A101 S001 1 SUB-BASEMENT 3/16" = 1'-0" SHEET (906) PH (906) FX 2 S101 NEW CONCRETE WALLS TO FORM WAVE TANK 3' - 0" 5' - 5"

Similar documents
SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

ADDENDUM NO. 1. Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

Design & Construction Standards, Revised January

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:

YOUR SPLASH PAD RESOURCE

CITY OF SELMA, TEXAS Inspection Guidelines: Residential

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

One and Two Family Additions

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

TYPICAL INSTALLATION INSTRUCTIONS

Delivering Reliability. Electrical Vaults. Power & Energy-Underground Structures

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

SAUSALITO-MARIN CITY SANITARY DISTRICT Marin County, California PLANS SECONDARY SEDIMENTATION TANKS IMPROVEMENTS

Village of Arlington Heights. Sewer Back-up Rebate Program

STRUCTURAL ABBREVIATIONS S-001 GENERAL NOTES CONCRETE MASONRY NOTES DESIGN NOTES SOF NSWG-10 UAS SUPPORT FACILITY FY 2016 MILCON P-225

Element Z General Design Requirements Existing Facilities Information

Concrete weighs about 150 pounds per cubic foot

KS SERIES - VERTICAL INSTALLATION

Concrete Formwork Systems

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS

Smarter. Safer. Leaner.

D-1 THE CITY OF HARRISBURG 1 1/2" MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2" MIN. ID-2 BINDER COARSE

Preventing Water Leakage through Construction Joints using SYNKOFLEX Preformed Compressible Waterstop

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD

Training Certification Categories

THE STRATA UNIT May 25, 2008

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

Planning and installation instructions

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

Zurn Z886. 6" Perma-Trench. Installation Instructions

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate


2003 International Residential Building Code

SEPTIC TANK CONSTRUCTION GUIDELINES

SECTION GROUNDING AND BONDING

City of Hughson Building Safety Division 7018 Pine Street Hughson, CA (209)


200 / 300 SERIES PANELS COLD STORAGE

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION UNIT MASONRY SYSTEM

SPECIFICATION FOR REINFORCED SOIL WALL

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components.

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

Table of Contents. Page Title

SECTION GYPSUM BOARD ASSEMBLIES

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Wall Panels. Structural wall panel. Architectural wall panel. Cladding wall panel. Sandwich wall panel

WIRING METHODS CHAPTER 38

Estimating Guide For Concrete Tilt-up Wall Using

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

Table of Contents. List of Drawings

Assembly Instruction. wedi Fundo Primo Shower System

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

PASSIVE FIRE PROTECTION PRODUCTS

On Site Detention System.

Foundation/Site Work Code Requirements

INSULATED CONCRETE MASONRY UNITS Section 04220

Inspection of New One- and Two- Family Dwellings

LIQUID RUBBER INDUSTRIES ENGINEERING SPECIFICATIONS FOR ENGINEERS AND ARCHITECTS. Diagram 1: Standard Membrane Continuation 150 mm Overlap

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

CHAPTER 7 SANITARY DRAINAGE SYSTEMS

MINIMUM SPECIFICATIONS

FLUID APPLIED WATERPROOFING

DIVISION 04 MASONRY CAST STONE. A. Design Considerations. 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone.

MIGUTAN FP110 (Previously FP 90, name changed as part of metric standardization program)

Electric Service Standards

PLATON FOUNDATION WRAP

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms.

RESIDENTIAL BUILDING PLAN REQUIREMENTS

A. Coordinate concrete unit masonry (also termed CMU and block ) work with work before and after, especially:

Series 510-I Thermal Heavy Commercial Projected Window

Daytona Beach Pier Building Renovation Jun 2010

Telecommunication Spaces

Residential Accessory Structures & Room Additions

BUILD A SHOWER CUBICLE

Introduction. Disclaimer. Table of contents

BUREAU Joe Iuviene, AIA January 20, 2017

Copyright 2017, ProVent Systems Inc., All Rights Reserved

The designer shall also submit additional information required by the University as described and underlined below.

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

Section BUILDINGS, SHELTERS, ENCLOSURES

ENBRIDGE GAS DISTRIBUTION METER BOX. Builders Installation Guidelines September 2011

Senergy Platinum CI Stucco Typical details for an impact resistant cement plaster stucco system featuring Neopor GPS Plus Rigid Insulation Board

General Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours

Construction. Hydrophilic, swellable hose for sealing construction joints in watertight structures. (formerly Sika Injectoflex HPM)

Single Post Anchor Part Number Spectrum Lane ~ Missoula MT ~

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

Transcription:

5' - 5" 3' - 0" 2 S0 NEW CONCRETE WALLS TO FORM WAVE TANK 7 SHEET NOTES (906) 487-2303 PH (906) 487-329 FX 9/22/207 :34:03 AM FILE: \\nas2.dcs.it.mtu.edu\sas_homes\desktop\meem wave tank.rvt 7 2' - 4" SUB-BASEMENT 3/6" = '-0" 4 3 5 8 ' - 4" 36' - 5 /4" GLASS PARTITION (BY OTHERS) EXISTING CONCRETE COLUMNS S00 3 7 4' - 7" 6 ' - 0" ' - 0" 2 NEW CONCRETE WALL (SEE DETAILS, SHEET S0) 2 NEW FLOOR DRAIN (SEE PLUMBING PLAN FOR DETAILS) 3 APPLY SIKAFLEX 2C SEALANT IN ALL CORNERS (FLOOR AND VERTICAL) FOLLOW ALL MANUFACTURER S REQUIREMENTS INCLUDING PRIMING WITH SIKAFLEX 429 PRIMER. 4 AFTER SEALANT (ITEM 3) HAS CURED, APPLY SIKAGARD 62 SEALANT TO EXISTING FLOOR AND INTERIOR OF NEW WALLS. FOLLOW ALL MANUFACTURER S REQUIREMENTS. CLEAN AND STRIP FLOORS AS REQUIRED. 5 NEW ALUMINUM STACKING FLOOD CONTROL BARRIER BY FLOOD CONTROL INTERNATIONAL (HTTP://WWW.FLOODCONTROLINTERNATIONAL.US) OR SIMILAR. HEIGHT OF BARRIER TO BE 3 6". COMPLETE DESIGN, SUPPORTS AND FLOOD BARRIERS FROM ONE MANUFACTURER. SUPPORT SPACING IS TO BE DETERMINED (SEE NOTE 6). 6 PROVIDE A 3 FOOT WIDE ACCESS OPENING IN THE FLOOD PANELS SYSTEM. PROVIDE PANELS FOR THIS SPACE TO COMPLETE THE FLOOD WALL. 7 REPAINT WALLS, DOORS AND FRAMES AT THE COMPLETION OF THE PROJECT UP TO, BUT NOT INCLUDING THE ROLLING PARTITION. 8 SUMP PIT SEE PLUMBING PLAN FOR DETAILS N TRA DRAWN BY: MICHIGAN TECHNOLOGICAL UNIVERSITY 20-7-02 P# DESIGNED: MEEM WAVE POOL FACILITIES MANAGEMENT 400 TOWNSEND DRIVE HOUGHTON, MICHIGAN CHECKED: FLOOR PLAN SHEET GRR APPR'D: A0 09/22/7 BIDDING AS INDICATED SCALE: 9/22/207 :34:03 AM FILE: \\nas2.dcs.it.mtu.edu\sas_homes\desktop\meem wave tank.rvt

' - 0" 0' - 8" (906) 487-2303 PH (906) 487-329 FX NEW POURED CONCRETE WALLS (TYP.) 0' - 8" 0' - 8" VERTICAL#4 BARS @ 8" O.C. EACH WAY (EPOXY ANCHOR EVERY OTHER BAR TO EX. CONCRETE SLAB) EPOXY HORIZONTAL#4 BARS FACILITIES MANAGEMENT 400 TOWNSEND DRIVE HOUGHTON, MICHIGAN 9/22/207 :40:23 AM FILE: \\nas2.dcs.it.mtu.edu\sas_homes\desktop\meem wave tank.rvt 4' - 4" TRA GRR WALL SECTION -TYP 3/4" = '-0" SHEET NOTES 2 3 #4 BARS @ 8" OC EACH WAY (EPOXY ANCHOR EVERY OTHER BAR TO EX. CONCRETE SLAB) EXISTING CONCRETE SLAB REINFORCING BARS SHALL BE EPOXIED INTO EXISTING SLAB WITH HILTI HIT RE 00 EPPOXY MORTAR SYSTEM, OR OTHER APPROVED. FOLLOW COMPLETE MANUFACTURERS REQUIREMENTS TO DEVELOP STRENGTH OF REBAR. 2 INSTALL (2) BEADS OF SIKASWELL S 2 EXTRUDABLE SWELLING WATER STOP. FOLLOW ALL MANUFACTURERS REQUIREMENTS. BEADS MUST BE A MINIMUM OF 4" FROM THE CONCRETE FORMS. 3 SIKAFLEX 2C CORNER SEALANT, APPLY AT ALL CONCRETE JOINTS. 2 3 EPOXY WAVE TANK WALL DETAILS " = '-0" EXISTING CONCRETE SLAB NEW #4 DOWELS NEW SLAB SECTION VIEW 3/4" = '-0" NOTE: ALL SLAB REPLACEMENTS SHALL BE MADE WITH #4 DOWELS AT 8" O.C. DRILLED AND EPOXIED INTO CONCRETE SLAB. NEW CONCRETE SLAB SUB BASEMENT FLOOR DRAWN BY: DESIGNED: CHECKED: APPR'D: MICHIGAN TECHNOLOGICAL UNIVERSITY P# 20-7-02 MEEM WAVE POOL STRUCTURAL DETAILS SCALE: AS INDICATED BIDDING 09/22/7 SHEET S0 9/22/207 :40:23 AM FILE: \\nas2.dcs.it.mtu.edu\sas_homes\desktop\meem wave tank.rvt

(906) 487-2303 PH (906) 487-329 FX S00B 3 S00 2 FACILITIES MANAGEMENT 400 TOWNSEND DRIVE HOUGHTON, MICHIGAN S003F TRA GRR 9/22/207 2:0:38 PM FILE: \\nas2.dcs.it.mtu.edu\sas_homes\desktop\meem wave tank.rvt S00 PLUMBING PLAN " = 0'-0" S003B S003A S003 S002A S002 SHEET NOTES 8"ø N EXISTING 8" SANITARY LINE (LOCATION SHALL BE VERIFIED IN FIELD BY CONTRACTOR) RUN NEW ½" COPPER COLD WATER LINE FROM THE SOUTH WALL OF ROOM B003 (DIRECTLY ABOVE ROOM S00). RUN PIPE THROUGH THE BASEMENT FLOOR, AND END 4 ABOVE FINISH FLOOR OF THE SUB BASEMENT. INSTALL A BALL VALVE AND COUPLING SYSTEM TO A 25 FOOT ½" HOSE TO FILL THE POOL. INSULATE ALL NEW PIPING WITH WRAPPED FIBERGLASS. PROVIDE AN ALLOWANCE TO INSTALL 50 FEET OF WRAPPED FIBERGLASS INSULATION FOR GAPS ON EXISTING PIPING IN THE BASEMENT LEVEL. 2 NEW FLOOR DRAIN JOSAM MODEL 30006 OR SIMILAR (2 REQUIRED). SAW CUT FLOOR AND TIE IN TO EXISTING 8" SANITARY LINE. USE 6" SCHEDULE 80 PVC PIPE AND TIE IN TO EXISTING SANITARY WITH FERNCO STRAP ON CONNECTOR. IN LINE DRAINS CAN SHARE A P TRAP. ARRANGE DRAINS BASED ON ACTUAL SANITARY LINE LOCATION. 3 PROVIDE A SUMP PIT AND PUMP FOR A REMOVABLE PUMP. PIT IS TO BE APPROXIMATELY 8"x8" AND A MINIMUM OF 6" DEEP. COORDINATE WITH CONCRETE CONTRACTOR. SEAL NEW CONCRETE TO EXISTING SLAB. NO LIP ALLOWED EXTENDING ABOVE THE EXISTING FLOOR. PROVIDE A.5 HP VERTICAL PUMP, CLEAN WATER PUMP WITH LOW WATER SHUT OFF. PROVIDE CONNECTIONS AND 00 FEET OF HOSE TO DRAIN THE POOL TO THE NEW FLOOR DRAIN. DRAWN BY: DESIGNED: CHECKED: APPR'D: MICHIGAN TECHNOLOGICAL UNIVERSITY P# 20-7-02 MEEM WAVE POOL PLUMBING PLAN SCALE: AS INDICATED BIDDING 09/2/7 SHEET P0 9/22/207 2:0:38 PM FILE: \\nas2.dcs.it.mtu.edu\sas_homes\desktop\meem wave tank.rvt

REV: Stage: Qty. Info Only REVISION HISTORY: concrete tank 8x 0.7m flap paddles independent drive system with force feedback control sloped beach galvanised steel frame with plastic covering holes lasercut in top channel to allow addition of instrument rail in the future one side of the tank is made from glass powdercoated steel frame DWG NO. DATE: /07/207 MTU flume tank SHEET OF 4 MTU-GA0 MATERIAL: WEIGHT (kg): 6588973.47 FINISH: SCALE: :50 Material <not specified> as cast PROJECTION: Third Angle A3 All rights reserved. Drawings and specifications are the property and copyright of Edinburgh Designs Ltd. and shall not be reproduced without written agreement of Edinburgh Designs Ltd.

S00B S003B S003A S003 3 S00 S003F S002A S002 EX. ROLLING PARTITION 2 3 P# SCALE: DRAWN BY: DESIGNED: CHECKED: APPR'D: 9/22/207 :56:33 AM FILE: \\nas2.dcs.it.mtu.edu\sas_homes\desktop\meem wave tank.rvt FACILITIES MANAGEMENT 400 TOWNSEND DRIVE HOUGHTON, MICHIGAN (906) 487-2303 PH (906) 487-329 FX SHEET 9/22/207 :56:33 AM FILE: \\nas2.dcs.it.mtu.edu\sas_homes\desktop\meem wave tank.rvt MICHIGAN TECHNOLOGICAL UNIVERSITY 20-7-02 MEEM WAVE POOL ELECTRICAL PLAN AS INDICATED BIDDING 09/22/7 TRA GRR N S00 ELECTRICAL PLAN " = 0'-0" SHEET NOTES REMOVE ALL ELECTRICAL DEVICES, CONDUIT, AND WIRE FROM THIS AREA. REMOVAL INCLUDES ALL EXPOSED CONDUIT BACK TO FEEDER PANEL. CAP HOLES AS REQUIRED AT FEEDER PANEL. 2 PROVIDE NEW ROOM LIGHTING IN AN EAST WEST CONFIGURATION (UP TO ROLLING PARTITION). RE USE EXISTING CIRCUITS AND SWITCHING. USE LED, WRAP AROUND FIXTURES AND DESIGN TO 65 FOOT CANDLES AT 4 FEET ABOVE FINISH FLOOR. 3 USING REFERENCE DRAWINGS AND CONDUIT TRACING DEVICES, LOCATE CONDUIT BURIED IN EXISTING CONCRETE FLOOR PRIOR TO CONCRETE CUTTING. E0

REV: Stage: Qty. Info Only REVISION HISTORY: 59 06 800 7608 3600 544 Tank can be moved around building as required 2590 DWG NO. DATE: /07/207 FINISH: SCALE: :50 Material <not specified> as cast PROJECTION: Third Angle MTU flume tank SHEET 2 OF 4 MATERIAL: WEIGHT (kg): 6588973.47 A3 All rights reserved. Drawings and specifications are the property and copyright of Edinburgh Designs Ltd. and shall not be reproduced without written agreement of Edinburgh Designs Ltd. 884 Plan MTU-GA0

REV: Stage: Info Only Qty. REVISION HISTORY: A DETAIL A SCALE : 5 Wavemaker Module DWG NO. MTU flume tank DATE: /07/207 MATERIAL: FINISH: SHEET 3 OF 4 Material <not specified> as cast SCALE: :50 PROJECTION: Third Angle A3 WEIGHT (kg): 6588973.47 All rights reserved. Drawings and specifications are the property and copyright of Edinburgh Designs Ltd. and shall not be reproduced without written agreement of Edinburgh Designs Ltd. MTU-GA0

REV: Stage: Qty. Info Only REVISION HISTORY: inside of this wall only should be as straight and true as possible otherwise wave quality will be reduced. 5mm minimum on this surface 06 3300 3600 300 300 Concrete should be reinforced General tolernaces 0mm acceptable 300 Concrete Dimensions 300 DWG NO. MTU flume tank MTU-GA0 DATE: /07/207 SHEET 4 OF 4 MATERIAL: WEIGHT (kg): 7545.64 FINISH: SCALE: :50 Concrete as machined PROJECTION: Third Angle A3 All rights reserved. Drawings and specifications are the property and copyright of Edinburgh Designs Ltd. and shall not be reproduced without written agreement of Edinburgh Designs Ltd.