Establishing a Green Deconstruction Project. Presenter: Barry J. Franz, PE, BCEE, PG, CP (119) Environmental Director

Similar documents
CONSTRUCTION AND DEMOLITION PERMIT APPLICATION PACKAGE

Construction / Demolition (C&D) Recycling Program

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************

CITY OF CHICAGO DEPARTMENT OF ENVIRONMENT. CONSTRUCTION or DEMOLITION SITE WASTE RECYCLING RULES AND REGULATIONS

H 7033 SUBSTITUTE A AS AMENDED ======== LC003107/SUB A ======== S T A T E O F R H O D E I S L A N D

CONSTRUCTION WASTE MANAGEMENT PLAN

Construction Waste Minimization and Reuse Management

Venable Hall Demolition recycling and waste management

Construction and Demolition Waste Used as Recycled Aggregates in Concrete: Solutions for Increasing the Marketability of Recycled Aggregate Concrete

Construction & Demolition Recycling Program Building Contractor s Resource Guide & FAQ s (Revised December 2016)

GREEN DEMOLITION CERTIFICATION

LEED-2009 Green Building Rating System. New Construction & Major Renovations

DIVISION 02 SELECTIVE DEMOLITION

KABA DEMOLITION INFORMATION PACKET

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

Construction & Demolition (C&D) Materials Management in the Northeast in 2013 December 7, 2017

Integrating Deconstruction and Recycling Into the Demolition Process in Buffalo, NY

Waste Management in Building and Construction Projects

INFORMATION SHEET. To demolish the entire building to the foundation will require a demolition permit (Form 6).

Tompkins County Solid Waste Management Plan Executive Summary

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

CONTRACT AGREEMENT. This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the

An Introduction to Recycling Construction and Demolition Waste

LEED Analysis of the Knight Management Center. Energy & Atmosphere. Materials & Resources

MICHIGAN WOOD WASTE A CIRCULAR ECONOMY OPPORTUNITY!

LEED FACT SHEET AND BACKGROUND

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

Table 11: Active C&D Debris Facilities in Florida (November 1998) DISTRICT C&D Disposal Land Clearing Debris Disposal

Construction and Demolition Material Recycling Program

ARCHITECTURE/ ENGINEERING

Project & Environmental Review. Guidelines Demolition. May 2016

Construction Summary

BuildingName The Description of the Project P DOCUMENTS

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST

Environmental Implications of Increasing Wood Use in Building Construction. Dr. Jim Bowyer Dovetail Partners Minneapolis, MN

HOW COST EFFECTIVE C&D RECYCLING METHOD. Bradley Guy and Sean McLendon. And Recovery Options

AN EXAMINATION OF WOOD RECYCLING PROVISIONS IN NORTH AMERICAN GREEN BUILDING PROGRAMS

C&D/wood debris management trends

A study on construction and demolition wastes from buildings in Seberang Perai

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Greenhouse Gas Mitigation from Waste Materials Recycling Steven B. Young

Recycling pioneers in Dandenong. An overview of the recycling activities at 185 Westernport Hwy, Dandenong South August 2011

REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St.

Research Topic LEED Guide for Trade Contractors

Integrated Waste and Resource Management

Reduce, Reuse, Recycle. Lesson Plan: NRES G1-1

Increasing Construction and Demolition Waste Diversion in Halifax Regional Municipality A Dalhousie University Case Study SEPTEMBER 2012.

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

Land Reclamation Site Siting and Application Guidelines

A Study on Effective Utilization of Wastes from Construction Industry in Road Construction

BUREAU Joe Iuviene, AIA January 20, 2017

HOTEL SANDFORD. C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated.

SAMPLE. Slab On Ground Construction. Carpentry - Residential Construction. Product Code: 5597

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #160 Douthit Hills Student Community, Clemson University Project Tony Greene

Max-Stacker III. Product Environmental Profile (PEP) Americas

Addendum No. 1 Page 1 of 2

Knoll and Sustainable Design. Life Chair LEED Credits

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5

Economic Impact of Recycling in Alabama and Opportunities for Growth. Alabama Department of Environmental Management. Land Division Solid Waste Branch

Davis Frame Co., Inc. Construction Budget Considerations

Sri Ganesha Temple HTNT Construction Update (June, 2016) Copyright All Rights Reserved.

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #154 Douthit Hills Student Community, Clemson University Project Tony Greene

SUBSTANTIAL IMPROVEMENT

A SYSTEM FOR ESTIMATING RESIDENTIAL CONSTRUCTION AND DEMOLITION DEBRIS

Commercial Tax Abatement

Builder Agreement. Access to build in Mountainside Village constitutes agreement to abide by the following:

Table of Contents. Section 10,010 - Demolition of Building Structures Section Includes Description of Work 1. 1.

Town of The Blue Mountains Waste Diversion Plan

Convenzione ENEA - MATTM

SAS International GSAS / QSAS compliance

LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH

Construction & Demolition Debris Reduction

30 July - 2 August 2018 AMMAN - JORDAN

ABSTRACT WOODY RESIDUES AND SOLID WASTE WOOD AVAILABLE FOR RECOVERY IN THE UNITED STATES, David B. McKEEVER * 1, Robert H.

CENTENNIAL SCHOOL DISTRICT

COST PREDICTION MODEL FOR DECONSTRUCTION AND IMPACT OF DESIGN FOR DECONSTRUCTION

Fates of end-of-life concrete and their economic implications

Table of Contents for Guide Specifications

General Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours

1. It closes biological material cycles, and reduces the linear economy of landfilling waste;

The Official BIFM Information Service Partner

REVIEW OF TEN YEAR PROGRAMME OF WORK ON SUSTAINABLE CONSUMPTION AND PRODUCTION PATTERNS

In Parallel and Integration with. AmmaN - Jordan 30 JULY 2 AUGUST 2018

SECTION UNIT PRICES. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Errata Sheet. LEED for Schools Reference Guide First Edition for the document titled:

Market Analysis of Used Building Materials in Metro Vancouver

2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone:

Project Green House. Green Team. Making the world greener one house at a time

THE CONSTRUCTION SUPERVISOR

Building green via design for deconstruction and adaptive reuse

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Definition of Terms **Non-capitalized references to a state refer to a state other than the State of Michigan.

THE POTTING SHED PF-1D-1144 CONSTRUCTION DRAWINGS PROJECT PLAN INDEX FOUNDATION / FLOOR PLAN 2 ROOF PLAN 3

Transcription:

Establishing a Green Deconstruction Project Presenter: Barry J. Franz, PE, BCEE, PG, CP (119) Environmental Director

Objectives of Presentation Define green deconstruction. Provide background for green deconstruction projects. Describe green deconstruction processes. Present deconstruction economic issues. Describe advantages and disadvantages. Present an example

Basic Premise of Green Deconstruction REDUCE RECYCLE REUSE

Definitions Deconstruction is the selective dismantlement of building components. Sustainable broadest sense of the word and includes the concept of livable. Green broadest sense of the word; essentially means less materials going to a landfill

Benefits of Green Deconstruction Potential cost savings through the reuse and recycling of materials Creates employment opportunities. Saves money - cuts down demolition costs. Reduces the production of greenhouse gas emissions, and other pollutants, and saves energy.

Benefits (Continued) Conserves landfill space and costs. Reduces the need to manufacture or harvest virgin materials. Tax benefits by donating recovered materials to qualified 510(c)(3) charities. Achieve green goals and compliance with various agency sustainability directives Creates community good will

Benefits (Continued) Supports local recycling and sustainability related businesses and charities. LEED 3.0 Credits M&R Credit 1.1 Building Reuse M&R Credit 2 Construction Waste Management M&R Credit 3 Materials Reuse

Materials for Potential Reuse and Recycling Concrete Asphalt Wood Metals wiring and structural framing Brick Glass Others gypsum and plastics

Materials (Continued) Landscaping Materials Roofing Doors Lighting Fixtures Windows Plumbing Fixtures Electrical and Electronic Components HVAC Components

Debris Quantities Percentage Potential Potential Potential Component by Weight Reuse Recycle Salvage Concrete, brick, and mixed rubble 40-50% X --- --- Wood 20-30% X X X Drywall 5-15% --- X --- Roofing 1-10% --- X --- Metals 1-5% X X X Bricks 1-5% X X X Plastics 1-5% X X X Carpet/Textiles 4% X X X Cardboard 1% --- X ---

Disadvantages Project schedule stretched out for material separation (about 15 to 20% longer). Increased labor costs due to longer schedule Pre-planning is more intensive. Material handling challenges Health and safety issues are different.

Issues to be Considered Build green deconstruction elements into the project approach Discuss with Project Stakeholders Agree to final goals of project Develop procedures to address waste management Discuss and agree on project impacts of cost and schedule Have current up to date market values and trends for materials Documentation is CRITICAL!

Contract Management Options Owner contracts out deconstruction project but retains ownership of all salvaged materials Owner allows contractor to retain salvaged materials as in-kind payment reduces cost of contract. Owner allows contractor to retain salvaged materials reduces cost of contract based on resale revenues. Owner contracts a non-profit contractor to conduct deconstruction for a fee and then donates salvaged materials to the contractor.

Deconstruction Methods Soft Skimming Salvage selected components Manual Requires extensive time but yields highest amount and best quality Panelized Structural components removed more quickly which reduces material value Mechanical Mechanical removal of material which may also reduce material value Combination of Methods Reference: DOA, 2007, NYWM, 2009

Deconstruction Procedure Material Hazardous Non-hazardous Recycle or Dispose per Federal, State & Local Regulations Ferrous, Non- Ferrous Metals Concrete, Brick, Masonry Natural Debris Interior Furnishing / Equipment Other Interior Materials Building Materials Leftovers Stone, Earth, Trees, Landscaping Waste Furniture, Office & Process Equipment Doors, Windows, Plumbing Fixtures Gypsum, Roof, Lumber FINAL USE OR DISPOSITION Recycle Crush and/or Clean & Reuse Chip/ Crush/ Compost & Reuse Resale or Reuse Resale, Recycle, or Reuse Resale, Recycle, or Reuse Landfill

Implementation of Green Deconstruction Project Site Walk with Project stakeholders Environmental Due Diligence Health & Safety Plan Markets for Recycled/Reused Materials Determine Deconstruction Goals Define Methods for Deconstruction Develop Project Budget and Schedule Implement /Monitor/Document

Recycled/Reuse Material Markets USEPA Waste Website www.epa.gov/epawaste/conserve/rrr/imr/cdm/bytype.thm National Bulletin Boards for salvaged or surplus building materials www.recycle.net www.greenguide.com www.rbme.com Local Recycling Centers Habitat for Humanity, Goodwill, and other non- profits.

Simplified Green Economics Demolition: Demolition labor + Demolition equipment + Disposal cost + Permitting + Engineering + Other Deconstruction: Deconstruction labor + Deconstruction equipment + Permitting + Engineering + Other Salvage revenue Reference: Dantata, et.al., 2004; Deconstruction Institute website, 2011

Summarized Economic Comparisons Items Deconstruction Demolition Labor Higher labor costs (hand labor maybe Traditional demolition costs required) Equipment May require specialized equipment Traditional demolition equipment (handling equipment) Transportation Reduced waste transport (less waste to landfill) Depends upon distance to disposal facilites Permits Demolition Permit Asbestos Abatement Permit Other waste disposal/abatement permits Demolition Permit Asbestos Abatement Permit Disposal Permits Other waste disposal/abatement permits Tipping Fees Reduced Fees Depends on amount of wastes to be disposed as well as distance to disposal facilities Taxes Tax Credits for Deconstruction Taxes on transport and disposal Return Value Revenue from salvaged materials and items, reduced tipping/disposal fees, tax donation for donated items. Minimal, if any Potential Loss Schedule extensions, higher labor costs If reconstruction at same location, costs for raw materials.

Real World Example Middletown Regional Hospital 105 McKnight Drive Middletown, OH

Project Team Complete Resources Company Preferred FIRE PROTECTION SK CONSTRUCTION Bio-Trauma 911, Inc.

Hospital History Hospital initially developed in 1917. Expanded facilities in 1922, 1938, 1956, 1964, 1978, 1987, and 1993. Community and regional needs outgrew hospital. Plans for entirely new complex approved in 2004.

Project Planning Planning Activities Develop recycling plan Crushed aggregate to be used as backfill Hospital equipment - donations Miscellaneous materials scrap metal, re-use of materials, etc. Identification of Donor Organizations Planned involvement of regulatory agencies Planned community involvement How to deal with complaints and questions

Project Schedule 2008 2009 Task Name Start Finish S O N D J F M A M J J A S Contract Award 9/1/2008 9/11/2008 Temporary Fence 9/12/2008 9/12/2008 Erosion Control 9/15/2008 11/28/2008 Investment Recovery & Equipment Salvage 9/15/2008 12/12/2008 Utility Isolation, Relocations & Disconnects 9/15/2008 1/16/2008 Site Set-up and Equipment Mobilization 12/8/2008 12/15/2008 Engineering Survey & Project Planning 9/15/2008 10/24/2008 Preparatory Interior Removals 9/29/2008 11/21/2008 Asbestos/Hazardous Materials Abatement 10/13/2008 6/12/2009 Garage/Building Demolition 12/15/2008 7/31/2009 Asphalt & Concrete Flatwork Removal 5/18/2009 7/31/2009 Demolition of Demolition Equipment 7/20/2009 8/7/2009 Underground Utility Removal 2/2/2009 7/3/2009 Rough Grade Site 5/11/2009 8/14/2009 Final Site work/topsoil/seeding Work 8/17/2009 8/31/2009 Project Complete 8/31/2009 8/31/2009

Deconstruction Process Soft Skimming Medical Equipment Office Furniture Manual Electronic equipment Tube System Panelized Wiring Structural steel Bricks Landscaping

Reused Medical Equipment Donated to Avon Lake United Church of Christ Missions for medical mission in India

Reused Medical Supplies Caring Partners International Matthew 25 Ministries

Reused Miscellaneous Supplies and Equipment Boy Scouts Fenwick High School Carlisle Fire Dept. City of Middletown Butler Co Port Authority

Reused Several Local Nursing Homes Camp Chautauqua Several Local Schools Other Groups

Recycled Habitat for Humanity Paint Soap Containers Building materials Doors Windows Sills Blinds

Recycled Pneumatic Tube System To be installed at Atrium Medical Center

Recycled Landscaping Materials Before After Relocated at the Employee Walking Trail, Cancer Survivor, and Memorial Gardens at the AMC Campus

Recycled Concrete Crushing On-site backfill

Sustainability Police Special Response Team (SRT) or SWAT Middletown Police SRT Kettering Police SRT Cincinnati Police SRT Other SRT / SWAT

Sustainability K-9 9 Training: Local / Regional Police K-9 K Training at MRH

Fire Fighters Training: Middletown FD Franklin Township FD Madison Township FD JEMS

Benefits of Green Deconstruction Concrete Recycled: 25,000 CY Metal Recycled: 3,127 Tons Salvage Items Reused: 900 CY Construction & Demolition (C&D) Debris Not Recycled: 25,975 CY Net Benefit of Recycling vs. Landfilling: $635,000 Avoidance of Importing 25,000 CY of engineered-fill $195,800 Total Benefit of Recycling vs. Landfilling: $830,800 Estimated Value of Donated Materials: $450,000

Green Deconstruction Questions?