Field Guide on. Safe Maintenance and. Work Zone Operations

Similar documents
GENERAL NOTES FOR WORK ZONE SAFETY SET UP GUIDE

TRAFFIC CONTROL STRATEGIES FOR SHORT- TERM, SHORT-DURATION, AND MOBILE WORK ZONES

Texas Transportation Institute The Texas A&M University System College Station, Texas

SECTION 616 TEMPORARY TRAFFIC CONTROL

for Law Enforcement KVE Developed by the Kentucky Transportation Center University of Kentucky in cooperation with the

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

COMPANY OFFICER SAFE VEHICLE PRACTICES DURING ON-HIGHWAY INCIDENTS. 3 hours TIME FRAME: LEVEL OF INSTRUCTION: AUTHORITY: BEHAVIORAL OBJECTIVE:

Table of Contents. List of Appendices

Scarborough Fire Department Scarborough, Maine Standard Operating Procedures

QUALITY STANDARDS for Temporary Traffic Control Devices

MUTCD Part 6F: Temporary Traffic Control Zone Devices

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

Wisconsin s Traffic Incident Management and Emergency Responders

Chapter 8 WORK ZONE TRAFFIC CONTROLS

2016 MUTCD CONCEPT TTC COMMENTS. Michael A. Chacon Traffic Operations Division

LOCATION AND DESIGN DIVISION

Safety. Introduction. Total System

Dr. Benjamín Colucci Ríos

Measures for Highway Maintenance Quality Assurance

NYSDOT TIME logo Draft 12/21/10. March 16, 2011

Utility Work Zone Safety Guidelines and Training

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

NYSDOT TRANSPORTATION MAINTENANCE DIVISION PAVING PROJECT QUALITY ASSURANCE ASSESSMENT Rating Guidelines (Revision #1)

Merging Taper Lengths for Short Duration Lane Closures

IOWA TRANSPORTATION BY THE NUMBERS:

Chapter URBAN & RURAL FREEWAY DESIGN

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY

500 Interchange Design

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

53.20 PAINTED ROADWAY LINES

MAINE TRANSPORTATION BY THE NUMBERS:

Presented by Henry L. Barbaro Stormwater Management Unit Supervisor MassDOT Highway Division

EMERGENCY OPERATIONS Educational Series

CONTINUOUSLY REINFORCED CONCRETE AND UNPAVED ROADS CONDITION SURVEY FIELD MANUAL PUBLICATION 343 APRIL 2017 PUB 343 (4-17)

Application of Road Safety Audits to Urban Streets

Computer-Aided Maintenance Management

Maintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

DuPage County Division of Transportation 421 N. County Farm Road Wheaton, IL / (Fax) 630/

APPENDIX A GUIDELINES FOR THE USE OF BARRIER/CHANNELIZING DEVICES IN WORK ZONES INTRODUCTION

THE USE OF LANE CONTROL SIGNALS AND CHANGEABLE MESSAGE SIGNS ON TEXAS HIGHWAYS

550 Surface Treatments

ArmorZone TL-2 Barrier and End Treatment

Curb Ramps [ 4.7.3] [ 4.7.2; 4.8.2; 4.1.6(3)(a)] [ 4.3.7] ADA Accessibility Survey Instructions Curb Ramps Page 1 of 6

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

600 Roadside Design. Table of Contents

Selecting Projects for Accelerated Bridge Construction

MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No T-02 October 30, 2014

NOTES ON THE SPECIFICATION FOR ROAD SAFETY BARRIER SYSTEMS

FLORIDA DEPARTMENT OF TRANSPORTATION MAINTENANCE RATING PROGRAM HANDBOOK

Sandstone Curb Replacement Standards

ROADSIDE SAFETY BARRIER ELEMENTS Module 3

Code of practice for temporary traffic management (CoPTTM)

Dynamic Lane Merge Systems

Updated August 1, 2016

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

Section 1 OBC FADS /13 Access to Parking Areas

RAPID INCIDENT SCENE CLEARANCE (RISC)

FINAL REPORT IMPROVING NIGHT WORK ZONE TRAFFIC CONTROL. B. H. Cottrell, Jr. Senior Research Scientist

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment

Since the Vision 2000 effort under taken in 1995, ODOT has operated under a Mission,

TMP reference: Contractor: Principal (Client):

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows:

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 806 ASPHALT CONCRETE WITH JOINT DENSITY FOR MULTI-LANE HIGHWAYS.

Concept of Operations for Intersection Conflict Warning Systems (ICWS)

Performance Based Practical Design (PBPD)

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

2017 Highway Safety Improvement Program Call

REQUIREMENTS FOR WORK WITHIN ROAD RIGHTS-OF-WAY IN UNION COUNTY

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

Conclusions & Lessons Learned

200 SIGNS Traffic Engineering Manual. TABLE OF CONTENTS Part 2 - SIGNS

Section 504. MICRO-SURFACING

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

CITY OF ELK GROVE SPEED CONTROL PROGRAM GUIDELINES

I-91 Viaduct Public Information Briefing

Guidebook on Incident Management Planning in Work Zones

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

INVITATION TO BID ON TOWN PAVING PROJECTS

BOOM-SUPPORTED ELEVATING WORK PLATFORM PROGRAM

MISSOURI DEPARTMENT OF TRANSPORTATION ATTACHMENT G FACILITIES EXPECTATION FORM

SPECIFICATION FOR THE RUBBER SPEED HUMPS

Product Manual Release 05/17

STAGING AREA MANAGER. REPORTS TO: Incident Commander Operations Section Chief

Highway Engineering. 3 _ 2/2 Lecture/Laboratory Hours

IMPROVING EXIT RAMP VISIBILITY IN WORK ZONES. Proposal submitted by: Cleveland State University and Ohio University. Principal Investigators:

TMP reference: Contractor (Working space): Principal (Client): Contractor (TTM):

ROAD CONDITION RATING MANUAL

LOUISIANA TRANSPORTATION BY THE NUMBERS:

Transportation Plan Soil Remediation Fort McClellan Baby Bains Gap Road Ranges, Phase III Range 18 (Parcel 74Q) Fort McClellan, Anniston, Alabama

DRIVER CODE OF CONDUCT FOR TRUCK AND HEAVY VEHICLE OPERATORS PERFORMING WORK FOR OR ASSOCIATED WITH CDM LOGISTICS

TRANSPORTATION & PUBLIC WORKS DEPARTMENT TECHNICAL STANDARDS

TRAFFIC CONES FOR USE IN HIGHWAY WORK ZONES EXECUTIVE LEADERSHIP. BY: John D. Eddinger Assistant Chief Boca Raton Fire-Rescue Boca Raton, Florida

Advanced Highway Maintenance and Construction Technology Research Center

CONNECTICUT TRANSPORTATION BY THE NUMBERS:

Transcription:

Field Guide on Installation and Removal of Temporary Traffic Control for Safe Maintenance and Work Zone Operations August 2008

Introduction This field guide provides field personnel with introductory guidance on installation and removal methods for temporary traffic control (TTC) zones. Proper setup and operation of temporary traffic control zones improves the safety of those working near traffic and is of the utmost importance. It is important to remember that temporary traffic control field personnel are most vulnerable during installation and removal of temporary traffic control devices. As noted in the Manual on Uniform Traffic Control Devices (MUTCD), The needs and control of all road users through a TTC zone shall be an essential part of highway construction, utility work, maintenance operations, and the management of traffic incidents. Part 6B Working near traffic requires training in safe practices, alertness, common sense, and a sense of responsibility. Workers are responsible for their own safety, the safety of other workers, the safety of the driving public, and the safety of pedestrians and bicyclists. Although maintenance and short-term work is not exposed to traffic as long, workers are still at risk during their activities. The following is a list of typical types of maintenance and short-term work that is performed: Bridge inspection. Cleaning drainage facilities - catch basins, drop inlets, etc. Debris cleanup - both routine cleanup and removal of debris, and emergency removal of storm debris and spilled material. Emergency repairs - miscellaneous operations necessary to restore safe highway operation that can be completed within a few minutes. Guardrail repair. 2

Mowing in the highway right-of-way (ROW). Pavement marking installation and removal. Pavement repairs - limited in scope, such as pothole patching, sealing cracks and joints, and other small repairs. Post mounted delineators - repair, replacement, installation. Raised pavement markers - new installations and lens replacement. Shoulder rumble strips - installation. Small roadside signs - repair, replacement, installation. Snow removal and ice prevention. Surveying. Traffic signal repairs - routine lamp replacement and emergency repairs. Vegetation control - application of herbicides adjacent to shoulders. High Visibility Safety Apparel High visibility safety apparel is required for all workers within the highway right-of-way. The American National Standards Institute (ANSI) provides guidelines for high visibility safety apparel based on minimum areas of retroreflective material. Some guidelines are listed below. ANSI Class 2 apparel is required for all workers within the highway right-of-way. ANSI Class 3 apparel is recommended for some types of work. Class 3 vests are required to have sleeves, but retroreflective pants may be worn in addition to a Class 2 vest to also meet Class 3 standards. Refer to http://www.atssa.com for additional information and products on high visibility safety apparel 3

Stationary Lane Closures The following diagram illustrates a lane closure and the parts of a Temporary Traffic Control Zone (TTCZ) based on the MUTCD. Legend Direction of travel Downstream Ta per Buffer Space (longitudinal) Termination Area lets traffic resume normal operations Traffic Space allows traffic to pass through the activity area Work Space is set aside for workers, equipment, and material storage Buffer Space (lateral) provides protection for traffic and workers Buffer Space (longitudinal) provides protection for traffic and workers Activity Area is where work takes place Transition Area moves traffic out of its normal path Shoulder Taper Advance Warning Area tells traffic what to expect ahead Figure 1. Component Parts of a Temporary Traffic Control Zone 4

Advance Preparation Checklist 1. Inventory the devices you plan to use make sure they are all clean and in good working order. 2. Review the Traffic Control Plans for appropriate installation. 3. Discuss safe procedures with your team, including proper personal protective equipment. 4. Make sure workers have the proper training prior to assignment. 5. Identify appropriate emergency contacts. 6. Visit the site in advance to identify any potential issues. 7. Notify other personnel as needed (law enforcement, rescue, etc.). 8. Prior to installation, locate signs and other devices along the shoulder so they can be quickly moved into position. 9. Install the devices per the guidance in this manual for the appropriate operation. 10. Review your installation for good driver navigation and make adjustments as needed. 5

Steps to Install a Stationary Lane Closure on a Multi-Lane Highway 6 1. L ocate the beginning of Work Space and mark the location (when using paint, use white or pink colors only, as other colors have designations for the type of utility being marked). 2. From the beginning of the Work Space, measure the buffer distance (empty space in advance of the work area) and mark the beginning of the Buffer Space. 3. From the beginning of the Buffer Space, measure the taper length and mark the beginning of the taper. 4. From the beginning of the taper, measure the advance warning sign spacing distances (see Figure 2) and mark each location. 5. Install advance warning signs in Advanced Warning Area, beginning with signs located on the right shoulder first, then signs on the left shoulder if applicable: 1 st sign Attracts the driver s attention. 2 nd sign Shows what the driver is approaching. 3 rd sign Shows the driver what must be done. 6. Install Arrow Panel on shoulder prior to taper or as close to beginning of the taper as possible. 7. Install traffic control devices and arrow panel in the Transition Area with the flow of traffic. Use of a TMA on the lead vehicle or shadow vehicle is recommended during installation. 8. Install traffic control devices along the Activity Area: Start installing along the Buffer Space with the flow of traffic Continue placing devices along the Work Space. 9. Install traffic control devices for the Termination Area with the flow of traffic.

10. Inspect the work zone: Perform a drive through inspection. Document the observations. Correct any deficiencies. 11. Observe motorists driving through the work zone to look for trends in motorist difficulty in maneuvering through the work zone. (see Section 6F.82) Buffer space (optional) L Shoulder taper (optional) A B C Figure 2. Advance Warning Sign Spacing Illustration 7

Table 1. Advance Warning Sign Spacing Distances Road Type A B C Urban (low speed) 100 100 100 Urban (high speed) 350 350 350 Rural 500 500 500 Freeways and Expressways 1000 1500 2640 While agencies may determine the break point between low speed urban and high speed urban, a general rule of thumb can be used. Typically, low speed is less than 45 mph and high speed is 45mph or greater when determining sign spacing distances. 8

TTCZ Considerations After the traffic control devices are in place, inspection and observation of the work zone needs to take place and adjustments need to be made if there are safety or drivability issues. Some observations that would be of concern include: Erratic motorist movements. Sudden stops. Squealing tires. Other indicators that motorists are having difficulty in maneuvering through the work zone. When these types of behaviors are observed, actions need to be taken to ensure the safety of the traveling public and the workers working in the work zone. Notify the supervisor of a potential problem. Suspend work due to safety concerns. Some factors that could contribute to erratic motorist behavior and maneuvers include: Hills. Curves. Obstructions. Color contrast. Bad weather. Visibility issues and/or glare. Poor pavement markings. 9

Eradicated lane lines that look like lane markings in wet weather. Poor signing. Driveways. Turning movements. Construction vehicles entering/exiting. Temporary roadway geometrics (lane widths, taper lengths, device placement). Possible solutions: Extend the buffer area beyond the area of concern. Move the transition area in advance of the curve. Provide additional advance warning of the situation. Major changes to an approved Traffic Control Plan must be authorized and approved by appropriate personnel. When in doubt, ask a supervisor. 10

Buffer Space Work zones are designed to compensate for driver error. One such design component is the buffer space an area that protects workers by allowing errant motorists to slow down and stop prior to the work space. This area also protects road users from hazards in the work space, such as work vehicles and equipment. The MUTCD states that the buffer space is optional and may be used. The following table provides longitudinal buffer distances based on the operating speed of a facility (not necessarily the posted speed). Lateral buffer distances should be based on engineering judgment. Speed(mph) Longitudinal Buffer(ft.) 20 115 25 155 30 200 35 250 40 305 45 360 50 425 55 495 60 570 65 645 70 730 75 820 11

Short-Duration Operations As compared to stationary operations, mobile and short-duration operations are activities that occupy a location for up to one hour. These operations might involve different treatments. Keep in mind that: Safety in short-duration operations should not be compromised by using fewer devices simply because the operation will frequently change its location. Appropriately colored or marked vehicles with flashing or rotating lights may be used in place of signs and channelizing devices for short-duration operations (these vehicles may be augmented with signs or arrow panels). During short-duration work, it often takes longer to set up and remove the TTCZ than to perform the work, and workers face multiple hazards during the process of setting up and taking down the TTCZ. Also, since the work time is short, delays affecting road users are significantly increased when additional devices are installed and removed. Considering these factors, simplified traffic control procedures may be warranted for short-duration work. A reduction in the number of devices may be offset when a work vehicle displays high-intensity rotating or flashing lights. 12

Temporary Traffic Control Should Reflect Actual Work Zone Conditions When work is complete or suspended, the MUTCD states that, All TTC devices shall be removed as soon as practical when they are no longer needed. When work is suspended for short periods of time, TTC devices that are no longer appropriate shall be removed or covered. When removed, devices shall be located outside of the clear zone (lateral distance measured from the edge of the travel way). Refer to the AASHTO Roadside Design Guide and/or your State s standards for typical clear zone distances based on speed. Steps to Remove Traffic Control Devices In The Work Zone 1. Remove devices from the Termination Area against the flow of traffic. Use of a TMA on the lead vehicle or shadow vehicle is recommended, where applicable, during removal. 2. Remove devices from the Activity Area against the flow of traffic: a. Make sure Work Space is clear and cleaned before removing devices. b. Remove devices from the Buffer Space. 3. Remove devices from the Transition Area against the flow of traffic. 4. Remove advance warning signs in the Advance Warning Area against the flow of traffic. Remove the first advance warning sign last. 13

14 Stationary Lane Closure Installation and Removal

Special Consideration for Installation and Removal for Detour Routes When the traffic control plan requires a detour route, installation and removal procedures are different than for a normal stationary lane closure. For installation of a detour: First install the last sign motorists will see (the sign that guides motorists back to the route they were detoured from). Second, install the remaining signs working back toward the beginning of the detour. This procedure allows motorists to detour only after all the signs are in place. For removal of a detour: First remove the sign at the beginning of the detour route. Second, remove the other signs with the flow of traffic. With the appropriate level of staff available, all detour signs may be placed in the field at the same time. Additionally, detour signs can be placed one by one and covered until ready for use. 15

Detour Installation and Removal Install B A A Remove Note: See Tables 6H-2 and 6H-3 for the meaning of the symbols and/or letter codes used in this figure. B Note: Northbound sign installation and removal shown. Reverse for southbound direction. 16

How To Approximate Distances in the Field To approximate the distance in the field, some methods are available: Roller Tape: Use a roller tape device for shorter distances (up to ½ mile). Vehicle Odometer: Use the vehicle odometer to measure longer distances such as longer sign spacing distances in the advance warning area. Intermediate Reference Location Signs: Approximate distances using Intermediate Reference Location Signs (typically located at one-tenth of a mile spacing). Survey Marking: On construction projects, station markings or other survey markings may be used if visible and distances are available. Skip-Line Method: Upon arrival at the scene, determine the pattern of the skip lines. Most skip lines are on a 10-30 pattern. This means that the painted lines are 10 feet long and the gap between them is 30 feet long. For this example, there are 40 feet from the beginning of one skip line to the beginning of the next skip line. Pacing Method: In advance, determine the length of your stride and how may paces it would take you to cover the distances needed. 17

Safety Tips Stay Alert. Do not turn your back on traffic. Have a bail-out plan in case of an errant vehicle. Protect yourself get out of the way of errant vehicles. Warn other workers of errant vehicles. Use a spotter. Use a TMA during installation and removal. Always wear High Visibility Safety Apparel when working in or near a roadway. (See the High-Visibility Safety Apparel In Highway Work Zones brochure). Install as many of the traffic control devices as possible from the shoulder. Ensure that proper lighting is available for nighttime installation and removal of temporary traffic control devices. Law enforcement personnel may be used during installation and removal activities to help deter speeding and provide enhanced visibility for the operation. Enforcement personnel should be in safe locations on the shoulder or off the roadway. 18

Any opinions, findings, and conclusions or recommendations expressed in this publication are those of the author(s) and do not necessarily reflect the views of the Federal Highway Administration. Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 (800) 272-8772 This material is based upon work supported by the Federal Highway Administration under Grant Agreement No. #DTFH61-06-G-00004 19