainage ditch, a 2,300 lf storm drainage system with piping ranging in size from 54" down to 24", 1,800 lf gravity sanitary system installed to a depth of 12', and various utility adjustments and connections. Mr. Ken Hooper was the City's Project Manager on this project. 503 Martin Luther King Jr. Boulevard, Phase I $3,803,645 Project consisted of 2,900 lf of new two-lane roadway construction including water main, storm and sanitary sewer, retention pond excavation, curb, sidewalk, signalization, irrigation and sod. 488 West Ramp Phase 2 and West Access Road $1,571,896 Kissimmee Gateway Airport Construct aircraft parking apron to include: storm, grading, base, asphalt, markings, electrical. Wednesday, November 17, 2010 Page 2 of 5

480 City of Ocoee Old Winter Garden Road & Professional Parkway $6,997,105 Project required the widening of 1.262 miles of existing Old Winter Garden Rd. from a 2 lane road into a 4 lane divided roadway. Work included utility relocations/improvements, storm pond excavation, storm drainage system installations, signalization, fencing, landscape & irrigation, signage, and pavement markings. Relocation and improvements of Sprint Telephone facilities located within the right-of-way of this project. 472 Cranes Roost PS Modif. & Reuse Weir Structure $406,220 City of Altamonte Springs Rehabilitation of storm water pump station from Cranes Roost, new 150 HP vertical turbine pumps, new controls. Also, sheet down to existing 21" gravity sewer & pour concrete structure for reclaimed water supply enhancement. 471 Budinger Avenue Roadway Improvements $390,252 City of St. Cloud Construction of water main, 30" storm drainage, roadway and signalization improvements. 468 Crystal Lake Stormwater Improvements $296,456 City of Clermont Work consists of clearing & grubbing, earthwork, construction of storm drainage system, installation of 6 baffle boxes to treat stormwater, grading and misc. work. 457 Drury Avenue Improvements $577,125 1169 LF of paving to improve road, sanitary and storm sewer drainage, utilities, paving and sidewalk Wednesday, November 17, 2010 Page 3 of 5

452 City of Oviedo Sugarberry Ditch $200,253 Installation of 30"- 42" HDPE storm drainage system in residential area under tight working conditions with 15' distance between homes. 451 East Palmetto Avenue Improvements $1,116,051 City of Longwood Storm replacement, road construction, new water lines, sanitary sewer, sidewalks, driveways, MOT, landscaping and sodding. 410 17-92 Vacuum Sewer - North Utility System Expansion $739,567 City of Longwood Installation of approx. 10,000 LF of 4" and 6" sewer pipe for an extension of existing vacuum sewer system and approx. 7,150 LF of 8" watermain. Work consisted of dewatering, excavation, restoration and sod. 395 Rio Grande Intersections: Drainage, Sanitary & Traffic Improve. $1,254,120 Drainage & sanitary improvements at Rio Grande intersections. Work included concrete pavers & header curb in 2 intersections, new concrete curbs & asphalt pavement, replacement of concrete curbs, sidewalk, wheelchair ramps, digging large retention pond and installed storm drain control structures and weirs. This pond helped eliminate flooding in a College Park neighborhood. 388 Boyd Street Phase 3: Vineland Rd & Palmetto St Rehab. $861,082 City of Winter Garden Replacement of sanitary & storm sewer on two city streets and complete reconstruction of streets, including asphalt paving, curbs, sidewalks, grading and grassing, MOT and temporary erosion control.. Wednesday, November 17, 2010 Page 4 of 5

379 Guernsey Basin Drainage Improvements Phase 2 $1,131,996 Approximately 1500 lf of 54 and 48 RCP was installed down the center of a historic brick paved street, the installation was deep enough to require the whole street to be removed and reconstructed. The storm system ended with a submerged outfall structure in Lake Adair which required a sheeted coffer dam to install in dry conditions. All brick pavers were cleaned and re-installed per the City requirements. As part of this project 2 new brick round-abouts were created. The storm installation included several inlets, conflict structures and manholes. 300 LF of Gravity sewer and new water services were installed for all residents in the construction area. Critical OUC (Florida Hospital) utilities were inspected and protected as part of the project. During the project all residents were provided access to their homes and all home delivery or pick up services were maintained at all times. 373 GOAA, OIA, Operations Fire Training Facility $946,056 Greater Orlando Aviation Authority Construction of 3-story fire training facility, 2 acres of 8" concrete paving, fire lines, storm, grading, GEO synthetic liners 313 Gore Street Outfall Improvements $902,487 Construction of an alum chemical feed system for the Gore feeder canal into Clear Lake. Work includes storm drainage, box culvert, concrete slope paving, dewatering, flac pump station, flac curtain. 298 City of Sanford Mill Creek Year 3A Drainage Improvements $597,286 Continuation of storm drainage system. Work included installation of large diameter RCP, box culvert, manholes, sanitary sewer relocations, pour-in-place headwalls, by-pass pumping, excavation of two retention ponds (approx. 60,000 CY), curbs & walks, base, asphalt paving. 278 City of Sanford Mill Creek Year 2 Drainage Project $719,985 Installation of storm drainage system including precast manholes, inlets, 58" x 91" elliptical RCP, 8' x 4' precast box culvert, excavation, dewatering, pour-in-place concrete structures, fabriform, by-pass pumping of existing ditch, open cut in roadways, Wednesday, November 17, 2010 Page 5 of 5