Tipton Flood Resilience Plan - Strategies for Smart Growth and Long-Term Flood Risk Reduction

Similar documents
SECTION 11: REGULATORY FLOODWAYS

New Castle County, DE. Floodplain Regulations

Natural Hazards Mitigation Plan Kankakee County, Illinois Executive Summary

Municipal Stormwater Management Planning

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

CHAPTER 7. San Dieguito River Flooding Adaptation

TOWN OF KILL DEVIL HILLS, NORTH CAROLINA ANNUAL PROGRESS REPORT ON ADOPTED HAZARD MUTIGATION PLAN COMMUNITY #

STREAM AND BUFFER AREA PROTECTION/RESTORATION

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

Increasing the Coastal Resilience of Vulnerable Wastewater Infrastructure on Cape Cod and the Islands Two Case Studies

Walnut Creek Watershed Management Authority. Project Kick Off March 18, 2015

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA

SECTION 6: MITIGATION STRATEGY

RIPARIAN PROTECTION Questions & Answers

Regional Watershed Planning. Calumet Summit 2010: A Call to Connect Calumet Conference Center April 27, 2010

Quantifying the Benefits of Stream Restoration

Worksheet Task Capability Assessment Worksheet. Planning and Regulatory. Jurisdiction:

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

GREEN BROOK FLOOD CONTROL PROJECT FLOODPLAIN MANAGEMENT PLAN

BUILDING A STRUCTURE IN THE FLOODPLAIN. IMPORTANT REQUIREMENTS Of Warren County Floodplain Management Ordinance

TWIN PLATTE NATURAL RESOURCES DISTRICT

POND SITING REPORT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES EXECUTIVE SUMMARY SECTION 1.0 INTRODUCTION SECTION 2.0 PROJECT DESCRIPTION

The newly updated and comprehensive SWMP shall:

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

Protecting Your Water Resources

ABC S OF FRESHWATER WETLAND DESIGN: CONCEPT TO CONSTRUCTION

SECTION 4 SURFACE WATER MANAGEMENT DESIGN AND CONSTRUCTION REQUIREMENTS

SoPo s SW Management Approach Purpose of SW Standards

STORMWATER MANAGEMENT LEGISLATION IN COOK COUNTY (P.A )

WATERSHED MANAGEMENT INITIATIVE: GOALS & IMPLEMENTATION OBJECTIVES, JULY 26, 1999

June 22, Francis E. Borcalli, P.E.

POTABLE WATER ELEMENT

Carbon Creek Channel (OCFCD Facility No. B01) from upstream Intersection of Western/Orange to upstream Beach Boulevard.

Georgia's Nonpoint Source Management Program. Linda MacGregor Watershed Protection Branch Georgia Environmental Protection Division

Development of a Stormwater Management Plan for Phase II Small MS4s Insight and Innovation

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines

MODEL LAND USE REGULATIONS

Public Notice. Applicant: Lennar Homes Project No.: SWF Date: October 29, Name: Mr. Darvin Messer Phone Number:

TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN

National Housing Trust Fund Environmental Review and Funding Requirements

FLOODPLAIN DEVELOPMENT AND BUILDING ORDINANCE

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

STORMWATER MANAGEMENT PROGRAM

Marysville Levee Commission

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

Currituck County Moyock Mega-Site Market Feasibility Study March 28, 2016

CHAPTER 6 BUILDING REGULATIONS ARTICLE I FLOOD PLAIN CODE

Village of Mamaroneck Flood Mitigation Status Report

BOROUGH OF HIGHLANDS STRATEGIC RECOVERY PLANNING REPORT. September 2014

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description

Holly Swartz and Jason Shirey

Municipal Stormwater Ordinances Summary Table

Ordinance No. 1365C Stormwater Management and Clean Water Regulations Ordinance for

Part 4: Floodplain, Riparian, & Lakeshore Regulations

Coordinated Hazard Assessment and Mapping Program

Pennsylvania Stormwater Best Management Practices Manual. Section 3 Stormwater Management Principles, Goals, and a Management Model

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

ARTICLE A. POST-DEVELOPMENT STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

CITY OF PACIFICA 170 Santa Maria Avenue Pacifica, California

Location Drainage Study

Go Green, Save Money: Lowering Flood Insurance Rates in Virginia with Stormwater Management. Kristen Clark VCPC Alumna, Spring 2014

Luzerne County Act 167 Phase II

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators

Emerging Trends in Ecological Offsets

Mitigation Plan Mission, Goals and Action Items

South St. Vrain / Hall Meadows Restoration Planning August 20, 2015

Adjusted Flood Prone Acres

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS

Regulatory Requirements

CHAPTER 3. NATURAL HAZARDS MITIGATION

Tioga County. Comprehensive Emergency Management Plan (CEMP)

WRIA 1 Long Term Monitoring Program Strategy for Implementation

STORMWATER MANAGEMENT PROGRAM. Table of Contents

The total population of the township is 9,942 (2015 Five-Year American Community Survey [ACS]). The median household income is over $109,000.

RESIDENTIAL BUILDING PERMIT

Credit Valley Conservation (CVC) Board of Directors. Chief Administrative Officer (CAO) Watershed Knowledge. Watershed Management

E. STORMWATER MANAGEMENT

Project Alignment Appendix A

CHAPTER 5: CONSERVATION ELEMENT

Clallam County Shoreline Master Program (SMP) Update

a landowner whose parcel was subjected to the discharge of a neighbor's ditch which was being used to drain a swamp;

Environment & Conservation Introduction

INTEGRATION OF THE LOCAL MITIGATION STRATEGY INTO THE LOCAL COMPREHENSIVE PLAN. Executive Summary

LOCATION AND DESIGN DIVISION

CHAPTER 26. SAN RAMON VALLEY FIRE PROTECTION DISTRICT ANNEX

Flood Mitigation Action Plan. Town of Avoca, Town of Bath, and Village of Bath

WISCONSIN. Enforceable Provisions Applicable to Nonpoint Source Water Pollution DISCHARGE PROHIBITIONS

SAN BRUNO CREEK / COLMA CREEK RESILIENCY STUDY FINAL REPORT

Habitat Grant Projects Clinton River Watershed

Chapter 2.0. Mitigation Strategy: Goals, Objectives, and Initiatives. Introduction. Vision: Chapter 2.0 Mitigation Strategy

ENVIRONMENTAL QUALITY

CHAPTER 9 DISCUSSIONS, CONCLUSIONS, AND RECOMMENDATIONS

Evaluating Release Rates for Specific Watersheds in Cook County

Municipal Class Environmental Assessment for Pottersburg Creek Slope Stability Study South of Hamilton Road, Schedule B

Central Florida Water Initiative Northern Everglades and Estuaries Springs Water Quality, Supply and Planning

Transcription:

Tipton Flood Resilience Plan - Strategies for Smart Growth and Long-Term Flood Risk Reduction An Action Discovery Project as part of the Upper White River Watershed Discovery Report Presented by: Siavash Beik Christopher B. Burke Engineering, LLC INAFSM, September 8, 2016 Flood Resilience Planning Flood resilience means measures taken to reduce the vulnerability of communities to damages from flooding and to support long-term recovery after an extreme flood. Integrating Smart growth principles into state and local policies Enhancing Local development regulations Integrating strategies in Hazard Mitigation and Comprehensive Land Use Plans Why was Tipton selected for this project? First community in Indiana for this approach Previous flood risk management studies and plans developed for the Big Cicero Creek Watershed No feasible structural alternatives Continued vulnerability to significant flooding 2 1

The City of Tipton Flood Zones Flood Zones Floodway 1.0% ACFH 0.2% ACFH Zone A Critical Facility 3 The City of Tipton Flood Depths 0.2% ACFH (500-yr) Flood Depths 4 2

Why Tipton Flood Resilience Plan A Major recommendation of the Nov 2014 Big Cicero Creek Watershed Flood and Erosrion Risk Management Plan Recognition that severe floods are expected to occur again, while no feasible effective flood control alternative exists Desire for a resilient, economically viable City despite its flood vulnerable settings April 2013 Flood Tipton, Indiana 5 Overview of the Planning Process 10-month Planning Process Review and Consolidation of Flood-related Data and Studies Meeting with Stakeholders 2 Group Meetings and Several One on One Meetings Completed Resiliency Checklist at First Meeting Develop Flood Resilience Planning Areas and Strategies 6 3

Flood Resilience Strategies for Tipton Adopt Overall Strategies Conducting regular audits of policies, regulations, and budgets Checking for consistency, updating, integrating, and revising plans, policies, and regulations Participation in the Community Rating System Adopt Specific Land Use Strategies for Distinct Geographical Areas River Corridors (floodway and erosional corridors) Other Flood Hazard Areas (floodway fringe areas) Vulnerable Settlements (developments already existing in harms way) Safer Areas (low flood risk areas) The entire Watershed (the Big Cicero Watershed) 7 Strategies for Flood Resilience Overall Strategies 1. Update floodplain regulations 2. Adopt flood elevation data from updated flood studies 3. Adopt a comprehensive stormwater ordinance and technical stds 4. Update, integrate and revise plans, policies and regulations 5. Conduct regular audits of programs and policies 6. Participate in the Community Rating System 8 4

Overall Strategies in detail Adopt a comprehensive stormwater ordinance and technical standards Basic and very general stormwater standards in zoning and subdivision control ordinances Freestanding stormwater ordinance and technical standards that: 1. Preserves upstream floodplain storage 2. Institutes requirements for channel protection volume 3. Promotes low impact development and green infrastructure Tipton should adopt stormwater ordinance and technical standards recently adopted by Big Cicero Creek Joint Drainage Board and Tipton County 9 Overall Strategies in detail Conduct regular audits of programs and policies Multiple plans, policies, and regulations play role in resilience including: Comprehensive Plan Multi-hazard Mitigation Plan Zoning Ordinance Subdivision Control Ordinance Capital Improvement Plan Economic Development Plan Need for coordination and complementary language Tipton should review current language and conduct regular audits to ensure consistency 10 5

Floodplain Terminology Refresher Fluvial Erosion Corridor 11 Flood Resilience Planning Areas Watershed 12 6

Flood Resilience Planning Areas Planning Area Area Boundary Intent of Area Strategy River Corridor Other High Flood Hazard Areas Vulnerable Settlements Safer Areas Floodway or fluvial erosion hazard area, whichever is greater Undeveloped land in the floodway fringe Existing developed land in the SFHA (floodway fringe and floodway) Outside the SFHA but within the planning jurisdiction To conserve land and prohibit new development To conserve land and maintain the natural and beneficial function of the floodway fringe To protect people, buildings, and facilities in vulnerable areas and reduce future flood risk To plan for and promote development in areas that are less vulnerable to future floods Watershed Entire drainage area To promote coordination and partnerships and implement practices to slow, spread, and infiltrate flood water 13 Strategies for Flood Resilience River Corridor 1. Adopt a river corridor overlay zone and prohibit land disturbance in this zone 2. Protect undeveloped land in the river corridors 3. Minimize streambank erosion 14 7

River Corridor in detail Adopt a river corridor overlay zone and prohibit land disturbance in this zone Establish additional or stricter standards and criteria to those of the underlying zoning district Defined by floodway and fluvial erosion hazard area, whichever is greater Due to susceptibility and vulnerability to flooding and erosion, development or disturbance should be prohibited Tipton should adopt more restrictive overlay zone into zoning ordinance 15 Strategies for Flood Resilience Other High Flood Hazard Areas 1. Prohibit development in the floodway fringe (including critical facilities) 2. Protect undeveloped land in the floodway fringe 3. Adopt compensatory floodplain storage requirement (where placement of fill is unavoidable and variance is granted) 16 8

Other High Flood Hazard in detail Prohibit development in the floodway fringe (including critical facilities) Intent is to maintain natural and beneficial function of the floodplain Prohibit new development on undeveloped land in floodway fringe Suitable uses include parks, woods, and fields that can flood without causing significant damage to life and property or exacerbate flooding elsewhere Tipton should adopt more restrictive language as amendment to zoning ordinance 17 Other High Flood Hazard in detail Adopt compensatory floodplain storage requirements (where placement of fill is unavoidable and variance is granted) Loss of floodplain storage on one property could negatively impact other properties Effective regulatory tool to compensate for any fill, structure, or other materials above grade in the regulatory floodplain Tipton should adopt a 3:1 compensation of floodplain storage into the proposed comprehensive stormwater ordinance 18 9

Strategies for Flood Resilience Vulnerable Settlements 1. Protect existing critical facilities 2. Buyout structures 3. Floodproof structures 4. Bring nonconforming uses into compliance 5. Create new flood storage capacity through redevelopment 6. Require building expansion and new accessory structure to meet additional requirements 7. Adopt a flood response plan 8. Adopt post-flood damage assessment data collection and protocols 9. Connect people to the river 19 Vulnerable Settlements in detail Protect existing critical facilities Intent is to protect critical facilities built in older communities prior to flood maps and advanced flood modeling Eight critical facilities in the SFHA Structural flood protection methods needed floodwalls and levees to protect 3 feet above BFE or 500-yr + 2 ft. Need to minimize impact from floodplain storage and/or flow conveyance losses Tipton should secure funding from FEMA for floodproofing projects 20 10

Conceptual Flood protection of Hospital 21 Hospital Conceptual Flood protection Simulation 22 11

Vulnerable Settlements in detail Relocation/Buyout Structures Intent is to remove individual flood prone structures from harm s way and create open space within flood hazard areas 800 homes and businesses are vulnerable to flooding About 50 are in floodway and another 200 in fringe areas but with flood depths expected over 2.5 feet good candidates for buyout Tipton should secure funding from FEMA for continued buyout and floodproofing 23 Vulnerable Settlements in detail Require building expansion and new accessory structure to meet additional requirements Preference for structures in vulnerable areas to be relocated or bought out and land converted to open space Intent to safely allow expansion of structures in floodway fringe Additional requirements needed to reduce flood losses including 1:1 compensatory floodplain storage and not allow building expansion, or new accessory structure, to be any closer to the river Tipton should adopt more restrictive language in both the proposed comprehensive stormwater ordinance and floodplain ordinance and identify incentives (flexible zoning, floodproofing assistance, or stormwater utility credits) 24 12

Vulnerable Settlements in detail Adopt a flood response plan Overwhelming level of activity and need for quick information and response during flood fight Plan needed for flood detection/ level determination, notification/ communication, expected actions, and termination/follow-up Reduces duplication of efforts and avoids gaps in response and recovery efforts Tipton should prepare a flood response plan 25 Strategies for Flood Resilience Safer Areas 1. Steer public policy and investment to support development in safer areas 2. Promote conservation design 3. Promote placement of critical facilities in safer areas 0.2% 26 13

Safer Areas in detail Steer public policy and investment to support development in safer areas Core of comprehensive plan is the land use and development section Current plan includes future growth and development in the SFHA which is in conflict with resilience planning Guide development with capital improvement projects and expansion of utilities and infrastructure into safer areas Tipton should promote smart growth principles in the comprehensive plan and zoning ordinance 27 Strategies for Flood Resilience Watershed 1. Support the efforts of the Big Cicero Creek Drainage Board (and implementation of the 2014 Big Cicero Watershed Flood and Erosion Risk Management Plan) 2. Adopt a natural resource overlay zone 28 14

Watershed in detail Support the efforts of the Big Cicero Creek Joint Drainage Board (and implementation of 2014 Plan) BCCJDB regulates drainage in watershed in Hamilton, and Tipton Counties (+ small areas in Boone & Clinton Counties) Efforts to improve situation cover crops, maintain stream gages, 2- stage ditch construction, BMPs to minimize erosion, flood elevation studies Tipton should continue to support efforts of the Board and implementation of the 2014 Plan 29 Where do we start? Prevent any increase in flood vulnerability (steer new development to safer areas) Prepare for the next flood (flood response plan, education, outreach) Reduce Flood vulnerability (relocate and/or floodproof bldgs and infrastructure) 30 15

Bottom Line Enough is enough Implications of climate change Need to change mindsets balance structural and nonstructural (planning and policy-based) solutions Prevent, Prepare, Reduce! 31 Call to Action Start implementing the plan! Modify the City s comprehensive plan, floodplain ordinance, and other documents to reflect the recommended changes and facilitate their adoption by the City Council Secure funding and develop a Flood Response Plan Start conversation with FEMA & IDHS to secure funding for general structure buyouts and protection of critical facilities Encourage and support the hospital to initiate design process for the recommended flood protection measures 32 16

Questions or Comments? Indiana Department of Natural Resources Division of Water Indianapolis, Indiana 317.232.4173 dknipe@dnr.in.gov Christopher B. Burke Engineering, LLC Indianapolis, Indiana 317.266.8000 sbeik@cbbel-in.com mrummel@cbbel-in.com smckinley@cbbel-in.com The Polis Center Indianapolis, Indiana 317.278.4935 mhriggs@iupui.edu lardunca@iupui.edu 33 17