AMMONIA REMOVAL USING MLE PROCESS EXPERIENCES AT BALLARAT NORTH. David Reyne. Central Highlands Water Authority

Similar documents
Choices to Address Filamentous Growth

General Information on Nitrogen

Nutrient Removal Processes MARK GEHRING TECHNICAL SALES MGR., BIOLOGICAL TREATMENT

Review of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng

AquaNereda Aerobic Granular Sludge Technology

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

INVESTIGATION INTO REUSE OF DECOMMISSIONED STP INFRASTRUCTURE, IMPROVING TREATMENT OUTCOMES. Liz Millan & Aleisha Myles

TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT

Closed Loop Reactor (CLR) Process. Innovative Technology, Flexible Orientation and Energy Saving Designs

NEW BIOLOGICAL PHOSPHORUS REMOVAL CONCEPT SUCCESSFULLY APPLIED IN A T-DITCH PROCESS WASTEWATER TREATMENT PLANT

Removal of High C and N Contents in Synthetic Wastewater Using Internal Circulation of Anaerobic and Anoxic/Oxic Activated Sludge Processes

AquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic.

Coupling Trickling Filter or RBC s with Activated Sludge

- 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants. by Glenn Thesing

Aqua MSBR MODIFIED SEQUENCING BATCH REACTOR

BIOLOGICAL NUTRIENT REMOVAL PROCESSES

Integrated Fixed Film Activated Sludge (IFAS) System for Additional Nitrification at the Coldwater WWTP

Case Study. BiOWiSH Aqua has Positive Long-Term Effects. Biological Help for the Human Race

IWA Publishing 2012 Water Practice & Technology Vol 7 No 3 doi: /wpt

COMPARISON OF PROCESS ALTERNATIVES FOR ENHANCED NUTRIENT REMOVAL: PERSPECTIVES ON ENERGY REQUIREMENTS AND COSTS

Case Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia.

SECTION 14.0 BIOLOGICAL NUTRIENT REMOVAL

COMPARISON STUDY BETWEEN INTEGRATED FIXED FILM ACTIVATED SLUDGE (IFAS), MEMBRANE BIOREACTOR (MBR) AND CONVENTIONAL ACTIVATED SLUDGE (AS) PROCESSES

NUTRIENT REMOVAL PROCESSES IN WASTEWATER TREATMENT. We re Glad You re Here!

Activated Sludge Process Control: Nitrification

TWO YEAR CASE STUDY OF INTEGRATED FIXED FILM ACTIVATED SLUDGE (IFAS) AT BROOMFIELD, CO WWTP West 124th Street Broomfield, CO 80020

ENVE 302 Environmental Engineering Unit Processes DENITRIFICATION

Advantages & Applications of MBBR Technologies

BIOLOGICAL PHOSPHOROUS REMOVAL AN OPERATOR S GUIDE

Preparing for Nutrient Removal at Your Treatment Plant

Nutrient Removal Enhancement Using Process Automation at Holly Hill

Technical Memorandum-Low Cost Retrofits for Nitrogen Removal at Wastewater Treatment Plants in the Upper Long Island Sound Watershed

CTB3365x Introduction to Water Treatment

Activated Sludge Process Control:

OPERATION OF AN STP FOR RECYCLED WATER PRODUCTION PLANT. Iain Fairbairn. Iain Fairbairn, Plant Manager, Sydney Water

Dr Martin Peter *, Joachim Scholz & Victor Ferre. Contents

Dealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017

UV DISINFECTION OF LOW TRANSMITTANCE PHARMACEUTICAL WASTEWATER

Renovation of secondary treatment facility into the Step-feed Biological Nitrogen Removal Process by the effective use of the existing structure

Module 19 : Aerobic Secondary Treatment Of Wastewater. Lecture 24 : Aerobic Secondary Treatment Of Wastewater

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

JTAC Presentation May 18, Nutrient Removal Process Fundamentals and Operation

Use of Biowin for Process Troubleshooting / Design for a Unique Wastewater

Chapter 11. Secondary Clarifiers

Comparison on the Treatment Performance of Full-scale Sewage Treatment Plants using Conventional and Modified Activated Sludge Processes

WASTEWATER TREATMENT SYSTEM

2/22/2011. Presentation Outline. Overview of Wastewater Aeration. Basic Equation. Some Acronyms. dc dt. dc dt TDS BP T C L

Evaluation of Conventional Activated Sludge Compared to Membrane Bioreactors

MARPAK modular biomedia WASTEWATER TREATMENT

Removal of High Ammonia Levels from Municipal Wastewater Using Humic Acid and Selective Bio-Augmentation

Biological Nutrient Removal Processes

SLUDGE SETTLEABILITY CONTROL AT ELANORA WWTP RAS CHLORINATION TRIAL. Martin Hindmarsh. Allconnex Water

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

City of Paso Robles Uses Online Monitor to Detect Low-Level of THMs in Treated Wastewater

Ballasted Activated Sludge Demonstration Study SEPTEMBER 30, 2016

Troubleshooting Activated Sludge Processes. PNCWA - Southeast Idaho Operators Section Pocatello, ID February 11, 2016 Jim Goodley, P.E.

WASTEWATER TREATMENT. Nelson Environmental Inc. Nelson Environmental Inc.

CUSTOM-DESIGNED WASTEWATER TREATMENT PLANTS

A REGULATORY GUIDE TO SEQUENCING BATCH REACTORS

Operation of a small scale MBR system for wastewater reuse

ADVANCED CONTROL SYSTEM OF ACTIVATED SLUDGE PROCESSES USING IN- SITU AMMONIUM AND NITRATE PROBES

Advances in Nitrogen and Phosphorus Removal at Low DO Conditions

MBBR Wastewater Treatment Processes

Environmental Dynamics International

Pilot Studies on Performance of Membrane Bio-Reactor in Treating Hong Kong Freshwater and Saline Sewage and Its Virus Rejection Ability and Mechanism

Startup and Performance of the World s first Large Scale Primary Dissolved Air Floatation Clarifier ABSTRACT KEYWORDS INTRODUCTION

TROUBLESHOOTING BNR PROCESSES E. Stone, S. Walker, R. Reardon Carollo Engineers, Inc.

Fixed-Film Processes

Industrial Wastewater Treatment Using High Rate Activated Sludge and Alum Additive

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

JEDDAH INDUSTRIAL CITY

Activated Sludge Treatment Extended Aeration (EA) and Sequencing Batch Reactor (SBR) Systems

Sulaibiya world s largest membrane water reuse project

New York State Department of Environmental Conservation

International Joint Commission Water & Wastewater Treatment Best Management Practices Forum Monday, March 26, 2012 Wayne State University, Detroit MI

American Water College 2010

Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest

A Hybrid Constructed Wetland System for Decentralized Wastewater Treatment

Prepared by the Operation of Municipal Wastewater Treatment Plants Task Force of the Water Environment Federation

CEDAR CREEK Wastewater Treatment Facility

Unit Treatment Processes in Water and Wastewater Engineering

SAF SAF SUBMERGED AERATED FILTER THE PARTNER OF CHOICE

Innovative Use of Dissolved Air Flotation with Biosorption as Primary Treatment to Approach Energy Neutrality in WWTPs

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

Shortcut Biological Nitrogen Removal for sustainable wastewater treatment and achieving energy neutrality

Figure Trickling Filter

LOW COST NUTRIENT REMOVAL in Montana a 2016 report on 11 wastewater treatment plants.

Conceptual Design for a Future Wastewater Treatment Plant

Advances in Wastewater Treatment Technology

A SITE-SPECIFIC TOOL FOR OPTIMIZING FINAL CLARIFIER DESIGN AND OPERATION

East Coast P Removal Technology Performance Summary

NUTRIENT OPTIMIZATION FOR PULP & PAPER WASTEWATER TREATMENT PLANTS AN OPPORTUNITY FOR MAJOR COST SAVINGS

IS DESIGNER RECLAIMED WATER IN NORTH CAROLINA S FUTURE?

DELTA ENVIRONMENTAL ECOPOD SERIES

Tour of Regional Water Reclamation Facility

INSTALLATION OF A STEP-SCREEN & VORTEX GRIT REMOVAL SYSTEM AT THE GRIFFITH SEWAGE TREATMENT PLANT. Peter Shanahan. Griffith City Council

BioWin 3. New Developments in BioWin. Created by process engineers.. for process engineers

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati

EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT

Transcription:

AMMONIA REMOVAL USING MLE PROCESS EXPERIENCES AT BALLARAT NORTH Paper Presented by : David Reyne Author: David Reyne, Plant Operator Wastewater Treatment, Central Highlands Water Authority 65 th Annual Water Industry Engineers and Operators Conference Kardinia Heights Centre - Geelong 4 and 5 September, 22 Page No 16

AMMONIA REMOVAL USING MLE PROCESS - EXPERIENCES AT BALLARAT NORTH Mr David Reyne, Plant Operator Wastewater Treatment, Central Highlands Water. ABSTRACT Ballarat North Wastewater Treatment Plant is one of the few Victorian plants remaining that discharge secondary class effluent to inland waters. With recent changes to the existing EPA discharge licence, Ammonia and Total Nitrogen limits have been set such that the traditional biological trickling filters struggle to achieve. To this end Central Highlands Water has been investigating a number of options to achieve compliance. It was decided to design and build a small pilot plant using an activated sludge process in the Modified Ludzack-Ettinger configuration, which has subsequently produced encouraging results. Having a high proportion of trade waste in the influent, CHW then decided to duplicate the pilot plant and test the process on a single industrial source, which has high ammonia concentrations. The pilot systems have successfully met ammonia removal efficiencies in excess of 95% and concentrations of less than 1. mg/l. KEY WORDS Ammonia, Modified Ludzak-Ettinger (MLE), Ballarat North Wastewater Treatment Plant (BNTP), a Recycle, Biological Trickling Filters (BTF), Mixed Liquor Suspended Solids (MLSS). 1. INTRODUCTION Ballarat North Wastewater Treatment Plant (BNTP) was designed and built in the 196s and consists of a conventional secondary treatment process using primary treatment, biological trickling filters and final clarification. Over the years minor upgrades have been made to improve plant performance such as chemically dosing to reduce phosphorus concentrations. BNTP receives trade waste from the largest customers of the Authority, with the organic load from these contributors accounting for about 7% of the total load on the plant. Central Highlands Water has plans to augment the Ballarat North plant over the next few years. However the existing plant currently suffers from extreme overload conditions brought about by an expanding catchment load and also a high industrial discharge from a number of sources. Therefore a need was established to investigate what, if any, interim options were available to CHW to achieve the Licence requirements for a short-term period. 2. METHODOLOGY The scope of the investigations was to determine works that were necessary for short term compliance with the existing EPA discharge requirements, keeping in mind the longer term objectives of the plant. Thus an interim solution was sought to meet the enforced targets until the major augmentation under SmartCycle is commissioned towards the end of 25. In order to reduce the ammonia and also the total nitrogen leaving the plant, additional nitrification/ denitrification capacity at the plant was required. To this end a decision was made to pursue the potential for a high rate activated sludge solids contact process to be added to the existing BTF to treat part or the entire flow stream. Page No 17

The principle is based on the BTF continuing to produce the current filtrate quality and part or all of this filtrate stream then being directed to the solids contact process to effect additional nitrification. If an anoxic zone or an intermittent operation of the aeration cycle is incorporated, this would assist in delivering denitrification which would reduce the nitrates and in turn reduce the total nitrogen leaving the process. 3. DISCUSSION Because of the significant and strong trade waste component, it was decided to proceed as follows: 1. Prove the ability of the waste to flocculate by firstly establishing a basic activated sludge process train; 2. If 1 was successful, trial the MLE process on Settled Sewage with its additional carbon source; 3. Subsequently trial the MLE process on various blends of Filtrate + Settled Sewage. The primary objective was to establish how well the MLE process in series with the biological trickling filtration plant, could nitrify and denitrify the Ballarat North raw sewage. A secondary objective was to establish just how low a sludge age (SRT) the process could successfully be operated at bearing in mind the very low sewage temperature. The initial attempt at the pilot plant utilized two tanks, one for aeration and one for clarification. Also a smaller drum was used as wet well for the Return Activated Sludge (RAS) to be pumped back to the aeration tank via a small submersible pump. Air was supplied by a small blower through four 6 stone diffusers. Initially the pilot study was to be conducted using filtrate from the BTF plant. However the biomass was slow to develop, and this was attributed to the C:N:P ratio of the filtrate being around 3.3:4.6:1. Seeding with RAS from the Ballarat South Treatment Plant (BSTP) was commenced and introduced into the pilot plant RAS wet well. This seeding process was repeated over several days with little success. Given the slow progress it was decided to switch from filtrate to settled sewage with a more optimal C:N:P ratio of 1:4.6:1. Once this configuration started building biomass with intense seeding from BSTP, some good results were achieved with an 8% reduction in Ammonia in a couple of grab samples which gave some confidence in the process. During this overall initial period, there was little success due to major mechanical problems. This manifested itself causing difficulties in keeping solids in the systems and other issues. During this phase, numerous practical problems were experienced, such as difficulty in adjusting the MLSS flow to the clarifier without disturbing the sludge blanket and floc shearing through pumping. Perhaps the most significant operational problem was the inability to concentrate solids and then remove the settled solids from the two flat-bottomed clarifiers. To overcome this problem a single coned shape plastic tank was installed to act as a clarifier. Page No 18

Once these initial practical problems were resolved, and although the plant consisted of the most basic activated sludge configuration, the pilot plant was clearly demonstrating significant nitrification and denitrification. Thus the suitability of the activated sludge process albeit in a basic conventional mode and using settled sewage, was proven. The way forward from this point was to achieve a stable process for nitrification and denitrification. Consequently the incorporation of a denitrification step within the process was required. In this case a separate anoxic zone was needed and the Modified Ludzack-Ettinger (MLE) process was chosen as the way forward. Figure 1 and 2 shows the flow schematic of the MLE process and a picture of the MLE pilot plant. Figure 1: Modified Ludzack-Ettinger Pilot Plant. Figure 2: Pilot Plant located at Ballarat North Wastewater Treatment Plant Page No 19

For a period the Pilot Plant was operated in a (MLE) process configuration at a sludge age (SRT) of 1 days. The SRT was known precisely by virtue of wasting a fixed flow-monitored quantity of MLSS each day. The changing of mode to the MLE process involved adding an anoxic zone and a recycle line from the aeration zone back to the anoxic zone a recycle or NML (nitrified mixed liquor ) recycle. Having run in the MLE mode with settled sewage as the feed for some days, the target MLSS was reached and wasting from the system began. Initially wasting from the RAS line was chosen. This proved to give operational problems with scum and rising sludge and it was difficult to maintain an accurate assessment of the SRT with consequent loss of control. To overcome this, wasting was changed to the aeration tank to give better control over MLSS. The change in method produced excellent results with ammonia reductions of >9%. These results were continuously achieved over the following months with ammonia levels reducing by 99% consistently. In order to achieve the initial aim of treating BTF filtrate through an additional process, the feed for the pilot was changed to give a 5:5 blend of filtrate and settled sewage. Settled sewage was added to the filtrate as a carbon source to aid in the process, especially for denitrification. The blend was then subsequently modified again to a 25:75 settled sewage/filtrate blend to push the system a little harder. Some modifications were made to the recycle rates and this process, once stabilised, also achieved an excellent reduction in ammonia. With the reduced proportion of settled sewage in the feed to the pilot plant, predictably denitrification suffered. Rather than continue and incorporate a larger denitrification zone, it was at this point that the trials were concluded. Quite clearly, the trials proved that: 1. Whilst the Ballarat North raw sewage is very strong with a 7% industrial component, the MLE activated sludge process is extremely effective in reducing TKN in the settled sewage from around 8.mg/L to <<1.mg/L and TN < 1. mg/l. 2. The MLE activated sludge process is very robust and repeatable. 3. Even treating low sewage temperatures, the activated sludge process performs extremely well at very low SRTs. 4. RESULTS Significant analysis of the waste was completed together with analysis of flow regimes, recycle rates, WAS rates, RAS rates and sludge age. The design and modelling for this project was undertaken by Zemek Environmental Pty Ltd. The model predictions were very close to the actual results analysed in the field. The pilot produced excellent results with significant reductions in BOD, phosphorus, ammonia and nitrate. Graph 1 depicts the levels of ammonia in the feed and the concentration leaving the process for pilot plant using the settled sewage as the only feed. Page No 2

Graph 1: BNTP Pilot Plant MLE Settled Sewage BNTP Pilot Plant MLE Settled Sewage 14 Influent Ammonia Effluent Ammonia 12 Ammonia mg/l 1 8 6 4 2 1/2/2 3/2/2 5/2/2 7/2/2 9/2/2 11/2/2 13/2/2 15/2/2 17/2/2 19/2/2 21/2/2 23/2/2 25/2/2 27/2/2 1/3/2 3/3/2 5/3/2 7/3/2 9/3/2 11/3/2 13/3/2 15/3/2 Date 17/3/2 19/3/2 21/3/2 23/3/2 25/3/2 27/3/2 29/3/2 31/3/2 During this period the pilot plant performed extremely well. Typically the pilot plant designed as a MLE process without any detailed consideration to its design for bio-p removal, has produced the following results: Ammonia - < 4. mg/l (the initial testing apparatus was limited to a minimum reading of 4.mg/L however based on CHW laboratory results this value was typically < 1. mg/l) Total Nitrogen ~ < 1. mg/l Ortho phosphorus ~ <.6 mg/l SVI ~ 123 Graphs 2 and 3 depict outcomes gained by using a combined feed of settled sewage and biological trickling filter filtrate. As shown the pilot performed very well with significant reductions, up 99%, in ammonia concentrations. Graph 2: BNTP Pilot Plant MLE 5% Settled Sewage : 5% BTF Filtrate BNTP Pilot Plant 5:5 Blend Effluent Ammonia Influent Ammonia 2.5 8 2 1.5 1.5 13/5/2 14/5/2 15/5/2 16/5/2 17/5/2 18/5/2 19/5/2 2/5/2 21/5/2 22/5/2 23/5/2 24/5/2 25/5/2 26/5/2 27/5/2 Ammonia mg/l 7 6 5 4 3 2 1 Date Page No 21

Graph 3: BNTP Pilot Plant MLE 25% Settled Sewage : 75% BTF Filtrate BNTP Pilot Plant 25:75 Blend Effluent Ammonia Influent Ammonia Filtrate Ammonia Ammonia mg/l 5 4.5 4 3.5 3 2.5 2 1.5 1.5 1 9 8 7 6 5 4 3 2 1 28/5/2 3/5/2 1/6/2 3/6/2 5/6/2 7/6/2 9/6/2 11/6/2 13/6/2 15/6/2 17/6/2 19/6/2 21/6/2 23/6/2 Date The above pilot plant results are based on grab samples taken morning and afternoon. Frequent reality checks were made of the on site test results by taking duplicate samples and having spotcheck analyses taken in the CHW laboratory. 5. CONCLUSION Experience and knowledge gained during the pilot process has proven that the MLE process is a robust activated sludge configuration. The process design was aggressive as defined by the low sludge age (SRT) of around 1 days and < 8 days in summer, whilst still producing excellent results with low levels of ammonia leaving the process. The process also produced excellent performance with respect to the reduction in parameters such as BOD and phosphorus concentrations. Modelling of the process has produced functional design criteria for which an interim plant could be based. 6. ACKNOWLEDGMENTS The contents of this paper are based on recent work undertaken at the Ballarat North Wastewater Treatment Plant. As such the author would like to acknowledge the following people in preparing this paper: Central Highlands Water Wastewater Treatment Team inclusive, Mr. Peter Zemek Zemek Environmental Pty Ltd, and Mr. Danny McLean Process Operations Manager, Central Highlands Water 7. REFERENCES: Zemek, P.M (21), Short Term Improvements For The Ballarat North Wastewater Treatment Plant Status Report 1, Internal correspondence. Zemek, P.M (22), Short Term Improvements For The Ballarat North Wastewater Treatment Plant Status Report 2, Internal correspondence. Page No 22