BUREAU Joe Iuviene, AIA January 20, 2017
|
|
- Nancy Russell
- 6 years ago
- Views:
Transcription
1 architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York ADDENDUM NO. 1 This addendum amends or supplements the Bid Documents dated 12/21/16 for the above referenced project as indicated below. All provisions that are not so modified remain in full force and effect. All Multiple Prime Contractors must acknowledge receipt of this Addendum on the Form of Bid. 1) Section P - Bid Form Plumbing Work - P: REMOVE bid form from Project Manual and REPLACE with bid form attached, dated 1/20/17. 2) Section H - Bid Form HVAC Work - H: REMOVE bid form from Project Manual and REPLACE with bid form attached, dated 1/20/17. 3) Section E - Bid Form Electrical Work - E: REMOVE bid form from Project Manual and REPLACE with bid form attached, dated 1/20/17. 4) Section L - Bid Form Lift/Elevator Work - L: REMOVE bid form from Project Manual and REPLACE with bid form attached, dated 1/20/17. 5) Section Supplementary Conditions DELETE: Bonds may be obtained through the Contractor s usual source and the cost thereof shall be included in the Contract Sum. The amount of each bond shall be equal to 100 percent of the Contract Sum. ADD: Bonds may be obtained through the Contractor s usual source and the cost thereof shall not be included in the Contract Sum. The amount of each bond shall be equal to 100 percent of the Contract Sum. 6) CLARIFICATION of Bid Documents for C Construction Contract: The Scope of Work for the C Construction Contract, does include all interior and exterior window trims (jambs, sills & casings) for ALL windows, including the windows where the sashes are indicated as Not in Contract (NIC) and all doors. 7) Section Scope of Work for C Construction Contract: DELETE: This contractor will provide all necessary shoring and bracing for the removal of the foundation under the existing building and removal of front porch and stairs. ADD: The Town will engage the services of a contractor to fully support and raise the existing building and maintain that support system for the Town to remove the foundation under the existing building and removal of front porch and stairs and for the C contractor to perform their work due to change in grade as shown on Grading & Utility Plan revised 1/19/17. (see item #11) Joe Iuviene, AIA Addendum #1-1 ARCHITECTURAL BUREAU Austerlitz New Town Hall 1/20/17 PO Box Main Street Chatham, NY (518)
2 Austerlitz New Town Hall Addendum #1 8) MODIFICATION of Bid Documents regarding top of brick shelf elevation at Addition: Modify the brick shelf elevation to: starting 5-0 from the southeast corner of the addition and continuing north to where the addition meets the existing building at the north elevation. The brick shelf elevation will remain as indicated at all other locations. 9) Division 22 - Plumbing Documents: Specifications: DELETE: All references to East Putnam Fire Station. Drawing P-1: REVISED: Sanitary piping layout as shown. Drawing H-2: REVISED: HP-2 underground piping layout as shown. ADD: Condensate drain cleanout coded notes as shown. Drawing H-3: ADD: Exhaust fan ductwork size and end cap. ADD: Condensate drain cleanouts as shown. ADD: Coded notes 10) Division 26 - Electrical Documents: Drawing E-4: ADD: Sewage effluent control panel, wiring and conduits as shown. Drawing E-6: REVISED: Circuit breaker for sewage pump in panel P2 schedule as shown. Drawing E-8: ADD/REVISED: Sewage effluent control panel, wiring and conduits as shown. 11) Division 31 Site Work Documents: Drawing 3 Grading & Utility Plan : REVISED: 1/19/17 Specification Section INSTRUCTIONS TO BIDDERS - Modification The Owner is responsible for excavation, sub-slab preparation, site drainage, foundation drainage, asphalt paving, septic system (including structures, pump, control panel), trenching (including bedding and backfill) for all contracts, exterior concrete preparation (curbs and slabs), seeding and landscaping. The Owner will provide temporary power, and temporary water as long as what is currently in the current Town Hall building is sufficient. There may be times during construction that other arrangements must be made for temporary water and power. E Electrical Work Clarification regarding Site Work 1. Provide all work necessary for coordination and providing of electric power, and conduit for phone and data to the building and the existing Town Hall Building. Trenching, bedding and backfill by Town. 2. Provide all site lighting fixtures, poles, concrete bases, conduit, wiring. Trenching, bedding and backfill by Town. 3. Provide all work necessary for coordination and providing power for the sewage effluent pump including power from the building to the pump control panel, and from the control panel to the sewage pump. Electrical contractor shall be responsible for final power connection at the pump control panel and the pump. The Town shall be responsible for furnishing and mounting the pump control panel, and the pump. Joe Iuviene, AIA Addendum #1-2 ARCHITECTURAL BUREAU Austerlitz New Town Hall 1/20/17 PO Box Main Street Chatham, NY (518)
3 Austerlitz New Town Hall Addendum #1 P Plumbing Work Modification and Clarification regarding Site Work 1. Septic System: Plumbing Contract shall terminate effluent piping 5 feet beyond building exterior. 2. The contract scope shall be revised so that the all work necessary for the septic system beyond 5 feet of the building shall be the responsibility of the Town. The effluent pump, rails, controls and piping within the pump station have been removed from the plumbing contract. 3. Plumbing contractor shall be responsible for installed new water line between the Building and the Existing Town Hall, as well as final connections. Trenching, bedding and backfill by Town. C Construction Contract- Modification and Clarification regarding Site Work 1. Provide complete layout and setting of grades for all site work. Contractor shall provide grade stakes for limits of excavation. All excavation and backfill of footings, foundation, utilities, and slab shall be completed by the Town Highway Department. 2. Contractor shall be responsible for the installation of all exterior concrete work, including concrete slabs, sidewalks, flatwork, equipment pads, and concrete curbing shown on the drawings and documents. All excavation and backfill shall be completed by the Town Highway Department ** THIS ADDENDUM INCLUDES THE REFERENCED SEVEN (7) DRAWINGS ** ** End of Addendum No. 1 ** Joe Iuviene, AIA Addendum #1-3 ARCHITECTURAL BUREAU Austerlitz New Town Hall 1/20/17 PO Box Main Street Chatham, NY (518)
4
5
6
7
8
9
Project Manual Index of Specifications Shenandoah Schools Concession Building
INDEX OF SPECIFICATIONS Division 0..BIDDING AND CONTRACT REQUIREMENTS 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 41 00 Bid Forms 00 43 13 Bid Security Form 00 72 00 General Conditions
More informationINSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST
Village of Vernon Hills Community Development Department - Building Division 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http://www.vernonhills.org INSPECTION TIMING
More informationA New Municipal Building for Limerick Township
A New Municipal Building for Limerick Township DOCUMENT 00 9001 - ADDENDUM NUMBER 01 December 9, 2016 Re: A New Municipal Building for Limerick Township From: Kelly Clough Bucher & Associates, Inc. 8 East
More informationAddendum! Project No: HFX A0 Client Project No: MISC Project: MacAulay Sports Field Project Date: March 23, 2015 Addendum No: 2
Addendum! Project No: HFX-00222868-A0 Client Project No: MISC-14-06 Project: MacAulay Sports Field Project Date: March 23, 2015 Addendum No: 2 The following information supplements and/or supersedes the
More informationTABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages
TABLE OF CONTENTS VOLUME 1 DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages SCHEDULE OF DRAWINGS...... 1 PROJECT PERSONNEL & DIRECTORY......
More information2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY
PART 1 - GENERAL SECTION 01 01 11 MULTIPLE CONTRACT SUMMARY 1.01 SCOPE OF WORK A. This Section includes a summary of each Contract, including responsibilities for coordination and temporary facilities
More informationADDENDUM No. 5 TO CONSTRUCTION CONTRACT DOCUMENTS BRIDGEPORT PUBLIC UTILITY DISTRICT (BPUD) Arsenic Removal Project Construction Contract
ADDENDUM No. 5 TO CONSTRUCTION CONTRACT DOCUMENTS BRIDGEPORT PUBLIC UTILITY DISTRICT (BPUD) Arsenic Removal Project Construction Contract May 15, 2017 THE BIDDER SHALL EXECUTE THE CERTIFICATION WITHIN
More informationADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV
ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION IN THE TOWN OF MALTA AND A PORTION OF THE 115KV LUTHER FOREST STATION IN THE TOWN OF STILLWATER SARATOGA
More informationPAWLEYS ISLAND TOWN HALL
DOCUMENT 001116 - INVITATION TO RE-BID 1.1 PROJECT INFORMATION A. Notice to Bidders: Prequalified bidders are invited to submit bids for Project as described in this Document according to the Instructions
More informationRIVERSIDE CHURCH OF CHRIST. Lafayette, LA
SECTION 000010 INVITATION FOR BIDS Bids for will be received in the office of Church Development Construction Services, 708 S. Rosemont Road, Suite #101,, until 12:00 noon Local Prevailing Time on Friday,
More informationAdministration Building Needs Assessment
Town Hall Meeting with the Habersham County Board of Commissioners Administration Building Needs Assessment JUNE 13, 2016 Detailed Evaluation Performed in 2015 Engineering Evaluation Site/Civil Architectural
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders
More informationADDENDUM NO. 2 Consisting of 3 pages and Attachments
10404-125 Street, Edmonton, AB. T5N 1T2 Tel: 780.455.5975 Fax: 780.454.2397 info@cdyarchitect.com ADDENDUM NO. 2 Consisting of 3 pages and Attachments PROJECT: Maina Centre Ville Phase II, Beaumont, Alberta
More informationBIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample
BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS Project Name: Address: Owner: Phone/Fax/Email: Architect / General Contractor Name: : BID DEADLINE DATE: SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME:
More informationADDENDUM #4 FOR THE WEST VALLEY FACILITIES INCREMENT 2 REPLACEMENT PROJECT WEST VALLEY COLLEGE
ADDENDUM #4 FOR THE WEST VALLEY FACILITIES INCREMENT 2 REPLACEMENT PROJECT AT WEST VALLEY COLLEGE Owner West Valley-Mission Community College District Saratoga, California Bid #01-1516 12-22-15 WEST VALLEY-MISSION
More informationBID ADDENDUM #1 September 24, 2010
BID ADDENDUM #1 September 24, 2010 To: Prospective Bidders/Planholders For: Science 1 Seismic Retrofit & Renovation California State University Stanislaus One University Circle, Turlock, CA 95382 Bid /
More informationCity Of Mendota Construction Procedures
City Of Mendota Construction Procedures Building Permit Application: A permit shall be obtained prior to commencing work of any type. Failure to do so may result in doubling the permit fees. At the time
More informationTexas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017
Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017 Plumbing - 220000 Without limiting the application of all of the Contract Documents to the Subcontract,
More informationSPITZER CONFERENCE CENTER BRIEFING SUITE REFRESH Addendum #2 02/22/2018 LCCC POJECT NO. SPBSR-17 BPA PROJECT NO
SPITZER CONFERENCE CENTER BRIEFING SUITE REFRESH Addendum #2 02/22/2018 LCCC POJECT NO. SPBSR-17 BPA PROJECT NO. 16-32 ADDENDUM NO. 2 SPITZER CONFERENCE CENTER BRIEFING SUITE REFRESH LORAIN COUNTY COMMUNITY
More informationThe following addendum supersedes previous addendums and does hereby become a part of the contract documents.
1 October 2014 Addendum No. 1 Swansboro Public Safety Facility The following addendum supersedes previous addendums and does hereby become a part of the contract documents. See attached Proposal for use
More informationINSTRUCTIONS FOR COMPLETING THE BUILDING PERMIT APPLICATION FOR COMMERCIAL PROJECTS
INSTRUCTIONS FOR COMPLETING THE BUILDING PERMIT APPLICATION FOR COMMERCIAL PROJECTS The Commercial Plan Summary has been designed to give you a clear understanding of the minimum requirements for submitting
More informationInspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.
Purpose 355 West Queens Road Single Family New Construction Required Inspection Stages Master Requirement GEN 110 Building Department: 604-990-2480, building@dnv.org, fax: 604-984-9683 The following procedure
More informationFranklin Hall Renovation TABLE OF Document Indiana University Bloomington
VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...
More informationSchedule of Values Cruise Terminal 2 Expansion
Schedule of Values The Schedule of Values outlined below is intended to reflect the standard format that would be used in a Contractors Application for Payment. Values reflect materials and labor. General
More informationHILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District
HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District Facilities and School Safety Committee Meeting October 25, 2018 Progress Update PROGRESS UPDATE Rien Construction (General
More informationSTANDARD SPECIFICATIONS
TOWN OF COLONIE DEPARTMENT OF PUBLIC WORKS DIVISION OF PURE WATERS STANDARD SPECIFICATIONS for RESIDENTIAL SANITARY SEWER CONNECTIONS Latest Revision Date: November 2017 TABLE OF CONTENTS Section Page
More informationCity of Westerville Guide to Commercial Inspections
City of Westerville Guide to Commercial Inspections FOOTINGS - After the excavation, with the form work and any required reinforcing steel in place. All footings shall have loose soil removed, reinforcing
More informationSTANDARD CONSTRUCTION PACKAGE Addendum A REV SITE & EXCAVATION Layout of the foundation and septic system as approved by local and state author
STANDARD CONSTRUCTION PACKAGE Addendum A REV 7-3-18 SITE & EXCAVATION Layout of the foundation and septic system as approved by local and state authorities Excavate material to pour footings and foundation
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More informationQUOTE Quote Process City Of Taylor
PROJECT SPECIFICATIONS QUOTE Quote Process City Of Taylor Budget & Finance Dept. Purchasing Manager: RMM 23555 Goddard Road Taylor, MI 48180 734-374-1459 The City of Taylor Central Purchasing Division
More informationNOTICE TO OFFERORS ADDENDUM NO. 2 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH
September 20, 2018 NOTICE TO OFFERORS ADDENDUM NO. 2 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH To Holders of Bid Proposals: Please make the following clarifications, additions,
More informationApril 18, 2018 CONTRACT NO.: TENDER CLOSING DATE: Friday April 27, :00 pm EST
April 18, 2018 CONTRACT NO.: 17003-001 TENDER CLOSING DATE: Friday April 27, 2018 2:00 pm EST TENDER FOR: 7th Avenue Watermain, Storm Sewer, Sanitary Sewer and Road Reconstruction from 12 th Street to
More informationC ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)
C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) 353-8115 Fax: (630) 852-4709 BUILDING PERMIT INFORMATION PACKET Revised: October 2018 Building Codes: International Residential
More informationTHE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS
THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE I MUNICIPAL SITE PLAN & LOT GRADING REQUIREMENTS (SUBDIVISION LOTS) Revised: July 27, 2017 1. INTRODUCTION This guide is intended to advise
More informationCITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION
CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and
More informationlegend. #1 is a gas relief valve? If so does Enbridge supply with station?
Michael Pacholok, Director Purchasing and Materials Management Division City Hall, 8 th Floor, West Tower 00 Queen Street West Toronto, Ontario M5H N Joanne Kehoe Manager Construction Services May 4, 06
More informationPolicies & Guidelines
Policies & Guidelines Facilities Maintenance and Repair These Policies and Guidelines are provided by the Falconbridge Homeowners Association (FHA) Board of Directors to explain how the Declarations of
More information1. Meeting minutes from the pre-bid conference are attached for inclusion in the Bid Documents.
PROJECT NO. 13-130.03 Splash Pad at Lakeside Park ADDENDUM #4 `` Splash Pad at Lakeside Park Pell City, AL WBA No. 13-130.03 OWNER: City of Pell City 1905 First Ave. North Pell City, AL 35125 ph. (205)338-2244
More informationTHE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS
THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE I MUNICIPAL SITE PLAN & LOT GRADING REQUIREMENTS (SUBDIVISION LOTS) Revised: November 18, 2014 1. INTRODUCTION This guide is intended to
More informationCONTRACT PROPOSAL/CONTRACT ACCEPTANCE. Bloomfield EMS Station
CONTRACT PROPOSAL/CONTRACT ACCEPTANCE PROJECT # 2016-NC-002 For Construction of Bloomfield EMS Station located in Bloomfield, Kentucky 02/12/2016 REQUEST FOR BIDS Bloomfield EMS Station Building The City
More informationCITY OF TACOMA Department of Public Utilities Tacoma Power
CITY OF TACOMA Department of Public Utilities Tacoma Power ADDENDUM NO. 1 DATE: August 4, 2017 REVISIONS TO: Request for Bids Specification No. PG17-0130F TPU Eductor Waste Decant Facility NOTICE TO ALL
More informationCONTRACT ADDENDUM # 1
date: January 5, 09 project: Bear River Bleachers CONTRACT ADDENDUM # by: Design West Architects subject: Revisions The Work shall be carried out in accordance with the following supplemental instructions
More informationHILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District
HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District Facilities and School Safety Committee Meeting September 20, 2018 Progress Update PROGRESS UPDATE Rien Construction (General
More informationNational Property Inspections
National Property Inspections Anywhere, USA (325) 382-8754 Property Location 9375 Burt Street Anywhere USA Prepared for John Investor Consultant Al Standard (325) 382-8754 Page 1 of 27 TABLE OF CONTENTS
More informationSTREET LIGHTING. Springville City Power standard street lights will be installed in accordance with Springville City Power's Line Extension Policy.
General The following general requirements shall apply to street lights installed in new underground residential subdivisions or developments located within the service area of Springville City Power (within
More informationCONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist
CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist
More informationADDENDUM NO. 1 CITY OF SOUTH PORTLAND, MAINE WATERMAN DRIVE PARKING IMPROVEMENTS BID # August 21, 2014 PREPARED BY:
ADDENDUM NO. TO CITY OF SOUTH PORTLAND, MAINE WATERMAN DRIVE PARKING IMPROVEMENTS BID #04-5 August 2, 204 PREPARED BY: SEBAGO TECHNICS, INC. 75 John Roberts Road Suite A South Portland, ME 0406 3036 Addendum
More informationSECTION PAYMENT PROCEDURES
SECTION 012900 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract including General and Supplementary Conditions and other Division 01 Specifications Sections apply
More informationPort KC RFP NORTHLAND PARK BUILDING V
Port KC RFP NORTHLAND PARK BUILDING V 1. The RFP refers to landscaping plans. However, it does not appear that the landscaping plans were issued with the rest of the RFP. Will these be issued with an addendum?
More informationSECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION
820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing
More informationSee attached answers to questions and requests for clarification received.
Office of the Vice President 971 Elmore Drive and Chief Financial Officer PO Box 115250 Procurement Services Gainesville, FL 32611-5250 http://procurement.ufl.edu/ (352) 392-1331 Fax 352-392-8837 June
More informationPADUCAH DOME RELOCATION NORTH 6 TH STREET PADUCAH, KENTUCKY MARCUM ENGINEERING NO ADDENDUM 1.00 NOVEMBER 25, 2015
PADUCAH DOME RELOCATION NORTH 6 TH STREET PADUCAH, KENTUCKY MARCUM ENGINEERING NO. 15637 ADDENDUM 1.00 NOVEMBER 25, 2015 The following Addendum Items shall be made part of the Contract Documents for the
More informationEXISTING CONDITIONS. Town of Bedford, NH Sand Volleyball Courts Existing Conditions Sheet 2 of 5 GENERAL NOTES
GENERAL NOTES 1. THE CONTRACTOR SHALL VERIFY AND DETERMINE THE LOCATION, SIZE AND ELEVATION OF ALL EXISTING UTILITIES SHOWN OR NOT SHOWN ON THESE PLANS PRIOR TO THE START OF ANY CONSTRUCTION. THE CONTRACTOR
More informationContact Clark Public Utilities Construction Services department at (360) to initiate a request for service.
CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation
More informationTOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST
Project Name: Project Location: Date Submitted: TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST Last Revised January 31, 2014 Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( )
More informationAppalachian Log Structures Construction Cost Estimating Guide
PLANNING Design/Architect Fees General Contractor Fees LOT CONSIDERATIONS Lot Costs Property Tax Surveying Zoning PRELIMINARY COSTS Taxes Building Permit Hazard/Liability Insurance Performance Bond Impact
More informationExhibit A Library Shell Construction
Exhibit A Library Shell Construction Library Component Building Requirements Approximately 15,000-17,000 square feet plus 900 square feet for mechanical room and additional space on roof for installation
More informationBuilding Permit Application
Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:
More informationIssued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS
669.7403.001 West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS Page C-111 Advertisement for Bids 1-2 C-200 Instruction to Bidders 1-10 C-410 Bid Form for Construction Projects
More informationTENDER WELLCOX ACCESS ROAD ADDENDUM 1
TENDER 2336-2019 WELLCOX ACCESS ROAD ADDENDUM 1 This addendum shall be read in conjunction with and considered as an integral part of the Tender Contract 2336-2019. Revisions supersede the information
More informationNOTICE TO OFFERORS ADDENDUM NO. 1 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH
November 29, 2018 NOTICE TO OFFERORS ADDENDUM NO. 1 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH To Holders of Bid Proposals: Please make the following clarifications, additions,
More informationAddendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications
Addendum No. 2 Project No. 2016-01EL West Barbour Street 12kV Underground Reconductoring Revisions to Drawings and Specifications Pre-Bid Meeting Notes and Scope of Work Clarifications Replace Section
More informationWIBLE BARBER Architects
WIBLE BARBER Architects Billingsley School Bleacher Replacement 2246 County Road 77 / Billingsley, Alabama 36006 BC PROJECT NO: 2017499 WBA PROJECT NO: 170901 ADDENDUM NO. 2 GENERAL: November 28, 2017
More informationOregon Building Officials Association
Oregon Building Officials Association Oregon Building Officials Association Inspector s Checklist 2010 Oregon Manufactured Dwelling Installation Specialty Code November 5, 2014 By: Frank Scheer, Building
More informationDOCUMENT BID DOCUMENT
DOCUMENT 00 40 00 BID DOCUMENT 1 Submit bids in compliance with Document 00 21 00Instructions to Bidders. Fill in blanks which pertain to the project or indicate N/A. The Owner reserves the right to reject
More informationResidential Construction Minimum Required Inspections
Residential Construction Minimum Required Inspections The permit which you have been issued gives authority for work to commence. The stamped, approved plans, returned with this permit, shall be retained
More informationResidential Miscellaneous Permits
Residential Miscellaneous Permits Planning and Development Services Department Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org
More informationSERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS
SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,
More informationNEW MIDDLE SCHOOL PROJECT
Monthly Report October 2017 INTRODUCTION P.J. Dick Incorporated is pleased to present to the Chartiers Valley Board of School Directors the following Construction Report for the Chartiers Valley Middle
More informationParish of Ascension Project Management ADDENDUM #1 NOTICE TO BIDDERS/ QUOTE
Parish of Ascension Project Management ADDENDUM #1 NOTICE TO BIDDERS/ QUOTE PROJECT #/ ENG-16-085 PROJECT NAME: FRANK SOTILE PAVILION ADDITION CODE: DATE: Wednesday, June 14, 2017 OWNER: ASCENSION PARISH
More informationTHE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER'S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS
THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER'S GUIDE I MUNICIPAL SITE PLAN & LOT GRADING REQUIREMENTS (SUBDIVISION LOTS) Revised:March 25,2014 1. INTRODUCTION This guide is intended to advise
More informationCITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application
CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application DATE: / / PERMIT # REQUEST FOR: NEW BUILDING ADDITION REMODEL PLUMBING ONLY ELECTRIC ONLY
More informationThe Metropolitan Sewer District of Greater Cincinnati
The Metropolitan Sewer District of Greater Cincinnati Dry Run Area Sewers, Phase 1 and Phase 2 Contract A, Project ID 10270000_10270005 Date Issued: 03/25/2010 ADDENDUM NO. 2 This addendum will only be
More informationST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT
Revised 04-19-2016 ST. TAMMANY PARISH REQUIRED INSPECTION STANDARDS AND PROCEDURES Permit Number I acknowledge receipt of and understand the below inspection requirements. I also acknowledge that by acting
More informationREVISED BID FORM. To Procurement Services, Room 1104, 900 East Broad Street, Richmond, Virginia:
REVISED BID FORM SEALED BIDS WILL BE RECEIVED at the Department of Procurement Services, City Hall, 900 E. Broad Street, Rm. 1104, Richmond, Virginia 23219, UNTIL BUT NOT LATER THAN 2:30 P.M. ON February
More informationREQUIRED RESIDENTIAL PERMITS
100 Parklane Drive Eagleville, PA 19403 www.lowerprovidence.org Administration: 610 539-8020 Fax: 610 539-6347 Police: 610-539-5901 Fax: 610-630-2219 REQUIRED RESIDENTIAL PERMITS The majority of construction
More informationVILLAGE OF ORLAND PARK, ILLINOIS ADDENDUM NO. 1 REBID # STELLWAGEN FARMHOUSE RESTORATION: PHASE 1 EXTERIOR FOUNDATION
VILLAGE OF ORLAND PARK, ILLINOIS ADDENDUM NO. 1 REBID #15-019 STELLWAGEN FARMHOUSE RESTORATION: PHASE 1 EXTERIOR FOUNDATION Date: Wednesday, April 13, 2016 To: From: RE: All Potential Bidders Village of
More informationSection 7: Specifications
Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required
More informationQUESTIONS & ANSWERS ITB HELEN MCCALL PARK IMPROVEMENTS
QUESTIONS & ANSWERS ITB 017-030 HELEN MCCALL PARK IMPROVEMENTS QUESTION: Site Lighting. The prints show that the existing site lighting structures are to be relocated on site. Is this the only site lighting
More informationA NEW PRE-K BUILDING FOR BIG SPRING LAKE KINDERGARTEN SCHOOL FOR THE ALBERTVILLE CITY BOARD OF EDUCATION ALBERTVILLE, ALABAMA
McKee and Associates Architecture and Interior Design Addendum No. FOUR Date: 09.24.18 Project: A NEW PRE-K BUILDING FOR BIG SPRING LAKE KINDERGARTEN SCHOOL FOR THE ALBERTVILLE CITY BOARD OF EDUCATION
More informationSMMUSD LINCOLN MIDDLE SCHOOL ATHLETIC FIELD PROJECT
ADDENDUM 01 SMMUSD LINCOLN MIDDLE SCHOOL ATHLETIC FIELD PROJECT 06/08/2017 DSA NO. A03-117787/File No.19-96 Prepared By DLR Group Project No. 75-07256-24 SECTION 00 91 00 GENERAL ADDENDUM 01 1.01 The following
More informationJ~e~~r Senior Director of Construction Services Facilities Design and Construction UNIVERSITY OF CALIFORNIA, SAN DIEGO.
BERKELEY DAVIS IR VINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SAN!' A BARBARA SANT A CRUZ OFFICE OF THE ASSIST ANT VICE CHANCELLOR CAMPUS ARCHITECT - FACILITIES DESIGN & CONSTRUCTION TEL:
More informationTown of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:
S FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE: Included Costs: Items that must be included in the costs of improvement or costs to repair are those that are directly associated with the
More informationArbor Heights Elementary School. Concrete for South Building Foundation Stem Walls
Arbor Heights Elementary School Concrete for South Building Foundation Stem Walls Arbor Heights Elementary School Workers Placing Concrete for South Building Foundation Stem Walls Arbor Heights Elementary
More informationTOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:
TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be
More informationDOCUMENT ADDENDA AND MODIFICATIONS
DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications
More informationGas meter clearances and service installation requirements
FEBRUARY 2018 Gas meter clearances and service installation requirements CALL PSE S CUSTOMER CONSTRUCTION SERVICES AT 1-888-321-7779 OR VISIT PSE.COM/CUSTOMERCONSTRUCTION FOR MORE INFORMATION. Builder/owner/developer
More informationCapital Projects Progress Report. January Presented by
Capital Projects Progress Report January 2019 Presented by February 8, 2018 Loretta Orologio District Superintendent Churchville-Chili Central School District 139 Fairbanks Road Churchville, New York 14428
More informationROUTT COUNTY REGIONAL BUILDING DEPARTMENT 136 * P.O.
ROUTT COUNTY REGIONAL BUILDING DEPARTMENT 136 6 th Street * P.O. Box 773840 * Steamboat Springs, CO 80477 (970)870-5566 * FAX (970)870-5489* Email: Building@co.routt.co.us INSPECTIONS POLICY SCHEDULING
More informationSECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationC o u n t y o f F a i r f a x, V i r g i n i a
001961 Page 2 C o u n t y o f F a i r f a x, V i r g i n i a A D D E N D U M DATE: August 2, 2016 ADDENDUM NO. 4 TO: REFERENCE: FOR: DUE DATE/TIME: ALL PROSPECTIVE BIDDERS Government Center Generator System
More informationTOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT
TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT 06045-0191 138 MCKEE STREET MANCHESTER, CT BID NO. 16/17-5 ADDENDUM NO. 1 1. The bid opening has been
More informationJob Order Sewer Repair Services
Job Order Sewer Repair Services Bid Addendum No. 1 October 10, 2018 All Contractual Requirements as defined within the Contract Documents shall remain in full force to the extent that they are not modified
More informationG703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project
Billing Requirements G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Sitework / Paving Excavation and Grading Labor
More informationQ&A: The Block/Parsons Alley Construction RFP
Q&A: The Block/Parsons Alley Construction RFP 1. Is there a Geotechnical Report available? 2. Would it be possible to extend the bid date to a day other than a Monday? 3. Is it possible to extend the date
More informationReason for Change Identifiers: OR= Owner Request; FC= Field Condition; AJ= Requirement of Local Authority CL= Clarification (No Scope Change)
Page 1 of 6 ADCI Bulletin No. 01 Date: March 30, 2015 Project: @580 Renovation for New Apartment Units Address: 580 Walnut Street Cincinnati, OH 45202 Commission: Prepared For: Prepared By: PDT P266 Cincinnati
More informationResidential Building Plans
Residential Building Plans 1. Building Site Plan indicating: a. Location of Proposed and Existing Buildings b. Location of Property Lines c. Building Setback Dimensions d. Location and Depth of Building
More informationBIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D
HOSKINS ARCHITECTURE, LLC 1827 1 ST AVENUE NORTH, SUITE 104 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 3 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS
More information