Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati
|
|
- Ruby Daniel
- 6 years ago
- Views:
Transcription
1 Taylor Creek Treatment Plant Metropolitan Sewer District of Greater Cincinnati
2 Who is this guy and what is he talking about? Brad Blankenship Taylor Creek Operator 3.5 years MSD Operator 5.5 years (total) Topics Taylor Creek Overview Taylor Creek s Future Taylor Creek s Operational Challenges Taylor Creek s First Violation
3 Taylor Creek Treatment Plant Completed in 1992 Started treatment in 1997 Platinum Award Winner (through 2014) Replacement for several package plants 2.5 MGD average flow (2015) Extended aeration plant Sanitary collection system Staff Operations (2); Maintenance (6); Truck Driver (1)
4
5 TCTP Drainage Basin Colerain Township Green Township Whitewater Township Miami Township
6
7 Influent Pumping Wesselman Pump Station Located ¼ mile from the plant Provides 90% of influent flow 10 MGD maximum pumping capacity 4 submersible raw sewage pumps MGD pumps (non VFD) 2-5 MGD pumps (non VFD)
8
9 Influent Pumping Miamitown Pump Station Completed in 2008 On site Provides 10% of influent flow Room for expansion 0.92 MGD capacity 2 submersible raw sewage pumps 0.46 MGD per pump (max)
10
11 Preliminary Fine Screens 2 Headworks automated fine screens 8.46 MGD each Conveyor system for removal 3 cubic yard dumpsters are used for storage Bar Rack 10 MGD
12 Preliminary Grit and Skims Aerated grit chamber / skim trough Traveling bridge Grit classifier 3 cubic yard dumpsters are used for storage
13
14 Preliminary Recycle Well and Pumps Main Drain Well and Pumps Influent Sampling Sampling occurs downstream of the recycle and main drain pumps
15 Secondary Aeration basins million gallons per tank Rotating bridge (rim drive) design Blowers 3 125HP multistage centrifugal blowers Manufacture: Lampson 2 computer controlled; 1 manual controlled
16
17
18 Secondary Secondary Settling 2 1 million gallon tanks Rotating bridge design (rim drive) Return Activated Sludge 3 screw pumps 2,390 GPM (3.44 MGD) capacity per pump Non-VFD
19
20
21 Ultraviolet Radiation 2 banks 80 bulbs per bank PLC controlled Trojan 3000 plus Banks are setup in series Post Aeration Cascade Effluent Sampling Disinfection
22
23
24 Sludge Handling Waste Batch wasting Typical wasting 90, ,000 gallons per day Average 8,000 mg/l WAS Batch size is determined by MXL-SS and RAS-SS MXL target Activated by a SCADA controlled valve on a timer Wasting is accomplished by gravity and supplemented by pumps if needed
25 Solids Handling Holding Tanks 2 90,000 gallon tanks 2 automatic floating decanters Siemens Auma valve Level sensors PLC control; No SCADA (future)
26
27
28
29
30 TSS (mg/l) TSS Influent
31 Secondary Characteristics Summer MXL: mg/l SVI: Sludge Age: Days Winter MXL: mg/l SVI Sludge Age: Days
32 Effluent TSS < 3 mg/l 98.5% removal ph: BOD < 4 mg/l 99% removal Fecal Coliform: < 200 colonies per 100ml Ammonia 1.6 mg/l
33 Operational Challenges Rim Drive Snow causes drive wheel to lose traction Aerating ¼ of the basin Maintenance on a rotating arm Can become frozen to the ground Has more moving parts
34 Operational Challenges
35
36
37
38 Operational Challenges Screw RAS Pumps No flow meters Difficult to determine flow Emergency power does not support RAS pumps The new generator for Miamitown Pump Station (on site) is large enough to power the whole plant but it not connected
39
40 Operational Challenges Influent Sampling Sampling occur after main drain and recycle pump discharge Inaccurate influent characteristics Personnel Staffed 8 hour per day; 5 days per week Monitored nights and weekends from MCTP (30 minutes away)
41 TSS (mg/l) TSS Influent
42 Operational Challenges Rollercoaster Flows Caused by RSP without VFD s Varying loading rates Varying UV contact time Multiple on/off equipment cycles
43
44 Operational Challenges UV Banks in Series in One Channel Multiple channels needed during high flow
45 Operational Challenges Floating Decanters Freeze in the winter No SCADA control (future) Sludge clogs decanters causing them to float above the water line
46
47 Operational Challenges Aeration Influent Gate Valves Controls flow into each aeration basin Opens to offline tank during high flow periods Controlled by flow (influent or effluent) Failures are disastrous Too much flow to one secondary train Wastewater backs up into preliminary Causes flooding of tanks, screens, clarifiers, and recycle well Flooding spills onto grass, gulley, and driveway
48
49 TCTP Future Expected to have tightened permit limits NH 3 Current average: 1.6 mg/l (see graph) Addition of new permit items Phosphorus Current average: 3.23 mg/l (see graph) E. coli Currently not monitored Fecal Coliform tested
50 mg/l NH
51 mg/l Total Phosphorus Total Phosphorus
52 TCTP Future Expected increase in flow Current average flow: <2.5 MGD 20 year projected flow (2038): 3.0 MGD Original 20 year design flow from 1993: 5.5 MGD
53 TCTP Future Convert one aeration basin to a BNR tank Utilize the other aeration basin as a surge basin Upgrade RAS to centrifugal pumps Upgrade SCADA (in progress) Add UV s to multiple channels Automate gate valves (in progress)
54 The First Permit Violation (and how it s mostly not my fault) During the month of March in 2015 TCTP had its first permit violation The ammonia level exceeded the weekly limit of 10.5 (average) All other violations were avoided (barely)
55 Permit Violation Week 1 (no violation) Grit and skim collection is offline/broken Clarifier #1 is frozen in place Aeration #1 is down Fixed by weeks end Major snow melt along with a major rain event coincide Aeration #2 breaks Causes a tank change during peak flow Both aeration basins become filled quickly but only #1 is online Operator (me) takes off for the birth of his son
56 Born 8:58pm Weight 9lbs 10oz Length 22 inches Likes: Naps, Eating, Water, Car Rides, Tom and Jerry, and Screaming at Dad Dislikes: Mornings, Doctors, St. Louis Cardinals, and Sleeping on a Schedule
57 Permit Violation Week 2 (no violations barely) Low solids content in aeration #1 Low solids content in RAS Clarifier #1 is put online by weeks end Aeration #2 (still down) is drained for maintenance Contributing to higher flows Operator is off until Thursday Ammonia is rising!
58 Permit Violation Week 3 (Violation Week) High flow continues Plant reseeded from Polk Run MXL and RAS are starting to build up Ammonia violation Aeration #2 is still draining (still offline) Aeration #2 was filled a few times during wet weather events
59 Permit Violation Week 4 Monday RAS solids are low but #1 clarifier has a heavy blanket #2 clarifier has no blanket Clarifiers are put on separate RAS pumps #2 RAS was suppressing #1 RAS from coming up to the common well Grit and grease may have partially clogged the RAS line for #1 clarifier Since TCTP is only staffed 5 days per week no one was able to catch this in time Returning sludge from aeration #1 into both aeration basins
60 Permit Violation Week 4 MXL becomes too high by Wednesday Wasting and hauling are increased Effluent became worse (NH 3 and SS) before it improved Plant is back to normal by the end of the week
61 Permit Violation Lessons Learned Check both sludge blankets every day Scheduled an operator to check TCTP during off hour (wet weather) Don t take off for the birth of a child (or take off more time to avoid all the blame) Increase preventative maintenance techniques for aeration basin rim drives Thaw tanks in advance to prevent freezing Move solids to holding tanks temporarily
62 Preventing a Future Violation Running both treatment trains during wet seasons Hired more operators to help cover shifts Increased predictive maintenance techniques Increased training for the West section
63 Questions?
City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant
City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant April 7, 2014 Prepared by Jerry Blain, P.E., Project Associate Environmental Finance Center Funding for this Energy Assessment was provided
More informationManaging the Largest Extended Wet Weather Event on Record at TRA CRWS
Managing the Largest Extended Wet Weather Event on Record at TRA CRWS April 21, 2016 Julia J. Hunt Trinity River Authority of Texas David R. Jackson, P.E., BCEE Freese and Nichols, Inc. TRA CRWS Treatment
More informationNorth Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of
North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of Greater Chicago Today s Goals Discuss project background Provide
More informationCITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018
CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 PREPARED: January 2019 2018 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY
More informationCITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014
CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 PREPARED: January 2015 2014 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY
More informationMUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT
MUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT 214 ANNUAL REPORT uary 1 to ember 31, 214 Environmental Compliance Approval # 3-442-9-938 Prepared by: Table of Contents Section 1: Overview...
More informationCity of Leadwood Wastewater System Engineering Report
City of Leadwood Wastewater System Engineering Report DRAFT H2O C Engneering www.h2oc.com 877-22-WATER Background The purpose of this report is to describe the City of Leadwood s wastewater system (System
More informationMeadowbrook-Limestone (MBLS) Wastewater Treatment Plant. Wet Weather Operating Plan
Meadowbrook-Limestone (MBLS) Wastewater Treatment Plant Wet Weather Operating Plan July 2014 TABLE OF CONTENTS Section 1 Introduction and Overview. 1 Section 2 Wet Weather Operational Strategy....2 a.
More informationCITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012
CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012 PREPARED: January 2013 2012 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY
More informationMUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT
MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT 214 ANNUAL REPORT uary 1 to ember 31, 214 Environmental Compliance Approval # 3-871-88-949 Prepared by: Table of Contents Section 1: Overview...
More informationTABLE OF CONTENTS. SECTION 1 INTRODUCTION 1.1 Background Purpose and Scope
TABLE OF CONTENTS Page EXECUTIVE SUMMARY... ES-1 SECTION 1 INTRODUCTION 1.1 Background... 1-1 1.2 Purpose and Scope... 1-2 SECTION 2 HYDRAULIC AND PROCESS ASSESSMENT 2.1 Data Gathering and Analysis...
More informationHIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE
City of Newark, Ohio HIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE 22, 2011 High Rate Treatment Tanks/UV Wet Weather Screen Building JC2/Wet Weather Pump Station Wet Weather Control
More informationCHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION
CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION 1.1 Introduction The GWA provides wastewater services for Guam s general population and for Andersen Air Force Base. The wastewater system is made up of seven
More informationTechnical Memorandum No. 1
To: From: Steve McGowan, P.E., BCEE Project Manager, Malcolm Pirnie, Inc. Eric Wang, P.E. Project Engineer, Malcolm Pirnie, Inc. Date: Subject: August 11, 28 (Final) Madison MSD Project No. 84251 Malcolm
More informationAltoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation
Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Presented by: Jim
More informationCity of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals
City of Elk River Wastewater Treatment Facility Improvements Achieving Wastewater Treatment Goals By Tejpal Bala, P.E. Bolton & Menk, Inc. The City of Elk River received a new NPDES permit and the existing
More informationCORPORATION THE EXPERIENCED LEADER IN SEQUENCING BATCH REACTOR TECHNOLOGY
ISAM SEQUENCING BATCH REACTOR PROCESS TRUST FLUIDYNE S EXPERIENCE The Fluidyne ISAM Sequencing Batch Reactor (SBR) system incorporates the latest and most innovative technology and over two decades of
More informationDRAFT SUBMITTED TO: TOWNSHIP OF LONG HILL PREPARED BY: KLEINFELDER
LONG HILL TOWNSHIP WASTEWATER TREATMENT PLANT CAPACITY ASSURANCE REPORT UPDATE DRAFT SUBMITTED TO: TOWNSHIP OF LONG HILL PREPARED BY: KLEINFELDER FEBRUARY 2018 LONG HILL TOWNSHIP WASTEWATER TREATMENT PLANT
More information2011 SEWAGE TREATMENT PLANT ANNUAL REPORT
ENVIRONMENTAL DIAGNOSTICS INC. 2011 SEWAGE TREATMENT PLANT ANNUAL REPORT Prepared for: KICKING HORSE MOUNTAIN SANITARY SEWER SERVICES LTD. 1505-17 Avenue SE Calgary, Alberta T2T 0E2 Prepared by: ENVIRONMENTAL
More informationCLR Process. Vertical Loop Configuration
CLR Process Vertical Loop Configuration Vertical Configuration System Flexibility Parallel Operation Raw wastewater and return activated sludge are introduced at a single point in each standard CLR basin.
More informationFrom manual to automatic at Spring Creek
When upgrading its water resource recovery facility on Spring Creek, the Springfield (Ill.) Metro Sanitary District designed with operations in mind. By bringing together operators and designers, the district
More information2017 Annual Performance Report
Newcastle Water Pollution Control Plant The Regional Municipality of Durham Newcastle Water Pollution Control Plant Environmental Compliance Approval (ECA): 3-2189-87-946 Dated July 26, 1994 Amendments:
More informationWASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts:
Mission: The mission of the Bentonville Wastewater Treatment Utility and staff is to protect public health and the environment through the effective treatment of wastewater. Effective wastewater treatment
More informationPresentation Outline
Presentation Outline Nitrification/denitrification refresher Treatment technologies available for nitrification and BNR/ENR What is the problem? BNR/ENR VPDES permitting Causes of reduced BNR performance
More informationATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l
ATTACHMENT 1 GENERAL FACILITY INFORMATION 1. Facility Name: 2. Type of Facility: 3. Population Served: Present: Design: 4. Flow: Average Maximum Peak 5. Water Quality: Present Design Assumed Actual Source:
More information2015 HDR, Inc., all rights reserved.
2015 HDR, Inc., all rights reserved. Hastings Utilities Water Pollution Control Facility Improvements Brian Bakke, HDR ASCE Environmental Conference 4/6/2017 Review Existing Facilities Need for the Project
More informationDundalk Wastewater Treatment Plant
Township of Southgate Dundalk Wastewater Treatment Plant 2014 Annual Report Jim Ellis Public Works Manager Dundalk Wastewater Treatment Plant 2014 Annual Report Table of Contents Wastewater Treatment Plant
More informationREHABILITATION OF THE ROCKAWAY BEACH MISSOURI WASTEWATER TREATMENT PLANT TURNING AROUND A CHRONICALLY FAILED SYSTEM
REHABILITATION OF THE ROCKAWAY BEACH MISSOURI WASTEWATER TREATMENT PLANT TURNING AROUND A CHRONICALLY FAILED SYSTEM THE PROBLEMS POOR EFFLUENT QUALITY BOD 5 87 MG/L TSS 105 MG/L E.COLI - > 2420 MPN TOTAL
More informationCORPORATION THE EXPERIENCED LEADER IN SEQUENCING BATCH REACTOR TECHNOLOGY
ISAM SEQUENCING BATCH REACTOR PROCESS TRUST FLUIDYNE S EXPERIENCE The Fluidyne ISAM Sequencing Batch Reactor (SBR) system incorporates the latest and most innovative technology and over three decades of
More informationTABLE OF CONTENTS. SECTION 1 INTRODUCTION 1.1 Background Purpose and Scope
TABLE OF CONTENTS EXECUTIVE SUMMARY... Page ES-1 SECTION 1 INTRODUCTION 1.1 Background... 1-1 1.2 Purpose and Scope... 1-2 SECTION 2 BASIS OF DESIGN 2.1 Existing Discharge Permit... 2-1 2.2 Plant Capacity
More informationW O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W
Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF
More informationProviding Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP
Timothy McCann AECOM Keith Bovard Rocky River WWTP WWTP Infrastructure Redundancy Redundancy As NASA Would Say: A Backup Plan for the Backup Plan Nuclear Power Plant Wastewater Treatment Plant Page 3 Infrastructure
More informationISAM INTEGRATED SURGE ANOXIC MIX
ISAM INTEGRATED SURGE ANOXIC MIX P r o v e n T e c h n o l o g y FLUIDYNE S ISAM IS A TOTAL TREATMENT SYSTEM incorporating BOD, TSS and nitrogen removal along with sludge reduction in an integrated system.
More informationAssuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:
Andelina Farms Wastewater Treatment Plant Preliminary Basis of Design May 2018 Andelina Farms is a proposed Planned Unit Development in Saline Township located along US-12 just west of the City of Saline.
More informationPerformance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility
Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Richard W. Gullick, Ph.D. Director of Operations Timothy Castillo Wastewater Manager Presented to the Albemarle County
More informationSSO Reduction Program. WWTP Effluent Violation Corrective Actions
SSO Reduction Program WWTP Effluent Violation Corrective Actions Report to United States Environmental Protection Agency: SSO Reduction Program This page intentionally left blank i WWTP Effluent Violation
More informationCITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION
CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION The City of London operates five Wastewater Treatment Plants namely: Adelaide, Greenway, Oxford, Pottersburg
More informationVILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY
EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire
More informationDitches for Energy Efficiency and Improved Nitrogen Removal
Upgrade of the Big Gulch WWTP Oxidation Ditches for Energy Efficiency and Improved Nitrogen Removal Thomas G. Authors: Thomas E. Coleman, dtec Systems Bridges, Mukilteo Water & Wastewater District Bend,
More informationChapter 2: Description of Treatment Facilities
2020 Facilities Plan Treatment Report 2.1 Introduction Chapter 2: Description of Treatment Facilities This chapter defines the Milwaukee Metropolitan Sewerage District (MMSD) service area. It also describes
More informationHARTFORD METROPOLITAN DISTRICT (MDC) WET WEATHER EXPANSION PROJECT PHASE 1 NEW 200 HEADWORKS FACILITIES
HARTFORD METROPOLITAN DISTRICT (MDC) WET WEATHER EXPANSION PROJECT PHASE 1 NEW 200 HEADWORKS FACILITIES THOMAS A. TYLER, PE GREGORY S. BAZYDOLA, PE NEWEA Conference January 22, 2018 Presentation Agenda
More informationEnvironmental Improvements Associated with Springfield WWTP EHRT. Using the Compressed Media Filter Technology
Environmental Improvements Associated with Springfield WWTP EHRT Tuesday, June 23 9:30 am Using the Compressed Media Filter Technology WWETCO WWETCO FlexFilter ENGINEERS CLUB OF ST. LOUIS Performance Testing
More informationCITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT
CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT FEBRUARY 2014 SUMMARY This annual report is in response
More informationA SIMPLE SOLUTION TO BIG SNAIL PROBLEMS - A CASE STUDY AT VSFCD S RYDER STREET WASTEWATER TREATMENT PLANT
A SIMPLE SOLUTION TO BIG SNAIL PROBLEMS - A CASE STUDY AT VSFCD S RYDER STREET WASTEWATER TREATMENT PLANT Timothy R. Tekippe, P.E.,* Robert J. Hoffman, P.E.,* Ronald J. Matheson,** Barry Pomeroy** *Carollo
More informationDecantech. Decantech SBR SBR Technology For Sewage Treatment Plants. Parchure Engineers Pvt. Ltd. Pune
Decantech SBR SBR Technology For Sewage Treatment Plants By Parchure Engineers Pvt. Ltd. Pune Decantech SBR is the latest offering by Parchure Engineers Pvt. Limited. It is based on the Sequential Batch
More informationUPGRADING FOR TOTAL NITROGEN REMOVAL WITH A POROUS MEDIA IFAS SYSTEM
UPGRADING FOR TOTAL NITROGEN REMOVAL WITH A POROUS MEDIA IFAS SYSTEM T. Masterson, J. Federico, G. Hedman, S. Duerr BETA Group, Inc. 6 Blackstone Valley Place Lincoln, Rhode Island 02865 ABSTRACT The Westerly,
More informationRE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System
14 th, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Wardsville Wastewater Treatment Plant and Collection System The Ontario Clean Water Agency
More informationSMCSD Headworks, Primary and Secondary Treatment Pre-Design
Technical Memorandum SMCSD Headworks, Primary and Secondary Treatment Pre-Design Water andenvironment Subject: Prepared For: Prepared by: Reviewed by: SMCSD Mark Takemoto, Dennis Gellerman Steve Clary
More informationTABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION
TABLE OF CONTENTS 2. Description of Water and Wastewater Systems... 2 2.1 General... 2 2.2 Existing Facilities Reference and Record Documents... 2 2.3 Existing Infrastructure Location and Legal Description...
More informationOak Orchard Wastewater Treatment Plant. Wet Weather Operating Plan
Oak Orchard Wastewater Treatment Plant Wet Weather Operating Plan July 2014 TABLE OF CONTENTS Section 1 Introduction and Overview. 1 Section 2 Wet Weather Operational Strategy.3 a. Wet Weather Operation
More informationFremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment
OWEA 2013 Annual Conference June 19, 2013 Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment Jeff Lamson, Superintendent, WPCC Robert Hrusovsky,
More informationCITY OF BELTON, MISSOURI WWTF FACILITY PLAN UPDATE TECHNICAL MEMORANDUM NO. 1 WWTF FLOW PROJECTIONS AND PROJECT PHASING. FINAL September 2012
CITY OF BELTON, MISSOURI WWTF FACILITY PLAN UPDATE TECHNICAL MEMORANDUM NO. 1 WWTF FLOW PROJECTIONS AND PROJECT PHASING FINAL September 2012 903 E. 104TH STREET, SUITE 320 KANSAS CITY, MISSOURI 64131 P.
More informationFeel free to contact me should you require any additional information regarding the report. I can be reached at
February 28, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Glencoe Wastewater Treatment Plant The Ontario Clean Water Agency is the Operating
More informationTECHNICAL BROCHURE WASTEWATER TREATMENT SYSTEMS
WASTEWATER TREATMENT SYSTEMS by PUMPING & WATER TREATMENT The system most preferred by customers who clearly understand the economic value in purchasing an expertly designed and professionally built system
More informationDeicing Fluid and Stormwater Management At Cincinnati/Northern Kentucky International Airport
Deicing Fluid and Stormwater Management At Cincinnati/Northern Kentucky International Airport Kenton County Airport Board 2009 ACI-N/A/ATA/RAA Deicing Management Conference July 8, 2009 Don Chapman CVG
More informationHistory of the Plant
History of the Plant Discharge began May 2008 Plant capacity as built 20 mgd Expansion capacity 30 mgd Beginning discharge approximately 5.5 6.0 mgd Currently discharging 7.5 mgd Activated Sludge treatment
More informationTreatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E.
Treatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E. Topics Covered Background Challenges and Priorities UV and Filters High Flows Evaluation Aeration Evaluation Aeration Basins
More informationThe following biological nutrient removal processes were evaluated in detail in the 2016 Liquid Processing Facilities Plan:
Nitrite Shunt Pilot Project Purpose: The purpose of this project is to full scale pilot test the nitrite shunt biological nutrient removal process to confirm process design criteria, impacts to sludge
More information6.2.1 Intermediate Pumping Overview
6.2.1 Intermediate Pumping Overview The intermediate pumps are the feed pumps to the MBR system. The pumps take flow from the primary effluent channel and pump it to the channel in front of the fine screens.
More informationBEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary
BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred
More informationUsing Process Optimization and Energy Audits to Reduce Energy Costs
Using Process Optimization and Energy Audits to Reduce Energy Costs PNCWA Annual Conference 23 October 2012 Ron Moeller Operations Services Leader Presentation Outline What is a process energy-audit? Energy
More informationDELTA WASTEWATER TREATMENT PLANT UPGRADES
Delta, Ohio Environmental and Electrical Engineering, Grant Administration Cost $2.6 million $3.2 million OWDA Loan 1,100 SF Admin Building Addition 0.725 MGD Average Daily Flow 1.5 MGD Peak Capacity Professional
More informationBorough of Chambersburg Wastewater Treatment Plant Expansion and Upgrade Project
Borough of Chambersburg Wastewater Treatment Plant Expansion and Upgrade Project Presented by: G. Bryan Salzmann, Esq. Manny Parada, PE Jake Rainwater, PE Beverley Stinson, PhD Don Lavine February 27,
More informationWastewater Treatment Works and Collections System Annual Report Year 2005 General Information
Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Facility / System: Town of Farmville Wastewater Collection System and Treatment Facilities Responsible Entity:
More informationCity of Hudson. Wastewater Treatment Plant Improvements. Columbia County, New York. Facility Plan. Delaware Engineering, P.C.
City of Hudson Columbia County, New York Wastewater Treatment Plant Improvements Facility Plan Prepared By: Delaware Engineering, P.C. 28 Madison Avenue Extension Albany, New York 12203 (Phone) 518-452-1290
More informationENHANCED TECHNICAL ASSISTANCE EVALUATION
BUREAU OF POINT AND NON-POINT SOURCE MANAGEMENT ENHANCED TECHNICAL ASSISTANCE EVALUATION Big Run Area Municipal Authority Sewage Treatment Plant Henderson Township, Jefferson County NPDES #PA0223107 The
More informationAilsa Craig Wastewater Treatment Plant Operations Report 2017 THIRD QUARTER
Ailsa Craig Wastewater Treatment Plant Operations Report 2017 THIRD QUARTER Submitted by: Ontario Clean Water Agency Date: July 1 September 30, 2017 Ailsa Craig Wastewater Treatment Plant and Collection
More information2017 Performance Report for Bobcaygeon Waste Water Treatment Facility
2017 Performance Report for Bobcaygeon Waste Water Treatment Facility Amended Environmental Certificate of Approval (ECA) #3028-AEUKDQ Section 11(4) requires the Performance Reports to contain the following:
More informationBest practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest
Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest Steve Russell WRc PLC Swindon UK Steve.russell@wrcplc.co.uk WRc plc 2011 Plan
More informationTexas A&M Wastewater Treatment Plant 9685 Whites Creek Rd., College Station, TX
Municipal Wastewater Treatment Plant Site Visit Report Thursday, October 2, 2014 Prepared by: Elora Arana, Environmental Studies student Prepared for: Dr. Heather Wilkinson, Professor BESC 489/411 Texas
More informationWastewater Treatment. Where does wastewater go when it leaves your house?
Wastewater Treatment Where does wastewater go when it leaves your house? Let s s take a look The process includes: Collection of wastewater Primary Treatment Secondary Treatment Solids Handling Influent
More informationEllis Creek Water Recycling Facility, City of Petaluma
Ellis Creek Water Recycling Facility, City of Petaluma Historical Timeline Facility Treatment Processes / Flow Schematics Challenges of Wetlands Dechlorination Mode of Operation Benefits of Natural Dechlorination
More informationCITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION
CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION The City of London operates six Wastewater Treatment Plants namely: Greenway, Pottersburg, Vauxhall, Adelaide,
More informationONTARIO ROCK ROAD LIFT STATION EQUALIZATION FACILITY
City of Ontario, Ohio Environmental Engineering Plans and Specifications, Construction Administration Cost $1.78 milliion 1.2 MG Professional Services: 2012 2013 PDG Project Manager Michael Atherine, P.E.
More information2017 Annual Performance Report
2017 Annual Performance Report Thornbury Wastewater Treatment Plant and Associated Collection System Prepared by: Wastewater Operations Staff Reporting Period: January 1 December 31, 2017 1 P age Executive
More informationBitterroot River Nutrient TMDL Technical Report WASTEWATER TREATMENT
Bitterroot River Nutrient TMDL Technical Report WASTEWATER TREATMENT Prepared By: Watershed Management Section Montana DEQ April 9, 2010 Technical Advisory Group Draft 1.0 INTRODUCTION This is a technical
More informationWet Weather Planning for Wastewater Treatment Plants
Wet Weather Planning for Wastewater Treatment Plants June 23, 217 Peak Flow Management: Collection vs. Treatment Collection System Peak Flow Management Single 24 hour design storm I/I reduction SSO elimination
More informationChapter 5: Treatment Assessment Future Condition
2020 Facilities Plan Treatment Report 5.1 Introduction Chapter 5: Treatment Assessment Future Condition The future performance of the Milwaukee Metropolitan Sewerage District (MMSD) wastewater treatment
More informationAeration Blower Requirements. Tom Jenkins 06/15/2016
Aeration Blower Requirements Tom Jenkins 06/15/2016 Aeration blowers receive a lot of attention from design engineers, suppliers, and end users. That is understandable since blowers account for more than
More informationWASTEWATER TREATMENT PLANT MASTER PLAN 3. EXISTING FACILITIES AND PERFORMANCE ASSESSMENT
WASTEWATER TREATMENT PLANT MASTER PLAN 3. EXISTING FACILITIES AND PERFORMANCE ASSESSMENT This chapter reviews in detail the current condition of the individual components of the Napa Sanitation District
More informationAPPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1
APPENDIX A PRELIMINARY TECHNICAL SPECIFICATIONS FOR BIOSOLIDS MANAGEMENT SERVICES JEA Buckman Residuals Management Facility 1. Background JEA is seeking biosolids management services from experienced biosolids
More informationWalter E. Deuchler Associates, Inc. Consulting Engineers
I. DESCRIPTION OF PROJECT HIGHLIGHTS P lanning for the latest improvements to the Salt Creek Sanitary District (District) began in 2001 with the updating of the Facility Plan, which identified the need
More informationEnergy Efficiency Modifications. Small Blowers D.O. Control and VFD s. Joe Cantwell Focus on Energy Kris August Kiel Wastewater Utility
Energy Efficiency Modifications Small Blowers D.O. Control and VFD s Joe Cantwell Focus on Energy Kris August Kiel Wastewater Utility Click icon Kiel to add pic ture Kiel Wastewater Utility Treatment Facility
More informationYours very truly, Municipality of West Perth. Environmental Services
January 30, 2018 Municipality of West Perth 169 St. David Street Mitchell, Ontario N0K 1N0 ATTENTION: Mr. Jeff Brick CAO REFERENCE: Municipality of West Perth Annual Wastewater Report 2017 Please find
More informationHOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN
HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins
More informationReview of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng
Review of WEFTEC 2016 Challenge & Overview of 2017 Event Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng Agenda Review 2016 Challenge Provide overview of updates to 2017 event Frequency WEFTEC Scores
More information9/27/2013. Regulation vs. Space Time & Temperature.Weather!
Land Application CASE STUDY: Stoneybrook Sanitation, Inc. Lowell, Michigan Regulation vs. Space Time & Temperature.Weather! Land Application WAS FREE! Regulations Got Tighter Hauling was: 4 & 5 per gallon
More informationWastewater Plant Tour. There Is Gold In Them There Plants
Wastewater Plant Tour There Is Gold In Them There Plants Why Should I Be Interested In Wastewater Treatment? Every municipality has at least one treatment facility. Many manufactures will have treatment
More informationNew Phosphorus Removal Requirement Tips the Scales: Lessons Learned on Biosolids Management and Odor Control at the Southington CT Treatment Plant.
New Phosphorus Removal Requirement Tips the Scales: Lessons Learned on Biosolids Management and Odor Control at the Southington CT Treatment Plant. Plant Overview Plant Operations Interim Phosphorus Permit
More informationPalmer Wastewater Treatment Plant 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed
6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed 6.7.1 Description This alternative considers expanding the capacity of the existing lagoon treatment facility and changing the discharge
More informationBaltimore City Department of Public Works
Baltimore City Department of Public Works Back River WWTP Process and Construction Overview Michael F. Gallagher, Chief Wastewater Facilities Division Wastewater Treatment Chesapeake Bay Restoration Water
More informationPost-Aerobic Digester with Bioaugmentation Pilot Study City of Meridian, ID WWTP PNCWA 2010
Post-Aerobic Digester with Bioaugmentation Pilot Study City of Meridian, ID WWTP by: William Leaf Adrienne Menniti Bruce Johnson CH2M HILL, Inc. Clint Dolsby Tracy Crane City of Meridian October 26, 21
More informationRMSAWWA/RMWEA Joint Technical Advisory Committee Presentation and Tour
RMSAWWA/RMWEA Joint Technical Advisory Committee Presentation and Tour Background Project Objectives Challenges Design Conclusions Features A phased 20 mgd (expandable to 30 mgd) greenfield water reclamation
More informationDonner Summit PUD Interactive Map Pop-up Text and Photos June 30, 2015
Donner Summit PUD Interactive Map Pop-up Text and Photos June 30, 2015 I Administration The administration building is home to DSPUD s friendly personnel. The adjacent garage provides vehicle and equipment
More informationSECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION
SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION Analytical Environmental Services 2-1 Jamul Indian Village Wastewater Treatment Plant Analytical Environmental Services 2-2 Jamul
More informationNEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE
NEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE Keith C. Dayton Department of Utilities Stafford County, Virginia P. O. Box 339 Stafford,
More informationBRACEBRIDGE WASTEWATER TREATMENT
2014 BRACEBRIDGE WASTEWATER TREATMENT ENVIRONMENTAL COMPLIANCE APPROVAL: #6801-7VKNAQ INTRODUCTION The Lagoon Lane Wastewater Treatment Plant is owned and operated by the District Municipality of Muskoka.
More informationFAIRMONT WASTEWATER TREATMENT PLANT
FAIRMONT WASTEWATER TREATMENT PLANT 2006 Page 1 PUBLIC UTILIES COMMISSION Bill Supalla Joe Kurtzman Andy Noll Jeff Ziemer David Kuhl SPECIAL THANKS TO CITY STAFF Jim Zarling, City Administrator Mike Humpal,
More informationPolishing Ponds. Biosolids Storage. Ammonia Removal. Digesters. Thickeners. Pretreatment. Final Clarifiers. Primary Clarifiers.
Wastewater Treatment Facility (2012) Polishing Ponds Biosolids Storage Ammonia Removal Digesters Thickeners Pretreatment Primary Clarifiers Activated Sludge Final Clarifiers OVERVIEW Whenever a home, business,
More informationPleasing. Alternative. top performer wastewater:
top performer wastewater: PLANT Pleasing Alternative A NEW OXIDATION DITCH TREATMENT PLANT PRODUCES HIGH-QUALITY EFFLUENT AND HELPS BRING AN OHIO VILLAGE INTO MORE CONSISTENT PERMIT COMPLIANCE STORY: Steve
More information