W. W. HAY SEMINAR SERIES. Tower 55 Multimodal Improvements NATIONAL UNIVERSITY RAIL CENTER UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN

Similar documents
Union Pacific in Houston: Investing to Meet Freight Demands. Brenda Mainwaring, VP Public Affairs, November 12, 2013

Tower 55 At-Grade Improvement Project

Route Selection and Design of a Coal Shuttle Railroad: Experiences of a Recent Railroad Engineering Graduate

LAFAYETTE RAILROAD RELOCATION, NORFOLK SOUTHERN CORRIDOR

Rail 101 Highway-Rail Crossing Program & Project Coordination

Passenger/Freight Railroad Projects in Michigan

Appendix E Cost Estimating Methodology for High-Speed Rail on Shared Rightof-Way

Trans-Texas Corridor-35 Update

Stockton Freight & Passenger Rail Mobility Enhancement

I-35 Corridor Segment Committee NW Loop 410 San Antonio, Texas. March 11, :00 AM to Noon

I-35 Corridor Segment Committee Bagby Ave. Waco, Texas. March 9, :00 AM to Noon

extent feasible. Per the and low constructability,

Installation of Multiple Deck-Girder Bridge Spans Utilizing A Rail-Mounted Launching Truss/Gantry Crane on Amtrak s Empire Line

Network Effects and Cost of Railroad Crosstie Maintenance and Replacement

STATEWIDE ANALYSIS MODEL (SAM-V3) June 5, 2014 Janie Temple

Summary of Current State of Practice for Composite Crossties

TECHNICAL MEMORANDUM. DRAFT Existing Freight Operations along Cotton Belt Corridor between DFW Airport and Plano, TX

U.S. Department of Transportation. National Infrastructure Investments Grant Program. TIGER Discretionary GRANT APPLICATION

South Sounder Capital Improvements Program

Chapter 1 Introduction

Metro-North s Response to Hurricane Irene. Chris Bennett, Vice President AECOM Toby Ritz, Chief Engineer MNR Capital Programs New York

Determining the Causes of Train Delay

For Personal Use Only This presentation contains copyrighted material. PLEASE DO NOT COPY OR DUPLICATE. NOT FOR COMMERCIAL USE.

ANALYTICAL METHOD TO CALCULATE RISK-BASED TRACK SEPARATION DISTANCES FOR HIGH SPEED TRACKS IN FREIGHT CORRIDORS

Analyst: Meilin C. Pierce Spring Recommendation: Hold Target Stock Price (12/31/2016): $120

Conclusions & Lessons Learned

Metro Blue Line Improvements & Project Update

Freight Movement Element

Technical Memorandum MULTIMODAL NEEDS. Prepared for: Oklahoma Department of Transportation. Prepared by:

Stone Consulting, Inc. Industrial Railroad Projects

Partnerships in Capital Projects. AAPA Facilities Engineering Seminar and Expo

TRANS-TEXAS CORRIDOR-35 CURRENT ISSUES

Billions of dollars per year in: Savings in shipping costs Taxes and purchases that support tens of thousands of additional jobs Avoided highway

Application Form Track 1a Final Design (FD)/Construction & Track 4 FY 2009 Appropriations Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

Sounder Extension to DuPont

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

Jacksonville Port Authority Blount Island Marine Terminal Rail Improvements Jacksonville, Florida

Class I Railroad Statistics

MetroLink Operations 700 South Ewing Street Saint Louis, Missouri

A long-term, comprehensive solution

Are We Prepared for the Energy Movements? JEANNIE BECKETT THE BECKETT GROUP ENERGY EXPORT PERMITTING IN THE NW JUNE SEA-TAC CONFERENCE CENTER

TABLE OF CONTENTS. Background of Existing Facility 3. Proposed Work 4

Eight County Freight Plan

TRANS-TEXAS CORRIDOR-35 REGIONAL/STATE UPDATE

Preface.

Economic Impact Analysis of Short Line Railroads. Louisiana State University - Research Team Dr. Jared Llorens Dr. Jim Richardson Mr.

lbfoster.com CXT CONCRETE TIES CATALOG

summary report West Texas Rail Feasibility Study Texas Department of Transportation Cambridge Systematics, Inc. HNTB August 2011

Insulated Joint Studies

2016 Mid-Continent Transportation Research Symposium, October 24-25, Donna Brown-Martin, Director Bureau of Planning and Economic Development

Cost Estimating Guideline February, 2017

Agency Scoping Meeting

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

TECHNICAL MEMORANDUM

INTERSTATE CORRIDOR PLANNING

YARDMASTERS GUIDE. South Central Region

US 75 Integrated Corridor Management System Using Technology and Partnership to Maximize Transportation System Capacity

Using Hybrid LiDAR for Positive Train Control (PTC) Systems

Table of Contents for Guide Specifications

SEASONAL EFFECT ON THE OPTIMIZATION OF RAIL DEFECT INSPECTION FREQUENCY

NEW JERSEY DEPARTMENT OF TRANSPORTATION. New Jersey Statewide Strategic Freight Rail Plan

Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options

Exposition Light Rail Transit Project

Ironton Russell Bridge Project

Ironton Russell Bridge Project

SCRRA RIGHT-OF-WAY ENCROACHMENT PROCESS

Designing for Longitudinal Force

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange

Introduction to North American Rail Transportation

Successful Partnerships in Innovative Project Delivery

Layout design element. in N scale. It was time for a new railroad to realize new objectives. By Daryl Kruse//Photos by the author

City of Denton On-system Project Status Report Prepared by ITS

NJ State Rail Plan. New Jersey Short Line Railroad Association Briefing September 12, 2012

SORR Rehabilitation and Presidio International Rail Bridge Reconstruction

Impact of CBTC and ECP Brakes on Capacity

High-Speed Rail - Chicago to St. Louis Alton Regional Multimodal Transportation Center Project

To provide an update on the progress of the Peel Goods Movement Task Force and Peel Goods Movement Strategic Plan.

Retaining Wall Design for the Railroad Infrastructure: What Makes Its Design and Construction Unique? A Selection Approach

Regional Initiatives on Land Use and Transportation

Railway Alignment Design and Geometry

Appendix F Railway Infrastructure and Train Volume Analysis

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

Hampton Roads Bridge-Tunnel Expansion Feasibility Study. Design Considerations

2017 FREIGHT DEVELOPMENT PLAN ST LOUIS REGIONAL FREIGHTWAY

Fig Plan of Access Road

Phase 2 Exposition Metro Line Project

Destination. D/FW and the world. PRECON is the choice for waterproofing on Dallas/Fort Worth International Airport rail station project

The Design of the New Portageville Bridge

2017 Marine Cargo Forecast and Rail Capacity Analysis

Maximize Transportation System Capacity

Transportation 101. What We ll Cover

Society of Women Engineers Region H Conference

Evaluation of Options for a. Twin Cities Red Wing Inter-city Rail Passenger Service

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD

JRC SIDING SPACING AND THE INCREMENTAL CAPACITY OF THE TRANSITION FROM SINGLE TO DOUBLE TRACK

Transcription:

W. W. HAY SEMINAR SERIES NATIONAL UNIVERSITY RAIL CENTER UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN Tower 55 Multimodal Improvements 2015 HDR, Inc., all rights reserved.

W. W. HAY SEMINAR SERIES TOWER 55 MULTIMODAL IMPROVEMENTS BNSF Railway / Union Pacific Railroad Fort Worth, Texas Mark A. Martin, P.E. Sr. Project Mgr. - Rail

LEARNING OBJECTIVES TOWER 55 MULTIMODAL IMPROVEMENTS PROJECT Understand opportunity to partner with Class I railroads to assist them and their stakeholders in achieving their objectives Identify ways to add value to complex projects by providing logical, timely, and economical solutions WITH clients (rather than FOR clients) Assess the Tower 55 Lessons Learned and translate them into valueadded services

TOWER 55: BACKGROUND Railroads in Fort Worth & Tower 55 History In 1873, B.B. Paddock envisioned Fort Worth as a bustling railroad town. He published a Tarantula Railroad Map with nine rail lines stretching out from the city s center like a spider s legs. In 1904, the railroads collaborated to construct Tower 55 - an interlocker or railroad intersection controlled by a tower operator or dispatcher.

TOWER 55: BACKGROUND More than a century after its installation, Tower 55 remains a critical connector of rail traffic throughout the United States and into Canada and Mexico. Union Pacific Railroad (UP) and BNSF Railway move o high-priority intermodal goods, o agricultural products, o low-sulfur coal, o industrial and manufactured goods through this critical at-grade junction.

TOWER 55: BACKGROUND

Consultants, suppliers and contractors partnered with Class I Railroads and their stakeholders to assist in achieving their objectives BNSF Lining New Track BNSF Track Welding UP Installed Diamonds BNSF Signal Bridge

MODELING BNSF Delays o Transit times through T55 up more than 30% since 2002 o Trains staged over 220 miles from the Red River to Temple o Impaired service & growth of Alliance IMF Union Pacific Delays o E/W traffic restricted to 30 MPH o Trains staged from 130 miles west of FTW to 80 miles east of Dallas o Impaired service to South Dallas IMF

FINANCE Public/Private Partnership BNSF/Union Pacific/FRA/TxDOT HDR assisted in obtaining TIGER II funding Project received funding from the following sources: UP $39 million BNSF $37 million TIGER II Grant $34 million NCTCOG $2.5 million TxDOT $1 million City of Fort Worth $1 million

ENGINEERING & MANAGEMENT Revised preliminary alignments on the BNSF Provided Historical Documentation Report Assisted both railroads in obtaining ROW Coordinated w/ the City of Fort Worth CFAs Assisted BNSF, UPRR, & TxDOT in contract coordination leading into Bid Phase Assisted BNSF by providing RE/PM services throughout the construction phase

STAKEHOLDER ASSISTANCE Amtrak Currently 4 trains/day o Texas Eagle (2) o Heartland Flyer (2) Provides improved operations o Efficient terminal movements o Potential service growth

OPERATIONS Trains had to continue to move throughout the duration of project, including construction Construction Phasing was revised 25 times Moved Diamond replacements and East Lancaster Bridge demo/construction to end

STRUCTURES Assessed existing structures Conceptualized proposed improvements Provided economical solutions Facilitated public agency partnering

TRACK Developed track alignments based upon operations models Included turnouts, x-overs & connections Coordinated connecting geometry between BNSF & UPRR to ensure proper alignments Evaluated & coordinated bridge clearances with City of Fort Worth and BNSF Structures Closing of 2 existing at-grade crossings, required appearing before Fort Worth Planning & Development Board

SIGNALS COORDINATION Wanted a Final Track Plan before they designed new signal blocks and structures Tended to make changes or add elements toward the end of the project Multiple When did THIS happen? moments Coordinated to determine Signal and Communications appurtenances Provided signal maintenance equipment access to signals, bungalows, and PTC Secondary power supply for signals (LP or Propane Gas)

CITY COORDINATION City Planning & Development Fire Protection Engineering Transportation & Public Works Storm Water Management Water/ Sanitary Sewer Traffic Engineering Tree Permitting Multiple Plan Reviews & Comment Resolutions

Adding value to complex projects by providing logical, timely, and economical solutions WITH clients (rather than FOR clients)

SAVING TIME & MONEY Retaining Wall vs Purchasing New ROW Replace Lime Treatment with Geogrid Replace Timber Trestle with RC Box Culvert Demo & Re-Construct Bridge in 2 Work Windows

CONSTRUCTION MANAGEMENT TEAM Project CM o Managed staff of six on daily basis o Developed materials testing schedules o Provided construction observation Coordinated with BNSF staff Coordinated with TxDOT staff & compliance team Coordinated with City of Fort Worth inspectors Construction coordination with other contracts Review and submit monthly pay applications Review and submit Change Orders through the BNSF

PROJECT SAFETY It Can Save Your Life.or Get You Dismissed From the Site. Proximity to Trains Bridge Safety Variety of Materials Overhead Movements

CONSTRUCTION OBSERVATION ACTIVITIES Placement of Bridge Girder & Walkway Testing Moisture & Density of Embankment Night Work Removing Existing Diamonds New Block Signals & Structures

BNSF TRACK LAYING MACHINE (TLM) Distribution of New CWR Ahead of TLM Tie Spacer Bridge Placing Ties Before Rail Flat Cars Carrying New Ties with Gantry Crane TLM Moving from Mainline to Roadbed

Translate Tower 55 Lessons Learned and translate them into value-added services Single Work Window Installing Diamonds Rock Riprap Installed Between Mainlines Railroads Managed City Utility Improvements Hazardous Materials Permitting & Disposal

RESULTS NOW Exceeding Client/Owner Needs Began construction in March 2013 & completed construction in December 2014 Bids received were approximate to the Engineer s Opinion of Probable Costs Executed all contracts within the FRA Flow-Down Agreement guidelines on time and within budget

TOWER 55 MULTIMODAL IMPROVEMENTS `

RESULTS NOW Adds 40% capacity for rail operations Provides short-term solution for up to 25 years Improves safety for travelling public Improves air quality

PROJECT COMPLETION AND RIBBON CUTTING NOVEMBER 7, 2014

TOWER 55 MULTIMODAL IMPROVEMENTS With over $1.1 billion in public benefits, the Tower 55 Project has addressed needed network capacity and eliminated a key freight and passenger rail bottleneck through implementing a creative engineering approach and extraordinary collaboration between two western Class I railroads and the creation of a public private partnership. Ed Hamberger, President and Chief Executive Officer Association of American Railroads

TOWER 55:FOLLOW-UP PROJECT OPERATIONS AFFECTS Sponsored by UPRR, BNSF, FRA & TxDOT Monitor and update rail traffic conditions pre-project at 10 grade crossings along initial route Project updates data each year for a period of 5 years following the completion of construction Data includes train queues, roadway traffic, air quality, occurrence of accidents

TOWER 55 MULTIMODAL IMPROVEMENTS AREMA 2015 W. W. Hay Award for Excellence in Railroad Engineering AASHTO 2015 President s Award

Thank you to

2015 HDR, Inc., all rights reserved.