Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study

Similar documents
The Don River and Central Waterfront are among the most degraded waterways in the City of Toronto.

Factor Potential Effects Mitigation Measures

GRAND NIAGARA Proposed Secondary Plan

COLE ENGINEERING GROUP LTD.

Preferred Elevated Tank Site

Airport Road from 1 km North of Mayfield Road to 0.6 km North of King Street Public Information Centre #1

407 TRANSITWAY. Planning & Preliminary Design

PROPOSED PIPELINES TO SERVE THE COMMUNITY OF FENELON FALLS: ENVIRONMENTAL REPORT

Municipal Class Environmental Assessment for Pottersburg Creek Slope Stability Study South of Hamilton Road, Schedule B

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

WELCOME! Mill Creek Daylighting Technical Feasibility Study. Thank you! Open House December Please sign in and get a comment form.

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

Welcome to the Boulevard Lake Dam Class Environmental Assessment. Public Information Session #1. June 14, 2016

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

Environmental Information Worksheet

There are several types of trenchless technology applications for new installations. The following are some of the most prominent applications.

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Campbell River Project Water Use Plan Physical Works Terms of Reference

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

Welcome to the Public Information Centre. Red Hill Business Park South Transportation Master Plan Addendum. June 25, :00 p.m. to 8:00 p.m.

Trenchless Pipeline Crossings

TRENCHLESS TECHNOLOGY. Department of Civil Engineering.

Cornwall Solar Project Renewable Energy Approval Modification Report

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR

City of Ottawa. Environmental Impact Statement Guidelines. 2 nd Edition April 2012

REROUTING DRAINAGE SYSTEMS

Storm Water and Sanitary Sewer

Application for resource consent Form B Damming and diversion of water

Horizontal Directional Drilling

Chapter 10 Natural Environment

Oil and Gas Fast Facts and Frequently Asked Questions February 19, 2013

POINTE DU BOIS MODERNIZATION PROJECT

Works, services and infrastructure code

Design Specifications & Requirements Manual

Controlling Odour and Corrosion in the Collection System: Region of Peel s Trunk Sewer Odour and Corrosion Control Master Plan

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Development in the City of Toronto

Comprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number:

Sections:

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

CHAPTER 9 DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS

June 1, Dear Mr. Simpson:

Temporary Watercourse Crossing: Culverts

E. STORMWATER MANAGEMENT

C&B Alberta Solar Development ULC

YOUR GROUND DRILLING PARTNERS.

ENVIRONMENTAL SCREENING REPORT

CIRCUIT C7BM (W6CS STR 1 JCT X BARRETT CHUTE SS) CLASS ENVIRONMENTAL ASSESSMENT. Draft Environmental Study Report

Provincial Policy Statement 2014

E7. Taking, using, damming and diversion of water and drilling

Trenchless Technology

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Environment & Conservation Introduction

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT

S.O.P. No. HMD

New Castle County, DE. Floodplain Regulations

4th International Engineering and Construction Conference - July 28, 2006

Transportation Environmental Study Report

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway

JEFFERSON COUNTY STORM WATER MANAGEMENT

APPENDIX 2. Nova Scotia Department of Environment and Labour Environmental Assessment Terms and Conditions for Environmental Assessment Approval

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

Environmental Regulation & Mine Permitting in Ontario

Canadian Solar Developers Ltd.

17/03/2017 CONTENTS. Real Cases Studies in the Region for Pipelines Inspection & Rehabilitation. Introduction CONTENTS. Introduction / Cont.

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

Provincial. Statement

Managed Forest Tax Incentive Program Encouraging Responsible Forest Stewardship Ministry of Natural Resources and Forestry

Information Sheet - Mountain Highway Interchange Noise Assessment and Sound Mitigation

William Rutley Solar Park

Site C Clean Energy Project Agricultural Mitigation and Compensation Plan

Sliplining 36-in. PCCP with Fusible PVC - DC Water's Long-Term Control Plan 'Division E'

Cass County Soil Erosion & Sedimentation Control Program

EPCOR Distribution & Transmission Inc.

DETAILED IMPACT ANALYSIS OF MARMOT BASIN LONG RANGE PLAN

Report for Agenda Item: 2

Greenfield Pond B Rehabilitation

Chapter 13: Wildlife and Vegetation

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

Provincial Policy Statement 2014 Training Aid

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

FINAL ENVIRONMENTAL IMPACT REPORT VERONICA MEADOWS SPECIFIC PLAN. January 2005

Construction of Dariali HEPP. Reinstatement Plan

421 FLOOD PLAIN AND DRAINAGE HAZARD AREA DEVELOPMENT Lands Subject to Flood Plain and Drainage Hazard Area Standards

Exposition Light Rail Transit Project

Pipe Jacking. Japan Sewage Works Association

SHEPPARD EAST LIGHT RAIL VEHICLE MAINTENANCE AND STORAGE FACILITY TRANSIT PROJECT ASSESSMENT

Operational Policy Statement

LAND DEVELOPMENT AND PLANNING FORUM 2014 THE 2014 PROVINCIAL POLICY STATEMENT AND ENVIRONMENTAL PROTECTION

Keeping your water flowing How we maintain our mains network

Project Goals and Scoping

Transcription:

Welcome Public Information Event Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Please sign in to be added to the study mailing list and receive project updates 1

Why are we here? We want to hear from you! The purpose of tonight s Public Information Event (PIE) is to provide: An overview of the study, including project background and reasons for the study; A description of the Municipal Class Environmental Assessment Process (Class EA); A description of the alternatives considered, evaluation process, impact assessment, preliminary recommendations; and Next steps. We want your input on: The alternatives considered, evaluation process, and preliminary recommendations; Impacts the project may have on the community (environmental, transportation, recreational, etc.); and Proposed mitigation measures. Please complete a Comment Sheet and leave it in the box provided, or return to the City by December 22 nd, 2017 2

Project Purpose and Objectives The purpose of the Study is to: Identify and assess system improvements for the Dufferin Sanitary Trunk Sewer. The study will recommend solutions to: Bring the Dufferin Sanitary Trunk Sewer into a state of good repair; Reduce inflow/infiltration and risk of a potential sewer collapse below the reservoir; and Improve accessibility for future operations and maintenance of the Dufferin Sanitary Trunk Sewer within the Study Area. This Class EA is not related to basement flooding. Basement Flooding is being addressed separately by the Basement Flooding Protection Program. This study will consider the information collected by the Basement Flooding study within the study area. 3

Problem & Opportunity Statement The Problem and Opportunity Statement provides the framework and objectives for the outcome of the study. Dufferin Sanitary Trunk Sewer: Was built in the early 1960s Is part of the City's Don Sanitary Trunk Sewer Collection System Has sections located under the G. Ross Lord Reservoir The maintenance holes (MH) and the sewer are in the reservoir and The Lord Reservoir Municipal Class EA is being undertaken to identify preferred solutions to address the deterioration of the system under the reservoir as they relate to the. This Class EA will be undertaken in accordance with the Municipal Class Environmental Assessment process (Municipal Engineer s Association 2000, as amended in 2007, 2011 and 2015). 4

Study Area Existing infrastructure within the Study Area includes the reservoir and sewers constructed at different times over the past 70 years; some of which have since been relocated or abandoned, and include: G. Ross Lord Reservoir built after the sewers Sanitary Trunk Sewers Collector sewers 5

Dufferin Sanitary Trunk Sewer and G. Ross Lord Reservoir Development History built in 1960 s as part of the City s Don Sanitary Trunk Sewer Collection System; built in 1973 to reduce flooding risks; Sections of the Dufferin and West Don Sanitary Trunk Sewer are now located making access for maintenance/repairs difficult; WILMINGTON AVE Significant amount of stormwater entering the trunk sewer ( ), impacting the sewer s capacity and treatment operations. 6

What is a Municipal Class Environmental Assessment (Class EA)? The Class EA process is a five phase planning process that: o identifies to the Schedule A and A+ Projects Typical or Emergency Operational Infrastructure Projects, Generally within Municipal Right of Way Typical Infrastructure Projects Pre-approved Proceed to Construction Pre-approved Notify Public Prior to Implementation Problem; o considers including net environmental effects; o requires ; and o provides clear documentation that Schedule B Projects We are here Phase 1 Problem or Opportunity Notice of Commencement Phase 2 Alternative Solutions Notice of Completion and 30-day Public Review Identify & Describe the Problem/Opportunity Prepare Environmental Inventory, Identify/Evaluate Alternative Solutions & Establish the Preferred Solution and Mitigation, Solicit Stakeholder Input Prepare and file Project File. describes the. This study will: o Follow the Class EA requirements; o Complete of the planning Schedule C Projects Phase 3 Alternative Design Concepts for Preferred Solution Phase 4 Environmental Study Report Evaluate Alternative Design Concept, Identify Environmental Effects Mitigation & Preferred Concept Prepare and File Environmental Study Report (ESR) Documenting Phases 1-3 for Public Review process; and o Document the decision making process in a Project File to be filed for a All Projects Phase 5 Implementation Design and Construct with Mitigation Measures, Restore Disturbed Areas 7

Social/Cultural Environment Located in Ward 10 York Centre; Land use consists primarily of Parks and Natural Areas (G. Ross Lord Reservoir) with bike trails, a cricket patch field, an off-leash dog area, and riding stables; Lands in the study area are owned by the City of Toronto, and the Toronto and Region Conservation Authority (TRCA); A Stage 1 Archaeological Assessment was conducted to identify areas of archaeological potential. Further assessments will be completed where proposed construction activities may impact identified areas of archaeological potential; and 1 Heritage Property was identified adjacent to the study area. A Cultural Heritage Assessment was completed by Stantec in 2017. City of Toronto Official Plan Map 16 Land Use 8

Natural Environment A Natural Environment Review was conducted to document the existing environmental conditions and significant features within the Study Area. For any potential impacts, mitigation measures will be identified for each alternative, to be carried through to detailed design and construction. There are a number of Significant Woodlands within the Study Area; There are Significant Valleylands located along the south of the G. Ross Lord Reservoir, and along Dufferin Creek south of Finch Avenue; The Reservoir Dam, and the steep exposed bank along the east side of Dufferin Creek provides nesting opportunities for Barn Swallow (Species at Risk); A number of Woodland communities provide potential habitat for endangered bat species; There are a number of other candidate significant wildlife habitats within the study area. Butternut tree surveys are to be completed prior to construction, work within 25 m of any Butternut trees will be avoided; and The Reservoir, Dufferin Creek, and the West Don River provide habitat for a number of warmwater fish species. 9

Development of Alternative Solutions Long List of Alternative Solutions Screening Evaluation to determine feasibility and suitability of Alternative Solutions Short List of Alternative Solutions Detailed Natural, Social, Technical, and Economic Evaluation Preferred Solution Mitigation and Monitoring Project Implementation and Restoration For the purpose of developing alternatives, the Study Area was divided into two areas: North and South of Finch Ave. Alternative solutions have been identified for North and South sections of Dufferin Sanitary Trunk Sewer, which impact both the Dufferin and West Don Sanitary Trunk Sewer. 10

Long List of Alternative Solutions and Pre-Screening Alternative 1 Do Nothing The Dufferin and West Don Sanitary Trunk Sewers would remain in place, without any improvements. The Do Nothing alternative does not address the Problem and Opportunity Statement for the study. Alternative 2 Rehabilitation The existing sections of the Dufferin Sanitary Trunk Sewer in need of repairs would be repaired in place. The following rehabilitation methods were reviewed: 2A Dry Rehabilitation 2B Flow Controlled Rehabilitation 2C Wet Rehabilitation Rehabilitation technology alternatives were screened based on the advantages and limitations of each. Alternative 3 Realignment Realign the sewer outside the Reservoir. Various realignment options were considered (see separate drawings). A number of construction technologies were reviewed, and the following were identified as feasible alternatives: Horizontal Directional Drilling (HDD) Microtunnelling (MT) Handtunnelling considered for tie-in connections only (HT) Alternative realignments were screened based on their impacts to land use, staging area requirements, utility or other infrastructure conflicts, traffic impacts, and environmental impact including tree/vegetation removal requirements. 11

Short Listed Alternatives North Area Do Nothing Realignment Alternative 3b Microtunnelling (MT) Realignment Alternative 3d Microtunnelling (MT) Realignment Alternative 3d Horizontal Directional Drilling (HDD) Realignment Alternative 3f Microtunnelling (MT) South Area Do Nothing Rehabilitation Alternative 2a Rehabilitate Dry using Cure-in-Place Pipe (CIPP) Rehabilitation Alternative 2b Rehabilitate Flow Controlled using Steel Reinforced Polyethylene (SRP PE) to Reline 12

Evaluation Criteria Public Health and Safety Property Impacts Construction/ Traffic Impacts Aesthetics Utilities Cultural Heritage Resources Conservation Authority Regulation Limit/Floodplain Terrestrial Wildlife/ Vegetation Aquatic Wildlife/ Vegetation Water Quality Social/ Cultural Natural Meets Applicable Planning/ Policy Objectives Connection to Adjacent Infrastructure Elements Operations and Maintenance Meets infrastructure design requirements Ability to reduce groundwater and surface water infiltration issues Hydraulic Performance Construction Complexity Technical Economic Initial Capital Cost Property Acquisition Costs Operations and Maintenance Cost 13

Evaluation Results North Area Alternatives South Area Alternatives Criteria Alt 1: Do Nothing Alt 3b - MT: New Alignment Alt 3d - MT: New Alignment Alt 3d - HDD: New Alignment Alt 3f - MT: New Alignment Alt 1: Do Nothing Alt 2a CIPP: Rehabilitate Dry Alt 2b SRP PE: Rehabilitate Controlled Flow Social/Cultural Public health and safety impacts Property impacts n/a n/a Impacts of construction activities on surrounding neighbourhoods Aesthetic impacts n/a n/a Utility impacts n/a n/a Impacts to cultural heritage resources Natural Environment Impacts to floodplain/trca regulation limit Impacts to Terrestrial wildlife and vegetation Impacts to aquatic wildlife/vegetation Water quality impacts Technical and Planning Considerations Meets policy and connectivity requirements Meets operational standards Infrastructure performance and effectiveness Legend Poor Constructability n/a n/a Construction complexity and availability of local expertise n/a n/a Economic Capital cost Property acquisition cost Operation and maintenance cost Overall Evaluation Fair Good Excellent Preliminary Preferred Alternative 14

Preferred Technologies Cured-in-Place Pipe (CIPP) Existing pipe is lined with flexible tube filled with thermosetting resin. Tube is pulled through pipe, inflated, and heated to begin curing process. This is a dry rehabilitation method (no flow). Microtunnelling (MT) Pipe jacking operation that uses a remotely-controlled microtunnel boring machine (MTBM). The MTBM is pushed into the earth by hydraulic jacks. Steel Pipe Reinforced Polyethylene (SRP PE) Steel-reinforced corrugated polyethylene strips with a smooth inner wall are spiral wound by machine into the existing pipe, and grouted in place. This method requires a controlled sewage flow. Horizontal Directional Drilling (HDD) Surfaced launched system often used for installation of pipes under rivers or other surface obstructions. A pilot tube is drilled, which determines the path of the installed pipe. CIPP is the preferred rehabilitation method, and Microtunnelling is the preferred Construction Technology for this application, with Hand Tunnelling to be used for short connections only. Hand Tunnelling (HT) Tunnel is sequentially excavated and supported as the installation progresses forward; considered for tie-in connections only. 15

North Area Recommended Alternative 3f Microtunnelling 16

South Area Recommended Alternative 2A Rehabilitate Dry Rehabilitation Alternatives: Alternative 2a Cast-In-Place Pipe Alternative 2b Steel Reinforced Pipe PE 17

Preliminary Preferred Alternatives North Area Alternative 3f Microtunnelling South Area Alternative 2a Cured-in-Place Environmental Component Evaluation Summary Pipe Rehabilitation Social/Cultural Connection location less disruptive to adjacent residential properties during construction due increased distance from residents and added tree separation and grade separation Reduced impacts to pedestrian pathways Minimal impact to traffic. Natural Reduced risk of a sewer failure to aquatic life due to elimination of sewer within reservoir at east end of study area Temporary impacts to vegetation and wildlife habitat construction mitigation to be identified. Replanting and restoration after construction. Technical Less construction risk than HDD based on subsurface soil conditions Lower operational risk when compared to Alternatives 3b and 3d due to the elimination of the eastern creek crossing. Environmental Evaluation Summary Component Social/Cultural Minimal traffic impacts; Minimal impact to adjacent residential lands tree cover and grade difference will lessen visual and noise impacts Natural Impacts similar between alternatives considered Temporary impacts to vegetation and wildlife habitat construction mitigation to be identified Technical Less impact to pipe capacity Widely-used and reliable technology Economic Less installation cost Economic Higher construction cost compared to 3b MT and 3d HDD, but less cost than 3d MT due to reduced drive length. 18

Opinion of Probable Cost OPTION METHODOLOGY COST NORTH AREA 1 Do Nothing $ 0 3f Microtunnelling $ 10,075,000 SOUTH AREA 1 Do Nothing $ 0 2a Cast-In-Place Pipe $ 980,000 Note: This is a Class D Cost Estimate which represents an order of magnitude cost opinion (-30%/+50%). 19

Stakeholder Consultation Notice of Study Commencement issued on Toronto Region Conservation Authority November 24, 2016. Consultation has been Indigenous Communities Metrolinx undertaken with the Toronto Project Team Region Conservation Authority and Metrolinx, and various provincial ministries. Utilities City of Toronto Property Owners and General Public All input received will be considered as part of the study, and will be documented in the Project File. Ministry of Tourism Culture and Sport Ministry of the Environment and Climate Change 20

Impacts and Mitigation No impact is anticipated to Cultural Heritage feature. A Stage 2 Archaeological Assessment will be undertaken for the preferred alternative and will be submitted to the Ministry of Tourism, Culture and Sport (MTCS). Based on the findings of the Stage 2 Archaeological Assessment, further recommendations for archaeological resources will be implemented during design and construction. Safety fencing and signs should be implemented to separate construction works from recreational users. Activities that create noise should be restricted to daylight hours when possible, and adhere to local noise by-laws. The contractor should implement a traffic management plan for all roads affected by construction. Vegetation clearing should occur outside of periods of active bird breeding (April 1 August 15), except when a nest sweep is completed by a biologist. Preconstruction surveys are recommended to survey for butternut trees and potential bat maternity habitat prior to construction. Further consultation will occur with the Ministry of Natural Resources and Forestry (MNRF), TRCA and City s PF&R during design. All work in the Dufferin Creek and the Don River West Branch is to be completed during the warm water timing window (July 1 to March 31). Appropriate erosion and sediment control measures are to be implemented. A water-tight coffer dam is to be installed when excavations works are located within the watercourse or reservoir. Protective measures may include dewatering at low velocities, dissipating water energy by discharging into a filter bag or equivalent, and utilizing protective riprap or equivalent. 21

Next Steps Information presented here will be made available on the City s website: www.toronto.ca/dufferinsewer Comments on the information are received and reviewed by the project team. Recommendations are confirmed and/or refined, and the Project File documenting the planning process and technical rationale is completed. The Project File is placed on file for a 30-day public review period, and concerns are addressed by the project team. If concerns remain unresolved, any member may submit a Part II Order within the review period, bumping up the status of the project.* If no Part II Orders are received during the 30-day review period, the project is complete and the Municipality may proceed to design and implementation Thank you for your participation. Your comments are important to us. Please fill out a comment sheet, place it in the box provided, or return to the address on the form by December 22 nd, 2017. Feel free to contact: Khatija Sahib Public Consultation Unit City of Toronto 55 John Street, Metro Hall 19 th Floor, Toronto, ON M5V 3C6 Email: khatija.sahib@toronto.ca Visit: www.toronto.ca/dufferinsewer/ *Any member of the public with outstanding concerns may submit a request to the Minister of the Environment and Climate Change to issue an order to comply with Part II of the Environmental Assessment Act, requiring the proponent to undertake a greater level of assessment. 22