Northern Intermodal Transit Facility WHAT IS AN INTERMODAL TRANSIT FACILITY?

Similar documents
Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

APPROVAL TO SUBMIT COMMENTS ON I-45 AND MORE DRAFT ENVIRONMENTAL IMPACT STATEMENT

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

DART s Role in Transit - Oriented Development. Jack Wierzenski,, Director Economic Development & Planning Dallas Area Rapid Transit

Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need

U.S. Department of Transportation Federal Transit Administration and Metropolitan Atlanta Rapid Transit Authority

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY

TRANSPORTATION TRANSPORTATION 9-1

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017

Transit Service Guidelines

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

Durham-Orange Light Rail Transit Project

Subarea Mobility Enhancements. 5.1 Transit and Pedestrian Improvements

South Sounder Capital Improvements Program

SOUTHEAST FLORIDA REGIONAL COMPACT CLIMATE CHANGE. Sustainable Communities & Transportation Planning

PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT

Your Bright Future: Municipal Development Plan

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

THE REGION S PLAN POLICY FRAMEWORK. August 2015

This page intentionally left blank.

High-Speed Rail - Chicago to St. Louis Alton Regional Multimodal Transportation Center Project

DENVER UNION STATION $500M TRANSPORTATION INFRASTRUCTURE FINANCING

METRA UP-W LINE. Locally Preferred Alternative Report

PUBLIC HEARING April 24, 2017

THIRD&GRAND. Public Workshop #2 August 28, Multimodal Transportation Plan. Alternatives

Chapter 1 Introduction

TRANSIT SERVICE GUIDELINES

ARLINGTON COUNTY TRANSIT DEVELOPMENT PLAN

Michael Gillam Deputy Program Director - Southern California

Executive Summary October 2017

5.D.1 HISTORIC, ARCHITECTURAL, ARCHEOLOGICAL, AND CULTURAL RESOURCES

Project No 2 CONSTRUCTION OF MULTI MODAL TRANSPORT HUB (MMTH) COLOMBO FORT/PETTAH

CHAPTER 21: COMMITMENT OF RESOURCES

Project Purpose. Federal Railroad Administration

S-09: Auburn Station Access Improvements

Sustainability. Sustainability Principles. 1. Framework. Spokane Transit s definition of Sustainability is:

Fairfax County Countywide Transit Network Study

Downtown Estes Loop Project Frequently Asked Questions

Agenda. Background. Economic Enhancement Study Master Plan Concept. Implementation Plan

CHAPTER 26. REGIONAL MOBILITY AUTHORITIES SUBCHAPTER A. GENERAL PROVISIONS SUBCHAPTER B. CREATION OF A REGIONAL MOBILITY AUTHORITY

2. OMNITRANS SYSTEM. 2.3 Omnitrans Services. 2.1 Background. 2.4 Traditional Fixed Route Service. 2.2 Omnitrans Mission TRANSIT DESIGN GUIDELINES

LOCALLY PREFERRED ALTERNATIVE REPORT

Economic Impacts of Greyhound Bus Passengers Visiting New York City

Wheaton PRELIMINARY RECOMMENDATIONS

Sounder Extension to DuPont

Agency Scoping Meeting

High Speed Rail Distribution Study

PUBLIC NOTICE. Dredging with ten-years maintenance, return flow to the waterway and upland placement. Georgica Cove, tributary of Georgica Pond

TRANSPORTATION FACTS. OUR CUSTOMERS: Travel Patterns

All Aboard Florida Project Status Update TREASURE COAST REGIONAL PLANNING COUNCIL

1.1 Purpose of the Project

$500M Public Transportation Infrastructure Project with 5 Public/Private Partners, and 9 financing Sources

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

TECHNICAL MEMORANDUM. DRAFT Existing Freight Operations along Cotton Belt Corridor between DFW Airport and Plano, TX

DC Circulator Fare Adjustment Plan. April 2018

State Route 8 Bridge Replacement Project

Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements

JCDecaux N O R T H A M E R I C A

Connecting Cleveland 2020 Citywide Plan TRANSPORTATION & TRANSIT

October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects

NJ TRANSIT BOARD CUSTOMER SERVICE COMMITTEE MEETING AGENDA OPEN TO MEMBERS OF THE PUBLIC

DOWNTOWN AUSTIN PARKING STRATEGY DETAILED IMPLEMENTATION PLAN

1RUWKZHVW#:LFKLWD 0DMRU#,QYHVWPHQW#6WXG\

Metro Blue Line Improvements & Project Update

Transit Oriented Development Study

Connectivity along Amtrak s NEC. Emmanuel S. Bruce Horowitz

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD

Caltrain Rapid Rail Plan

Funding Intelligent Transportation Systems in the Los Angeles Region

Transit Oriented Development Strategic Plan for Bhopal

Prospects and Challenges of the Proposed Intermodal Train Station at T.F. Green Airport in Rhode Island

Ballard-Interbay MIC Summary Statistics

Transbay Transit Center Program

Indirect and Cumulative Effects

Welcome and thank you for your interest in the proposed Baltimore-Washington Superconducting Maglev Project.

Appendix H. Millennium Hollywood Project Trip Cap and Mitigation Triggers

Vero Beach Vision Plan

Public Hearing for April 2018 Major Service Changes. January 4, 2018

North Side Transfer Zone. Public Open House April 16, 2014

2. What is the genesis of the KOP Rail project? How long has this been studied?

Evaluating Transit Stops and Stations from the Perspective of Transit Users

Identification and Evaluation of Alternatives Tier 1

Staff Priority and UPWP Committee Priority List 3/25/2016. ID Proposed Study Name Project Category Tentative Project Cost

Are We Prepared for the Energy Movements? JEANNIE BECKETT THE BECKETT GROUP ENERGY EXPORT PERMITTING IN THE NW JUNE SEA-TAC CONFERENCE CENTER

1.1.1.b. Agencies share best practices as they integrate COMPASS facilitates

California State Rail Plan. Santa Cruz County Regional Transportation Commission November 2, 2017

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

Currituck County Moyock Mega-Site Market Feasibility Study March 28, 2016

IX. STRATEGIC PLAN ELEMENT

Project Steering Committee April 14, 2015

Transit Applications and the EMTRAC System

Overcoming Barriers to Mixed-Use Infill Development: Let s Get Trip Generation Right

I-35 Corridor Segment Committee Bagby Ave. Waco, Texas. March 9, :00 AM to Noon

TECHNICAL MEMORANDUM

Trans-Texas Corridor-35 Update

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

Stockton Freight & Passenger Rail Mobility Enhancement

To provide an update on the progress of the Peel Goods Movement Task Force and Peel Goods Movement Strategic Plan.

City Council Workshop Agenda Item #2

Draft Final Report HOUSTON FRIENDSWOOD HARRIS CO. GALVESTON CO. Figure. Arterial. RR Tracks. County Line

Transcription:

WHAT IS AN INTERMODAL TRANSIT FACILITY? An intermodal transit facility gathers many modes of transportation together and is strategically located to increase destination alternatives. Intermodal facilities can help to improve mobility for a city and a region. Intermodal facilities usually have services and amenities for transportation patrons, such as ticket booths, secure and comfortable waiting rooms, restrooms, food service, newsstands, and gift shops. Some intermodal facilities are part of larger developments that include retail, offices, residential, hotel rooms, and entertainment venues. Los Angeles County Metropolitan Transportation Authority s Union Station is an example of an intermodal facility that provides major transit service connections from throughout Los Angeles County and beyond. More than 50,000 trips are made through Union Station on a daily basis, which includes trips made via METRO Bus and Rail, Metrolink, AMTRAK and various municipal bus operators. Recent service additions include the FlyAway Airport Shuttle.

MODES OF TRANSPORTATION THAT COULD BE INCLUDED Bus Rapid Transit (BRT) Light Rail Transit (LRT) Local and Regional Bus Commuter Rail Taxi Service Paratransit Service Shuttle Bus Service AMTRAK Commercial Bus

INTERMODAL TRANSIT FACILITIES IN OTHER CITIES Tower City Center - Cleveland, Ohio Union Station - Los Angeles, California Gateway Plaza - Los Angeles, California Science City at Union Station - Kansas City, Missouri

REGIONAL LOCATION ANALYSIS STEP 2. Area A - Evaluated Locations STEP 1. Initial Sites Evaluated An area north of downtown Houston was selected as the preferred location because of its proximity to Houston s major activity centers and existing and future transit and transportation projects including national and international bus carriers. This location also provides the greatest opportunity for connecting existing and proposed infrastructure. In 2005, the Houston Downtown Management District initiated a feasibility study of an intermodal facility. The study analyzed and presented the best option for the facility s location. Seven general areas within the Houston metropolitan region were initially identified as candidates for accommodating multiple transportation programs for numerous transportation providers.

FINAL SITES RECOMMENDED BY FEASIBILITY STUDY The White Oak and Hardy Yards areas were identified as the preferred areas for the Northern Intermodal Transit Facility. These highly visible locations allow for opportunities Hardy Yard area for: Intermodal connectivity with transit and freeway White Oak area access; The best overall proximity to major regional activity center; and The most compatible land use for an Intermodal Center/Multimodal Terminal facility. The White Oak sub-area is located northeast of the IH 45/IH 10 interchange near north downtown Houston. The White Oak and Hardy Yards areas were identified as final sites recommended by the Feasibility Study. The Hardy Yards sub-area is located between Northside Village residential area and the multi-track Union Pacific Hardy Rail Yards.

ORGANIZATIONS INVOLVED IN THE INTERMODAL FACILITY FEASIBILITY STUDY AMTRAK Main Street Coalition Central Houston Midtown Management District City of Houston Metropolitan Transit Authority of Harris County First Ward Civic Council Northside BOND Greater East End Management District Old Sixth Ward Greater Greenspoint Municipal Management District Silverdale Civic Association Greyhound Bus Lines South Main Center Association Houston-Galveston Area Council Texas Department of Transportation Harris County University of Houston - Downtown Houston Airport System Houston Downtown Management District

METRO S NORTHERN INTERMODAL TRANSIT FACILITY METRO intends to pursue the design and construction of the Northern Intermodal Transit Facility that would serve as a major transportation hub for Houston. This facility would enable Houston residents, visitors, and workers to easily transfer between the different modes of transit buses, light rail, bus rapid transit, and commercial bus lines. The facility could potentially provide service to airport shuttles, commuter rail, taxis, and national passenger rail (AMTRAK) services in the future. This facility will improve public access to bus and rail services to meet current and future transit needs; reduce non-transit vehicle usage; and promote transit-friendly development.

PROJECT SITE AERIAL PHOTOGRAPH

SITE ANALYSIS - CONSTRAINTS

POTENTIAL ACCESS IMPROVEMENTS

POTENTIAL FACILITY CONCEPT

NEPA PROCESS WHAT IS NEPA? WHAT IS AN ENVIRONMENTAL ASSESSMENT? The primary law governing the Federal Transit Administration s (FTA) environmental protection process is the National Environmental Policy Act of 1969. The National Environmental Policy An EA is a document that evaluates the proposed project. Other regulatory agencies such as the U.S. Army Corps of Engineers and the Texas Historical Commission are involved throughout the process. Act (NEPA) establishes an umbrella process for coordinating compliance with each law. The EA document: Because the Northern Intermodal Transit Facility project aims to create a new transit facility and METRO intends to pursue some federal funding for the project, FTA requires that an Environmental Assessment (EA) be completed to comply with NEPA. Evaluates the project for potential social, economic, or environmental impacts; Identifies alternatives and measures that might mitigate adverse environmental impacts; and Initiates coordination with regulatory agencies. Public involvement is an essential element of the EA process. The final document must be made available for public inspection and a public hearing may be held.

ELEMENTS OF AN ENVIRONMENTAL ASSESSMENT ELEMENTS ANALYZED DURING THE EA PROCESS Social & Economic Impacts Transportation Impacts Air Quality Water Quality Endangered Species Wetlands Environmental Justice Floodplains Hazardous Materials & Brownfields Historic, Archeological, and Cultural Resources Navigable Waterways and Coastal Zones Noise and Vibration Parklands

SECTION 106 Commonly called the Section 106 process, Section 106 of the National Historic Preservation Act of 1966 (16 U.S.C. 470) requires projects which include federal participation to take into account the effects on any properties listed, or eligible for listing, on the National Register of Historic Places. In addition, Section 106 requires that the Advisory Council on Historic Preservation (ACHP) must be provided with an opportunity to comment on the project. Historic properties may include districts, sites, buildings, structures, or objects. Archeological sites are also protected under the National Historic Preservation Act, and the Section 106 process is applied in a similar fashion when a mass transit project involves excavation of any kind.

SITE DEVELOPMENT ISSUES Site development issues for consideration include: Safety & Security Neighborhood Cohesion Pedestrian Access Vehicular Circulation Visibility In addition, the introduction of the new transit facility could spawn transit-friendly development. This development could include a mix of high density residential and commercial development within walking distance of the facility. Example of transit-oriented development at Mockingbird Station Dallas, Texas

PROJECT DEVELOPMENT PROCESS PROJECT DEVELOPMENT PROCESS COMPLETED IN AUGUST 2005 Feasibility analysis - this analysis sought to solicit input from stakeholders; determine the best location for the facility; and WE ARE HERE build a cohesive group of Intermodal facility stakeholders to support funding applications for the facility; Planning Basis for Design - where project costs, benefits, and impacts are refined; Federal environmental studies are completed; and local funding commitments are secured; EA Schedule - 2006 February - Project Kick-off April - Public Open House June - Draft EA Available for Public Review July - Public Open House SCHEDULED FOR LATE SUMMER/ EARLY FALL 2006 Preliminary Engineering - where project engineering and probable costs are developed; and August - Final EA Approval by FTA Expected SCHEDULED FOR SUMMER 2007 Final Design - which includes right-of-way acquisition, utility relocation, and the preparation of final construction plans.