SKYLINE HOUSE CONDOMINIUM 3711 SOUTH GEORGE MASON DRIVE FALLS CHURCH, VIRGINIA

Similar documents
Application Instructions for Keystone Kool Deck on Existing Concrete

Balconies Information. How to waterproof and reduce efflorescence

Specifier Notes: Edit the following list as required by the project. List other sections with work directly related to the floor coating.

Tile on Existing. Viewpoint

AQUATITE. Also designed as: Crack/gap filler for masonry and unglazed ceramics Sealants against leaks Repairer for roof cracks and gutters

1.3 Work shall include all reinforcement and accessories necessary to complete installation.

Appalachian Flooring ltd. Care and Maintenance Guide

USA USA USA PURE CLICK

Interior Painting Artesi II & III Day Care Facilities at 777 & 333 W. Matthews Road

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL


ITEM 458 WATERPROOFING FOR STRUCTURES

Installation Data Freedomline 4-Piece Showers F1364P, F1424P*, F1604P Fax on Demand # 1163

FLUID APPLIED WATERPROOFING

AVM System 500. Aussie Membrane 500

WATER TUFF VINYL FLOORING ATTENTION! READ BEFORE INSTALLING! Angle-Tap Installation Instructions

Installation Instructions for CushionBac Renew Tiles

TILE TILE

Vulkem EWS with PUMA Technology (Heavy Duty) APPLICATION INSTRUCTIONS

Kolorines Glass Mosaic Tiles Project Specification

A Design Review of Waterproofing Codes

100 Veka Drive Fombell, PA GO4.VEKA

General Applications Before applying, mix the pre-measured catalyst* into Liquid Roof by following label directions.

METHOD STATEMENT 001 CONCRETE BALCONY WATERPROOFING FOR DIRECT FIXED TILES

INSTALLATION MANUAL. METAL INSULATED PANELS -ROXUL -Expanded Polystyrene

1-part polyurethane pourable self levelling floor joint sealant

SECTION RESILIENT SHEET FLOORING

Product Information. DiamondCoat Polyurethane Concrete Floor Finish Clear, high build, high abrasion resistant, decorative concrete floor coating

PEDA-GARD ALIPHATIC. Pedestrian Traffic Coatings. System Summary

SPECIFICATIONS: Architectural Aluminum Railings

Application and Maintenance

2. Drying and curing of concrete shall be 28 days 2. Wind-lock B-Ml mixing blade or equivalent

SECTION CONCRETE PAVING SLABS SET IN MORTAR

Aluminum Component Pipe Railings

Never use wire brushes, acid cleaners, power washers, bleach, paint remover or any other type of concrete cleaner.

SECTION IMPACT RESISTANT WALL PROTECTION

Engine Bay Floors Floor Resurfacing 4000

SILASEC DESCRIPTION FEATURES AND BENEFITS SURFACE PREPARATION

DURA 500 THERMOPLASTIC FLAT ROOF COATING SYSTEM BY SUPERIOR POLYMERS INC.

m2 Anti-Slip Tape Daylight Fluorescent R13

Florock Seamless Flooring Systems

1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards

CSI GUIDE Countertops

Soft Grip. WATERBASED Anti-Slip Coatings

FLOORING FOR FLOOD-PRONE AREAS. Vinyl Flooring. Pros of Vinyl Flooring for Flood-Prone Areas

SECTION DECORATIVE METAL AND GLASS RAILING

DURO-SHIELD ROOF COATING CARE GUIDE TABLE OF CONTENTS

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

SECTION ALPHAGUARD RESTORATION 20 YEAR WARRANTY SYSTEM. f. Conditions and Division 01 Specification Sections, apply to this Section.

SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE. Product. Scope. Appraisal No. 811 [2013] Appraisal No. 811 (2013) Amended 28 August 2017

SECTION ACOUSTICAL PANEL CEILINGS

Technical Data Sheet

PRODUCT GUIDE SPECIFICATION

Pacific Polymers Elasto-Deck BT Guide Specification

Product Information CHEMGLAZE B 9942 A/B. Coating for Casting Pits. Easy Application Chemglaze B 9942 A/B will bond to damp and wet surfaces.

INSTALLING A CYPRESS DECK. The Natural Choice. Southern Cypress Manufacturers Association

Table of Contents. List of Drawings

SECTION COMMON WORK RESULTS FOR CONCRETE SSPECIALTY COATINGS

HYBRID. Pre-Laying Checks

The HardieZone System: HZ5 Care and Maintenance Guide

A. Section includes surface preparation and the application of high-performance coating systems on the following substrates:

SECTION MOISTURE RESISTANT/WATER-PROOF FLOORING ADHESIVE FOR CONCRETE SLABS

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building

Specifications for FL-100 Soffit Panel

SIDER-POOL. Product Data. Features and Uses

SECTION WOOD AND ATHLETIC FLOORING. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Industrial Sealers & Coatings

INSTALLATION INSTRUCTIONS 2G DA VINCI LVT

ROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

SECTION EPOXY FLOORING SYSTEMS

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

ROOF BALLAST MATERIALS ARCHITECTURAL CONCRETE PAVING SLABS SRS LEVELING BLOCK SYSTEM INSTALLATION PART GENERAL 1.

RediMat. surface applied. Features. Physical Characteristics. Installation. Colors. Sizes. the original flexible surface applied mat

Rust Bullet Home and Farm FAQ s

FLEX SHOWER DOOR INSTALLATION INSTRUCTIONS. For more information on DreamLine TM Shower Doors please visit

Application Specification:

INSTRUCTIONS FOR EDITING AND COORDINATION SECTION WOOD FLOORING - ATHLETIC

SECTION COLD APPLIED RUBBER MODIFIED ASPHALT WATERPROOFING

Product guide to hospital flooring

Suggested Specification for Tri-Patch Versatile Concrete Patching Compound

Section COATING RESTORATION

Commercial Resilient Sheet Flooring

***********************************************************************************

TOPCOAT Restoration Specifications Fiberglass & MB Granulated Cap Sheets

SECTION SELF-ADHERING SHEET WATERPROOFING

SECTION EPOXY TERRAZZO

STORAGE AND TRANSPORTION

PIPE AND TUBE RAILINGS

SECTION ALUMINUM RAILINGS

Sample Specification

FLEX SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

SECTION RESINOUS FLOORING or SECTION QUARTZ FLOORING

Installation Instructions

TUFF-TAC TM BRIDGE MEMBRANE INSTALLATION GUIDE

VELCRO brand Adhesives. p re s s u re sensitive, fire re t a rd a n t, solve n t and heat ac t i v a t e d

Molokai ShowerSpa Model #1006

ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound

LAHAINA. Lahaina Showerspa Model #1030 Installation Instructions

CEMENTITIOUS CRYSTALLIZING WATERPROOFING PART 1 GENERAL

Professional Floor Restoration & Rejuvenation MADE EASY

Transcription:

SKYLINE HOUSE CONDOMINIUM 3711 SOUTH GEORGE MASON DRIVE FALLS CHURCH, VIRGINIA BALCONY CARE & MAINTENANCE GUIDELINES SK&A Project No. 09%620%06 Updated June 14, 2012 Prepared By SMISLOVA, KEHNEMUI & ASSOCIATES, P.A. CONSULTING STRUCTURAL ENGINEERS 12505 Park Potomac Avenue, Suite 200 Potomac, Maryland 20854 Telephone: (301) 881%1441 Prepared For Skyline House Unit Owners Association, Inc. 3711 South George Mason Drive Falls Church, Virginia 22041

INTRODUCTION The following are care and maintenance guidelines for the recently installed urethane" based balcony deck waterproofing coating system and powder"coated aluminum railing system at the Skyline House Condominium. Following these guidelines will help ensure the long"term performance of these products and ensure that material warranties are maintained. The information provided was partially derived from published guidelines provided by the system manufacturers. Cleaning Procedures BALCONY COATING SYSTEM Deck surfaces should be periodically swept to remove loose dirt that can cause excessive abrasion and lead to premature wearing of coating surfaces. Removal of hard, abrasive materials such as sand, gravel, etc. is particularly critical. A trisodium phosphate and water or any other non"sudsing detergent should be used to remove contaminants such as grease, salts or other materials that may leave residues. Use a push broom or scrub brushes/pads to clean the deck coating. Never use solvents, bleach, alcohol or harsh chemicals to clean coating surfaces. Do not use wire brushes for cleaning. For ice removal, use snow removal equipment and/or shovels with rubber tip blades and rubber tires. Equipment or shovels with sharp metal blades will damage the coating system. The volume of traffic and frequency of use of the balcony will govern the frequency of cleaning needs. Manufacturer recommends a minimum cleaning frequency of twice a year. Protection Against Damage Avoid dragging heavy objects across the coating surface such as concrete planters, metal furniture, etc. Avoid furniture on the balconies with sharp edges or metal feet. Furniture should have rubber or plastic tips on the leg bottoms so items will not dig into coating system. Avoid harsh chemicals or abrasive cleaning equipment as noted above to avoid premature coating system failure. 2

Inspection and Repair Manufacturer recommends semi"annual physical inspections of the deck coatings. Physical inspection should include evaluating all sealant joints for proper adhesion to the substrate. Coating should be inspected for holes, cuts or ruptures particularly in areas subject to high levels of abrasion. Building management should be contacted regarding needed repairs. Temporary repairs may be performed via vinyl tape over the damage or application of a compatible polyurethane caulk or waterproofing coating. Do not use asphalt or tar modified products. Final repairs should be performed by a licensed applicator of Advanced Polymer Technology particularly during the warranty period for the product. Cracking or heaving of the concrete under the coating should be reported to building management for evaluation by a structural engineering firm. Tile/Carpet over the Coating System Manufacturer permits tile installation over the urethane coating system as long as the coating surface is prepared by application of 7"10 mils of APT #152 primer followed by a broadcast to excess of sand. Tile system shall be appropriately designed for exterior use to avoid failure and associated potential moisture collection between the tile and coating. Tile contractor shall not directly abrade, roughen or pressure clean the coating surface prior to installation as protective primer and sand broadcast must be installed beforehand. Tile contractor shall be directed to provide weep channels in the tile layout at the outside face of all railpost base plates extending from the plate to the balcony slab edge to allow water from the new railing post base weeps to drain from the balcony. Weep channels shall be approximately ¼ wide with the depth matching the tile depth. It is recommended that new tile or existing tile finishes be treated with a waterproofing, penetrating grout sealer annually. Products such as the Tile Guard Penetrating Grout Sealer or equivalent system available at local hardware stores can be used. The sealer will prevent staining, mildew and general deterioration of the grout. Carpet installation is not recommended as it encourages moisture collection on top of the coating surface. If carpet is installed, installation should be limited to spring/summer months (April through October) and carpet should be non"rubber backed and should never be glued down. Products have been developed that consists of a tile or carpet surface integrated with a drainage mat system under the flooring. The membrane manufacturer strongly recommends this system for maximum protection of the waterproofing 3

and for ease of future deck maintenance. A strongly recommended product in the area is the Coverdeck Systems (www.coverdeck.com). Cleaning Procedures ALUMINUM RAILING SYSTEM Railing can be cleaned with a warm soapy water using a sponge or soft cloth. Use only mild detergents. Avoid leaving drips or splashes that may leave streaks or uneven appearances. Do not use heavy duty or abrasive chemical cleaners. Do not use steel wool or abrasive brushes that may scratch or harm the powder"coated finish. Avoid excessive scrubbing. Avoid cleaning aluminum surfaces in direct sunlight or in excessively hot or cold temperatures. Avoid letting cleaners dry on the aluminum surface as surfaces should be quickly wiped down to avoid staining from dried cleaner residue. A quality brand of car wax can be applied to the aluminum surface for a protective wax finish if desired. Cleaning frequency of once a year is recommended. Protection Against Damage Anything mounted from the railings such as planter boxes, etc. should be suspended via hangers or clamps that are not mechanically anchored through the rail sections. No screws or anchors that penetrate the aluminum rail sections should be used. Brackets or hangers should have rubber or soft backings that avoid metal"to"metal contact. Items should be installed at the inside face of the railings. Items suspended from the rails should not exceed 200 pounds if attached to the top rail section and 50 pounds if attached to pickets. Heavier items and/or items requiring mechanical anchorage should be mounted off the brick masonry/concrete walls. Inspection and Repair Annual physical inspections of the aluminum railings are recommended. Physical inspection should include evaluating all screws at splice connections and 4

nuts/washers at rail post bases to ensure anchors are snug. Rail sections should also be inspected for loose conditions. Inspect coated surfaces for scratches or color changes. Building management should be contacted regarding needed repairs. Replacement screws or anchor hardware must be stainless steel. For minor scratches of powder"coated finish, rail manufacturer can provide management with touch"up paint product. Railing manufacturer should be contacted regarding large scale coating issues such as fading or peeling. 5