Construction Specification for Concrete Unit Pavers

Similar documents
CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

PAVING SLABS ON A CONCRETE BASE

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION

SECTION INTERLOCKING CONCRETE PAVERS

INTERLOCKING CONCRETE PAVERS SECTION 02780

BIO-AQUIFER STORM SYSTEM

Installation Specifications for Interlocking Concrete Pavements

PERMEABLE PAVERS PHYSICAL AND GEOMETRICAL CHARACTERISTICS - PAVERS DRIVEWAYS, PERMEABLE DRIVEWAYS & PATIOS CHARACTERISTICS CSA A231.

CHARACTERISTICS CSA A TECHO-BLOC Compressive strength psi [45 MPa] min.

PERMEABLE INTERLOCKING PAVERS

Narrow Modular Pavers (NMP) for Sand-Set Installations

CHARACTERISTICS CSA A TECHO-BLOC Compressive strength 50 MPa [7200 psi] min. 50 MPa [7200 psi] min.

SECTION ECO-CITYLOCK PERMEABLE INTERLOCKING CONCRETE UNIT PAVING

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

CW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS

SECTION CONCRETE PAVING SLABS SET IN MORTAR

SECTION RIPRAP, BOULDERS, AND BEDDING

A Guide for the Specification of Mechanically Installed Interlocking Concrete Pavements

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

CW 3615 RIPRAP TABLE OF CONTENTS

SECTION 3: SUB BASE AND BASE COURSES

EXPANDED POLYSTYRENE (EPS GEOFOAM) EMBANKMENT DIVISION 31 EARTHWORK

BASE CONSTRUCTION MATERIALS A Aggregate

SECTION AGGREGATES

MATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE

US-airfield pavers FAA P-502.doc INTERLOCKING CONCRETE PAVEMENT CONSTRUCTION FOR AIRPORT

SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO)

SECTION BITUMINOUS CONCRETE PAVEMENT

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

MACHINE-LAY Installation Manual

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

MATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE

Redi Rock Specification and Installation Manual

StormTech Construction Guide

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

CITY OF FARGO SPECIFICATIONS CONCRETE SIDEWALKS AND DRIVEWAYS

Design Considerations for Interlocking Concrete Pavements

SECTION 904 AGGREGATES

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

AUGUST 2017 HASTINGS. retaining walls installation guide

for Mortar-Set Concrete Tiling Installations

Ontario Ministry of Transportation Carpool Parking Lot (Campbellville) Location: Campbellville Constructed: 2007

A.2.a Random Riprap... Table

BEST PRACTICE DESIGN FOR CONCRETE PAVERS FOR CANADIAN MUNICIPAL APPLICATIONS

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

Applications. 5 reasons why you should choose Hebden X Grid cellular paving

VERTI-BLOCK - DESIGN MANUAL

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

C. Foundation stabilization for pipe and utility structures.

Tasman Retaining Wall System

SECTION CAST-IN-PLACE CONCRETE

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

Holland Stone Series Concrete Pave Stones

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

CHAPTER 1 INTRODUCTION

SECTION SITE CONCRETE

UNHSC Bioretention Soil Specification February, SOIL PREPARATION (PERFORMANCE SPECIFICATION) for Bioretention Systems

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase.

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

LANDSCAPE RETAINING WALLS

CRUSHED AGGREGATE BLENDED WITH GRANITECRETE ADMIXTURE SURFACING

SERIES 1100 KERBS, FOOTWAYS AND PAVED AREAS

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

HydraPressed Slabs. Yorkstone Tan. Wherefunctionmeetsstyle

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation)

CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT

Comparison of Airport Paving Specification Requirements in Canada & USA

BIO-AQUIFER STORM SYSTEM

SECTION TRENCHING & BACKFILLING

SPECIFICATIONS FOR CAST-IN-PLACE CONCRETE SLAB DUNN COUNTY TRANSFER STATION MENOMONIE, WISCONSIN

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

SECTION UTILITY MANHOLES AND STRUCTURES

How To Install Your Cambridge Pavingstones System How To Install Your Cambridge Segmental Retaining Wall System

ITEM 340 DENSE-GRADED HOT-MIX ASPHALT (METHOD)

LAYING IBSTOCK CLAY PAVERS FOR PERMEABLE PAVEMENTS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

DIVISION II CONSTRUCTION AND MATERIAL SPECIFICATIONS SECTION 2200 PAVING. APPROVED AND ADOPTED THIS 15th DAY OF FEBRUARY, 2017

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

ROOF BALLAST MATERIALS ARCHITECTURAL CONCRETE PAVING SLABS SRS LEVELING BLOCK SYSTEM INSTALLATION PART GENERAL 1.

PART A: JOB PROCDRE FOR PLASTERING

DRAFT Guidance Specification for Porous or Dense-Graded Asphalt Pavement Structures for Storm Water Management Revised July 28, 2016

SECTION FOUNDATION DRAINAGE

MATERIAL SPECIFICATION FOR SUPERPAVE AND STONE MASTIC ASPHALT MIXTURES

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

CITY OF GREATER SUDBURY SUPPLEMENTAL SPECIFICATIONS TO THE ONTARIO PROVINCIAL STANDARD SPECIFICATIONS

Section 25 Aggregate Subbase

TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS

AMENDMENTS TO OPSS 914 (SEPT 88) CONSTRUCTION SPECIFICATION FOR WATERPROOFING BRIDGE DECKS ASPHALTIC MEMBRANE 1

SECTION PRECAST CONCRETE PAVERS AND PEDESTAL LOK DOWN SYSTEM

NCMA TEK CONCRETE GRID PAVEMENTS. TEK 11-3 Pavers (2001)

SITE PLAN CERTIFICATION REQUIREMENTS Rev 2 May 25, 2017

DIVISION 6 - CONCRETE

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

SAND INSTALLATION GUIDE

Transcription:

Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS 3.80.03 DEFINITIONS... 3 TS 3.80.04 DESIGN AND SUBMISSION REQUIREMENTS Not Used... 3 TS 3.80.05 MATERIALS... 3 TS 3.80.05.01 Granular Subbase... 3 TS 3.80.05.02 Concrete Base... 3 TS 3.80.05.03 Granular Base... 3 TS 3.80.05.04 Bedding Sand... 3 TS 3.80.05.05 Joint Sand... 4 TS 3.80.05.06 Polymeric Sand High Strength... 4 TS 3.80.05.07 Concrete Pavers... 4 TS 3.80.05.08 19 mm Type II Clear Stone... 5 TS 3.80.05.09 Geotextile Fabric... 5 TS 3.80.06 EQUIPMENT... 6 TS 3.80.07 CONSTRUCTION... 6 TS 3.80.07.01 Excavation... 6 TS 3.80.07.02 Base... 6 TS 3.80.07.02.01 Granular Base... 6 TS 3.80.07.02.02 Concrete Base... 6 TS 3.80.07.03 Bedding... 7 TS 3.80.07.04 Concrete Paver Placement... 7 TS 3.80.08 QUALITY ASSURANCE... 7 TS 3.80.08.01 Surface Tolerance... 7 TS 3.80.08.02 Acceptance... 7 TS 3.80.09 MEASUREMENT FOR PAYMENT... 8 TS 3.80.09.01 Unit Pavers... 8 TS 3.80.10 BASIS OF PAYMENT... 8 TS 3.80.10.01 Unit Pavers Item... 8 for Concrete Unit Pavers Page 1 of 9

TS 3.80.01 SCOPE This specification covers the requirements for the installation of concrete unit pavers. TS 3.80.02 REFERENCES This specification refers to the following standards, specifications or publications: City of Toronto Standard Specifications TS 2.10 for General Excavation TS 501 Amendment to OPSS.MUNI 501 for Compacting TS 1003 Amendment to OPSS 1003 Material Specification for Aggregates Hot Mixed, Hot Laid, Asphaltic Concrete TS 1010 Amendment to OPSS 1010.MUNI Material Specification for Aggregates Base, Subbase, Select Subgrade and Backfill Material TS 1350 Amendment to OPSS 1350.MUNI Material Specification for Concrete Material and Production City of Toronto Standard Drawings T-310.020-2 Sidewalk Paved with Unit Paver Band at Curb T-310.050-2 Vehicular Crossing of Sidewalk with Unit Paver Installation T-561.030-1 Unit Pavers on Concrete Base Non-Vehicular Locations T-561.030-2 Unit Pavers on Granular Base Non-Vehicular Locations Ontario Provincial Standard Specifications OPSS 180 General Specification for the Management of Excess Materials OPSS.MUNI 1002 Material Specification for Aggregates Concrete OPSS.MUNI 1004 Material Specification for Aggregates Miscellaneous OPSS 1860 Material Specification for Geotextiles Canadian Standards Association A23.2-11C Water Absorption of Concrete A231.2 Precast Concrete Pavers American Society for Testing and Materials C144 Standard Specification for Aggregate for Masonry Mortar Page 2 of 9 for Concrete Unit Pavers

TS 3.80.03 DEFINITIONS For the purpose of this specification, the following definitions apply: Aspect Ratio means the overall length of a paver divided by its thickness. Example: A 100 mm wide by 200 mm long by 80 mm thick paver has an aspect ratio of 2.5. Compare to Plan Ratio. Bedding Sand means a layer of uncompacted sand that is screeded smooth prior to placement of the pavers. Concrete Paver means a precast concrete paving product according to CSA A231.2. Edge Paver means a precast concrete unit made or field cut with a straight side for placement flush with a concrete curb or other edge restraint. Edge Restraint means a curb, edging, building or other appurtenance that is intended to confine the bedding sand and concrete pavers so that the pavers do not spread and lose interlock. Laying Face means the exposed vertical face of a row of pavers on the bedding sand. Plan Ratio means the overall length of a paver divided by its width. Compare to Aspect Ratio. TS 3.80.04 TS 3.80.05 DESIGN AND SUBMISSION REQUIREMENTS Not Used MATERIALS TS 3.80.05.01 Granular Subbase The granular subbase material shall be Granular A according to TS 1010. TS 3.80.05.02 Concrete Base The materials for and the production of concrete base shall be according to TS 1350 and the following: 1) Cement type Normal Portland GU / Portland limestone GUL 2) Minimum 28 day cylinder compressive strength 32 MPa 3) Class of exposure C-2 4) Nominal maximum size of coarse aggregate 19 mm 5) Slump at point of discharge (formed concrete) 80 ± 30 mm 6) Total air content 6.5 ± 1.5% 7) Maximum water/cementing materials ratio 0.45 TS 3.80.05.03 Granular Base The granular base material shall be Granular A according to TS 1010. TS 3.80.05.04 Bedding Sand Bedding sand shall be according to OPSS 1002 for fine aggregates, except that the gradation shall be as follows: for Concrete Unit Pavers Page 3 of 9

Table 1: Bedding sand gradation Sieve number Per cent passing 9.52 mm 100 4.75 mm 95-100 2.36 mm 80-100 1.18 mm 50-85 600 µm 25-60 300 µm 10-30 150 µm 5-15 75 µm 0-10 For applications under vehicular traffic, a manufactured sand shall be used. Limestone screenings or stone dust shall not be used. TS 3.80.05.05 Joint Sand Joint sand shall be according to OPSS.MUNI 1004 for mortar sand, except that the gradation shall be as follows: Table 2: Joint sand gradation Sieve number Per cent passing 1.18 mm 100 75 µm 0-10 TS 3.80.05.06 Polymeric Sand High Strength Polymeric sand shall be blended native sands according to ASTM C144 sand mixed with synthetic polymers for pavement joint stabilization. TS 3.80.05.07 Concrete Pavers Concrete pavers shall be according to CSA A231.2. Concrete pavers shall be uniform in size and texture. Units having imperfections, chipped edges or cracks shall not be used. The colour and finish shall be as specified in the Contract Documents. Concrete pavers shall be 200 mm x 200 mm or as specified in the Contract Documents and shall be of the specified depth of 70 mm or 80 mm or as specified in the Contract Documents. The concrete pavers shall not differ in length or width by more than ±1.6 mm and in depth by more than ±3.2 mm. Concrete pavers shall be tested according to CSA A231.2, in sets of 5 units. The number of sets shall be determined by the City. Page 4 of 9 for Concrete Unit Pavers

Each individual concrete paver shall have a compressive strength of not less than 50 MPa and the average of the 5 units shall not be less than 55 MPa. Concrete pavers shall be tested according to CSA A23.2-11C for water absorption. The average absorption of the test set shall not be greater than 5 per cent and no individual paver shall be greater than 7 per cent. The average weight loss of a set of concrete pavers subjected to 50 freeze/thaw cycles, while immersed in a 3 per cent sodium chloride solution, shall not exceed one per cent of the initial dry weight. Failure to meet any of the requirements will result in the rejection of all of the concrete pavers represented by the failed set. All rejected pavers shall be replaced, with all associated costs, including the testing of the replacement set, at no extra cost to the City. TS 3.80.05.08 19 mm Type II Clear Stone Clear stone shall be 19 mm Type II, according to OPSS.MUNI 1004 and meet the following physical properties. Table 3: Clear Stone 19 mm Type II Laboratory test MTO test number Clear Stone 19 mm Type II loss by washing, pass 75 m sieve, % maximum LS-601 1.3 b absorption by mass, % maximum LS-604 2 magnesium sulphate soundness, % maximum loss c LS-606 15 percent crushed particles, % minimum LS-607 80 particles with 2 faces crushed, % minimum LS-617 flat and elongated particles, % maximum LS-608 20 Petrographic Number (HL), maximum LS-609 insoluble residue, retained 75 m sieve, % minimum LS-613 freezing and thawing, % loss maximum LS-614 15 c micro-deval abrasion Loss, % maximum LS-618 21 TS 3.80.05.09 Geotextile Fabric Geotextile fabric shall be non-woven, Class I according to OPSS 1860 with an FOS of 60 to 120 µm. for Concrete Unit Pavers Page 5 of 9

TS 3.80.06 EQUIPMENT Concrete pavers shall be set into the bedding sand using a high frequency, low amplitude, mechanical flat plate vibratory compactor having a plate area sufficient to cover a minimum of 12 pavers (200 mm x 200 mm). The compactor shall transmit an effective force of not less than 75 kn per square metre of plate area. The frequency of vibration shall be within the range of 75 to 100 Hz. TS 3.80.07 CONSTRUCTION TS 3.80.07.01 Excavation Prior to any excavation, the Contractor shall have all utilities located and clearly marked, including an areaway locate to mark all underground walkways, rooms, coal chutes and so on. The excavation shall be to the lines and grades shown on the Contract Drawings. All surplus or unsuitable material is to be disposed of, off the site, according to OPSS 180. The subgrade shall be prepared according to TS 2.10. The Contractor shall be required to make good all damage caused during the course of the construction to any part of the roadway, boulevard and private property and to restore the same, to as good or better condition as existed prior to commencement of work. TS 3.80.07.02 Base The concrete pavers shall be placed using a granular or a concrete base, as specified in the Contract Documents. TS 3.80.07.02.01 Granular Base Granular base shall be placed in depths of 150 mm, for walkways and boulevards, and 200 mm, for pavements and driveways. It shall be compacted to a minimum of 100% of maximum dry density according to TS 501. TS 3.80.07.02.02 Concrete Base Prior to the placement of the concrete base, the Contractor shall construct a granular subbase. The subbase shall be placed to a depth of 75 mm and shall be compacted to a minimum of 95% of maximum dry density according to TS 501. The concrete base shall be poured to a minimum depth of 100 mm. At the outer limits of the concrete pavers, the concrete depth shall be increased to form a 200 mm wide edge restraint, level with the proposed surface of the pavers. The 200 mm wide edge restraint shall be omitted when the pavers are placed adjacent to a concrete curb. At all maintenance holes, valve boxes, handwells and so forth, the surrounding concrete shall be increased to the proposed surface of the pavers. The concrete shall be squared off and the outer edge of the appurtenance shall be encased by a minimum of 50 mm of concrete. The size and location of the raised concrete shall be governed by the alignment of the concrete pavers. No concrete paver shall be cut or trimmed to less than half of its original dimensions. Page 6 of 9 for Concrete Unit Pavers

The slope of the concrete base shall match the final slope of the concrete pavers. Plastic drain pipes (50 mm diameter) shall be placed at the low side of the base, spaced at every 3 m along the length of the concrete base. The drain shall be a minimum of 400 mm long and shall be flush with the top of the base. A drainage pocket shall be constructed at every drain. The pocket shall consist of Clear Stone placed 200 mm wide x 200 mm long x 300 mm deep from the bottom of the concrete base. It shall be situated to drain into the granular material at the back of the curb. If the drain cannot be discharged into a well-draining granular material, the drainage pocket shall be increased to 300 mm wide x 300 mm long. Prior to placing the bedding sand, the drain shall be covered by centering a 200 mm x 200 mm piece of geotextile fabric over the opening. TS 3.80.07.03 Bedding The bedding sand shall be placed loosely, in a uniform layer with sufficient depth to achieve the final compacted thickness of 20 to 30 mm. The bedding sand shall be screeded in a loose condition and protected against compaction prior to placement of the concrete pavers. Concrete pavers shall be placed only on loose, moist bedding sand. TS 3.80.07.04 Concrete Paver Placement Concrete pavers shall be installed in the specified pattern. Concrete pavers shall be placed uniformly and hand tight, such that all joints are correctly aligned. Where concrete pavers require trimming, they shall be cut with a quick-cut saw or a guillotine, to give a straight edge. After placement, compactive effort shall be applied to the concrete pavers until the bedding sand is compacted to achieve the proper grade and the pavers are free of movement. At least three passes of a plate compactor shall be made across the surface of the concrete pavers. After initial compaction, dry joint sand shall be broomed to fill in the joints and spread uniformly over the concrete pavers to a depth of not less than 5 mm. At least two passes of a plate compactor shall be applied to the surface while simultaneously sweeping the sand into the joints. Water shall be sprinkled over the sand to ensure proper compaction. Joints shall be completely filled at the completion of compaction. Excess sand shall then be removed from the pavement surface by brooming. TS 3.80.08 QUALITY ASSURANCE TS 3.80.08.01 Surface Tolerance The surface of the concrete pavers shall be such that when tested with a 3 m long straightedge, placed in any direction on the surface, the gap between the straightedge and the surface of the pavers shall not be greater than 3 mm, at any point. TS 3.80.08.02 Acceptance If any pavers are loose, chipped or unevenly cut pavers will be rejected. Areas failing to meet the requirement for surface tolerance will be rejected. for Concrete Unit Pavers Page 7 of 9

Any rejected pavers or areas shall be removed and either reinstalled or replaced by the Contractor. All costs associated with the removal, reinstallation and replacement of rejected concrete pavers shall be at no extra cost to the City. TS 3.80.09 MEASUREMENT FOR PAYMENT TS 3.80.09.01 Unit Pavers Measurement of unit pavers shall be of the surface area, including any edge restraint, in square metres (m²). No deduction will be made for poles or utility frames and covers. TS 3.80.10 BASIS OF PAYMENT TS 3.80.10.01 Unit Pavers Item Payment at the Contract Price for the above tender item shall be full compensation for all labour, Equipment and Material to do the work. Payment shall include all excavation, the supply, placing, levelling and compacting of all granular, the supply and placement of concrete base and edge restraints, the supply and placement of drains, the supply and placement of concrete pavers and the filling of all joints. Page 8 of 9 for Concrete Unit Pavers

Appendix 3.80-A, April 2015 For Use While Designing and Administrating City Contracts Note: This is a non-mandatory commentary appendix intended to provide information to a designer and contract administrator during the design and construction stage of a contract on the use of this TS specification in a City contract. This appendix does not form part of the standard specification. Actions and considerations discussed in this appendix are for information purposes only and do not supersede an owner s design decisions and methodology. Notes to Designer: The designer should specify the following in the Contract Documents: size, shape, colour, thickness and texture of the concrete pavers (3.80.05.06) Use aspect ratio of pavers (length divided by thickness) to determine the thickness of the paver. For pedestrian and driveway applications, use a max 4:1 ratio. For street/parking applications, use a max 3:1 ratio. Application should be restricted to roads with traffic speeds of 70 km/h or less. A herringbone pattern at 45 to the vehicular traffic is recommended for roadway pavements. Where surface sealers are specified, a reduction in frictional resistance may result. Related technical publications for designers' use are available from the Interlocking Concrete Pavement Institute (ICPI) at www.icpi.org. for Concrete Unit Pavers Page 9 of 9