APPENDIX A-2 TECHNICAL REFERENCES

Similar documents
CIVIL BREADTH Exam Specifications

North Mountain IMS Medical Office Building

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity

PF-Series Gantry Crane

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

Project Address: Name of Person Completing Form:

BUREAU Joe Iuviene, AIA January 20, 2017

SECTION GROUNDING AND BONDING

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

UNIFIED FACILITIES GUIDE SPECIFICATIONS

CVEN 483. Structural System Overview

STATEMENT OF SPECIAL INSPECTION FORM

11/07/2017. Tolerances & The Intolerant World of Structural BIM Coordination. Dave Merrifield. BIM and Tolerances. Speaker Twitter Handle.

Special Inspections Instructions

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

DESIGN CRITERIA. Allowable Stress Design (ASD) AISC-1999.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION FOUNDATION DRAINAGE

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

E-Series Steel Gantry Crane

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

PLAN SUBMITTAL REQUIREMENTS - ARCHITECTURAL

A-Series Aluminum Gantry Crane

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Table of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8

CHAPTER 7. ERRATA. 1) Chapter 1 Introduction and Summary:

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS

City and County of San Francisco CONTRACT No A SFO - Data Center, Building 60 SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Solar Standards Development

PATHWAYS FOR COMMUNICATIONS SYSTEMS

CONSTRUCTION MANAGEMENT

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers.

Specification Lightning Protection Systems

FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR

Protecting Penetrations in Fire Rated Construction

T-Series Gantry Crane

SEWER SYSTEM DESIGN GUIDELINES

UNIFIED FACILITIES GUIDE SPECIFICATIONS

North Mountain IMS Medical Office Building

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

HIGH DENSITY CROSSLINKED POLYETHYLENE STORAGE TANKS WITH OXIDATION RESISTANT LINING SYSTEM (NSF/ANSI 61)

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

BUILDING CODES & DESIGN CRITERIA

August 2015 INTERIM No. 180 (I)

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

LANE ENTERPRISES, INC. STANDARDS & SPECIFICATIONS

ICC Product Update January 29, 2010

2. Is there anything I can do to prevent my water service lateral from freezing?

behind every great accomplishment...

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

Reclaimed Water Treatment, Distribution, Pumping and Storage Engineering Report Form

Structural Redesign Gravity System

TECHNICAL REPORT 2 BUILDING CODES, SPECIFICATIONS, AND LOADS

SECTION VINYL ACRYLIC CLAD WOOD DOORS PART 1 GENERAL 1.1 RELATED DOCUMENTS

The University of Texas at Austin September 30, 2011

A/E Design Deliverable Checklist

EVALUATION SUBJECT: TEEL BQ POLYPROPYLENE (PP-RCT) PIPING SYSTEM

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

SECTION STAINLESS STEEL FLEXIBLE CABLE MESH. Show hidden Specifier Notes for best results

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

ELECTRICAL BULLETIN

Jean Vaillancourt Fire Protection Specialist Hilti (Canada) Corp.

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

Details for Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses

LARGE STORAGE TANK PROJECT

Report on First Revisions with Statement June 2014 NFPA 5000

NATIONAL DIPLOMA: ENGINEERING: CIVIL Qualification code: NDCI03 - NQF Level 6

SECTION SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM

TYPICAL INSTALLATION INSTRUCTIONS

We provide exceptional Quality project Management, multi disciplinary Engineering design and Construction consultancy. QMEC Company Profile 1

Mount Vernon Elementary School Grades PK 5

GUIDELINES FOR SANITARY DESIGN AND CONSTRUCTION OF MILK PRODUCTS PLANTS (rev )

Structural Engineering

ELECTRICAL CODE TRADE REFERENCE

LIFE SCIENCES BUILDING STRUCTURAL CONCEPTS AND EXISTING CONDITIONS

Wall Mounted Jib Crane

Washoe County PLAN SUBMITTAL

Structural Eurocodes an overview

One and Two Family Additions

State of Connecticut Plumbing Apprenticeship Information Packet 17-18

EVALUATION SUBJECT: NIRON POLYPROPYLENE (PP-RCT) PIPING SYSTEM DIVISION: PLUMBING SECTION: DOMESTIC WATER PIPING

DIVISION 14 CONVEYING SYSTEMS

02800 SHADE STRUCTURES

REINFORCING TABLES INSTALLATION MANUAL

DYNAMIC PROTOTYPE BIM MANUAL FOR A FITNESS CENTER V1.0 November 21, 2011

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

Testing Methods of Driven Piles on INDOT Demonstration Projects

2014 Commercial Plan Submittal Checklist

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

Thule Prototype BIM Manual for Dormitories. February 5, 2010

The Building Codes A.R.E. Building Design and Construction Exam Prep

Transcription:

APPENDIX A-2 TECHNICAL REFERENCES Appendix A-2

APPENDIX A-2 TECHNICAL REFERENCES 1.0 GENERAL Refer to Section 01015 TECHNICAL REFERENCES for application of codes and technical criteria included below. This list is not exhaustive and is not necessarily complete. The publications to be taken into consideration shall include those editions referenced in Chapter 35 of the 2009 International Building Code (2009 IBC) or the most recent editions. Additional references are listed in the Appendix A-1 SPECIFICATIONS. 2.0 LIST OF CODES AND TECHNICAL CRITERIA 2.1 STANDARDS A/E/C CAD Standards, V4.0 (or newer) available online at: https://cadbim.usace.army.mil/default.aspx?p=s&t=13&i=4 2.2 GENERAL CONSTRUCTION ACI 318 ACI 530/ASCE 5/TMS 402 AISC 341 AISC 360 Building Code Requirements for Structural Concrete, American Concrete Institute Building Code Requirements for Masonry Structures Seismic Provisions for Structural Steel Buildings including Suppliment No. 1, American Institute of Steel Construction Specification for Structural Steel Buildings, American Institute of Steel Construction ANSI-ASC A14.3-2008 American National Standard for Ladders Fixed Safety Requirements ASCE 7 ASTM ASTM-D-1586 ASTM-D-5299 AWS D1.1 BS7671 Minimum Design Loads for Buildings and Other Structures American Society for Testing and Materials Standard Test Method for Standard Penetration Test Standard Guide for Decommissioning Ground Water Wells Structural Welding Code Steel, American Welding Society Requirements for Electrical Installations, Institution of Electrical Engineers (IEE), Wiring Regulations, Seventeenth Edition Appendix A-2 - Page 1

CMAA 70 CMAA 74 EIA ANSI/TIA/EIA-607 Factory Mutual (FM) Specification for Top Running Bridge and Gantry Type Multiple Girder Electric Overhead Traveling Cranes (Crane Manufacturer s Association of America) Specification for Top Running Bridge and Under Running Single Girder Electric Overhead Traveling Cranes Utilizing Under Running Trolley Hoist (Crane Manufacturer s Association of America) (1994) Commercial Building Grounding/Bonding Requirement Standard Approval Guide-Fire Protection, latest edition IBC IEEE C2 IFGC IMC IPC Lighting Handbook International Building Codes, 2009 edition (including the Referenced Standards in Chapter 35 or the latest editions of those Standards) National Electrical Safety Code (NESC), latest edition International Fuel Gas Code, latest edition International Mechanical Code, latest edition International Plumbing Code, latest edition IESNA, latest edition International Mine Action Standards latest edition see http://www.mineactionstandards.org for copy of standards TM 5-802-1 TM 5-805-4 TM 5-811-1 Economic Studies Noise and Vibration Electrical Power Supply and Distribution 2.3 FIRE PROTECTION AND LIFE SAFETY NFPA 1 NFPA 10 NFPA 70 NFPA 72 NFPA 75 NFPA 80 NFPA 101 NFPA 110 General Fire Protection, latest edition Portable Fire Extinguishers, latest edition National Electrical Code, latest edition National Fire Alarm Code, latest edition Standard for the Protection of Information Technology Equipment Fire Rated Doors and Windows, latest edition Life Safety Code, latest edition Standard for Emergency and Standby Power Systems, latest edition Underwriters' Laboratories (UL) Fire Protection Equipment Directory (2010) Appendix A-2 - Page 2

2.4 UL STANDARDS (AS APPLICABLE)UNIFIED FACILITIES CRITERIA Unified Facility Criteria (UFC) is available online at: http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 1-200-01 UFC 1-300-07A UFC 1-300-09N Design: General Building Requirements Design Build Technical Requirements Design Procedures UFC 3-230-06a Subsurface Drainage, 16 Jan 2004 UFC 3-240-03N Operation and Maintenance: Wastewater Treatment System Augmenting Handbook, 16 Jan 2004 UFC 3-240-04a Wastewater Collection, 16 Jan 2004 UFC 3-240-09fa Domestic Wastewater Treatment 16 Jan 2004 UFC 3-240-07fa Gravity Sewers 16 Jan 2004 UFC 3-240-04A Wastewater Collection 16 Jan 2004 UFC 3-310-01 UFC 3-310-02A UFC 3-410-01FA UFC 3-420-01 UFC 3-460-01 Structural Load Data Structural Design Criteria for Buildings Heating, Ventilating and Air Conditioning Plumbing Systems Design Petroleum Fuel Facilities UFC 3-501-01 Electrical Engineering, 3 Feb 2010 UFC 3-520-01 Interior Electrical Systems, 3 Feb 2010 UFC 3-530-01AN Design: Interior and Exterior Lighting and Controls, 22 Aug 2006 UFC 3-540-04N Design: Diesel Electric Generating Plants, 16 Jan 2004 UFC 3-550-03 Design: Electrical Power Supply and Distribution Systems, 3 Feb 2010 2.5 USACE-AED DESIGN REQUIREMENTS In addition, technical criteria provided in USACE-AED Design Requirements (most recent version) shall be required for use in design and construction specifications as indicated in the following documents. The following design criteria shall be used: AED Design Requirements Electrical Design Requirements, latest version Site Layout Guidance, latest version Water Tanks and System Distribution, latest version Booster Pumps, latest version Chlorinators, latest version Jockey Pumps, latest version Hydrology, latest version Appendix A-2 - Page 3

Culvert and Causeways, latest version Sanitary Sewer and Septic System, latest version Vertical Curve Design, latest version CERP Road Geometric Requirements and Flexible Pavement Section Design Geotechnical Investigations, latest version CADD Design Guide Mechanical & Plumbing Guide, latest version Well Pumps & Well Design, latest version 2.6 COMMUNICATION SYSTEMS 2.6.1 APPLICABLE SPECIFICATIONS The Publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by designation only. UFC 1-200-01 Design: General Building Requirements United States Department of Agriculture Rural Utilities Service RUS Bulletin 1751F-643 RUS Bulletin 1751F-644 RUS Bulletin 1753F-151 RUS Bulletin 1753F-201 Underground Plant Design, (latest edition) Underground Plant Construction, (latest edition) Construction of Underground Plant, Parts II & III (latest edition) Acceptance Test and Measurements Of Telecommunications Plant, (latest edition) RUS Bulletin 1753E-001 RUS General Specification for Digital, Stored Program, Controlled, Central Office Equipment; RUS Form 522 (latest edition) RUS Publication IP 344-2 List of Materials Acceptable For Use on Telecommunications Systems of RUS Borrowers, (latest edition) RUS Bulletin 345-65 Shield Bonding Connectors (PE-33), (latest edition) RUS Bulletin 345-83 REA Specification for Gas Tube Surge Arrestors (PE- 80), (latest edition) RUS Bulletin 1753E-001 RUS General Specification for Digital Stored Program Controlled Central, (latest edition) Office Equipment Form 522 American National Standards Institute/Telecommunications Industry Association/Electronics Industry Association ANSI TIA/EIA 606-A Administration Standard for The Telecommunications Infrastructure Appendix A-2 - Page 4

ANSI TIA/EIA 607-A Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications, (latest edition) ANSI TIA/EIA 607-A ANSI TIA/EIA 568 ANSI TIA/EIA 569-B ANSI TIA/EIA 758-A Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications, (latest edition) Commercial Building Telecommunications Cabling Standard, (latest edition) Commercial Building Standard for Telecommunications Pathways and Spaces, (latest edition) Customer-owned Outside Plant Telecommunications Infrastructure Standard, (latest edition) 2.7 OTHER STANDARDS Standards other than those mentioned above may be accepted if the standards chosen are internationally recognized and meet the minimum requirements of the specified standards. The Contractor shall be prepared to submit proof of this if requested by the Contracting Officer. -END OF SECTION- Appendix A-2 - Page 5