Office of Planning, Design and Construction. Capital Program Update May 10, 2017

Similar documents
RFP Feasibility Design Services: Clinical Education & Assessment Center Expansion Questions & Answers: February 13 th, 2018

SUNY Hospitals & A Healthier New York. Capital Briefing March 1, 2013

RATIONALE AND REASONING

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017

Architectural Services

LANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent

LIFE OF A CAPITAL PROJECT

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011

A PRESENTATION OF THE SCHEMATIC DESIGN FOR THE CHEMISTRY BUILDING RENOVATION PROJECT WILL TAKE PLACE AT THE MAY MEETING MEMORANDUM

- DATA REQUIREMENTS BIM

Procedure for Department Managed Repair and Renewal Projects Under $15,000

CITY OF NOVI. Police Department

CONSTRUCTION UPDATE. June 2017 THIS IS PROGRESS. THIS IS AUBURN.

CONSTRUCTION UPDATE NOVEMBER 2016 THIS IS PROGRESS. THIS IS AUBURN.

UAA Science Renovation Phase 2 Narrative EXISTING BUILDING SITE

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

TEXAS A&M ENGINEERING

Auburn University Facilities Management Policy :

Division 09 FINISHES TABLE OF CONTENTS

1.0 ABOUT THE NU GUIDELINES

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

Mueller Laboratory Renovation

Sustainable Renovation

Chair of FLMC and CFO Approvals

UCSF Mission Bay & Dogpatch Construction Community Meeting 11/7/2017

New York State Contract Reporter NYS' official source of contracting opportunities Bringing business and government together

APPENDIX B FF&E RESPONSIBILITY MATRIX

Completed projects. Projects in progress. Program developments

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT

The Consumer s Guide to. Basement Renovations. The Consumer s Guide to Basement Remodeling Total Renovations

School Without Walls

Abington Memorial Hospital Abington, PA. Project Description

INSPIRE each student to develop a strong

MR Project Implementation Guide

Design Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright

Rice University Request for Proposal August 26, 2016

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************

Perimeter Site Improvements

PRESCRIPTIVE COMPLIANCE METHOD

A/E Design Deliverable Checklist

3. Has a hazardous materials survey been completed for the project to identify any potential contaminates? Answer: Yes.

PROJECT DESCRIPTION. The project is the Spartan Complex Seismic Upgrade, San Jose, California.

Request For Proposal (RFP) For Architectural/Design Services. Ski Hi Park Multi-Purpose Building

FUTURE BOND PROGRAM PROPOSED PROJECTS Summary Report. September 2013

University of Colorado Denver Facilities Projects Scope of Work Questionnaire

SECTION ALTERNATES

The Performance. Michael G. Meyers Competition PROJECT REQUIREMENTS: 2018 Design Competition. The design for "The Performance

LECKIE ELEMENTARY SCHOOL

Projects Currently in Planning, Design and Construction. April 12, 2017

Landscape elements will be completed between now and Spring Break by UCO Contractor should have resolved parking lot lighting issues

East Los Angeles College Project Priority List Occupancy Date

LEWIS ELEMENTARY SCHOOL

Laker Hall Program Study Intercollegiate Athletics. Preferred Concept & Project Phasing SUCF Project No

Building Information Modeling (BIM) Execution Plan

Crockett Elementary School Renovations

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

University of Wisconsin La Crosse Science Lab Building DFD# 13B3H / RA# 1290.A December 3, 2014

Office of Design & Construction State University Plaza Albany, New York

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #160 Douthit Hills Student Community, Clemson University Project Tony Greene

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

PERFORMANCE PROGRESS REPORT SF-PPR. 2. Federal Grant or Other Identifying Number Assigned by Federal Agency 60NAN B

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

THE CONSTRUCTION SUPERVISOR

Vertical Transportation Planning Retail/Mixed-Use

Comparison of the life safety elements of the 1997 UBC and the IBC 2000.

What happened to Division 17? and what is CLA? A Strategic Plan for Communications, Life Safety and Building Automation Systems

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

Contracted Scope ABC of the Carolinas Excellence in Construction Awards Carolinas HealthCare System CMC Kitchen Healthcare.

CODE COMPLIANCE PLAN REVIEW PROCEDURES

Building Inspection Report

3 CITY CENTER 180 SOUTH CLINTON AVENUE Rochester, NY 14607

Service Level Agreement for University Facilities

CITY OF GLENDALE-CALIFORNIA REPORT TO CITY COUNCIL

HQ Building Renovation. Mark Focht, President Nancy Somerville, EVP Michael O Brien, CFO

Budget Estimate Basic Tenant Improvement

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

THE DESIGN PROCESS HEALTHCARE DESIGN RESOURCE INDUS HOSPITAL, KARACHI PAKISTAN AUGUST 2010 AUG. 02, 2010

Michael G. Meyers Student Design & Scholarship Competition

Healthcare Specific Metrics

LASALLE - BACKUS EDUCATION CAMPUS

Monthly Progress Report November 1, 2011

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

OMAHA BASEBALL STADIUM. May 21, 2009 Report No. 2

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

SCHEMATIC DESIGN CANNING WAREHOUSE BOZEMAN, MT. The Cannery District CQ + MA SD Set Canning Warehouse / 100% SD

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

Ongoing and Future Project Work. Construction Management

Case Study The Polyclinic Northgate Plaza, Seattle, WA

Retrofit of an Existing Californian Hospital to Immediate Occupancy Standards One Year Later Again R. Jay Love, S.E.

CONSTRUCTION TRADES LABORATORY September 30, 2010

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016

FACILITIES MAINTENANCE WORKER

MANHATTAN COLLEGE STUDENT COMMONS

Cottage of the Year SL-593 MOSER DESIGN GROUP PLAN SPECIFICATIONS ABOUT THIS PLAN PLAN PRICING. illustration MUIR STEWART

CASESTUDY: UNITEC s integrated information system

UNASSISTED OFFICE MOVES FREQUENTLY ASKED QUESTIONS

Midwest Healthcare Engineering Conference. ASHRAE Standard : Sustainability Defined for Healthcare

Transcription:

Office of Planning, Design and Construction Capital Program Update May 10, 2017

Projects Under Construction

Translational Research Center

Translational Research Center Phase I Site work Status: Completed - June 2015 Phase 2 Building Status: Ceilings and doors being installed Floors install continues Lab casework installation in progress Site work-asphalt and sidewalks in progress Selection of furniture and equipment complete Construction Completion July 2017

Translational Research Center

Translational Research Center (First Floor)

Translational Research Center (Second Floor)

Translational Research Center (Third Floor)

School of Medicine (SOM)

School of Medicine (SOM) Phase I Site Utilities Completed December 2015 Phase 2 Building Status: Site work continues Floors, ceiling, paint, coming to completion General cleaning and inspections ongoing Contractor furnished millwork, furniture & interior glass complete Furniture selected and ordered A/V and technology design complete Landscape and simulation packages in design Construction Completion - July 2017

School of Medicine (SOM)

School of Medicine (First Floor)

School of Medicine (Second Floor)

School of Medicine (Second Floor)

School of Medicine (Third Floor)

School of Medicine (Fourth Floor)

School of Medicine (Fourth Floor)

School of Medicine (Fifth Floor)

School of Medicine Infrastructure Contract II Phase 3 Alumni Drive Improvements Scope: Improving maneuverability of Alumni Drive, pedestrian circulation and parking Status: Construction Start - March 2016 Repaving of Lot 11 to begin May 22 Completion- July 2017

N215 Pathology Lab Renovation Scope: Pathology lab renovation to improve exhaust and create additional tissue workspace Status: Currently in demolition Construction Completion October 2017

Farmers Market Up In Farms Scope: To convert a portion of the Farmers Market to a Food Hub Status: Project is substantially complete.

Farmers Market Up In Farms

Farmers Market Up In Farms

Farmers Market Up In Farms

Farmers Market Up In Farms

Children s 3 rd Floor Finish Upgrades Scope: Phased updating of finishes in 3 rd floor Children s Hospital space Status: Public space complete 21 patient rooms complete 4 rooms currently under phased construction Construction Completion June 2017

UP Belhaven / Watkins Building Scope: Interior facelift for the public portions of the G.I. Clinical space 2nd floor. New paint, flooring, and countertops will be part of the package. Status: Lease execution in December, 2016 Construction ongoing First Patient June 2017

UP Belhaven / Watkins Building

UP Belhaven / Watkins Building

UP Belhaven / Watkins Building

UP Belhaven / RAD Building (Relocate UMMC G.I. Clinics) Scope: Relocate UMMC G.I. Clinics. Upgrade interior finishes, flooring for the G.I. procedural space on the 3 rd floor, elevator lobby finishes upgrades, exterior waterproofing, painting in 4 th floor offices and occupied spaces. Status: Construction started February 1 st and is in progress Above ceiling inspection complete First Patient - August 2017

Third Floor Plan G.I. Procedure

UP Belhaven / RAD Building (Relocate UMMC G.I. Clinics)

UP Belhaven / RAD Building (Relocate UMMC G.I. Clinics)

UP Belhaven / RAD Building (Relocate UMMC G.I. Clinics)

Humphreys County Urgent Care Scope: Build out space in existing warehouse to provide new clinic, classroom, and office space Status: Paint, doors, flooring and ceiling installation in progress Construction complete May 2017

Radiology Reading Room Scope: In order for the new pediatric MRI to be installed it was necessary to create space to relocate the current reading rooms Status: Construction began 4/17/2017 Demolition underway Construction completion August 2017

Telehealth Lease C Spire Building Scope: Telehealth to lease roughly 11,500 square feet of the 6 th floor Will allow for growth by doubling existing square footage Full-Service Lease Status: Expected Occupancy: September 2017

Telehealth Lease C Spire Building

Mayo Freezers at the Jackson Medical Mall Scope: Freezers of priceless samples arriving from the Mayo Clinic in late May/early June; UMMC needs a location to house these freezers. They will be located in an empty space on the 3 rd floor of JMM. Freezers can move right in, no work needed other than electrical modifications Outlets need to be put on emergency power; our generator from the USB building will be returned in August/September. Status: PO has been issued. Preconstruction meeting being scheduled

Planning & Design Projects

Children s of Mississippi Expansion Project

Children s of Mississippi Expansion Project Scope: Ambulatory Clinics New Critical Care Tower Parking & Infrastructure Status: Design Development in progress Development of project plan in progress Procurement of CMAR in progress

Clinical Research Unit Scope: Full design and construction project for a new Clinical Research Unit on the south wing of the 6 th floor shell space in the Adult Hospital Status: Schematic Design documents complete. Documents under review Budget and Equipment Evaluation underway PLAN FOR CLINICAL RESEARCH UNIT

Translational Research Center Furniture Phase I Furniture Order Scope: Select new furniture and finishes for TRC and retrieve proposals from selected vendors. Status: Completed - April 2017 Phase 2 Furniture Install Status: Furniture Installation July 2017

School of Medicine Furniture Phase I Furniture Order Scope: Select new furniture and finishes for SOM and retrieve proposals from selected vendors. Status: Completed - April 2017 Phase 2 Furniture Install Status: Furniture Installation June 2017

Lakeland Drive Wellness Center Scope: Preliminary planning and budgeting for minor renovation of main building (entry, lockers, and support spaces) and major renovation of field house and exercise rooms Status: Initial estimates complete Meeting with user group scheduled PLANS FOR LAKELAND WELLNESS

Select Specialty Hospital Scope: Assisting Administration with planning and budgeting for moves, expansions and the addition of services throughout Select Specialty Hospital O.R. FLOOR PLAN Status: Ongoing Planning and pricing for the O.R. and 3 rd Floor complete 3 RD FLOOR PLAN

Main Hospital Pharmacy Renovation Scope: Reconfigure and renovate the existing pharmacy to comply with USP 797 Regulations Create more efficient work flow, including a new modular clean room for compounding & an Ante-Room Create a central office suite for drug information services and pharmacy resident staff Phase 1 Phase 2 Status: Bids opened May 4, project in process of being awarded Phase 3

Children s MRI Renovation Scope: Conversion of existing Reading Room to space for Pediatric MRI and Recovery Status: Design Development documents are complete; Construction Documents in the process of production MRI FLOOR PLAN

Pediatric Pharmacy Relocation Scope: Build out a portion of the shell space above Children s Emergency Service Move the Pediatric Pharmacy out of the Wiser building to the renovated shell space. This will allow the non-clinical part of NICU s expansion and reconfiguration Phase 1 Status: Construction documents complete Advertisement for bid pending final budget review Phase 2

Pre-Anesthesia Testing Scope: Provide a newly renovated clinic for Pre-Anesthesia Testing, in the recently vacated Pavilion Lab. This will move Pre-Anesthesia Testing out of Suite A and allow Suite A to fully utilize their entire clinic, freeing up 6 dedicated exam rooms and 1 shared exam room. Status: Architect submitted preliminary construction budget PDC working with DIS and requestor to compile FF&E budget for Administration review Waiting on funds and administration approval

Milk Bank Scope: Renovate existing W117 Conference Room to a Milk Bank to accommodate preparation and storage of milk. Construct a pass thru window for drop off. Status: Two schematic plans have been developed and presented to users, incorporating feedback to include additional square footage from adjacent nurse lounge Initial Fire Safety review complete

Bed Shop and Patient Equipment Relocation Scope: Relocate Bed Shop and Patient Equipment from the 6 th floor of the Critical Care Tower Status: Currently performing test fit for space behind Pharmacy in basement Proposed space would require significant downsizing of current bed storage (approximately 60 beds downsized to 18 beds) Additional storage to be made available for beds off-campus with box truck transportation as needed

Children s Stair Enclosure Scope: Enclose existing children s stairwells Status: Currently working with manufacturers to obtain material cost for an aluminum mesh-like material Preliminary approval from UMMC Fire Safety based on proposed product and existing conditions Structural engineer to provide proposal for designing connections

CIA Relocation Scope: Relocate Center for Informatics and Analytics from the 1 st floor Medical Mall location shared with DIS to a dedicated 2 nd floor suite Status: Schematic drawings approved by users Construction and Furniture, Fixtures and Equipment budgets completed and submitted to users Quote documents to be completed this month for submission to Medical Mall for bidding Anticipated move date: August 1

UMMC Access Center Renovation Scope: Relocate select department schedulers from various hospital locations and consolidate to vacant space on 3 rd floor of JMM. Status: Schematic drawings approved by users Construction and Furniture, Fixtures and Equipment budgets completed and submitted to users Quote documents to be completed this month for submission to Medical Mall for bidding Anticipated move date: July 10

Office of Planning, Design & Construction Project Management Summary No. of Projects Total Project Cost UMMC FUNDS* 78 $ 300,805,904 OTHER 6 $ 94,402,488 TOTAL 85 $ 395,208,392 PROJECTS IN PLANNING 151 * Includes Children s of MS Expansion - $180 million

Office of Planning, Design & Construction Small Projects Status No. of Projects As of 04/28/2017 As of 05/04/2017 Design / Estimating 22 21 Estimate Submitted 33 37 Approved / PO in Process 18 17 TOTAL 73 75

Determination of Reviewability (DoR) Status Projects* Submitted to MSDH Answered Days CON Req d? UP Belhaven/Watkins 10/03/16 11/17/16 45 No GE MRI Replacement 03/23/17 *As of 05/04/17

Office of Planning, Design and Construction Questions?