Application for Underground Pipeline Crossing or Longitudinal of Railroad Property and or Track

Similar documents
THE KANSAS CITY SOUTHERN RAILWAY COMPANY 427 West 12 th Street Kansas City, Missouri

NORTH CAROLINA RAILROAD COMPANY SPECIFICATIONS FOR PIPELINE OCCUPANCY OF NORTH CAROLINA RAILROAD COMPANY PROPERTY

Village of Arlington Heights. Sewer Back-up Rebate Program

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

CHAPTER 5: UTILITIES

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit

FORM SJ INSTRUCTIONS FOR FILING APPLICATION FOR PERMIT PROPOSED SEWAGE COLLECTION AND TREATMENT SYSTEM

API & AOPL Provisions of a Model State One Call Law

TECHNICAL PROCEDURE TABLE OF CONTENTS

SPECIFICATION : BORING AND JACKING

SECTION WATER MAINS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

CITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE. FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

Soil Erosion and Sedimentation Control 12 Items required on a SESC Plan pursuant to Rule 1702

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

Minn. Stat. Sec.18C.305 BULK PESTICIDE/FERTILIZER STORAGE - NEW PERMIT APPLICATION

Fire Protection Underground Piping. ASCE Meeting 12/17/14 Columbia, SC

ITR CONCESSION COMPANY LLC

Residential Engineering P.O. Box 430 Memphis, TN (Deliveries at 5791 Summer Trees Memphis, TN 38134) (901) / (901) Fax

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703)

All service lines shall conform to the following requirements:

Steel Pipelines Crossing Railroads and Highways

Cass County Soil Erosion & Sedimentation Control Program

Burlington Northern Santa Fe UTILITY ACCOMMODATION POLICY

Walker County Manufactured Home Rental Community Regulations Infrastructure Development Plan

REQUIREMENTS FOR WORK WITHIN ROAD RIGHTS-OF-WAY IN UNION COUNTY

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

Wheeling and Lake Erie Railway Co. TARIFF WE A GENERAL RULES FOR UNLOADING AND HANDLING OF BULK COMMODITY TRAINS

For Public Input Period

ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS

SCRRA RIGHT-OF-WAY ENCROACHMENT PROCESS

EXCAVATION PERMIT CHECKLIST

Sidewalk Repair Program. Charter Township of Canton Engineering Services

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

West Virginia Department of Health & Human Resources Department of Health

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

Georgia Department of Transportation Railroad Coordination Submission Checklist

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

Chisago County Environmental Services 313 No. Main St., Room 243 Center City, MN

SECTION TRENCHING & BACKFILLING

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST

Permitting. Information Packet

Residential Sewer Backup Prevention Program

MetroLink Operations 700 South Ewing Street Saint Louis, Missouri

Welcome! Thank you for your interest in upgrading your service with Great Lakes Energy Cooperative (GLE).

Marbella Isles Homeowners Association, Inc.

In the event of any occurrence that does or could pose a hazard to rail traffic or the public, contact Canadian Pacific Railway at

SECTION CONSTRUCTION SERVICES

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:

IFB B Attachment 3 Page 112-1

Special Research Study. Comparison of Stormwater Pipe Installation Lengths and Costs in Texas: Frisco, Arlington, Austin, Victoria and Hidalgo County

Appendix P. CNR Crossing Application

Reclaimed Water Treatment, Distribution, Pumping and Storage Engineering Report Form

Application for Gas Exploration and Production

ENVIRONMENTAL SITE ASSESSMENT QUESTIONNAIRE

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

ENVIRONMENTAL INFORMATION FORM

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Bureau Policy for Tent Permit

Last Updated March 15, 2016

State of West Virginia Earl Ray Tomblin, Governor

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

YOLO-SOLANO AIR QUALITY MANAGEMENT DISTRICT 1947 Galileo Court, Suite 103; Davis, CA Phone (530) ; Fax (530)

For more information, visit our web site at: h2o.enr.state.nc.us/ndpu/

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

The following is required for a complete permit submittal for each unit.

SECTION 8 WATER SUPPLY SYSTEMS

Bloomington Township Public Water District User Information Packet. Water Service

SCHOOL DISTRICT 27J - HIGH SCHOOL #3 THORNTON, COLORADO CONSTRUCTION PLANS - ONSITE

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

CITY OF SELMA, TEXAS Inspection Guidelines: Residential

REQUEST FOR PROPOSAL SCRAP TIRE TRANSPORTATION AND RECYCLING FOR THE CARROLL-COLUMBIANA-HARRISON SOLID WASTE DISTRICT

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

The following is required for a complete permit submittal for each unit.

Nova Scotia Lands Inc. Crown Corporation Province of Nova Scotia Business Plan

Required Information for Permit Issuance

Form 2L - Land Application of Industrial Wastewater and/or Sludge

REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St.

BUILDING PERMIT APPLICATION PACKAGE

APPLICATION To The Minister of the Ministry of Highways and Infrastructure

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

Missouri State Law Underground Facility Safety and Damage Prevention RSMO Chapter to

l Setback 00_ Overview ~/ Rightofj Why regulate signs? When is a temporary sign permitted? How many signs can I have and where can I put them?

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

16. Design of Pipeline Structures.

PEN SEAL. Pipe Penetration Seals

REQUEST FOR PROPOSAL

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

MONROE COUNTY ZONING OFFICE

DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services)

A-2000 PVC Pipe for Storm Sewers and Drainage

Section 3. Applications. A separate application shall be made and a separate meter shall be installed for each premise, defined as follows:

Seasons Business Center New Construction!

Water Service Connection/Alteration Permit Application

REQUEST FOR STATEMENT OF QUALIFICIATIONS FOR WATER SOURCE RAW WATER TRANSMISSION MAIN

BID FORMS AND SPECIFICATIONS FOR THE DEMOLITION OF COMMERCIAL STRUCTURES IN THE 1700 BLOCK OF M STREET. CITY OF BELLEVILLE

Transcription:

Wheeling and Lake Erie Railway Company Real Estate Department, 100 East First Street, Brewster, OH 44613 Application for Underground Pipeline Crossing or Longitudinal of Railroad Property and or Track SECTION 1 APPLICATION DATA Complete Name of Applicant Applicant Type Corporation Partnership Individual Sole Proprietor Municipality Developer Other State of Incorporation or Partnership Mailing Address Billing Address FEIN or SSN Contact Name & Title Telephone Number Fax Number Email Address Emergency Contact Name Emergency Telephone Number

SECTION 2 LOCATION DATA Proposed Date of Installation Railroad W&LE ABC PWV Municipality County State OHIO PENNSYLVANIA WEST VIRGINIA Railroad Subdivision Nearest Railroad Mile Post Feet from Railroad Mile Post (specify direction) Nearest US DOT/AAR Crossing Feet from nearest US DOT/AAR Crossing (specify direction) Is crossing located within Public Road Right-Of-Way? YES NO If YES, Name of Street Fed-State-County No. Latitude/Longitude Quarter, Section, Township and Range

SECTION 3 PIPELINE DATA Crossing or Longitudinal Crossing Longitudinal Installation New Maintenance Upgrade Replacement Other Product to be Conveyed Water Sewer Oil Gas Storm Drain Is the Product Flammable? YES NO Temperature of Product Type of Service Transmission Distribution Service Other Will facility be used solely by applicant? If no, list all parties that will be using this facility: Location of Shut-Off Valves: Number of Manholes:

SECTION 4 PIPELINE SPECIFICATIONS CARRIER PIPE CASING PIPE Material Material Specifications & Grade Minimum Yield Strength of Material (PSI) Mill Test Pressure Inside Diameter Outside Diameter Wall Thickness Type of Seam Laying Lengths Type of Joints Total Length within RR ROW Vents: Number Size Height above ground Seals: Both Ends? YES NO One End? YES NO Cathode Protection: YES NO Protective Coating: YES NO Type, size and spacing of insulators or supports: Number of Tracks Crossed: Total Buried Length on RR:

Bury (Base of rail to top of casing) ft., in: Bury (Not beneath tracks) ft., in: Bury (roadway ditches) ft,in: Location of Boring Pits Launching Pit: Receiving Pit: adjacent to track: Describe in detail the manner and method of installation:

SECTION 5 LONGITUDINAL DATA Total Buried Length on Railroad Right of Way: Begin of Longitudinal Railroad Milepost: End of Longitudinal Railroad Milepost: Describe in detail the manner and method of installation:

Plans for proposed installation shall be submitted to and approved by the Railroad before construction or work can begin. Upon application approval, applicant agrees to reimburse Railroad for any cost incurred by Railroad incident to the installation, maintenance and/or supervision necessitated by the installation. Applicant further agrees to assume all liability for accidents or injuries that arise as a result of this installation. Material and installation are to be in strict accordance with specifications of the American Railway Engineering Association, National Electric Safety Code and requirements of the Wheeling and Lake Erie Railway Company. Please allow up to 30 business days for processing from the date of receipt of the completed application. Expedited Processing is available and will reduce the processing time at an additional cost listed below. If expedited processing is required then put EXPEDITED before Director of Real Estate in the address line. Schedule of Fees (non-refundable): *Due with application **Due with signed agreement (if approved) ***Optional - due with application *Application Review Fee $200 *Engineering Review Fee $500 **Document Preparation Fee $300 **Access/Flagman Fee (1 day min) $750 **First Year of Rental TBD ***Expedited Processing Fee $875 If installing more than one facility in the same location, a separate application MUST be completed for each new line to be installed. Applications submitted with more than one facility listed or with incomplete data or information will be returned and will not be processed until all applications are returned accurate, complete and with all applicable fees. APPLICANT INFORMATION: Date: Phone: Email: Signature: Print Name: Title: