REQUEST FOR ELECTRIC SERVICE Residential

Similar documents
Welcome! Thank you for your interest in upgrading your service with Great Lakes Energy Cooperative (GLE).

Basic Service. This Section provides information regarding a. Introduction

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703)

Welcome to Douglas County PUD

Residential Engineering P.O. Box 430 Memphis, TN (Deliveries at 5791 Summer Trees Memphis, TN 38134) (901) / (901) Fax

PRIMARY LINE EXTENSION

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Developer Pre-Construction Guidelines Developer Electric Service Information Form Authorization to Install Underground Facilities Form

COMMUNITY DEVELOPMENT

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Applying For New or Revised Electric Service. ComEd is happy to assist you in initiating new or revised electric service to your location.

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

BUILDING PERMIT APPLICATION

Large Basic Service. This Section applies to members requiring new. Introduction. Service Types

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

B U I L D I N G P E R M I T A P P L I C A T I O N

The following materials and documents are required in order for you to obtain a Building Permit:

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit

Electric Service Handbook

Cass County Soil Erosion & Sedimentation Control Program

PROCEDURE FOR REQUESTING A BUILDING PERMIT

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.

ComEd Customer Requirements for An Underground Service

Electric Service Handbook

SWIMMING POOL PERMIT AND INSPECTION REQUIREMENTS

Application Requirements for obtaining a Building Permit

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX:

The following is required for a complete permit submittal for each unit.

MONROE COUNTY ZONING OFFICE

RESIDENTIAL BUILDING PERMIT PROCEDURES

New York State Unified Solar Permit Expedited Solar Permit Process for Small-Scale Roof-Mounted Residential and Commercial Solar Electric

METHOD OF PAYMENT FORM

2013 R-1 Building Permit Package For Additions, Decks, Fences & Garages

ELECTRICAL ORDER FORM

NASSAU COUNTY ELECTRICAL PERMIT APPLICATION FOR CONTRACTORS

+AaAAPP. When planning please be aware of utility, walking and riding easements as well as County Ordinances.

Section 2: Underground

NY State Unified Solar Permit

Residential Electrical Upgrade Permit Revised: 11/15/17

ELECTRICAL ORDER FORM

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide

Residential Sewer Backup Prevention Program

ELECTRICAL SERVICE EXTENSION POLICY

City of Centerville Building, Zoning & Code Enforcement Department

Last Updated March 15, 2016

The following is required for a complete permit submittal for each unit.

METHOD OF PAYMENT FORM

BASEMENT FINISH CONSTRUCTION

CITY of COLDWATER. Requirements for Obtaining Building Permits City of Coldwater, Michigan

Guide to Residential Permits and Inspections

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

Building Permit Submittal Requirements

INSTRUCTIONS FOR PREPARING APPLICATIONS FOR ELECTRIC SERVICE & METER

CITY OF GRANDE PRAIRIE

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

City of Roman Forest

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

CUSTOMER SERVICE POLICIES

Residential Accessory Structure Application Packet (Carport, Shed, Garage, Pool)

CONSTRUCTION PLANS REVIEW APPLICATION PACKET

Customer Connection Guide. Document number SOP Issue number 9 Status Approver

BUILDING PERMIT APPLICATION

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

APPLICATION FOR PORCH / DECK PERMIT

VIRGINIA UTILITY PROTECTION SERVICE, INC. Title: Ticket Entry - Work Type List Working Document

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER:

RESIDENTIAL BUILDING PERMIT

VICTORIAN SERVICE & INSTALLATION RULES MANAGEMENT COMMITTEE

Chisago County Environmental Services 313 No. Main St., Room 243 Center City, MN

(Condensed from National Electric Code)

APPLICATION FOR SOLAR PERMIT

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

City of Norwalk. Residential Development Permit Process

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

City of Jacksonville Development Guide Building Permits

BUILDING PERMIT BASICS

PERMITS, ADDRESSES, AND INSPECTIONS

WARWICK TOWNSHIP Dept. of Planning & Zoning

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

Residential Building Permit Application

Madison County Property Improvement Check List

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

Medina County Building Department

ELECTRICAL SERVICE UPGRADE RESIDENTIAL AND COMMERCIAL QUICK INFORMATION REFERENCE

CITY OF BERKLEY, MICHIGAN FENCE APPLICATION

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Lot 2. 1 Mile Population: 5,200 Median HH Income: $46, Mile: Population: 35,500 Median HH Income: $49,300

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

Reems Creek Homeowners Association, Inc. P.O. Box 1546, Weaverville, NC

Home Building Planner

1 Introduction. 2 Office Locations/Map. 3 General Requirements. 4 Structures and Planting. 5 Equipment Crossings. 6 Excavations. 7 Utility Crossings

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

BUREAU Joe Iuviene, AIA January 20, 2017

Marbella Isles Homeowners Association, Inc.

EARLY START PERMITS. Site cleaning, including removal of any existing asphalt, and/or concrete slab, Excavation work under the building footprint,

Transcription:

This form should be completed if you are applying to have new electric facilities installed on your property for the purpose of providing electric service to a permanent or seasonal residential dwelling, cottage, mobile home, barn, garage, outbuilding or similar structure. PROJECT CHECKLIST Below is a checklist to assist you with your project: 1. In order to expedite the assignment of your job to our Field Supervisor, please complete the following: Complete and sign the Application for Electric Service with accurate Service Address Complete and attach a detailed site sketch, blueprint, survey, plat or similar document Complete the Liability Waiver Form Sign and notarize any necessary easements (TCL&P can notarize these documents if needed all parties must be present when signing) 2. Upon receipt of the above, the Field Engineer may contact you to arrange an appointment to meet at the site to discuss your job. Please make sure property pins are in place or property boundaries are marked prior to this meeting. 3. After the on-site meeting, the Field Supervisor will design your job, calculate the construction cost and provide you with an Electric Service Estimate Sheet. Please review the Electric Service Estimate Sheet when you receive it and contact the scheduling department at (231) 922-4940 ext. 243 with any questions or concerns. The Electric Service Estimate Sheet is valid for 120 days and will show the estimated cost to install the electric facilities required to provide service. 4. All new electrical services are REQUIRED BY THE STATE OF MICHIGAN to have an electrical inspection of the meter base before the service can be connected. Please see below for your appropriate electrical inspector: ELECTRICAL INSPECTORS METER BASE PICK-UP LOCATIONS Grand Traverse County DeWeese Hardware Contact: Ed Moody, Phil Nault and/or Mark Russell 1029 Carver Street, Traverse City Office: (231) 995-6049 and (231) 995-6028 (231) 947-7670 Leelanau County Standard Electric Contact: Ted Klumpp 3743 W. Front Street, Traverse City Office: (231) 256-9806/Fax: (231) 356-7555 (231) 947-4440 Local State Inspector State Inspector Traverse City Light & Power Contact: Dean Reid 1131 Hastings Street, Traverse City Office: (231) 263-4160 (517) 241-9320 (231) 922-4940 5. In order to secure a place in the construction schedule, all documentation listed above must be submitted and the meter base must be mounted or the location clearly marked on the outside of the building. Upon Revised: September 15, 2017 Page 1 of 6

receipt of this TCL&P will contact you to coordinate scheduling of your job. (Failure to mark the meter base location can result in delays and in some cases the rescheduling of the installation of your electric service.) NOTE: Obstacles such as lumber piles or brush located in the proposed path of the electrical facilities (e.g. poles, lines, transformers, etc.) can result in delays and in some cases the rescheduling of the installation of your electric service. NOTE: In accordance with chapter 1366.04 of City of Traverse City, city ordinances, all new installation of utilities shall be placed underground. CONTACT INFORMATION All documentation should be sent to: Traverse City Light & Power, Attn: Scheduling Mail: 1131 Hastings Street, Traverse City, MI 49686 Fax: (231) 922-4638 The scheduling department can be reached at (231) 922-4940 ext. 243 CANCELLATION The applicant may cancel the Application for Electric Service at any time. Please notify our scheduling department at (231) 922-4940 ext. 243 as soon as possible. Revised: September 15, 2017 Page 2 of 6

APPLICATION TYPE OF SERVICE REQUESTED: Check all the apply REQUEST FOR ELECTRIC SERVICE *If submitting an application for a Yard Light, please complete the Service Address and Customer Information section only and sign on page 5. New Service Upgrade Relocate Temporary Electric Yard Light* Service Address: Customer Information ( Primary contact for ALL project communications) Customer Contact Numbers: Name: Mailing Address: Email Address: Responsible Party Home: Work: Party responsible for utility installation charges: Customer Contractor Party responsible for service/usage after meter(s) are set: Customer Contractor Billing Information ( Check here if billing information is same as Customer Information) Name: Address: Cell: Fax: Phone: Contractor/Builder Information ( Primary contact for ALL project communications) Contractor Contact Numbers Company Name: Mailing Address: Email Address: Contact Person: Business: Electrician Information (If Applicable) ( Primary contact for ALL project communications) Electrician: Contact Person: Daytime Phone: Fax: Site/Structure Information Building Use: (check two) Construction Type: (check one) Square Footage Sq. ft. Single Family Spec Home Multi-Family Framed/Custom Year-Round Modular Delivery date: Seasonal Mobile Delivery date: Duplex Revised: September 15, 2017 Page 3 of 6 Cell: Fax:

Site/Structure Information (Continued) Privately owned buried facility: (Check all that apply) Sprinkler System Animal Fencing Outside Landscaping Lighting Other Present Status of Building Project: (Check all that apply) In the planning state? Yes No, When? Property staked? Yes No, When? Site has been excavated? Yes No, When? Basement walls/foundation poured? Yes No, When? Basement walls/foundation back-filled? Yes No, When? Desired service route cleared of debris? Yes No, When? Date site will be READY for service: (This date helps with scheduling of service installation. See box to the right.) Service Information Note: Before service can be installed Site sketch or survey AND Liability Waiver must be sent to TCL&P. Easements need to be signed and on file at TCL&P. The site and foundation must be back filled within 6 of final grade. The electric meter base must be installed. All electrical inspections are customer s responsibility. An approved inspection is required to energize service. Electric: Estimated Load: Voltage Requirement: Temporary Overhead Amperage: Single Phase Permanent Overhead Estimated Demand: Three Phase Temporary Underground Permanent Underground Electric Load Information Main Disconnect Size: Amps Volts Phase Electric Appliances: (Check all that apply) Other Load (i.e. Well Pump, Sump Pump) A/C Oven Heat Dryer Total kw of Other Load: Range Water Heater Other: Revised: September 15, 2017 Page 4 of 6

NEW SERVICE SITE SKETCH AND LIABILITY WAIVER FORM Note: The location of all private underground facilities and structures must be identified or exposed. Include the location of all underground facilities or structures on the drawing below. If providing a blueprint, survey, plat or similar document be sure to sign the Construction Authorization/Underground Damage Liability Waiver below. Electrical wiring to outdoor facilities Cable, Satellite TV or internet lines (e.g. yard lights, garages, etc.) Future additions, decks or outbuildings Septic Systems, mound systems or drain fields Driveways and sidewalks Wells, water lines and/or sprinkler systems Preferred location of electric meters LP or natural gas lines Provide distance from the closest corner of building to Sewer Lines the meter Invisible fencing Structure distance from nearest intersection: N Please read before signing: The Construction Authorization/Underground Damage Liability Waiver must be signed by the PROPERTY OWNER LISTED ON THE TAX PARCEL RECORDS. Construction Authorization/Underground Damage Liability Waiver: I certify that I own the property of the service address indicated on this Site Sketch, blueprint, survey, plat or similar document provided and that I have read and understood the above statement regarding marking, exposing or locating all private underground facilities. I represent that the information in this application is correct to the best of my knowledge. I understand that any changes made to the information or attached documents may increase the time and costs required for Traverse City Light & Power to provide service to this project. I furthermore agree to indemnify and hold Traverse City Light & Power, its employees and agents harmless for any damage to private underground facilities that occurs during the installation of electric service, or as a result of failure on my part to ensure that the private underground facilities on this property have been adequately marked, exposed or located. Signature (Property Owner) Date Printed Name Title (if applicable) Revised: September 15, 2017 Page 5 of 6

SCHEDULE OF FEES Standard Installation The cost of new underground installations is $3.50 summer, $5.25 winter*, per trench foot length, plus $50.00 for overhead to underground conversion. This is based on a clear and unobstructed path a minimum of 24" deep, from the source to the metering location. The customer will be responsible for the installation of conduits where open trenching is not possible. Where the customer installs conduit, the underground charge through that conduit will be reduced by $1.00 per foot. Any subterranean boring required or removal of obstacles such as rocks, old foundations, trees and stumps will be billed to the customer at actual cost. *NOTICE: Winter rates help pay for the additional cost of the fuel and special equipment that may be required in order to begin construction during the period of winter when the ground is frozen. However, this is not a guarantee TCL&P will be able to perform the work. All required information for construction to begin must be submitted within two weeks of the winter period (December 1- March 31), or a winter rate will apply. If TCL&P chooses to begin construction during this period, winter rates will not apply. Time and Material Billing Any work that does not classify as a new standard underground installation, such as relocation of poles, relocation of lines or temporary electric, will be billed on a time and materials basis at TCL&P rates. Utility Billing Rates For electric tariff rates please refer to our Service Rates, Senior Citizen Service Rates, Life Support Rates and Power Service Cost Recovery for additional information. These are found on our website at www.tclp.org. Revised: September 15, 2017 Page 6 of 6